2005 dyna fdx ignition wire color

You search Auto repair manual PDF 2005 dyna fdx ignition wire color, if there are search results will appear below. If search results do not exist, please search by others keyword.



  2005 dyna fdx ignition wire color Direct Download speed 5282 Kb/s

  2005 dyna fdx ignition wire color Full Version speed 6162 Kb/s



HI-4 DUAL FIRE MOTORCYCLE IGNITION INSTALLATION INSTRUCTIONS

0

Filed Under (Yamaha) by admin on 09-11-2010

download
Turn ignition switch off and disconnect battery ground cable. 2. Refer to Figure 3. Remove OE ignition module and wire harness (items 1-4). You will disconnect two wires at the coil (15), a wire going to the VOES (Vacuum Operated Electrical Switch) (18), a black ground wire at the ignition module, and the 3 pin plug (20) that connects to the sensor plate (11). Refer to shop manual for locations. 3. Remove ignition cover plates and gasket (items 5- 9). This will require drilling out two rivets. The rivets will later be replaced with two supplied self- threading screws. 4. In order to remove the sensor plate cable, the cable plug (20) must be removed first. Use needle nose pliers to pull the terminals out of the plug. Then pull the cable through the exit hole at the bottom of the timing cover. 5. Note location of sensor plate (11). There is a V notch in the sensor plate used for alignment. When you install the HI-4, you should align the V notch in the same location. This should set the timing close enough to start the engine. Remove and save the two standoffs and washers (10). Remove the sensor plate (11). HI-4 INSTALLATION Refer to Figure 4. The HI-4 requires use of the OE timing rotor P/N 32402-83 (used only on 1985 and newer models). If you have an older model or are not sure, check the rotor (9) for the correct part number. For models prior to 1980, use the supplied 10-32 x ¾”bolt and washer to mount the rotor. 1. Install the HI-4 system in place of the OE breaker or sensor plate. Rotate the HI-4 about 90 degrees to give better access to the cable exit hole. Install the HI-4 first, then push the cable through the hole. On some early models it may be necessary to enlarge the wire harness exit hole in the gear cover. Align the V notch on the HI-4 same as the OE plate you removed. Use the OE standoffs to secure the HI-4. You must use lockwashers under the standoffs for proper clearance between the HI-4 and cover plate. Do not fully tighten the standoffs until the timing has been set. 2. Route the HI-4 wire harness along the frame rails up to the coil. Make sure that harness will not be chafed or burned by exhaust heat. Secure harness with tie wraps. Do not install timing cover. HI-4 HOOKUP Crimp terminals and hardware are supplied for your convenience. Use the ring terminals for coil hookup. Use male-female quick disconnects for connections to the tach and vacuum switch (VOES). Tape up any unused wires. 1. Circuit Breaker Cover Screws (2) 2. Circuit Breaker Cover 3. Circuit Breaker Cover Gasket 4. Breaker Plate Screws (2) 5. Breaker Plate Screw Lockwashers & Washers (2 each) 6. Retainer (1971 to early 1972) 7. Circuit Breaker Cam Bolt 8. Breaker Plate Assembly 9. Breaker Cam 10. Advance Assembly 11. Gear Case Cover 11 10 9 8 7 6 5 4 3 2 1 NOTE: Damage will result if the brown tach wire comes in contact with +12V. Figure 1. Harley-Davidson®OE Points System
9000-4002A REV A 3 2/05 1. Identify switched +12 volt wire and tach wire (if equipped) going to the coil. Refer to your service manual, or reconnect the battery and use a test light or voltmeter. The switched +12 volt wire will be hot when the ignition key is turned on. 2. Refer to Figure 5. Connect the HI-4 red wire and switched +12 volt wire to Coil positive. 3. The HI-4 white wire is not used and should be taped. 4. Connect the HI-4 black wire to the Coil negative terminal. 5. Connect the HI-4 green wire to the vacuum switch (Figure 3, item 18), if used. 6. Connect the HI-4 brown wire to the tach wire, if equipped with tach. Tape up if unused. 7. The HI-4 is grounded via the timing housing; a separate ground connection is not required. 8. Reconnect battery ground cable. Verify proper ground connections to the frame and engine. VOES HOOKUP The OE vacuum switch (VOES) is normally an open circuit. Above 3-5 inch-Hg vacuum, the VOES closes and grounds the vacuum input on the OE ignition module. This increases the total advance generated by the OE ignition module. Vacuum advance improves part throttle 17 16 1. Cover Screws (2) 2. Ignition Timer Cover 3. Ignition Module 4. Timer Plate Screws (2) 5. Washers (2) 6. Screws & Washers (2 each) 7. Shield 8. Sensor 9. Trigger Rotor Bolt 10. Timer Plate 11. Trigger Rotor 12. Advance Assembly 13. Gear Case Cover 14. Ignition Coil 15. Spark Plug Wires (2) 16. Ignition Coil Terminal (FX) 17. Ignition Coil Terminal (FL) 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 NOTE: Most motorcycle coils do not have terminals marked. Use either terminal for Coil+ (positive) and the other one for Coil- (negative). Warning: The HI-4 (8-1100) Dual Fire ignition will not work with 2 plugs per head, dual coil application. Damage will result if attempted. Use the HI-4 (8-2100) single fire ignition for 2 plugs per head applications

Incoming search terms:

NORTON LIGHTWEIGHT TWIN ELECTRONIC IGNITION Installation Instructions

0

Filed Under (Norton) by admin on 31-10-2010

download
1. All connections must be of the highest quality, use crimped or soldered connections; twisted wires will not give a satisfactory operation. 2. Remove the petrol tank and/or seat to gain access to the ignition coils, condensers and wiring. 3. For safety, disconnect the battery (preferably both terminals). 4. Remove timing cover. 5. Disconnect the two wires (usually black-white & black-yellow) and remove the contact-breaker plate. At the other end, these two wires must be disconnected from the ignition coils & condensers. The condensers are no longer required and can be removed. They should not be connected to the electronic ignition system. 6. Remove auto-advance unit. 7. Disconnect the remaining wires from the ignition coils. These come from the ignition switch supply. The colour of this ignition supply wire may be different on some machines; if so check using a test lamp or meter to find the live wire when the ignition is switched on. 8. Find a suitable place for the ignition module, preferably near to the ignition coils. Secure the ignition module to the frame using one or more large cable ties. An adhesive mounting base is provided; this can be affixed to the underside of the module and the cable tie passed through and around the module and frame. Do not completely wrap the module in foam rubber. 9. Using the black coil link wire, connect the negative (—) terminal of one ignition coil to the positive (+) terminal of the other ignition coil. See figs. 1/2 on page 7. • BLACK COIL LINK WIRE • RED EARTHING WIRE • CRIMP CONNECTORS & INSULATORS • LARGE & SMALL CABLE TIES • CABLE TIE ADHESIVE MOUNTING BASE 3 10. Take the black wire from the ignition module, cut to length and fit an insulator and female spade connector to the end. Connect to the negative (—) terminal on ignition coil #2. See figs. 1/2 on page 7. 11. Take the red wire from the ignition module, cut to length and fit an insulator and female spade connector to the end. Connect to the positive (+) terminal on ignition coil #1. See figs. 1/2 on page 7. 12. For NEGATIVE EARTH electrics go to step 15. 13. For POSITIVE EARTH electrics (standard): Take the white wire from the ignition module, cut to length and fit an insulator and male spade connector to the end. Connect to one of the negative ignition feed wires previously removed in step 7. The other wire (if fitted) is spare and should be covered with insulation to prevent shorting to the frame etc. 14. Take the red earthing wire, fit an insulator and female spade connector on one end and connect to the positive (+) terminal on ignition coil #1. Cut to length and fit a ring terminal on the other end and connect to a good earth point on the frame, ideally the battery positive (+) terminal. See fig.1 GOTO STEP 17.

Incoming search terms:

TRIUMPH TWIN CYLINDER MOTORCYCLES WITH POINTS IN THE SIDE CASING INSTALLATION INSTRUCTIONS

0

Filed Under (Triumph) by admin on 30-10-2010

download
1. All connections must be of the highest quality, use crimped or soldered connections; twisted wires will not give a satisfactory operation. 2. Remove the petrol tank and/or seat to gain access to the ignition coils, condensors and wiring. 3. For safety, disconnect the battery (preferably both terminals). 4. Remove timing cover. (The Atlas engine has the points housing behind the cylinder head). 5. Disconnect the two wires (usually black-white & black-yellow) and remove the contact-breaker plate. At the other end, these two wires must be disconnected from the ignition coils & condensors. The condensors are no longer required and can be removed. They should not be connected to the electronic ignition system. 6. Remove auto-advance unit. 7. Disconnect the remaining wires from the ignition coils. These come from the ignition switch supply. On the Norton Commando, remove the white-blue wire from the ballast resistor between the two ignition coils; the ballast resistor is no longer required. The colour of this ignition supply wire may be different on some machines; if so check using a test lamp or meter to find the live wire when the ignition is switched on. 8. Find a suitable place for the ignition module, preferably near to the ignition coils. Secure the ignition module to the frame using one or more large cable ties. An adhesive mounting base is provided; this can be affixed to the underside of the module and the cable tie passed through and around the module and frame. Do not completely wrap the module in foam rubber. 9. Using the black coil link wire, connect the negative (—) terminal of one ignition coil to the positive (+) terminal of the other ignition coil. See figs. 1/2 on page 7. 10. Take the black wire from the ignition module, cut to length and fit an insulator and female spade connector to the end. Connect to the negative (—) terminal on ignition coil #2. See figs. 1/2 on page 7. 11. Take the red wire from the ignition module, cut to length and fit an insulator and female spade connector to the end. Connect to the positive (+) terminal on ignition • BLACK COIL LINK WIRE • RED EARTHING WIRE • CRIMP CONNECTORS & INSULATORS • LARGE & SMALL CABLE TIES • CABLE TIE ADHESIVE MOUNTING BASE 3 coil #1. See figs. 1/2 on page 7. 12. For NEGATIVE EARTH electrics go to step 15. 13. For POSITIVE EARTH electrics (standard): Take the white wire from the ignition module, cut to length and fit an insulator and male spade connector to the end. Connect to one of the negative ignition feed wires previously removed in step 7 (white-blue wire for Norton Commando). The other wire (if fitted) is spare and should be covered with insulation to prevent shorting to the frame etc. 14. Take the red earthing wire, fit an insulator and female spade connector on one end and connect to the positive (+) terminal on ignition coil #1. Cut to length and fit a ring terminal on the other end and connect to a good earth point on the frame, ideally the battery positive (+) terminal. For the Norton Commando, the earth tag on the end of the condensor pack can be used (fit a female spade connector to the end of the red earthing wire). See fig.1 GOTO STEP 17

Incoming search terms:

Kawasaki Sxi/ SXR Ignition twin cylinder Jet Ski ignition Installation Instructions

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
1. Remove electronics enclosure from its mounting location. 2. Unplug and remove the OEM ignition. 3. Set the programming switches on the T3 to your settings. 4. Install the T3 Ignition in the same location in the electronics enclosure. 5. Test the T3 Ignition. 6. Close the electronics enclosure cover plate and mount the module in the PWC. Installation Remove electronics enclosure from its Mounting Location 1. Using a 10mm socket remove the mounting bolts on each side of the electronics enclosure. 2. Remove the enclosure cover and set aside the screws, 2 mounting flanges, ‘O” ring, and enclosure top. Unplug and Remove the OEM Ignition 1. Using 10mm socket, remove bolts from each side of the OEM ignition. Lift out the ignition and unplug all connectors attached to the OEM ignition. Now remove the protective metal plate that was under the ignition and two 3/16″ thick washers under that plate. 2. On 2004 models and newer remove the wire harness for the two black connectors just unplugged from the OEM ignition. Trace each wire from each black connector back to in-line connectors and separate each of these connectors. Set the two harnesses aside. Install the T3 Ignition in the Electronics Enclosure 1. Install the T3 ignition into the mounting bracket supplied with your T3. Slide the end of the ignition module under the lip at the rear of the bracket an press the wire end of the ignition firmly into the bracket. Attach the keeper bracket using two 5mm bolts supplied. Place the ignition/bracket in the location where the OEM ignition and metal plate were removed. Secure the ignition in place with the supplied bolts

Incoming search terms:

Harley-Davidson Electronic Ignition Module Installation instructions

0

Filed Under (Harley Davidson) by admin on 23-04-2012

download
Step 1: Switch main dashboard switch to “off” position (Ignition& light switch) Step 2: Disconnect negative (ground) cable from the Battery Step 3: Remove the Condenser and Breaker points from the circuit breaker timing base. Step 4: Disconnect advance/ retard cable from timing base Step 5: Remove timing base from timer shaft and housing (see your manual for instructions) Step 6: Remove circuit breaker wire stud or circuit breaker to coil wire assembly from timing base Step 7: Remove circuit breaker wire from Ignition coil, and mark terminal on coil with piece of tape. Step 8: Install the Electronic Ignition Module on the timing base. Mount this short black wire to one on the timer base screws by keeping some slack in this wire so the timing base can turn free. Solder the flag terminal to this short black wire and mount it under the timer to motor bolt. This way of mounting provides a much better grounding. Do NOT use the screws (number 1 or 2 screws from picture below) from the timing base!!!! Step 9: Now three wires pass this hole via the rubber grommet. Figure 1 Figure 2 Step 10: Reinstall the timer base on the timer shaft housing, and keep some slack in the wires before protruding the hole in the timer shaft housing, and secure with ground spring and cover retainer. Reconnect the advance/retard cable to the timer base. Step 11: Route the two long wires to the ignition coil. Check in the HD service manual for a proper route to the ignition coil. (Keep away from hot surfaces like exhaust systems). Cut the wires to the exact length necessary for mounting. Step 12: Determine the exact length of the wire loom. Keep in mind that one end of the loom enters the timer shaft housing by 1cm. Cut the loom to the proper length. Step 13: Insert both wires in the loom. Strip both wire ends and solder the two flag terminals on the wires. Step 14: Connect the red wire to the ignition coil, on the terminal where the 6 or 12 volt is supplied to. This terminal has at minimum one wire connected which runs to the main switch. Step 15: Connect the black wire to the ignition coil on the terminal which is empty, and has piece of tape on it. (Old place where the circuit breaker wire was connected to) Step 16: Install the trigger rotor on the timer shaft cam, and tighten the hex screw by using the hex key tool. Do not over tighten the screw! Step 17: Check for clearance between trigger rotor and Electronic Ignition Module. Appropriate clearance is between 0,5mm and 1,5mm . Minor adjustments can be made by unlocking the two screws and slightly shift/move the Electronic Ignition Module. Check if the rotor moves free. Timing instructions: Remove the spark plugs from the engine, but keep them connected to the spark coil cables and engine ground. This enables normal operation of the spark, and prevents unwanted engine firing on compression stroke. See service manual or handbook for timing instructions of your model Step 18: Reconnect the negative (ground) cable to the battery. Step 19: Switch main power to “on” position. The red light in the Electronic Ignition Module might already light up. If not, turn the kick starter slowly. The red light is on while charging (closed points)the Ignition coil, facing solid metal of the trigger rotor. The light goes off (open points) when the end of the solid surface of the trigger rotor passes the centre of the Electronic Ignition Module. At that point a spark is generated by the coil

Incoming search terms:

NORTON TWIN CYLINDER MOTORCYCLES ELECTRONIC IGNITION SYSTEM INSTALLATION INSTRUCTIONS

0

Filed Under (Norton) by admin on 31-10-2010

download
1. All connections must be of the highest quality, use crimped or soldered connections; twisted wires will not give a satisfactory operation. 2. Remove the petrol tank and/or seat to gain access to the ignition coils, condensors and wiring. 3. For safety, disconnect the battery (preferably both terminals). 4. Remove timing cover. (The Atlas engine has the points housing behind the cylinder head). 5. Disconnect the two wires (usually black-white & black-yellow) and remove the contact-breaker plate. At the other end, these two wires must be disconnected from the ignition coils & condensors. The condensors are no longer required and can be removed. They should not be connected to the electronic ignition system. 6. Remove auto-advance unit. 7. Disconnect the remaining wires from the ignition coils. These come from the ignition switch supply. On the Norton Commando, remove the white-blue wire from the ballast resistor between the two ignition coils; the ballast resistor is no longer required. The colour of this ignition supply wire may be different on some machines; if so check using a test lamp or meter to find the live wire when the ignition is switched on. 8. Find a suitable place for the ignition module, preferably near to the ignition coils. Secure the ignition module to the frame using one or more large cable ties. An adhesive mounting base is provided; this can be affixed to the underside of the module and the cable tie passed through and around the module and frame. Do not completely wrap the module in foam rubber. 9. Using the black coil link wire, connect the negative (—) terminal of one ignition coil to the positive (+) terminal of the other ignition coil. See figs. 1/2 on page 7. 10. Take the black wire from the ignition module, cut to length and fit an insulator and female spade connector to the end. Connect to the negative (—) terminal on ignition coil #2. See figs. 1/2 on page 7. 11. Take the red wire from the ignition module, cut to length and fit an insulator and female spade connector to the end. Connect to the positive (+) terminal on ignition

Incoming search terms:

1982-2005 Harley Motorcycle Removal and Installation Instructions

0

Filed Under (Harley Davidson) by admin on 31-03-2012

download
” bolt from the mounting stem on the Signal® mirror. While seated on the motorcycle, position the Signal® mirror on the handle bar. Secure the Signal® mirror to the handle bar using the 5/ 16 ” bolt. Make sure the bolt is tight! Guide the Signal® mirror wire harness into the cowling by going along side the existing factory wire harness. 4 Remove any slack in the wire harness. Secure the wire harness to the handle bar using a supplied tie wrap. 5 6 Adjust the position of the Signal® mirror and tighten the ball retention screws. Remove the motorcycle seat. Remove the aft mounting bolts on the fuel tank. 7 Guide the Signal® mirror wire harness along the inside of the fuel tank’s front mounting bolt and between the crossover tube. 8 9 Lift up the aft portion of the fuel tank and guide the Signal® mirror wire harness down the backbone of the motorcycle frame, alongside the existing factory wire harness. The motorcycle’s electrical wiring for turn indicators is located aft of the gas tank on the backbone of the frame. Guide the new wire harness from the Signal® mirror to the electrical wiring. Cut off any excess slack in the wire. Locate the SOLID BROWN wire from the wire connector. Turn the ignition key so that electrical power is on and activate the right side turn indicator. Probe the wire with the wire tester to verify that flashing turn indicator power is present. Label that wire as ‘right side turn’. Repeat all of the previous steps to replace the left side factory mirror with the new Signal® mirror. Locate the SOLID VIOLET wire from the wire connector. Activate the left side turn indicator and probe the wire with the wire tester to verify that flashing turn indicator power is present. Label that wire as ‘left side turn

Incoming search terms:

2002-2005 Honda VFR800/A Wire Harness Replacement Manual

0

Filed Under (Honda) by admin on 21-04-2011

download
If the 18P (light blue) connector is in abnormal condition as shown below, contact TechLine at (800) 421-1900, option 9. FRONT SUB-HARNESS REPLACEMENT 1. Remove the front sub-harness from the cowl stay hooks. Disconnect all the electrical components from the front sub-harness. 2. Temporarily set the main wire harness aside, and disconnect the 6P (natural) con- nector. Then, carefully remove the front sub-harness. 3. Install the new front sub-harness by con- necting the 14P (natural) and 18P (light blue) connectors. NOTE: For routing specifications, refer to the WIRING & HARNESS ROUTING SECTION on pages 7-8. 4. Attach the front sub-harness on the cowl stay hooks. Make sure the front sub-harness is routed elow the main sub-harness. ABNORMAL CONDITION STAY HOOKS 6P (NATURAL) CONNECTOR FRONT UB-HARNESS 14P (NATURAL) CONNECTOR 18P (LIGHT BLUE) CONNECTOR FRONT SUB-HARNESSSTAY HOOK Page 4 VFR800/A #4 4 of 12 NOVEMBER 2007 5. Place the front sub-harness between the radiator and the frame, and below the rec- tifier. Be careful not to damage the front sub-harness or other components. 6. Re-connect the front sub-harness to the 6P (natural) connector. 7. Secure the main wire harness and the front sub-harness using the longer wire band. 8. Secure the main wire harness and the upper side of the front sub-harness using the shorter wire band. Adjust the wire har- ness located within the frame and the radi- ator hose accordingly. 9. Secure the main wire harness fuse box to the front sub-harness using the shorter wire band. FRONT SUB-HARNESS STAY HOOK MAIN-HARNESS FRONT SUB-HARNESS FRONT SUB-HARNESS 6P CONNECTOR (Male) 6P CONNECTOR (Female) WIRE BAND (LONG) WIRE BAND (SHORT)
WIRE BAND (LONG) WIRE BAND (SHORT) MAIN WIRE HARNESS FUSE BO

Incoming search terms:

SR-C400 Motorcycle Security System INSTALLATION MANUAL AND USER'S GUIDE

0

Filed Under (Tips and Review) by admin on 29-01-2011

download
Routing the Antenna Wire The MCM includes an 18″ antenna wire. The first 12″ is a coaxial wire; the remaining 6″ is the reception antenna wire. When routing, try to avoid running the antenna along or near metal. For best performance, have the antenna wire as vertical as possible and exposed. Wire Connections The system includes one harness (HAR-1a) that connects directly into the MCM. The harness is split into three plugs: one for the GEN-1a connector, one for the optional SN-5 connector and one for the data output for future expansion. Note: Each plug is unique and will only fit the appropriate component one way. Main Harness Note: If the optional factory connector kit is being used, please disregard this section of the instructions and refer to the instructions supplied with the factory connector kit. The main harness consists of two harnesses. One is labeled (HAR-1a) and the second is labeled (GEN-1a). Plug in the white 4 pin connector from the (HAR-1a) into the matching 4 pin connector from the (GEN-1a). The (HAR-1a) also has a waterproof connector that plugs into the MCM. The wires should be connected as follows: HAR-1a Black wire with fuse and ring terminal – To battery Positive (+). GEN-1a Black wire – To ground (-). Orange wire – To tail light wire or any other wire that is hot (+) when ignition is ON (NOTE: this is an input to the alarm this connection is not designed to flash the tail light). Color Codes: Ground (-) Tail Light Honda Green wire Brown wire Kawasaki Black wire Red wire Suzuki Black/White Brown wire Yamaha Black wire Blue wire Harley Davidson Black wire Blue wire

Incoming search terms:

DYNA III ELECTRONIC IGNITION INSTALLATION INSTRUCTIONS

0

Filed Under (Tips and Review) by admin on 27-10-2010

download
1)Fasten the clamp to the electronic module using the 4-4O x 5/16 screws and lockouts provided. The damp and nuts go on the inside of the case. 2)Remove the fuel tank. Attach the module to the frame in the location selected. Cut off excess clamp material. 3)Remove an engine case or valve cover bolt and fasten the ground lug (black wire) securely to the engine. DO NOT ATTACH TO FRAME. 4])Locate the two ignition coils (they are positioned behind the left side cover on some models). There is a white wire going to the positive side of one coil that carries the switched 12 volts. A short blue/black wire then connects that point to the positive side of the other coil. Connect the separate red wire included with the kit to the spare spade terminal that is available on the positive terminal of the second coil. 5)Plug the red wire coming from the electronic module into the red wire installed in Step 4. 6)Remove the cap from the contact breaker housing. Remove the alternator cover, timing mark inspection plug, and spark plugs. 7)Remove the two screws and clips holding the points plate to the housing. Remove the screws holding the condensers to the housing. Disconnect the red and green wires where they plug into the wire harness (or coils), and remove the entire points/plate/condenser assembly. 8)Make sure the top of the housing is clean. Place the DYNA III sensor plate on the housing and orient it so that the wires exit to the rear. Place one of the original wire grommets on the front end of the plate and secure it with the screw and clip previously removed. Route the sensor cable wires through the other grommet (2 wires in the largest hole) and secure with the other screw and clip. Before tightening the plate screws, make sure the plate does not obstruct the cap screw holes. 9)Using a hex wrench in the alternator bolt, rotate the engine forward until the right hand cylinder is at top dead center on the compression stroke (D mark aligned with index mark on engine case). 10) Make sure the points cam is free of dirt and grease, and slip the DYNA III rotor over the cam Push the rotor down until it’s flange is in contact with the top of the cam. Orient the rotor so that the mark on top aligns with the line on the left (right cylinder) sensor. While pushing down on the rotor, tighten the set screws using the alien wrench supplied with the kit. 11)Rotate the engine by hand and check run-out (wobble) of rotor by watching the rotor/sensor gap. If the rotor is installed correctly, there should be no more than . 005 run-out, and it should not come in contact with either sensor. As a final check, turn the engine with the electric starter and observe the run-out. 12)Connect the three sensor cable plugs to the module receptacles, matching the red, white, and black wires. 13)Plug the remaining red and green wires onto the spade terminals where the original points connected, matching the colors

Incoming search terms: