2003 buell blast timing chain

You search Auto repair manual PDF 2003 buell blast timing chain, if there are search results will appear below. If search results do not exist, please search by others keyword.



  2003 buell blast timing chain Direct Download speed 5282 Kb/s

  2003 buell blast timing chain Full Version speed 6162 Kb/s



MOTORCYCLE ROLLER CHAIN Maintenance and Lubrication

0

Filed Under (Tips and Review) by admin on 27-11-2010

download
Cleaning and Relubrication Perhaps the largest contributor to shortened chain life is inadequate lubrica- tion. All working parts of a chain should be lubricated uniformly. The use of the highest viscosity oil that allows for flow between the link plates and coats pin-bushing areas will normally provide the greatest wear resistance. Apply oil to the upper edges of link plates. This allows for the greatest access of oil to pin-bushing joints. For open drives, excess lubrication on outer chain surfaces should be removed, since it will either be thrown off during operation or serve to collect foreign materials. If foreign objects or surplus lubrication accumulates on chain surfaces to the extent of making re-lubrication of the joints impossible, the chain must be cleaned. Standard roller chains may be cleaned by washing in kerosene or any other good petroleum-based solvent. WARNING: These solvents are flammable. Agitate the chain to assure penetration of the solvent and a thorough flushing of the pin-bushing areas. Drain off excess solvent and inspect bushings and pins for wear. Replace the chain if wear is excessive or parts are fractured or missing. O-ring chains may be cleaned externallyby washing in kerosene. Do not use any other cleaning agent or the O-rings may be damaged. When cleaning O- ring chain, clean only the external areas of the chain. Do not attempt to force kerosene into the pin-bush cavity. Do not try to repair a worn-out chain by replacing individual links. The pitch of the new links will be shorter and will most likely result in chain fatigue failure and/or severe sprocket damage. For chains which are still usable, soak them in SAE 40 or 50 automotive engine oil (without additives). Flexing the chain in oil will assure greater penetration of lubricant. Inspect and clean sprockets. If sprockets are worn or damaged, they should be replaced.Installing new chain on worn out sprockets will significantly shorten the chain’s service life. WARNING: always wear eye protection when assembling or disassembling chain

Incoming search terms:

Yamaha YZ 250F Camshafts REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 30-12-2011

download
Remove the 4 bolts that hold the exhaust cam cap in place, lift the cam cap off. It may be necessary to pry very lightly on the cap to lift it off its dowel pins. Do not use the cam lobes as the pry point. Be careful not to drop the dowels and also be careful to not lose the half moon shaped retainer for the bearing under the cam cap. Remove the 6 bolts that hold the intake camshaft cap and lift the cam cap off the camshaft, again, be careful to not drop the retainer or dowels. Lift the intake camshaft out of its pocket in the cylinder head casting. Remove the cam chain from the sprocket, set the stock camshaft aside. Lift the exhaust cam out of its pocket in the cylinder head casting and remove the chain from the sprocket. Do not drop the cam chain, dangle it over the side of the engine while keeping slight upward pressure on the chain to maintain its position on the drive sprocket on the crankshaft. Fit the half moon shaped retainers in the grooves of the Hot Cams camshaft bearings to ensure good fit, set retainers aside for the time. Using assembly lube, lube the shim buckets, bearing surfaces for the camshafts in the cylinder head, and pack some in the camshaft bearings. Set the exhaust cam into the cylinder head casting while at the same time fitting the cam chain over the sprocket. Make sure that you keep all the cam chain slack to the back of the engine. The cam chain pulls the camshaft sprockets in a counter clockwise direction and the slack of the chain must be kept on the cam chain tensioner side of the engine. The exhaust cam has two timing marks on it. When correctly installed one mark will be at the 9 o’clock position and the other mark will be at the 12 o’clock position. When correctly timed the mark at 9 o’clock will be aligned with the valve cover gasket surface. Repeat the above process for the intake camshaft. Again, make sure you keep the chain slack to the cam chain tensioner side of the engine. Check to be sure the crankshaft is still at TDC. The intake cam has two timing marks also. One at 12 o’clock and the other at 3 o’clock. When both cams are installed correctly, the valve cover gasket surface will form a straight line through the exhaust timing mark at 9 o’clock and the intake timing mark at 3 o’clock

Incoming search terms:

Harley-Davidson CHAIN DRIVE INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 15-04-2012

download
1) Assemble & install the chain tensioner assembly over the primary chain as shown in figure 1. 2) Install the compensator sprocket with extender & spacer (numbers 5, 6, & 7, FIG 2)(#7 is not included in this kit), primary chain, chain tensioner, and clutch basket simultaneously onto the motor drive shaft & transmission main shaft. Rotate the chain drive slightly as needed to allow the splines to line-up. 3) Install the chain tensioner nut loosely on the chain tensioner bolt. 4) Install the sliding cam onto the compensator sprocket, & slide the compensating sprocket cover-assembly (#3) over the cam. 5) Apply 2 drops of Rivera “Red” thread-lock on the threads of the motor drive shaft, & install the motor nut loosely with the fingers at this time. The hex spacer (#7) and spacer (#2) as seen in fig.2 are not provided in Rivera Engineering’s chain drive kit. These components are required with some applications, and can be purchased from your local Harley-Davidson dealer. FIG 2 6) Apply 2 drops of Rivera “red” thread-lock on the threads of the transmission main-shaft and loosely install the clutch hub nut (left hand threads). 7) Place the HD “Primary Drive Locking Tool” HD-41214 on the primary chain as shown in figure XXX and tighten the motor sprocket nut to 150-165 foot-pounds. 8)Turn the locking tool 180 degrees and move it to the clutch sprocket. Tighten the clutch hub nut to 70-80 foot pounds (left- hand thread). Adjust chain tension so that the top strand has 5/8″- to-7/8″ of up and down play (cold drive train). Tighten the center bolt nut to 21-29 foot pounds of torque.

Incoming search terms:

2003 – 2007 4Runner OIL LEAK FROM FRONT TIMING COVER

0

Filed Under (Toyota Manuals) by admin on 31-10-2011

download
evidence of a small oil leak located where the Bank 1 cylinder head, engine block, and timing cover meet. Use the following repair procedure to address this condition. 2003 – 2007 model year 4Runner vehicles equipped with the 1GR-FE engine and produced BEFORE the Production Change Effective VINs shown below. MODEL PLANT DRIVETRAIN PRODUCTION CHANGE EFFECTIVE VIN 2WD JTEZU17R#68064608 Hino 2WD JTEZU14R#78076191 4Runner Hino 4WD JTEBU14R#78078323 4Runner 4WD JTEBU14R#78090468 Tahara 2WD JTEZU14R#70091230 Tahara 4WD JTEBU14R#70117349 OP CODE DESCRIPTION TIME OFP T1 T2 EG7036 Reseal FrontTiming Cover with FIPG 2WD7.6 113100P0306548 EG7036 Reseal Front Timing Cover with FIPG 4WD8.5 11310-0P030 65 48 Applicable Warranty*: This repair is covered under the Toyota Powertrain Warranty. This warranty is in effect for 60 months or 60,000 miles, whichever occurs first, from the vehicle’s in-service date. *Warranty application is limited to correction of a problem based upon a customer’s specific complaint

Incoming search terms:

2003 Ducati ST4s Timing Belt Adjustment

0

Filed Under (Aprilia) by admin on 31-10-2010

download
This instruction on cam belt adjustment starts after you remove the fairing pieces. Plan on an hour to remove these. Since you are performing your own service, buying Ducati belts may not be that expensive. There may be another belt source, but I have not confirmed this for the 996 engine of the 02-03 ST4s. Fig 1 – ST4s ready for belt adj./ repl. Fig 2 – Crank tool installed. See dwg. 1) Ensure maximum of ½ tank of gas. Fuel will leak into the charcoal canister, then onto the floor if the tank is over half full and the tank is tilted up on its hinge. So put the tank up on its hinge. 2) Remove spark plugs. Cover sparkplug wells with boots or rags. This is a great time to toss out those Champions for a set of NGK DCPR8E’s. 3) Remove the front shield from the horizontal cylinder head. 4) Remove crankshaft cover on Riders LH side and insert crank tool. A crank tool can be made by following the drawing at the end of this document. See Fig 2 above. The flat head screws used are kind of soft so beware on their removal. 5) Remove oil pressure sending unit cable and remove oil sending unit. No oil should pour out. 6) Remove battery and remove bolts fastening battery box to engine/frame. You can let the battery box dangle or partially support it via a bungee cord. Be careful of the cable on the ground of the ECU. By dangling the battery box excess stress could be placed on this cables connector and you don’t want to troubleshoot an intermittent electrical issue. 7) Remove cam belt covers. The two covers over the cams are real easy. The center piece is removed by pulling it down. You may have to move some hoses and cables out Timing belt adj. doc 1
of the way because it is a tight fit. Removing the oil pressure sending unit gave clearance for the removal. Fig 1 shows bike ready to be worked on. On the Rider’s LH is a window on the case cover. Using a flashlight to illuminate the area, marks can be rotated into view using the engine turning tool. There are two marks denoting the TDC of each of the cylinders. When a mark in the window aligns with the pointer, look at the crank driving pulley on the Rider’s RH of the engine. If the driving pulley’s mark is aligned with the pointer on the engine case, you are at TDC horizontal cylinder. If the pulley mark and the pointer on the engine do not align, rotate the engine until the mark in the window on the Rider’s LH side case cover aligns as well as the pulley’s mark and the engine’s pointer. Fig 3 shows the engine pulley and pointer. You can check that the horizontal piston is at TDC by inserting a welding rod into the spark plug well and touch the top of the piston with it to sense its position. Timing marks on cam pulleys are clearly stamped on all four pulleys. When the crank driving pulley aligns with its corresponding pointer on the engine case and the marks on the pulleys align with their corresponding marks on both cylinders, you are in position for belt adjustment and replacement

Incoming search terms:

1999 – 2003 1.25, 2.0, 2.5 and 2.9 Sherco Ignition Timing Removal And Installation Manual

0

Filed Under (Sherco) by admin on 20-04-2011

download
Remove the gear shift lever bolt by using a 5mm Allen wrench. Insert the wrench through the hole in the skid plate. Holding the gear shifter up in second gear makes it easier to align the wrench into the head of the bolt. Pull the gear shift lever as far as possible towards the chain. (The chain does not have to be removed in order to remove the ignition cover and flywheel) Remove the three ignition cover bolts by using a 4mm Allen wrench. Carefully remove the ignition cover-which requires a little twisting and some outward pressure on the gear shift lever. The shift lever may also have to be pressed down into the first gear position. Inspect the rubber ring gasket for cracks or cuts while the ignition cover is off. Replace if necessary. We recommended applying a ring of high grade silicone sealant to further improve the seal of the rubber ring gasket. Tap a chisel-mark across the flywheel retaining nut and the crankshaft by using a small, sharp chisel. This mark serves as a reference point for retightening the flywheel in its original position during reassembly.

HONDA GL1800 TIMING CHAIN COVER INSPECTION NUT INSTALLATION MANUAL

0

Filed Under (Honda) by admin on 28-02-2011

download
GL1800 TIMING CHAIN COVER INSPECTION NUT 1. Place bike on center stand. 2. Remove the inspection nut on the bike using a 17mm socket. 3. Remove the rubber o-ring seal from the inspection nut and place on new inspection nut. 4. Install the new inspection nut using the 17mm socket.

ULTIMA IGNITION MODULE AND KIT INSTALLATION MANUAL FOR HARLEY DAVIDSON

0

Filed Under (Harley Davidson) by admin on 03-03-2011

download
Disconnect battery. 2. Mark location of timing plate in relation to inside of cam cover. This will give a starting point for timing on new module. Remove old ignition if applicable (see manual) Clymer, Haynes. 3. If your bike is not equipped with timing rotor M/W# 53-528 OEM#32402-83 you must buy one (included in kit). Also a single fire coil is needed (included in kit) M/W# 53-632. Any single fire coil rated 2-4 ohms can be used. NO SOLID CORE PLUG WIRES (copper, silver) they will damage the unit. 4. Install module: helpful hints, early model nose cones, i.e. Shovel Heads, the hole for the wire may need to be drilled out. Align with previously scripted mark for timing. Use lockwashers for stand offs for correct clearance of cover plate. Run wire loom. 5. Connect wires, see wiring diagram. Tape unused wires, green or brown. 12v to tach (brown) will damage module. Set timing. 1996 and later should not be timed 20˚ BTDC as the OEM module, but at 35˚ BTDC. Use this mark when using timing light. If VOESswitch is not used you must ground VOES wire (green) while timing. Refer to manual for correct identification of timing marks. At start up and timing, set spark advance in middle position. FUNCTION SWITCHES LED timing indicator light: When out, shows TDC. When ignition is on, LED will light up. When engine is cranking LED will blink. Electric Start/Kickstart: Set accordingly. VOES/Race mode: VOES switch lets the motor run smoother and improves gas mileage. If you don’t use it or add one tape up green wire and switch to race. VOES switch to use, M/W# 53-652. Spark advance: High compression motors should use race mode and 93 octane or better gas. Changing from VOES to race changes advance curves. Agood rule of thumb is if the engine knocks when throttle is applied in high gear, turn back spark advance curve until it stops engine knock. RPMlimiter: Set at desired RPM to cut engine power. Rear Cylinder: This is for racing and should be set at a dyno. +/-5˚. Rear cylinder timing is achieved through this adjuster. Most should dial to middle setting and leave alone. After all switches are set, install cover with supplied gasket and feel the increased performance of a solid state single fire ignition. Again, we remind you, if you don’t feel confident about installing this unit, let a qualified mechanic do it and be assured you are getting the best performance and gas mileage possible.

Incoming search terms:

Ducati Monster 600/750/900; Buell S1, X1, M2, Blast Sequential LED Tail Light Installation Manual

0

Filed Under (Ducati) by admin on 25-10-2010

download
1. Please use supplied sub harness to connect the sequential signals 2. Connect the blue and yellow wire on the shorter end of the sub-harness to the corresponding blue and yellow on the LED tail light. Make sure the connector is pushed all the way in and use the green covers to insulate. 3. Disconnect and remove factory signal lamps. We recommend one at a time. 4. Locate the longer end of the sub-harness and connect the blue/black wires to the left signal output and the yellow/black wire to the right signal output. 5. Insulate as necessary and cable tie any wires out of the way

BUELL BLAST SS2-R Exhaust System Removal And Installation

0

Filed Under (Tips and Review) by admin on 18-12-2010

download
REMOVING THE STOCK EXHAUST SYSTEM 1. Remove the two nuts that mount the header to the cylinder head. 2. Remove the rear muffler mounting bolts. Remove the bolt from the insulated mount at the front of the muffler. Save the nuts and bolts for reuse. 3. Remove the stock head pipe and muffler assembly. 4. Using circlip pliers carefully remove the circlip and flange from the stock exhaust system.Save for reuse. INSTALLING YOUR NEW VANCE & HINES EXHAUST SYSTEM 1. Slide the circlip and flange over the VHR head pipe. NOTE: If the circlip looks bent or twisted replace it with a new circlip. 2. Slide the supplied clamp over the head pipe. 3. Install the head pipe into the exhaust port using the stock flange nuts. Leave finger tight at this time. 4. Bolt the head pipe clamp to the engine using the supplied bracket stamped #311. Refer to Fig. 1for the assembly order of the front mounting hardware. Leave loose at this time. 5. Slide the supplied clamp onto the notched end of the muffler assembly. 6. Slip the muffler assembly onto the head pipe. Bolt the muffler assembly to the original mounting points at the rear of the frame, using the supplied 5/16″-18×3/4″ socket head capscrews, stock nuts and washers. 7. Tighten the exhaust flange nuts and muffler clamp. 8. Tighten the two bolts that mount the muffler assembly to the motorcycle. 9. Be sure to tighten all hardware before starting your motorcycle. RE-JETTING INSTRUCTIONS Re-jetting the carburetor will result in realizing the “full” potential of this performance exhaust system. Vance & Hines offers jet kits for most applications

Incoming search terms: