2006 yamaha stratoliner handlebar issue

You search Auto repair manual PDF 2006 yamaha stratoliner handlebar issue, if there are search results will appear below. If search results do not exist, please search by others keyword.



  2006 yamaha stratoliner handlebar issue Direct Download speed 5282 Kb/s

  2006 yamaha stratoliner handlebar issue Full Version speed 6162 Kb/s



HARLEY DAVIDSON FLAME HANDLEBAR GRIPS REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 12-02-2011

download
REMOVE AND INSTALL THE LEFT GRIP 1. See Figure 1. Using a T27 TORX® drive head, remove the two screws with flat washers securing the handebar clamp (3) to the clutch lever bracket. Remove the clamp and position the clutch hand lever assembly away from the handlebar 2. Using a T25 TORX® drive head, loosen but do not remove the upper and lower switch housing screws (1). 3. Remove the end cap from the existing left handlebar grip if so equipped. Remove the grip by carefully cutting it away from the handlebar using a sharp blade or knife. Do not lubricate left handlebar grip before installation. Lubricating grip can cause it to come off while riding, which could result in loss of control and death or serious injury. (00315a) NOTE Make sure that the handlebar surface and the inside of the grip are smooth, dry and thoroughly cleaned of all dirt or adhesive residue. 4. Position the new left grip (4) so the larger flange (5) is at the bottom. Push the grip fully onto the handlebar. 5. Fit the grooves (2) on the outboard side of the upper and lower switch housing over the flanges on the end of the grip, then loosely fasten the two screws. 6. Position the clutch hand lever assembly inboard of the switch housing assembly, engaging the tab on the lower switch housing in the groove at the bottom of the clutch lever bracket. 7. Align the holes in the handlebar clamp with those in the clutch lever bracket, and loosely fasten the two screws with flat washers. Adjust the switch housing and clutch hand control position for rider comfort. 8. Using a T27 TORX® drive head, tighten first the upper, then the lower handlebar clamp screws to 60-80 in-lbs (6.8-9 Nm) . 9. Using a T25 TORX® drive head, tighten first the lower, then the upper switch housing screws to 35-45 in-lbs (4- 5.4 Nm) . 5 3 1 1 4 2 2 is00735 1. Switch housing screws 2. Grooves 3. Handlebar clamp 4. Left handlebar grip 5. Larger flange Figure 1. Left Handlebar Switch Housing REMOVE AND INSTALL THE RIGHT GRIP NOTE Right handlebar switch removal requires a Service Manual for your model and year of motorcycle. A Service Manual can be purchased from your Harley-Davidson Dealer. 1. Refer to the RIGHT HANDLEBAR SWITCH section of the Service Manual for removal of the switch housing assembly. This is necessary to access the throttle cables. 2. Refer to the THROTTLE CONTROL section of the Service Manual to disconnect the throttle cables and remove the existing right grip/throttle sleeve assembly. After removal, make sure that the handlebar end is clean and smooth. 3. Follow instructions in the Service Manual to install the new right grip/throttle sleeve to the handlebar and connect the throttle cables. 4. Verify that the right grip/throttle sleeve rotates and returns freely and does not bind on the handlebar or switch housing.

Incoming search terms:

Victory V92SC Sport Cruiser COMFORT SPORT HANDLEBAR REMOVAL AND INSTALLATION

0

Filed Under (Victory) by admin on 13-11-2010

download
1. Remove wiring harness dart clips. 2. Disconnect clutch switch connector. 3. Remove 2screwsforclutch lever bracket clamp, remove clutch lever bracket from handlebar. 4. Remove screws for left handlebar switch assembly. Disconnect fast idle cable from lever. Remove switch assembly. 5. Grasp left grip end firmly. While twisting grip end back&forth, pull grip end off and discard. 6. Remove left grip by insertingathin screwdriver between the grip and handlebar end. Spray as mall amount of water/soap solution into the area between the grip and handlebar end. Aggressively twist the grip back-and-forth while simultaneously pulling the grip off. 1. Locate accessory handlebar. 2. Clean inside of throttle grip assembly and throttle cable flange grooves. Ill. 1. 3. Clean throttle grip area. Ill. 1. 4. Slide throttle assembly onto right handlebar end (cableshavenot been removed and should still be attached to the throttle tube). 5. Position the handlebar over the top of the triple clamp and reinstall using bolts removed instep 10. of handlebar removal. Torque to 30 ft. lbs. 6. Install right handlebar switch housing onto handlebar. NOTE: Make sure that locating pin of switch assembly aligns with hole in handlebars. 7. Install right handlebar switch housing screws, make sure locating pin properly aligns with hole in handlebar. Tighten screws to specified torque. 8. Install master cylinder and clamp, install screws. 9. Torque screws to specification. 10. Connect front brake switch wiring harness. 11. Install fast idle cable onto fast idle lever. 12. Clean inside of left grip and handlebar grip surfaces

HARLEY DAVIDSON CHROME HANDLEBAR CLAMP BOLT KITS INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 02-02-2011

download
INSTALLATION Improperly aligned handlebars can contact the fuel tank when turned to the left or right. Contact with the fuel tank can cause cosmetic damage. (00372a) NOTES Check that the handlebar is centered on the risers. To make sure that the handlebar is centered, verify that the knurled areas on the outboard side of each riser are equal. Slowly turn the front wheel to the full right fork stop and then the full left fork stop to be sure the handlebar does not contact the fuel tank. If contact with the fuel tank occurs or the handlebars are not properly centered, see Figure 1. Slightly loosen the four upper clamp screws, and center the handlebar or raise the handlebar angle as necessary until proper clearance is obtained, then temporarily snug the screws, but do not fully tighten. 4 1 2 3 4 is00868 1. Upper clamp 2. Screw (4) 3. Handlebar 4. Handlebar risers (2) Figure 1. Handlebar Clamp Hardware 1. Remove and discard screws (2) that fasten upper clamps (1) to handlebar risers (4). Save washers under screw head for later use. 2. For Kit 94453-04: Select new chrome screws from the kit that match the length of the screws removed. For all other Kits: Select new chrome screws from the kit. 3. Slide washers previously removed onto screws, and thread screws through the upper clamps into risers. -J03586 1 of 2 4. If handlebar adjustments were made, snug screws but do not fully tighten. a. The bottom surfaces of upper clamps are offset, creating a gap between the clamp and riser on one side. b. Tighten clamps so the gaps appear to the rear of the handlebar, then tighten screw to 12-15 ft-lbs (16.3- 20.3 Nm). 5. If handlebar adjustments were not made, tighten screws to 12-15 ft-lbs (16.3-20.3 Nm). SERVICE PARTS

Yamaha Stratoliner 2006 3" Big Straights REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 02-01-2012

download
1. Remove right side Foot peg assembly or Floorboard. (Whichever is applicable to your model.) 2. Remove bolts that are holding muffler at rear mounting bracket. 3. Remove Cables from exhaust valve. 4. Remove O2 Sensor from pipe. 5. Remove the two nuts that secure the rear exhaust header pipe to the rear cylinder head. 6. Remove the two nuts that secure the front exhaust header pipe to the front cylinder head. 7. Remove complete pipe assembly. Hard-Krome Exhaust System Installation NOTE: Take care when fitting this Hard-Krome aftermarket exhaust system on your motorcycle. It has been designed to replace a STOCK exhaust system on a motorcycle with its engine, frame and other components in their STOCK design, configuration and location. WARNING : Re-check and re-tighten ALL fasteners and supports after 50 miles, then re-check and tighten as necessary on a periodic basis to ensure proper operation and performance. NOTE: All fasteners should be loose during initial installation to ensure proper fit and location of the new exhaust system. 1. Install new exhaust gaskets. 2. Install mounting bracket using Bolts with flat & lock washers. (See Illustration) 3. Install O2 Sensor onto front pipe and install front pipe onto front cylinder, taking care to not scratch chrome surfaces on pipe, engine or motorcycle. 4. Install the two nuts to secure the flange that holds the exhaust header pipe to the front cylinder head — DO NOT TIGHTEN NUTS! 5. Install 3/8-16 Square nut into each slotted bracket of front pipe and start the 3/8-16×3/4″ Bolt with flat & lock washer through backside of mounting bracket. — DO NOT TIGHTEN BOLTS! 6. Carefully install rear pipe onto rear cylinder. 7. Install the two nuts to secure the flange that holds the exhaust header pipe to the rear cylinder head — (Remove chrome plastic valve cover to access top nut) — DO NOT TIGHTEN NUTS! 8. Install 3/8-16 Square nut into each slotted bracket of rear pipe and start the 3/8-16×3/4″ Bolt with flat & lock washer through backside of mounting bracket. — DO NOT TIGHTEN BOLTS! 9. Tighten the two bolts that secure the rear exhaust header pipe flange. 10. Tighten the two bolts that secure the front exhaust header pipe flange. 11. Tighten front pipe bolts at mounting bracket. 12. Tighten rear pipe bolts at mounting bracket. 13. Reinstall foot peg assembly or floorboard. 14. If applicable to your model install foot peg relocating brackets and foot pegs as shown in illustration.

