1974 norton commando wiring diagram

You search Auto repair manual PDF 1974 norton commando wiring diagram, if there are search results will appear below. If search results do not exist, please search by others keyword.



  1974 norton commando wiring diagram Direct Download speed 5282 Kb/s

  1974 norton commando wiring diagram Full Version speed 6162 Kb/s



SUZUKI SV 1000 RADIATOR (COOLING SYSTEM) SERVICE MANUAL

0

Filed Under (Suzuki) by admin on 26-02-2011

download
FI SYSTEM MALFUNCTION CODE AND DEFECTIVE CONDITION MALFUNCTION CODE DETECTED ITEM DETECTED FAILURE CONDITION CHECK FOR COO NO FAULT C11 Camshaft position sen- sor The signal does not reach ECM for more than 3 sec . after receiving the starter signal . The camshaft position sensor wiring and mechanical parts (Camshaft position sensor, intake cam pin, wiring/coupler con- nection) C12 Crankshaft position sensor The signal does not reach ECM for more than 2 sec . after receiving the starter signal . The crankshaft position sensor wiring and mechanical parts (Crankshaft position sensor, wiring/coupler connection) C13 Intake air pressure sensor The sensor should produce following voltage . (0.50 V < sensor voltage < 4 .85 V) Without the above range, C13 is indicated. Intake air pressure sensor, wiring/coupler connection C14 Throttle position sen- sor The sensor should produce following voltage . (0.20 V < sensor voltage < 4 .80 V) Without the above range, C14 is indicated. Throttle position sensor, wiring/coupler connection C15 Engine coolant temperature sensor The sensor voltage should be the following. (0.15 V <_ sensor voltage < 4 .5 V) Without the above range, C15 is indicated. Engine coolant temperature sensor, wiring/coupler connection C21 Intake air temperature sensor The sensor voltage should be the following. (0.15 V < sensor voltage < 4 .5 V) Without the above range, C21 is indicated. Intake air temperature sensor, wiring/coupler connection C22 Atmospheric pressure sensor The sensor voltage should be the following. (0.50 V < sensor voltage < 4 .5 V) Without the above range, C22 is indicated. Atm. pressure sensor, wiring/coupler connection C23 Tip over sensor The sensor voltage should be the following for more than 2 sec . after ignition switch turns ON . (0 .20 V < sensor voltage < 4 .80 V) Without the above value, C23 is indicated. Tip over sensor, wiring/coupler connection C24 or C25 Ignition signalCrankshaft position sensor signal is produced and ECM determines the ignition signal but signal from ignition coil is interrupted continuous by 4 times or more. In this case, the code C24 or C25 is indicated. Ignition coil, wiring/coupler connection, power supply from the battery SERVICING INFORMATION 8 .3 C28 Secondary throttle valve actuator No operating voltage is supplied from the ECM, C28 is indicated. STVA can not operate. STVA lead wire/coupler, STVA C29 Secondary throttle valve position sensor The sensor should produce following voltage . (0.10 V < sensor voltage < 4 .90 V) Without the above range, C29 is indicated . Secondary throttle position sensor, wiring/coupler connection C31 Gear position signalGear position signal voltage should be higher than the following for more than 2 seconds. (Gear position switch voltage >_ 0 .6 V) Without the above value, C31 is indicated. Gear position sensor, wiring/coupler connection, gearshift cam, etc. C32 or C33 Fuel injector Crankshaft position sensor signal is produced and ECM determines the injection signal but fuel injection signal is interrupted continuous by 4 times or more. In this case, the code C32 or C33 is indicated. Injector, wiring/coupler connection, power supply to the injector C41 Fuel pump relay No voltage is applied to fuel pump although fuel pump relay is turned ON, or voltage is applied to fuel pump although fuel pump relay is turned OFF . Fuel pump relay, connecting lead, power source to fuel pump relay C42 Ignition switchIgnition switch signal is not input in the ECM . Ignition switch, lead wire/coupler C44 Heated oxygen sensor (HO2S) [For E-02, 19] During 02 feedback control, 02 sensor voltage is higher or lower than the specification . No signal is detected during engine operation or no electrical power is supplied from the battery . HO2S lead wire/coupler connection Battery voltage supply to the HO2S C49 PAIR control solenoid valve (PAIR valve) When no operating voltage is supplied from the ECM, C49 is indicated. PAIR valve can not operate. PAIR valve lead wire/coupler

Incoming search terms:

1992 Toyota Cressida Vehicle Wiring Chart and Diagram

0

Filed Under (Toyota Manuals) by admin on 18-06-2011

Download
Listed below is the vehicle specific wiring diagram for your car alarm, remote
starter or keyless entry installation into your 1992 Toyota Cressida . This
information outlines the wires location, color and polarity to help you identify the
proper connection spots in the vehicle. Please be sure to test all of your wires
with a digital multimeter before making any connections. More information on
using a multimeter and testing wires please see our Technical Support Area.

Incoming search terms:

HONDA GL1100 AM/FM RADIO INSTALLATION MANUAL/ WIRING DIAGRAM

0

Filed Under (Honda) by admin on 22-04-2011

download
INSTALLATION ■ Outline Procedures This section gives general information needed for mounting the individual radio components on and in the fairing. A) Fairing 1) Install radio on fairing before mounting fairing on motorcycle. (Remove fairing from your motorcycle when already mounted). 2) Remove fairing parts. 3) Drill unit mount holes. 4) Install six wire clips. 5) Install windshield on fairing before install- ing speakers. 6) Install radio indicator I on indicator panel II , then install indicator panel on fairing. 7) Install speakers III. 8) Install nutplate IV. 9) Install Power Amplifier in fairing. 10) Install radio funer VI. 11) Install the radio controller VII. 12) Install controller base panel VIII 13) Install radio switch sub-wire. 14) Connect adapter harness and wires inside fairing by working through left turn signal lens hole. B) Motorcycle frame and handlebar 1) Remove travel trunk and seat. Unscrew four shelter bolts (M6, one on each side at front and rear) to route antenna feeder. 2) Install antenna mount and antenna IX. 3) Route antenna feeder along the frame tube. 4) Install radio switch X on left handlebar lever bracket and route the wires. 3 of 11 Page 4 C) Fairing instllation 1) Install fairing on motorcycle. 2) Connect motorcycle wire harness 9-P coupler to fairing wire 9-P coupler. 3) Connect radio switch wire to switch sub- wire.4) Connect antenna feeder. 5) Confirm that radio operates properly. Reinstall parts removed in step 2 or (A) and in step 1 of (B). REWORKING ■ Remove Fairing and Fairing Parts (Fig.10) 1) Install radio on fairing before mounting fairing on motorcycle. (Remove fairing from your motorcycle when already mounted). 2) Remove right and left fairing pockets, right and left turn signal lenses, right and left nutplates, left hole cover and indi- cator base panel from fairing. (Fig.10) Fig. 10 LEI-1 NU I PLATE 4 of 11■ Reworking on Fairing — Speaker mounting holes- 1) Remove 18 mm grommet. 2) Lightly roll template so that it will follow contour of fairing snugly. 3) Position template on fairing with its upper and outer edges aligned with those offairing as indicated by arrows. 4) Attach template to fairing using adhesive tape where shown. 5) Punch mark centers of four holes with a
drift and hammer. 6) Drill 6 mm holes through marked centers. To obtain a more balanced response with richer, deeper bases, drill two 50 mm holes in the fairing so as to link the speaker box with the inside of the fairing. Fig. 11-1
—Power amplifier mounting holes- 7) Drill two 5.5 mm holes through concaves in fairing. Fig. 11-2 RIGHT HAND SHOWN, LEFT SIMILAR ADHESIVE TAPE

Incoming search terms:

EDELBROCK NITROUS SYSTEM UNIVERSAL MOTORCYCLE NITROUS SYSTEM

0

Filed Under (Suzuki) by admin on 26-11-2010

download
Wiring Diagram #1 Wiring Diagram #2 Red Red Red Red Black Black Black Black Black Black Factory Harness to Horn Factory Harness to Horn Horn Horn Nitrous Solenoid Nitrous Solenoid Switch Switch Bottom View Bottom View +12V with Key On From Horn Button (Ground when button is pressed) From Horn Button (Ground when button is pressed) To Nitrous Bottle To Nitrous Bottle To Nitrous Nozzle To Nitrous Nozzle Install Relay for OPTIONAL RPM Activated Switch Here. See Section 7.0 for More Details. Install Relay for OPTIONAL RPM Activated Switch Here. See Section 7.0 for More Details ©2007 Edelbrock Corporation Brochure #63-71940 Catalog #71940 Rev. 2/07 – DC/mc Page 4of 4 To Nitrous Bottle To Nitrous Nozzle Nitrous Solenoid To Starter Solenoid Switch Bottom View Ground Starter Button +12V when Pushed Install Relay for OPTIONAL RPM Activated Switch Here. See Section 7.0 for More Details. Wiring Diagram #3 Starter Button Activation for Suzuki Hayabusa 7.0 – WIRING MSD 8950 RPM SWITCH NOTE – This is a suggested wiring application. There are many ways that the RPMswitch may be installed. The installer needs to set RPMswitch to proper RPM and test operation. Use diagrams on page 3 for relay terminal #30 connection. Nitrous Solenoid To Nitrous Bottle To Nitrous Nozzle RPM ACTIVATED SWITCH 10,000 Desired RPM Chip Here Connect as Outlined in Wiring Diagrams White to 4-Coil Tach Adapter #T-101-MSD Black Battery Ground Yellow – N/C Gray – OFF When Set RPMis Exceeded Connect as Outlined in Wiring Diagrams NOTE – RPM Chips are Ordered Separately Red to Switched +12 Volt Tailight Power or any Other +12 Volt Source with the Key On Note – This Method Will Turn the Nitrous Off When Set RPM has Been Exceeded. 85 87A 30 86 87 A Test Light Can Be Used Here to Check Operation 8.0 – OPTIONAL PRODUCTS FOR EFI MOTORCYCLES A Progressive Timing Retard Controller is available from Schnitz Racing for fuel injected motorcycles. The EFIR Series Timing Retard Controllers can be used with or without a Power Commander installed.

Incoming search terms:

TOYOTA COROLLA 1984-2006 VEHICLE WIRING VEHICLE WIRING REMOVAL

0

Filed Under (Toyota Manuals) by admin on 04-10-2011

download
IRING INFORMATION: 1984 Toyota Corolla FWD WIRE WIRE COLOR WIRE LOCATION 12V CONSTANT WIRE WHITE OR WHITE/RED Ignition Harness STARTER WIRE BLACK/WHITE Ignition Harness IGNITION WIRE BLACK/YELLOW Ignition Harness SECOND IGNITION WIRE BLACK/ORANGE Ignition Harness ACCESSORY WIRE BLUE/RED Ignition Harness POWER DOOR LOCK (-) BLUE/WHITE Harness In Driver’s Kick Panel POWER DOOR UNLOCK (-) BLUE/RED Harness In Driver’s Kick Panel PARKING LIGHTS (+) DK. GREEN Harness In Driver’s Kick Panel PARKING LIGHTS (-) LT. GREEN Harness At Steering Column HEADLIGHTS (-) RED/WHITE Harness At Steering Column DOOR TRIGGER (-) RED/WHT OR BLK/WHT Harness At Fuse Box TRUNK TRIGGER COMMON WITH DOORS (Hatchback Only) TACHOMETER WIRE BLACK At Ignition Coil BRAKE WIRE (+) GREEN/WHITE Brake Pedal Switch HORN TRIGGER (-) GREEN/RED Steering Column LEFT FRONT WINDOW UP GREEN/BLACK At Driver Window Motor Inside Door LEFT FRONT WINDOW DOWN BLUE/RED At Driver Window Motor Inside Door RIGHT FRONT WINDOW UP GREEN Harness In Driver’s Kick From Driver Door RIGHT FRONT WINDOW DOWN BLUE/WHITE Harness In Driver’s Kick From Driver Door LEFT REAR WINDOW UP RED/BLACK Harness In Driver’s Kick From Driver Door LEFT REAR WINDOW DOWN RED/YELLOW Harness In Driver’s Kick From Driver Door RIGHT REAR WINDOW UP RED/BLUE Harness In Driver’s Kick From Driver Door RIGHT REAR WINDOW DOWN BLUE/BLACK Harness In Driver’s Kick From Driver Doo

Incoming search terms:

BMW Heated Seat Wiring Instructions

0

Filed Under (BMW) by admin on 28-10-2010

download
1. Locate the battery. 2. Find an appropriate and convenient mounting location for the controller. NOTE: The heat controller has adhesive Velcro on the back for mounting on a flat surface. 3. Connect the components per the wiring diagram. Route and secure wires with electrical friction tape and/or wire ties. In this system, the relay control wire is designed to be connected/spliced to a IMPORTANT: “switched”wire such as a tail light, head light, etc. NOTE: For CANbussystembikes (see above), you MUST spliceor connect to anon-board accessory jack circuit. S T EA RELAY BATTERY 10 AMPFUSE HEAT CONTROLLER SPLICE INTO SWITCHED LINE (I.E. TAIL LIGHT OR ACC. JACK HOT LEAD) WIRING DIAGRAM SARGENT CYCLE PRODUCTS Chilliis a registered trademark of Calamander ltd. * BATTERY SIDE OF POWER CONNECTOR INDICATED WITH RED WRAPPING * IMPORTANT! Caution: Sargent’s limited warranty does not extend to any products damaged as a result of accident, misuse, abuse, normal wear and tear, acts of God or other circumstances beyond Sargent’s control, including loss or damage in transit by carrier, or as a result of service or modification by anyone other than Sargent.

NORTON TWIN CYLINDER MOTORCYCLES ELECTRONIC IGNITION SYSTEM INSTALLATION INSTRUCTIONS

0

Filed Under (Norton) by admin on 31-10-2010

download
1. All connections must be of the highest quality, use crimped or soldered connections; twisted wires will not give a satisfactory operation. 2. Remove the petrol tank and/or seat to gain access to the ignition coils, condensors and wiring. 3. For safety, disconnect the battery (preferably both terminals). 4. Remove timing cover. (The Atlas engine has the points housing behind the cylinder head). 5. Disconnect the two wires (usually black-white & black-yellow) and remove the contact-breaker plate. At the other end, these two wires must be disconnected from the ignition coils & condensors. The condensors are no longer required and can be removed. They should not be connected to the electronic ignition system. 6. Remove auto-advance unit. 7. Disconnect the remaining wires from the ignition coils. These come from the ignition switch supply. On the Norton Commando, remove the white-blue wire from the ballast resistor between the two ignition coils; the ballast resistor is no longer required. The colour of this ignition supply wire may be different on some machines; if so check using a test lamp or meter to find the live wire when the ignition is switched on. 8. Find a suitable place for the ignition module, preferably near to the ignition coils. Secure the ignition module to the frame using one or more large cable ties. An adhesive mounting base is provided; this can be affixed to the underside of the module and the cable tie passed through and around the module and frame. Do not completely wrap the module in foam rubber. 9. Using the black coil link wire, connect the negative (—) terminal of one ignition coil to the positive (+) terminal of the other ignition coil. See figs. 1/2 on page 7. 10. Take the black wire from the ignition module, cut to length and fit an insulator and female spade connector to the end. Connect to the negative (—) terminal on ignition coil #2. See figs. 1/2 on page 7. 11. Take the red wire from the ignition module, cut to length and fit an insulator and female spade connector to the end. Connect to the positive (+) terminal on ignition

Incoming search terms:

Ducati 748 – 749 – 999 – 1098 – 848 – 1198 – Streetfighter CGS2 kit installation Manual

0

Filed Under (Ducati) by admin on 25-10-2010

download
Remove body panels uppers and lowers A B C SP electronics ( CGS2 kit installation procedure on Ducati motorbikes models 748 – 749 – 999 – 1098 – 848 – 1198 Streetfighter ) 2) Place the CGS2 eBox near Dashboard. We recommend to arrange all wiring on the right side (Gear indicator display is optional) – Gear indicator display – CGS2 eBox – CGS2 main wiring – CGS2 accessory wiring (*) *NOTE: keep this wiring away from dashboard’s connector! SP electronics ( CGS2 kit installation procedure on Ducati motorbikes models 748 – 749 – 999 – 1098 – 848 – 1198 Streetfighter ) FEED SPEED CW SP electronics ( CGS2 kit installation procedure on Ducati motorbikes models 748 – 749 – 999 – 1098 – 848 – 1198 Streetfighter ) Arrange the Plug&Play wiring under Airbox and between the two strokes for right to left crossing eBox 3) Connect the Plug&Play CGS2 wiring: RPM CSS sMec SP electronics ( CGS2 kit installation procedure on Ducati motorbikes models 748 – 749 – 999 – 1098 – 848 – 1198 Streetfighter ) sMec Arrange the Plug&Play wiring under Airbox and between the two strokes for right to left crossing sMec SP electronics ( CGS2 kit installation procedure on Ducati motorbikes models 748 – 749 – 999 – 1098 – 848 – 1198 Streetfighter) 4) Connect the CGS2 sensor (sMec label) – Sensor wiring – Ducati lever senso

Incoming search terms:

HARLEY DAVIDSON FLSTF TURN SIGNAL RELOCATION KIT REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 24-02-2011

download
REMOVAL 1. Remove seat according to the instructions in the Service Manual. To prevent accidental vehicle start-up, which could cause death or serious injury, disconnect battery cables (negative (-) cable first) before proceeding. (00307a) Disconnect negative (-) battery cable first. If positive (+) cable should contact ground with negative (-) cable connected, the resulting sparks can cause a battery explosion, which could result in death or serious injury. (00049a) 2. See Figure 1. Disconnect battery cables, negative (-) cable first. 2 1 is03242 1. Negative (-) cable 2. Tail lamp connector Figure 1. Negative Battery Cable and Tail Lamp Connector 3. See Figure 2. Remove two screws and tail lamp lens (1) from base (2). 2 1 is03243 1. Tail lamp lens 2. Tail lamp base Figure 2. Remove Tail Lamp Lens 4. See Figure 3. Using a Terminal Pick Tool (1), depress locking tabs and disconnect turn signal connectors (2- place) (2, 3) from circuit board. 5. Feed turn signal wiring and connector through opening in circuit board assembly and into rear wheel area. 6. See Figure 4. Remove turn signal wiring (1, 2) from clips (3) under rear of fender INSTALLATION NOTE Proper installation of kit requires that tasks be completed for one side of the motorcycle first before continuing to the opposite side. Route Turn Signal Wiring Through Rear Fender and Support 1. See Figure 5. Remove three rear screws (1) from fender support (2). 2. Loosen, but do not remove two front screws (3) from fender support. 1 3 2 is03285 1. Screw, rear (3) 2. Fender support 3. Screw, front (2) Figure 5. Fender Support Screws and Fender Support 3. Pull fender support away from rear fender to gain access to turn signal mount. 4. Remove stock screw and washer from turn signal mount. 5. See Figure 7. Pull turn signal (B) and turn signal mount (A) away from fender support. 6. Remove turn signal and wires from vehicle by routing turn signal wiring and connector through holes in rear fender and fender support. Gently guide wires through holes to ensure they do not get damaged. Feed Wiring and Install Relocation Bracket 1. See Figure 6. Feed turn signal wiring and connector through middle hole in turn signal relocation bracket and under rear of fender support. 1 is04635 1. Wire harness Figure 6. Wire Harness Routing 2. See Figure 7. Insert stock screw and washer through rear hole of relocation bracket (1) and turn signal mount (A). 3. Thread screw into turn signal (B). Tighten to 12-16 ft-lbs (16.3-21.7 Nm). 4. Align relocation bracket (1) with rear of fender support and install with screw (2) and nut (3) from kit. Tighten nut to 12-16 ft-lbs (16.3-21.7 Nm). Complete Turn Signal Relocation Wiring 1. See Figure 5. Install one rear screw (1) to hold fender support in place while routing wiring. Install screw snugly but do not fully tighten

Incoming search terms:

TRIUMPH TWIN CYLINDER MOTORCYCLES WITH POINTS IN THE SIDE CASING INSTALLATION INSTRUCTIONS

0

Filed Under (Triumph) by admin on 30-10-2010

download
1. All connections must be of the highest quality, use crimped or soldered connections; twisted wires will not give a satisfactory operation. 2. Remove the petrol tank and/or seat to gain access to the ignition coils, condensors and wiring. 3. For safety, disconnect the battery (preferably both terminals). 4. Remove timing cover. (The Atlas engine has the points housing behind the cylinder head). 5. Disconnect the two wires (usually black-white & black-yellow) and remove the contact-breaker plate. At the other end, these two wires must be disconnected from the ignition coils & condensors. The condensors are no longer required and can be removed. They should not be connected to the electronic ignition system. 6. Remove auto-advance unit. 7. Disconnect the remaining wires from the ignition coils. These come from the ignition switch supply. On the Norton Commando, remove the white-blue wire from the ballast resistor between the two ignition coils; the ballast resistor is no longer required. The colour of this ignition supply wire may be different on some machines; if so check using a test lamp or meter to find the live wire when the ignition is switched on. 8. Find a suitable place for the ignition module, preferably near to the ignition coils. Secure the ignition module to the frame using one or more large cable ties. An adhesive mounting base is provided; this can be affixed to the underside of the module and the cable tie passed through and around the module and frame. Do not completely wrap the module in foam rubber. 9. Using the black coil link wire, connect the negative (—) terminal of one ignition coil to the positive (+) terminal of the other ignition coil. See figs. 1/2 on page 7. 10. Take the black wire from the ignition module, cut to length and fit an insulator and female spade connector to the end. Connect to the negative (—) terminal on ignition coil #2. See figs. 1/2 on page 7. 11. Take the red wire from the ignition module, cut to length and fit an insulator and female spade connector to the end. Connect to the positive (+) terminal on ignition • BLACK COIL LINK WIRE • RED EARTHING WIRE • CRIMP CONNECTORS & INSULATORS • LARGE & SMALL CABLE TIES • CABLE TIE ADHESIVE MOUNTING BASE 3 coil #1. See figs. 1/2 on page 7. 12. For NEGATIVE EARTH electrics go to step 15. 13. For POSITIVE EARTH electrics (standard): Take the white wire from the ignition module, cut to length and fit an insulator and male spade connector to the end. Connect to one of the negative ignition feed wires previously removed in step 7 (white-blue wire for Norton Commando). The other wire (if fitted) is spare and should be covered with insulation to prevent shorting to the frame etc. 14. Take the red earthing wire, fit an insulator and female spade connector on one end and connect to the positive (+) terminal on ignition coil #1. Cut to length and fit a ring terminal on the other end and connect to a good earth point on the frame, ideally the battery positive (+) terminal. For the Norton Commando, the earth tag on the end of the condensor pack can be used (fit a female spade connector to the end of the red earthing wire). See fig.1 GOTO STEP 17

Incoming search terms:

Incoming search terms: