Harley-Davidson Mid Kit POWERLET Installation Instructions

0

Filed Under (Harley Davidson) by admin on 07-05-2012

download
STEP #1 Remove seat. STEP #2 Route wires starting at the battery end and finishing at the bracket. STEP #3 Connect the wires to the socket. STEP #4 Mount the bracket on the horn bracket located under the gas tank. STEP #5 Fasten ty-wraps. STEP #6 Put everything you took off back on. Detailed Instruction: STEP #1 -Remove the seat exposing the battery. See the owner’s manual. STEP #2 – Remove negative battery lead. Remove the positive battery lead and attach the red wire [B]. Attach the black wire to the gas tank bolt [C]. Run the wires below the gas tank by passing through the gap between the frame & gas tank [D]. STEP #3 – Finish routing the wire under the tank and up to the horn bracket. Install the fuse in the fuse-holder. The center terminal is plus and the outer ring is negative (see dwg below). Apply either dielectric grease or Vaseline to the spade terminals. Connect the red wire to the positive spade terminal & the black wire to the negative terminal. Use a voltmeter to check if the polarity is correct. STEP #4 – On the left side of the bike, under the gas tank, locate the horn and bracket. Remove the acorn nut from the bracket [A]. You may need to remove the second nut also. Attach the Powerlet bracket utilizing the supplied chrome & rubber washers (if necessary). Adjust the bracket so it is aligned. Tighten to 8 Nm. STEP #5 – Apply the three ty-wraps. Use one to secure the fuse-holder and the other near point [D] and the third near the socket. Do NOT allow the harness to directly contact the motor or exhaust

Harley Davidson Steering Wheel Radio Control Interface Installation instructions

0

Filed Under (Harley Davidson) by admin on 03-05-2012

download
1) Turn on the ignition to supply power to the SWI-3. 2) Use a pen to depress the “program mode” button. Remove pen when left LED light comes on. 3) Within 10 seconds press and hold one of the steering wheel function buttons. Continue to hold steering wheel button until the left LED turns off. Release the steering wheel button and the right LED turns on. 4) Place the stereo’s IR remote within 3″ of the “IR Input” port on the side of the SWI-3 next to the program button. Press and hold the remote’s button that corresponds to the steering wheel button that was pressed. Continue to hold the remote’s button until the right LED turns off. Release the button and the left LED will turn on. 5) Repeat steps 3 and 4 until all radio steering wheel functions are programmed. 6) When programming is complete, wait 10 seconds and both LED’s will flash 3 times. This indicates an automatic program exit. Do not stop more than 10 seconds while programming or there will be an automatic program exit and you will have to start over at step number 2 above. Turning off ignition before the automatic exit will require starting over at step 2 above. The SWI-3 can be reprogrammed unlimited times. Testing • Test the SWI-3 by holding it’s infrared LED (LED on the end of 4′ lead) close to the stereo and verify that it works properly. Experiment with various locations for the LED. You should be able to find a hidden and convenient mounting location. Try along the top front and /or bottom of the stereo as well as it’s sides. The LED can be replaced with most any IR LED, like Radio Shack’s # 276-143. The longest lead of the LED connects to the red wire of the 4′ cable and the short lead of the LED connects to the black wire of the 4′ cable

Harley-Davidson XL 883 and 1200 MODELS SADDLEBAG SUPPORT KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 27-04-2012

download
1. 1994-99 models: Remove upper shock absorber nut, washer, shock cover and backing washer. Save nut and washer and discard shock cover and backing washer. 2000-03 models: Remove upper shock bolt, washer and shock cover and save washer. NOTE: Do not remove stock inboard washer that is positioned behind shock cover and against shock absorber. 2. All models: Remove OEM buttonhead screw and flanged nut directly to the rear of the upper shock mount on fender support. Note T-spacer in fender support. Save nut and discard bolt. 3. 1994-99 models: Position saddlebag support (item 1) with front bracket over shock stud and rear mount over hole in fender support. Install ½ * bushing (Item 2) over shock stud and into hole of support front mount. Install saved OEM nut and washer (items 3,4) and tighten securely. 2000-03 models: Apply Locktite to the OEM shock screw (Item 5) and install through the saved washer (Item 6), front bracket of the saddlebag support (Item 1), shock and into the frame. Tighten to 21-35 ft. -lbs torque. NOTE: If installing supports with sissy bar side plates, omit 5/16 * lock washer (Item 8). H-D sissy bar side plate mounts between fender support and fender. Khrome Werks® sissy bar plate mounts outboard of fender support. CAUTION: Be careful to not dislodge T-spacer from its position in fender while inserting screw through fender support and fender. 4. Insert supplied socket head cap screw (Item 7) and lock washer (Item 8) (if applicable) through the rear saddlebag support mount, sissy bar side plate (if applicable) , fender with T-spacer and frame. Apply Loctite to the saved flanged nut and secure. Tighten to 8-13 ft-lbs torque.

Harley-Davidson FLTR/ FLH/ FLHT/ FLHR EFI models 1995-2001 Variable Pressure Fuel Regulator Intallation manual

0

Filed Under (Harley Davidson) by admin on 27-04-2012

download
1 . Ensure vehicle runs correctly through all rpm ranges and idles correctly before attempting any work. It is highly recommended that a pressure / flow test be carried out before & after installation of the VariReg to determine fuel system condition . Stock HD 300 kPa / 44 psi, VariReg as delivered 360 kPa / 52 psi Note: In some countries gas stations do not “final filter” the fuel & therefore we recommend that the fuel filter canister be replaced every 15,000 klms (10,000 miles). Restriction of the fuel by way of a blocked or partially blocked filter will result in difficulty in tuning or failure to obtain satisfactory results during tuning. Should you experience difficulties in tuning, see Diagnosing fuel filter and pump faults 2. Remove air filter cover, air filter and backing plate. Check Throttle Position Sensor value at completely closed throttle as best performance will be obtained at the nominated settings. This will require backing off the idle screw and cold start idle actuator and screw adjustment as described in the workshop manual. The original T.P.S. values should be recorded for possible future reference. To set TPS values without the HD breakout box see VariReg TPS Setting for Harley-Davidsons The T.P.S. values must be set to 1995 – 1996 175 mV (+/- 25mV) 1997 – 2001 275 mV (+/- 25mV) Record the original TPS value here. ………………..mV YOU MUST ENSURE THROTTLE PLATES ARE COMPLETELY CLOSED AND NO BINDING EXISTS IN CABLES to obtain the correct value setting. 3. Reset idle screws to approximate previous settings, no need to start the engine. 4. Complete full or partial fuel tank removal as described in workshop manual. 5. Remove stock fuel pressure regulator as described in workshop manual and leave Horn removed from vehicle until after tuning, this will allow ease of access to the regulator

Harley Davidson Honing Plates Installation Manual

0

Filed Under (Harley Davidson) by admin on 25-04-2012

download
Honing Plate Kits are available for the Harley Davidson Shovel Head, Evolution and Twin-Cam engines. Kits are supplied with a Base Plate, which features side clamping of the spigot area on the Jug to address the recurring problem of spigot deflection during honing. This is especially prevalent in large-bore applications and will eliminate additional clearance that would be necessary to achieve correct piston to cylinder wall clearance. The Plate allows the user to hone straight, round bores through the full length of the Jug. The Plate also has tapped holes in the bottom surface to facilitate clamping onto most honing machines. The Shovel/Evolution Kit is supplied with the above Base Plate machined with a dual bolt pattern to accept both Shovel Head and Evolution Jugs. Two Honing Plates are included, to accommodate each engine type. A Hardware Kit containing all the fasteners needed to simulate the assembled engine condition for both setups is also included. The Twin-Cam Kit is supplied with the above Base Plate machined with the bolt pattern to accept the Twin-Cam Jug and one Honing Plate. A Hardware Kit containing all the fasteners needed to simulate the assembled engine condition is also included.

Harley-Davidson Standard Seat Installation Instructions

0

Filed Under (Harley Davidson) by admin on 24-04-2012

download
Step 1 – Remove the original seat and place it bottom side up next to your new custom replacement seat. Step 2 – Remove each bracket from your original seat and install it in the corresponding location on your new seat, using the 1/4-20 bolts provided. Place the new bolts through the brackets and into the threaded jacknuts in the new seat bottom. Repeat until all hardware is transferred. Step 3 – Check all fasteners for tightness, 10-15 ft/lbs is recommended, do not over-tighten. Step 4 – Remove rubber bumpers from your original seat and move them to your new custom seat. In some instances we have already installed bumpers that are needed, but some models require the special specific bumpers from your original seat for proper tolerance and fit. The stock bumpers are easily removed by twisting and pulling at the same time. Reinstallation requires drilling a hole of the same diameter as the original into the new seat pan. Rubber bumpers are most easily installed using either water or silicone spray as a lubricant.
Step 5 – Reinstall the seat on the motorcycle. Check to make sure the seat fits properly. The new seat will be more firm than the original seat and will break-in over time to provide greater comfort. During the break-in, the seat will also settle-in, or lower, about ½ to one inch. Older seats may seem substantially lower because of the worn-out, compressed foam that has deteriorated with time on your original seat

Harley-Davidson CUSTOM FIT SADDLEBAG INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 24-04-2012

download
INSTALLATION INSTRUCTIONS 1. It is anticipated that the smooth back side of the bags will be drilled to facilitate mounting, and that you will fabricate mounting brackets, spacers or supports. Mounting bolts with then pass thru the bags and, using the supplied fender washers, be secured to either your fabricated brackets, fender or fender struts. Most installations utilize the fender struts and their fender mounting locations for connecting the saddlebags to the motorcycle. Other locations can also include turn signal or top shock mounting points. Mount points should be as far apart as possible and use the fender washers supplied to provide a stable mount base and spread the mounting load and stress over the largest area possible. The bags can also be mounted utilizing aftermarket saddlebag support brackets and securely attaching the saddlebags to these brackets. 2. The saddlebags must be securely mounted to the motorcycle so that they can support any load that you intend to carry (less than 10 pounds per side) and so the bags clear all moving or suspension components thru the full suspension travel, even when the bags are fully loaded. Be expecially careful that the cantilevered bottom inside edge of the bag, and all other surfaces, clear all components such as shocks, swingarm, brake calipers, brake rods and lines, chain guard, etc. after installation. 3. Inspect the bags immediately after first use to determine that the bags are not interfereing with moving components. Inspect weekly thereafter to be certain that the bags are not contacting moving parts and that the bags are not developing cracks as a result of inadequate mounting support. 4. If the installed bags obstruct the original factory supplied side reflectors, please contact Saddlemen to purchase self-adhesive reflectors, which must be installed where they are clearly visible from the side of the motorcycle. LOCKABLE BUCKLES FEATUREDrifter and Desperado models feature leather straps with hidden lockable buckles. Once locked, bags cannot be opened. Cruis’n models feature lockable twistlocks, with small padlocks included.

Incoming search terms:

Harley-Davidson Electronic Ignition Module Installation instructions

0

Filed Under (Harley Davidson) by admin on 23-04-2012

download
Step 1: Switch main dashboard switch to “off” position (Ignition& light switch) Step 2: Disconnect negative (ground) cable from the Battery Step 3: Remove the Condenser and Breaker points from the circuit breaker timing base. Step 4: Disconnect advance/ retard cable from timing base Step 5: Remove timing base from timer shaft and housing (see your manual for instructions) Step 6: Remove circuit breaker wire stud or circuit breaker to coil wire assembly from timing base Step 7: Remove circuit breaker wire from Ignition coil, and mark terminal on coil with piece of tape. Step 8: Install the Electronic Ignition Module on the timing base. Mount this short black wire to one on the timer base screws by keeping some slack in this wire so the timing base can turn free. Solder the flag terminal to this short black wire and mount it under the timer to motor bolt. This way of mounting provides a much better grounding. Do NOT use the screws (number 1 or 2 screws from picture below) from the timing base!!!! Step 9: Now three wires pass this hole via the rubber grommet. Figure 1 Figure 2 Step 10: Reinstall the timer base on the timer shaft housing, and keep some slack in the wires before protruding the hole in the timer shaft housing, and secure with ground spring and cover retainer. Reconnect the advance/retard cable to the timer base. Step 11: Route the two long wires to the ignition coil. Check in the HD service manual for a proper route to the ignition coil. (Keep away from hot surfaces like exhaust systems). Cut the wires to the exact length necessary for mounting. Step 12: Determine the exact length of the wire loom. Keep in mind that one end of the loom enters the timer shaft housing by 1cm. Cut the loom to the proper length. Step 13: Insert both wires in the loom. Strip both wire ends and solder the two flag terminals on the wires. Step 14: Connect the red wire to the ignition coil, on the terminal where the 6 or 12 volt is supplied to. This terminal has at minimum one wire connected which runs to the main switch. Step 15: Connect the black wire to the ignition coil on the terminal which is empty, and has piece of tape on it. (Old place where the circuit breaker wire was connected to) Step 16: Install the trigger rotor on the timer shaft cam, and tighten the hex screw by using the hex key tool. Do not over tighten the screw! Step 17: Check for clearance between trigger rotor and Electronic Ignition Module. Appropriate clearance is between 0,5mm and 1,5mm . Minor adjustments can be made by unlocking the two screws and slightly shift/move the Electronic Ignition Module. Check if the rotor moves free. Timing instructions: Remove the spark plugs from the engine, but keep them connected to the spark coil cables and engine ground. This enables normal operation of the spark, and prevents unwanted engine firing on compression stroke. See service manual or handbook for timing instructions of your model Step 18: Reconnect the negative (ground) cable to the battery. Step 19: Switch main power to “on” position. The red light in the Electronic Ignition Module might already light up. If not, turn the kick starter slowly. The red light is on while charging (closed points)the Ignition coil, facing solid metal of the trigger rotor. The light goes off (open points) when the end of the solid surface of the trigger rotor passes the centre of the Electronic Ignition Module. At that point a spark is generated by the coil

Incoming search terms:

HARLEY DAVIDSON ULTRA CLASSIC AND ELECTRA GLIDE CLASSIC TOUR PACK ADJUSTMENT KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 23-04-2012

download
1. Open the Tour Pack and remove all of the contents. 2. Remove map bag and inner pack liner. Pack liner comes out quite easily once map bag is removed. 3. Remove the 4 bolts inside the tour pack that are located on top of the metal support plate that hold the tour pack to the luggage rack. Have your assistant hold the pack in place before removing the last bolt. 4. Gently tip the tour pack forward to expose the supporting luggage rack under the pack. 5. While your assistant holds the pack up, place the two adjusting bars on top of the supporting luggage rack. Use the 4 flat head screws supplied with the kit to mount the bars snugly to the support rack (see fig. 1). 6. Reposition the tour pack over the threaded holes in the adjusting bars at the 2″ or 3″ position and bolt it in place snugly (see fig. 2). 7. Replace the trunk liner and map case and the installation is complete

Incoming search terms:

HARLEY DAVIDSON EDITION F 150 LIGHTNING HIGH PERFORMANCE INTAKE KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 22-04-2012

download
Turn off ignition and remove negative battery connection. 2. Loosen the hose clamp on the OEM intake. 3. Disconnect the MAF sensor off intake 4. Pull out air temp sensor and then pull out intake unit. 5. Install NPT hose barbs in the cold air intake with the 1/4″ in the center position. 9.Connect the hoses to the S&B intake tube 6. Put the 4.5x2hose adapter with #72 hose clamps on the S&B tube . 10. Install the S&B intake on the throttle body, push the air temp sensor into the tube 7. Locate the three vacuum hoses 11. Remove the air box grommets and use the 1/4″-20″ speed nuts 8. Place the small sections of 5/8″ hose on the vacuum hoses. 12. Install the hose adapter onto the MAF sensor assembly