Incoming search terms:

HARLEY DAVIDSON SLOTTED HANDLEBAR RISER KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 02-02-2011

download
INSTALLATION NOTE Cover the fuel tank with a clean shop towel to prevent scratching. Damage to the finish could result. 1. Remove the two hex head cap screws and split lock- washers on the underside of the upper fork bracket that hold the currently installed risers in place. Discard the screws, but retain the lockwashers for re-assembly. Retain all additional hardware components that become dislodged from the riser when the screws are removed. 2. Remove and discard the four screws that fasten the currently installed handlebar upper clamp(s) to the risers. Remove and discard the clamp(s). Remove the handlebar from the risers, and carefully allow the handlebar to rest on the fuel tank. 3. Obtain the new slotted risers (1) and hex head cap screws (2) from the kit, and the split lockwashers and hardware components removed in Step 1. NOTE The upper cup washer (A) must be oriented with the flat side up , and the lower cup washer (D) with the flat side down . The ground wire (G) and internal tooth lockwasher (H) are mounted to the right-side riser. 4. Refer to Figure 1 for the correct orientation and reassembly sequence. Install the new risers onto the upper fork bracket using the saved hardware and new screws. Snug the riser screws, but do not fully tighten at this time. 5. Center the handlebar on the risers. To make sure that the handlebar is centered, verify that the knurled areas on the outboard side of each riser are equal. 6. Position the new handlebar upper clamps (3) from the kit, and install with new hex socket head screws (4). Snug the upper screws, but do not fully tighten. Improperly aligned handlebars can contact the fuel tank when turned to the left or right. Contact with the fuel tank can cause cosmetic damage. (00372a) 7. Slowly turn the front wheel to the full right fork stop and then the full left fork stop to be sure the handlebar does not contact the fuel tank. If contact occurs and the handlebars are properly centered, raise the handlebar angle as necessary until proper clearance is attained. 8. Tighten the upper handlebar-clamp screws as follows: a. Tighten the front screws to 12-15 ft-lbs (16-20 Nm) . b. Tighten the rear screws to 12-15 ft-lbs (16-20 Nm) . c. Tighten the front screws to 12-15 ft-lbs (16-20 Nm) . NOTE The gap between the upper clamps and the risers should be equal at the front and rear of the handlebar after tightening. 9. One at a time, remove the riser bolts installed in Step 4. Apply two drops of Loctite® 271 (Red) to the bolt threads and re-install. Tighten the riser bolts to 50-60 ft-lbs (68-81 Nm)

HARLEY DAVIDSON HANDLEBAR GRIPS INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 30-01-2011

download
INSTALLATION Remove and Install the Left Grip 1. See Figure 1. Remove the two screws with flat washers securing the handlebar clamp (3) to the clutch lever bracket. Remove the clamp and position the clutch hand lever assembly away from the handlebar. 2. Loosen, but do not remove, the upper and lower switch housing screws (1). 3. Remove the end cap from the existing left handlebar grip if equipped. Remove the grip by carefully cutting it away from the handlebar using a sharp blade or knife. Do not lubricate left handlebar grip before installation. Lubricating grip can cause it to come off while riding, which could result in loss of control and death or serious injury. (00315a) NOTE Make sure that the handlebar surface and the inside of the grip are smooth, dry and thoroughly cleaned of all dirt or adhesive residue. 4. Position the new left grip (4) so the larger flange (5) is at the bottom. Push the grip fully onto the handlebar. 5. Fit the grooves (2) on the outboard side of the upper and lower switch housing over the flanges on the end of the grip, then loosely fasten the two screws. 6. Position the clutch hand lever assembly inboard of the switch housing assembly, engaging the tab on the lower switch housing in the groove at the bottom of the clutch lever bracket. 7. Align the holes in the handlebar clamp with those in the clutch lever bracket, and loosely fasten the two screws with flat washers. Adjust the switch housing and clutch hand control position for rider comfort. 8. Tighten first the upper, then the lower handlebar clamp screws to 60-80 in-lb (6.8-9 Nm) . 9. Tighten first the lower, then the upper switch housing screws to 35-45 in-lb (4-5.4 Nm)

HARLEY DAVIDSON "LIVE TO RIDE" HANDLEBAR GRIPS INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 02-03-2011

download
installation Do not lubricate the left grip of handlebar in any way before installation. This could allow grip to come off while riding which could result in loss of control of vehicle and death or serious injury. 1. Remove existing left handlebar grip by carefully cutting it away from the handlebar using a sharp blade or knife. Remove right grip/throttle sleeve assembly following instructions in appropriate Service Manual. After removal, make sure that left and right handlebar ends are clean and smooth. 2. Check that end caps are securely fastened to grips. Tighten screw inside grip to secure end caps. 3. Assemble new throttle sleeve to handlebar. Refer to appropriate Service Manual for detailed procedure. NOTE Surfaces to be glued must be clean, dry, and free from oil. If surfaces are not clean, dry, and free from oil, then the new application may not adhere as desired. Please observe the following WARNINGS when using the adhesive contained in this kit. FLAMMABLE, INJURIOUS TO EYES, HARMFUL IF SWALLOWED, VAPOR HARMFUL. FLAMMABLE: CONTAINS METHYL ETHYL KETONE. Use only in well ventilated areas. Avoid contact with eyes, mucous membranes, and prolonged skin contact. KEEP OUT OF REACH OF CHILDREN. If swallowed, do not induce vomiting. Call a physician immediately. This product contains a chemical(s) known to the State of California to cause cancer, birth defects or other reproductive harm. 4. Liberally apply a coating of Harley-Davidson Adhesive (Part No. 99839-95) to the inside of left handlebar grip using the cotton swab. Make sure adhesive fully covers all inside surface area of the grip. Also, apply a coat of adhesive to the handlebar end. 5. Check how the rectangular pattern is oriented on the throttle (right) grip. Align pattern on left grip to match right grip and immediately push the new grip completely onto handlebar end. 6. Rotate the end caps so the “Live to Ride”text is positioned at the top of both grips. NOTE Do not hesitate when installing left grip or adhesive will dry before installation is complete. Allow 6-8 hours at 70°F to achieve full cure of the adhesive. Prior to starting engine, verify that the throttle control will snap back to the idle position when released. A throttle control that prevents the engine from automatically returning to idle can lead to a loss of control of vehicle which could result in death or serious injury. Cleaning

HARLEY DAVIDSON SPORTSTER HAND GRIPS INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 24-02-2011

download
Remove and Install the Left Grip 1. See Figure 1. Using a T27 TORX®drive head, remove the two screws with flat washers securing the handlebar clamp (3) to the clutch lever bracket. Remove the clamp and position the clutch hand lever assembly away from the handlebar. 2. Using a T25 TORX®drive head, loosen but do not remove the upper and lower switch housing screws (1). 3. Remove the end cap from the existing left handlebar grip if so equipped. Remove the grip by carefully cutting it away from the handlebar using a sharp blade or knife. Do not lubricate left handlebar grip before installation. Lubricating grip can cause it to come off while riding, which could result in loss of control and death or serious injury. (00315a) NOTE Make sure that the handlebar surface and the inside of the grip are smooth, dry and thoroughly cleaned of all dirt or adhesive residue. 4. Position the new left grip (4) so the larger flange (5) is at the bottom. Push the grip fully onto the handlebar. 5. Fit the grooves (2) on the outboard side of the upper and lower switch housing over the flanges on the end of the grip, then loosely fasten the two screws. 6. Position the clutch hand lever assembly inboard of the switch housing assembly, engaging the tab on the lower switch housing in the groove at the bottom of the clutch lever bracket. 7. Align the holes in the handlebar clamp with those in the clutch lever bracket, and loosely fasten the two screws with flat washers. Adjust the switch housing and clutch hand control position for rider comfort. 8. Using a T27 TORX®drive head, tighten first the upper, then the lower handlebar clamp screws to 60-80 in-lbs (6.8-9.0 Nm). 9. Using a T25 TORX®drive head, tighten first the lower, then the upper switch housing screws to 35-45 in-lbs (4.0-5.1 Nm). Remove and Install the Right Grip 1. Refer to the RIGHTHANDLEBARSWITCH section of the service manual for removal of the switch housing assembly. This is necessary to access the throttle cables. 2. Refer to the THROTTLECONTROL section of the service manual to disconnect the throttle cables and remove the existing right grip/throttle sleeve assembly. After removal, make sure that the handlebar end is clean and smooth. 3. Follow instructions in the service manual to install the new right grip/throttle sleeve to the handlebar and connect the throttle cables. 4. Verify that the right grip/throttle sleeve rotates and returns freely and does not bind on the handlebar or switch housing.

YAMAHA ROAD STAR HANDLEBAR RISERS INSTALLATION INSTRUCTIONS

0

Filed Under (Yamaha) by admin on 29-01-2011

download
1. Place a blanket folded several times over the fuel tank to prevent any damage during the installation of the risers. Loosen the two 19mm riser mounting nuts located on the bottom side of the upper steering head. Pry out the chrome plugs from the heads of the four handlebar top clamp bolts using a knife blade. Loosen the four handlebar top clamp 6mm socket head screws. 2. It will help having a second person to hold the handlebars while you change the risers. Remove the four screws from the clamps and then the clamps. Pull the handlebars up off the risers, pull them back and rest them on top of the blanket. 3. Remove the nuts from the bottom of the risers and remove the risers. Insert the two supplied spacer tubes into the riser mounting holes on the upper steering head. Using the bolts, lock washers and washers supplied install the new risers making the bolts finger tight only. (Take care not to scratch the top surface of the upper steering head while installing the new risers.) 4. Place the handlebars back up onto the new risers. Reinstall the top clamps using the four socket head screws removed earlier. Set the height of the handlebars to the desired position, tighten the front bolts first and then the rear securely. (15-18 ft. lbs. There should be no gap between the riser and clamp at the front side.) Tighten the two riser mounting bolts securely. (20-25 ft. lbs.) 5. Turn the handlebars all the way to the left and then right checking for any pulling or binding of the wires, hoses or cables. Also check that the throttle returns freely on it’s own

YAMAHA ROADLINER / STRATOLINER Fuel Injected INSTALLATION INSTRUCTIONS

0

Filed Under (Yamaha) by admin on 28-10-2010

download
1. Be sure the main switch is in the off position during the installation process. Failure to do this will cause the “check engine” light to be set. 2. Remove seat exposing the Electronic Control Unit (ECU) and battery. 3. Remove the right side coil cover by removing two allen screws and gently pulling. 4. Disconnect the 6 pin factory connector behind the ignition coils. (Fig 1) 5. Connect Fuelpak 6 pin connectors in-line with factory connectors. 6. Disconnect 3 pin factory connectors behind the ignition coils and connect Fuelpak 3 pin connectors in-line with factory connectors. 7. Route Fuelpak harness up to battery area and reinstall coil side cover. 8. Connect Fuelpak black wire to negative ground wire. (Fig 2) 9. Locate factory 2 pin connector with brown and black wires. Disconnect empty connector and attach Fuelpak red wire connector. 10. Connect Fuelpak 10 pin connector to Fuelpak harness. 11. You are now ready to set-up your Fuelpak. INSTALLATION INSTRUCTIONS FOR P/N 65001 READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION FUEL INJECTION MANAGEMENT SYSTEM ROADLINER / STRATOLINER NOTICE: Fuelpak is intended for racing or off-highway use only, and is not legal for sale or use in California on pollution-controlled vehicles. PLEASE NOTE: FUELPAK USE REQUIRES A HIGH PERFORMANCE AIR FILTER. HOW IT WORKS ENTERING VALUES 1. Remove Fuelpak clear case cover by removing all four screws, save hardware . 2. Turn on main power with key, but do not start engine. Fuelpak display should light up, if not, turn power off and verify the connectors are fully seated. 3. Refer to Fuelpak Setting Reference to locate the Setting Values specific to your bike and exhaust system. If you do not find your setting, visit fuelpakfi.com or call tech support at (562) 921-0071. 4. Starting with mode 1 selected, press the value (+) or the value (-) buttons to input the correct value as indicated in your Setting Value. After entering your first value, press the mode select button to move to mode 2 and enter the value. Continue until you have entered the value for each of the first 18 mode positions. Each time the value (+) is pressed, the value increases by one number. Each time the value (-) is pressed, the value decreases by one number. (Please refer to the “How It Works” section directly above if you have questions about this step. 5. As the next procedure, after you have entered in your values for the first 18 modes, press the mode select button to move to mode 19. Fully twist open the throttle and return to idle position to calibrate the Fuelpak to your bike. 6. By pressing the mode select button twice, move to mode 21 and verify that it reads “0″ with the throttle closed, “50″ at approximately half-throttle and “99″ when fully opened; if not, repeat step 5. Do not proceed to step 7 until mode 21 is verified.

Incoming search terms: