2003 super glide chain or shaft driven

You search Auto repair manual PDF 2003 super glide chain or shaft driven, if there are search results will appear below. If search results do not exist, please search by others keyword.



  2003 super glide chain or shaft driven Direct Download speed 5282 Kb/s

  2003 super glide chain or shaft driven Full Version speed 6162 Kb/s



MOTORCYCLE ROLLER CHAIN Maintenance and Lubrication

0

Filed Under (Tips and Review) by admin on 27-11-2010

download
Cleaning and Relubrication Perhaps the largest contributor to shortened chain life is inadequate lubrica- tion. All working parts of a chain should be lubricated uniformly. The use of the highest viscosity oil that allows for flow between the link plates and coats pin-bushing areas will normally provide the greatest wear resistance. Apply oil to the upper edges of link plates. This allows for the greatest access of oil to pin-bushing joints. For open drives, excess lubrication on outer chain surfaces should be removed, since it will either be thrown off during operation or serve to collect foreign materials. If foreign objects or surplus lubrication accumulates on chain surfaces to the extent of making re-lubrication of the joints impossible, the chain must be cleaned. Standard roller chains may be cleaned by washing in kerosene or any other good petroleum-based solvent. WARNING: These solvents are flammable. Agitate the chain to assure penetration of the solvent and a thorough flushing of the pin-bushing areas. Drain off excess solvent and inspect bushings and pins for wear. Replace the chain if wear is excessive or parts are fractured or missing. O-ring chains may be cleaned externallyby washing in kerosene. Do not use any other cleaning agent or the O-rings may be damaged. When cleaning O- ring chain, clean only the external areas of the chain. Do not attempt to force kerosene into the pin-bush cavity. Do not try to repair a worn-out chain by replacing individual links. The pitch of the new links will be shorter and will most likely result in chain fatigue failure and/or severe sprocket damage. For chains which are still usable, soak them in SAE 40 or 50 automotive engine oil (without additives). Flexing the chain in oil will assure greater penetration of lubricant. Inspect and clean sprockets. If sprockets are worn or damaged, they should be replaced.Installing new chain on worn out sprockets will significantly shorten the chain’s service life. WARNING: always wear eye protection when assembling or disassembling chain

Incoming search terms:

Harley-Davidson CHAIN DRIVE INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 15-04-2012

download
1) Assemble & install the chain tensioner assembly over the primary chain as shown in figure 1. 2) Install the compensator sprocket with extender & spacer (numbers 5, 6, & 7, FIG 2)(#7 is not included in this kit), primary chain, chain tensioner, and clutch basket simultaneously onto the motor drive shaft & transmission main shaft. Rotate the chain drive slightly as needed to allow the splines to line-up. 3) Install the chain tensioner nut loosely on the chain tensioner bolt. 4) Install the sliding cam onto the compensator sprocket, & slide the compensating sprocket cover-assembly (#3) over the cam. 5) Apply 2 drops of Rivera “Red” thread-lock on the threads of the motor drive shaft, & install the motor nut loosely with the fingers at this time. The hex spacer (#7) and spacer (#2) as seen in fig.2 are not provided in Rivera Engineering’s chain drive kit. These components are required with some applications, and can be purchased from your local Harley-Davidson dealer. FIG 2 6) Apply 2 drops of Rivera “red” thread-lock on the threads of the transmission main-shaft and loosely install the clutch hub nut (left hand threads). 7) Place the HD “Primary Drive Locking Tool” HD-41214 on the primary chain as shown in figure XXX and tighten the motor sprocket nut to 150-165 foot-pounds. 8)Turn the locking tool 180 degrees and move it to the clutch sprocket. Tighten the clutch hub nut to 70-80 foot pounds (left- hand thread). Adjust chain tension so that the top strand has 5/8″- to-7/8″ of up and down play (cold drive train). Tighten the center bolt nut to 21-29 foot pounds of torque.

Incoming search terms:

HARLEY DAVIDSON 45-AMP. UPGRADE ALTERNATOR ROTOR KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 15-03-2011

download
This 45-amp Rotor Kit is designed for installation on 1999 and later FLHT, FLHTC, FLHR, FLHRI, FLHRCI and FLTR Model Motorcycles. Existing Rotor Removal 1. Remove seat and disconnect battery terminals, negative cable first. 2. Follow instructions in applicable Service Manual and remove the primary chaincase cover. Remove the clutch, primary chain, compensating sprocket and shaft extension as a single assembly. 3. Remove the alternator rotor spacer, if present. Installation The laminated high-output rotor in this kit contains magnets that are considerably more powerful than those used in most previous rotors. The ROTOR REMOVER/INSTALLER and SHAFT PROTECTOR SLEEVE (HD-41771) must be used to prevent parts damage during rotor removal and installation. 1. See Figure 1. Verify threads are clean and thread the Shaft Protector and Rotor Remover/Installer, if removed. NOTE The Shaft Protector Sleeve not only protects the threads from the splines of the rotor, but acts as a guide to ensure that the rotor is properly centered. 2. Turn thumbscrews of Rotor Remover/Installer into threaded holes in rotor face. CAUTION 1 WARNING 1 WARNING 1 WARNING Kit Number 29999-97B Figure 1. Install Shaft Protector and Rotor Installer Engine Sprocket Shaft 1. Make Sure Threads are Clean 2. Install shaft protector sleeve. Shaft protector sleeve 3. Install Rotor Remover/Installer i04153 Handle Thumbscrew Forcing screw . Center ball on forcing screw in recess at end of engine sprocket shaft. Rotate the handle of the tool in a counterclockwise direction to ease rotor into position over stator. 4. Loosen thumbscrews and remove Rotor Remover/Installer. Remove Shaft Protector Sleeve. 5. Install the shaft extension on engine sprocket shaft. No alternator rotor spacer is necessary). 6. Follow instructions in applicable Service Manual and install the clutch assembly, primary chain and shaft extension as a single assembly. 7. Apply two drops of Red LOCTITE®262 to threads of clutch nut and engine sprocket nut. Tighten nuts as fol- lows: Clutch nut- (left hand threads), 70-80 ft-lbs (94.9-105.5 Nm) Engine sprocket nut- 150-165 ft-lbs (203-223 Nm). 8. Follow instructions in Service Manual and install the Primary Chaincase Cover using new gasket from kit, if necessary.

Incoming search terms:

HARLEY DAVIDSON SHIFTER SHAFT COVER WITH INSERT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 03-02-2011

download
INSTALLATION 1 2 4 3 5 6 7 is01872 1. Shifter shaft 2. Inner cover 3. Toe shifter lever 4. Outer cover 5. Set screw (for outer cover) 6. Set screw (for inner cover) 7. Casting Figure 1. Shifter Shaft Covers 1. See Figure 1. Remove the stock heel shift lever and toe shift lever (3) from the gear shifter shaft (1). 2. Install the set screw (6) into the inner gear shifter shaft cover (2). 3. Install inner gear shifter shaft cover with installed set screw over the casting (7) in-board of the shifter shaft (1). 4. Tighten the set screw until light contact is made with the casting. Do not overtighten. 5. Re-install toe shift lever on the gear shifter shaft. Tighten the shifter retaining screw to 18-22 lb-ft (24-30 Nm) . 6. Install the set screw (5) into the outer gear shifter cover (4). 7. Install outer gear shifter shaft cover with installed set screw over the end of the gear shifter shaft (1). 8. Loosen the set screw slightly to allow the gear shifter shaft cover to rotate. Rotate the cover until the set screw faces down, then tighten the set screw. SERVICE PARTS

Incoming search terms:

Harley-Davidson Motorcycle Reverse Gear Installation Instructions

0

Filed Under (Harley Davidson) by admin on 31-10-2010

download
2.1 Obtain a small tube of Loctite® #262 (red) for use later. 2.2 Drain the transmission oil. 2.3 Remove the clutch adjustment cover (left side). 2.4 Remove rear exhaust header pipe (cross over exhaust pipe). 2.5 Remove the muffler support bracket. 2.6 Remove the clutch release cover (right side). 2.7 Remove clutch push rod and oil slinger. To be disassembled and modified later. 2.8 Remove the two nuts from the main (rear) and counter (front) transmission shafts. 2.9 Remove the transmission bearing housing (puller available from Champion Sidecars). To be replaced with new reverse gear transmission bearing housing (Trap Door). 2.10 Cover the exposed gears in the transmission with a cloth in preparation to cut the shifter fork shaft. 3 Install New Main and Countershaft Gears NOTE: Gears and Tapered Split Rings are factory matched sets. Do not mix!. 3.1 Locate the shifter fork rod, mark fork rod flush at transmission case and pull out 1/4″. Figure 1 Figure 2. Exposed Shoulders Mark shifter fork rod flush with case Remove Spacers Vehicle Transmission Counter Shaft Main Shaft Front of Motorcycle Figure 1
Reverse Gear Installation Instructions For EVO / 5 Speed and Twin Cam Harley-Davidson® Motorcycle Page 3 of 6 Revision 7 © 2007 Champion Motorcycle Accessories International, Inc. dba Champion Sidecars 11841 Monarch Street Garden Grove, CA 92841 (800) 875-0949 (714) 847-0949 www.championsidecars.com www.championtrikes.com Figure 6 CAUTION: Do not pull the shifter fork rod out of the transmission more than 1/4″. If you pull the shifter fork rod out too far, it will be difficult to realign it with the internal shifter fork. 3.2 Cut the shaft at the mark and push it back in. The shaft end MUST NOT stick out of the transmission case. If the shaft is in deeper, fill the hole with silicone to prevent the shaft from moving in and out. NOTE: Shifter fork is made of non-tempered metal and may be cut with a hacksaw or Dremel® cutting tool. 3.3 Important: Remove stock spacers from main and counter shafts. Spray with silicon remover (Brake-Clean) then, using supplied cleaning pad, clean shafts, new counter and main shaft gears and tapered lock rings (inside and outside) Figure 1 3.4 With motorcycle in neutral, pull both the shafts out and simultaneously push the OEM outermost gears in until seated completely to expose the shoulders of both shafts. The countershaft shoulder should be flush with the gear face. For the main shaft the gear would “hang over” the shoulder a small bit. Figure 2 3.5 Apply supplied Champion Super-Lock retaining compound to the inside and outside surfaces of the large gear tapered split ring, to the inside of the new countershaft gear (large gear) and to the transmission countershaft (the forward most shaft). 3.6 Install new countershaft gear to the transmission countershaft. Insert tapered split ring (tapered end first) into the countershaft gear. Install ring seat tool and spring to counter shaft and new countershaft gear. Torque ring seat tool to 40 ft-lb’s. Figures 3 and 4

Incoming search terms:

HARLEY DAVIDSON GEAR SHIFTER SHAFT COVER INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 30-03-2011

download
Models This kit fits 1982 and later Touring and FL Softail model motorcycles. Kit Contents Table 1. Kit Contents Part Number Description (Quantity) Not Sold Separately Gear shifter shaft cover Not Sold Separately Screw, set There are no Service Parts available with this kit. INSTALLATION 1. Remove the stock heel shift lever from the gear shifter shaft. 2. Install the set screw into the gear shifter shaft cover. 3. Install gear shifter shaft cover with installed set screw over the end of the gear shifter shaft. 4. Tighten the set screw until light contact is made with the shaft groove. 5. Loosen the set screw slightly to allow the gear shifter shaft cover to rotate. Rotate the cover until the set screw faces down, then tighten the set screw.

KTM 990 SUPER DUKE 950 SUPERMOTO 950 SUPER ENDURO REPAIR MANUAL

0

Filed Under (KTM) by admin on 22-11-2010

download
Adjusting the position of the compression and rebound damping Rebound damping: -Turn in the adjusting screw 1 in a clockwise direction all the way to the stop. -Turn back the respective number of clicks in a counterclockwise direction. Compression damping, low speed: -Turn in the adjusting screw 2 in a clockwise direction all the way to the stop. -Turn back the respective number of clicks in a counterclockwise direction. Compression damping, high speed: -Turn in the adjusting screw 3 in a clockwise direction all the way to the stop. -Turn back the respective number of clicks in a counterclockwise direction. Adjusting the spring preload NOTE: the spring preload is the difference between the unloaded and preloaded length of the spring. -Tighten the adjusting nut 4 with the special tool T106 until you have the prescribed spring preload. -Tighten the lock screw on the adjusting nut Disassembling the shock absorber -Write down the spring preload. -Write down the rebound and compression damping settings, counting the clicks or number of turns while turning in a clockwise direction. -Unscrew all of the adjusting screws in a counterclockwise direction. -Clamp the upper part of the shock absorber in a vise as shown in the photo, using protective jaws. -Loosen the lock screw 1 (AH 4 mm), loosen the adjusting nut 2 using the special tool T106 3 and relieve the spring. NOTE: mark the position of the lock screw. -Press the spring down with the special tool T101S and pull out the spring retainer 4 . -Remove the washers 5 and spring 6 . 4-2 Repair manual WP Shock absorber 990 Super Duke, 950 Supermoto, 950

Incoming search terms:

Yamaha YZ 250F Camshafts REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 30-12-2011

download
Remove the 4 bolts that hold the exhaust cam cap in place, lift the cam cap off. It may be necessary to pry very lightly on the cap to lift it off its dowel pins. Do not use the cam lobes as the pry point. Be careful not to drop the dowels and also be careful to not lose the half moon shaped retainer for the bearing under the cam cap. Remove the 6 bolts that hold the intake camshaft cap and lift the cam cap off the camshaft, again, be careful to not drop the retainer or dowels. Lift the intake camshaft out of its pocket in the cylinder head casting. Remove the cam chain from the sprocket, set the stock camshaft aside. Lift the exhaust cam out of its pocket in the cylinder head casting and remove the chain from the sprocket. Do not drop the cam chain, dangle it over the side of the engine while keeping slight upward pressure on the chain to maintain its position on the drive sprocket on the crankshaft. Fit the half moon shaped retainers in the grooves of the Hot Cams camshaft bearings to ensure good fit, set retainers aside for the time. Using assembly lube, lube the shim buckets, bearing surfaces for the camshafts in the cylinder head, and pack some in the camshaft bearings. Set the exhaust cam into the cylinder head casting while at the same time fitting the cam chain over the sprocket. Make sure that you keep all the cam chain slack to the back of the engine. The cam chain pulls the camshaft sprockets in a counter clockwise direction and the slack of the chain must be kept on the cam chain tensioner side of the engine. The exhaust cam has two timing marks on it. When correctly installed one mark will be at the 9 o’clock position and the other mark will be at the 12 o’clock position. When correctly timed the mark at 9 o’clock will be aligned with the valve cover gasket surface. Repeat the above process for the intake camshaft. Again, make sure you keep the chain slack to the cam chain tensioner side of the engine. Check to be sure the crankshaft is still at TDC. The intake cam has two timing marks also. One at 12 o’clock and the other at 3 o’clock. When both cams are installed correctly, the valve cover gasket surface will form a straight line through the exhaust timing mark at 9 o’clock and the intake timing mark at 3 o’clock

Incoming search terms:

Harley-Davidson BAKER COMPENSATING SPROCKET INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 19-04-2012

download
1) Remove the primary chain case cover. Refer to your Factory Service Manual for this procedure. 2) Remove the compensating sprocket nut with a 1-1/2″ socket. A ½” impact gun is best for this task. *) Remove the 1-3/16″ clutch nut. This is a left handed nut so loosen it by turning it in the clockwise direction (as viewed from the left side of the motorcycle). 4) With one hand on the compensating sprocket and one on the clutch assembly, remove the primary drive assembly (compensating sprocket, primary chain, tensioner assembly, and clutch as shown in figure a and set it on a clean surface. 5) Flip the adjuster shoe bracket on the chain tensioner assembly. figure b shows the stock orientation of the adjuster show and bracket. Figure C shows the adjuster show bracket flipped 180°. To flip the shoe bracket, remove the two ¼-28×2 bolts that hold the bracket assembly together. This will allow you to separate the chain tensioner assembly components from the primary chain. Flip the bracket around as shown in figure c . PAGE 4 Figure B Figure A BAKER COMPENSATING SPROCKET INSTALLATION INSTRUCTIONS 6) install the new compensating sprocket, chain, and clutch onto the motor sprocket shaft and the transmission input shaft. The flipped chain tensioner assembly (as shown in figure c ) is not ‘captured’ on the primary chain like the stock configuration. Loosely install the chain tensioner assembly onto the anchor plate bolt. Tighten the compensating sprocket nut to 157+ 7 ft-lbs and the clutch hub nut to 75+ 5 ft-lbs using red Loctite on the threads.

Incoming search terms:

Harley Davidson FL series Electra Glide, Ultra Classic, Road King, Road Glide Left and Right Mounting Plate Installation Installation Manual

0

Filed Under (Harley Davidson) by admin on 25-02-2012

download
Remove existing control arm end cap and grind the outside flush. See picture below for reference. The swing arm will drop if both sides are removed at the same time. To ease installation, complete one side before starting on the other. Note: there is a left and right. Left and right end caps shown. 2. Install mounting plate assembly 10002351 on top of the end cap using 7/16″ hex head bolt and lock washer in the bottom hole. Use the 7/16″ counter sink bolt in the top hole. Make sure the end cap is seated properly. The end cap notch should fit into the recess on the frame. The pivot arm assembly is shipped on mounting plate assembly; you may remove the pivot arm to make installation easier. 3. Snug up the bolts evenly, make sure the end caps are not crooked in relation to the frame. Tighten both bolts to 25 ft lbs. (Further tightening will be required after the toe in is set). 4. If you removed the left hand pivot arm assembly, remount it now, 10002575-A (pg 20) with seal, bearings (2), washer, nut, cotter pin and dust cover. 5. Repeat for right hand side. 5 Toe In Adjustment Adjustment made with the mounting plates, bolts, pivot arms, and hubs (without wheels and tires) in place

Incoming search terms:

Incoming search terms: