2014 dyna 103 which head gaskets

You search Auto repair manual PDF 2014 dyna 103 which head gaskets, if there are search results will appear below. If search results do not exist, please search by others keyword.





Harley-Davidson Camshaft TC, EVO, Shovelhead, XL EVO, Iron Head, XR Specifications

0

Filed Under (Harley Davidson) by admin on 02-11-2010

download
EVO Black Widow PP8833-2 – 29 55 62 25 264 267 54 103 109 105.8 0.600 0.602 EVO Black Widow PP8826-2 – 27 61 63 29 268 272 56 107 107 107.0 0.602 0.602 EVO Black Widow PP8817-2 – 254 254 0.590 0.590 EVO Carl’s Speed Shop CM4 – 28 44 52 20 252 252 48 98 106 102.0 0.495 0.495 EVO Carl’s Speed Shop CM495F Y 19 47 50 16 246 246 35 104 107 105.5 0.495 0.495 0.179 0.168 EVO Carl’s Speed Shop CM580 – 19 47 50 16 246 246 35 104 107 105.5 0.580 0.580 0.194 0.163 EVO Carl’s Speed Shop CM612 – 36 60 68 28 276 276 64 102 110 106.0 0.612 0.612 0.277 0.235 88 EVO Carl’s Speed Shop CM660 – 38 62 68 28 280 276 66 102 110 106.0 0.660 0.660 0.314 0.277 90 EVO Carl’s Speed Shop CM774 – 284 284 0.784 0.784 0.277 0.236 EVO Carl’s Speed Shop CM780F – 34 70 74 30 284 284 64 108 112 110.0 0.774 0.774 103 EVO Crane EVR0020 – 31 64.5 77 23 275 280 54 107 117 112.0 0.608 0.589 88 EVO Crane Fireball 2000 Y -12 22 20 -10 190 190 -22 107 105 106.0 0.490 0.490 0.026 0.032 EVO Crane Fireball 300 Y 12 34 41 15 226 236 27 101 103 102.0 0.490 0.490 4000 EVO Crane Fireball 310 Y 16 40 43 19 236 242 35 102 102 102.0 0.490 0.490 1500 4500 75 EVO Crane Fireball 316 Y 19 43 48 24 242 252 43 102 102 102.0 0.490 0.490 2000 5000 80 EVO Crane Fireball 326 – 24 48 57 25 252 262 49 102 106 104.0 0.490 0.500 2500 5500 EVO Crane H286 Y 19 43 48 24 242 252 43 102 102 102.0 0.490 0.490 2000 5000 80 EVO Crane H290 – 17 43 45 23 240 248 40 103 101 102.0 0.581 0.581 1800 5200 EVO Crane H296 – 24 48 57 25 252 262 49 102 106 104.0 0.490 0.500 2500 5500 EVO Crane H304 – 24 50 55 25 254 260 49 103 105 104.0 0.600 0.600 2500 5800 EVO Crane H306 – 28 54 69 23 262 272 51 103 113 108.0 0.500 0.510 0.224 0.195 3000 6000 EVO Crane H310 – 23 63 68 28 266 276 51 110 110 110.0 0.550 0.550 0.229 0.229 3000 6500 88 EVO Crane H314 – 26 54 65 21 260 266 47 104 112 108.0 0.600 0.600 2800 6000 EVO Crane HEV0042 – 27 59 71 23 266 274 50 106 114 110.0 0.600 0.576 0.226 0.194 3000 6000 100 116 EVO Crane HEV0067 – 24 50 56 24 254 260 48 103 106 104.5 0.600 0.530 0.128 0.113 EVO Crane HEV0098 – 36 62 72 34 278 286 70 103 109 106.0 0.650 0.650 0.171 0.156 96 EVO CycleRama CR-E550 – 24 52 53 23 256 256 47 104 105 104.5 0.550 0.530 EVO CycleRama CR-E581 – 22 46 53 23 248 256 45 102 105 103.5 0.581 0.550 EVO CycleRama CR-E600A – 24 50 56 24 254 260 48 103 106 104.5 0.600 0.530 EVO CycleRama CR-E600B – 23 51 54 22 254 256 45 104 106 105.0 0.600 0.550 EVO CycleRama CR-E617 – 22 50 50 22 252 252 44 104 104 104.0 0.617 0.617 EVO CycleRama CR-E630 – 18 60 63 13 258 256 31 111 115 113.0 0.630 0.630 EVO CycleRama CR-E660 – 27 59 71 23 266 274 50 106 114 110.0 0.660 0.660 3500 6500 140 EVO Dave Mackie DM500 Y 22 38 52 12 240 244 34 98 110 104.0 0.500 0.500 0.189 0.138 EVO Dave Mackie DM500X Y 25 40 55 20 245 255 45 98 108 102.5 0.500 0.500 0.208 0.178 EVO Dave Mackie DM530 – 28 42 55 15 250 250 43 97 110 103.5 0.530 0.530 0.221 0.141 EVO Dave Mackie DM580 – 26 42 56 12 248 248 38 98 112 105.0 0.580 0.580 0.227 0.144 113 EVO Dave Mackie DM581 – 26 42 56 12 248 248 38 98 112 105.0 0.580 0.580 0.227 0.144 EVO Dave Mackie DM595 – 21 49 57 14 250 251 35 104 112 107.8 0.595 0.595 0.192 0.150 EVO Dave Mackie DM635 – 20 56 59 18 256 257 38 108 111 109.3 0.635 0.635 0.194 0.176 EVO Edlebrock 1740 Y 19 43 48 24 242 252 43 102 102 102.0 0.490 0.490 0.176 0.203 EVO Edlebrock 1741 – 20 46 52 22 246 254 42 103 105 104.0 0.600 0.600 0.183 0.187 EVO Head Quarters HQ-23 – 19 47 52 24 246 256 43 104 104 104.0 0.600 0.530 EVO Head Quarters HQ-24 Y 20 36 52 19 236 251 39 98 107 102.3 0.500 0.500 EVO Head Quarters HQ-25 – 18 38 42 14 236 236 32 100 104 102.0 0.550 0.550 EVO Head Quarters HQ-26 – 20 54 53 22 254 255 42 107 106 106.3 0.600 0.530 89 EVO Head Quarters HQ-27 – 26 60 70 24 266 274 50 107 113 110.0 0.650 0.575

Incoming search terms:

BMW Motorcycles All R1100 Models- Cylinder Head Gasket

0

Filed Under (BMW) by admin on 16-11-2010

download
Situation: All R1100 models produced from calendar week 18 (April 28, 1997) onwards will be equipped with head gaskets of Multi-Layered Steel (MLS) technology. Service Information: The MLS cylinder head gasket can be used in place of all earlier gaskets, on all R1100 models, without any modifications. Part Number: MSL cylinder head gasket for all R1100 models. P/N: 11 12 1 341 173 Note: The MLS cylinder-head gasket is applicable to R1100 models only. If it becomes necessary to replace cylinder-head gaskets on R850 R models, the conventional gasket, P/N 11 12 1 342 082, must be used. Warranty Processing: If your retail center has any quantity of the conventional head gasket for the R 1100 models, P/N: 11 12 1 342 127, in stock, please file a warranty claim using the information below. If your retail center has the engine gasket set, P/N: 11 00 1 341 901 in stock , please make sure that the new style MLS gaskets are used in place of the conventional head gasket supplied in this set. All current BMW NA inventory of P/N 11 00 1 341 901 will have the MLS head gasket included. Defect Code: 00 11 01 00 00 Frame Number: 4990150 Warranty Type: 2 Warranty Stage: 1 Very truly yours,

Incoming search terms:

Harley-Davidson DYNA Straightshot Exhaust System Installation Manual

0

Filed Under (Harley Davidson) by admin on 22-12-2010

download
REMOVING THE STOCK EXHAUST SYSTEM 1. Loosen the heat shield clamps on both front and rear exhaust pipes. 2. Remove the two mounting nuts from each head pipe, located at the cylinder head. 3. Remove both front and rear head pipe clamp bolts. 4. Remove the entire exhaust system and set it aside. 5. Carefully remove the flanges and circlips from the stock exhaust system using snapring pliers. Note: If circlips look bent or twisted replace them with new circlips. 6. Remove the rear head pipe clamp bracket from the transmission cover. Remove any studs and bolts necessary and set aside to use when installing the new muffler mounting bar to the transmission housing. Refer to figure 1. INSTALLING YOUR NEW VANCE & HINES EXHAUST SYSTEM 1. Install the mounting bar (supplied) to the transmission housing using the stock hardware. Refer to figure 1 . Note: The mounting bracket should mount flatagainst the transmission housing. Some motorcycles use a stud to mount the stock rear head pipe clamp, be sure to remove the stud from the transmission housing and replace it when mounting the bracket, this will insure that the bracket is flat against the housing. 2. Check condition of stock exhaust gaskets. Replace if worn. Vance & Hines recommends you replace your gaskets with Screamin’ Eagle gaskets, part number 17048-98. 3. Install the circlips and flanges from the stock system onto both new head pipes. 4. Slide one pipe clamp (supplied) onto the front head pipe. Position the clamp in the approximate location on the tube where it mounts to the engine. 5. Slide one pipe clamp (supplied) onto the rear head pipe. Position the clamp in the approximate location on the tube where it mounts to the top hole in the mounting bar bracket. Refer to figure 1. 6. Unscrew all of the hose clamps (supplied) until they are completely loose. Feed the tail end of the hose clamp into the clips on the inside of both heat shields. Note: The screw end of the hose clamp should be accessible, but not visible when pipe is mounted on the bike

HARLEY DAVIDSON DYNA LongShot Exhaust System Installation Manual

0

Filed Under (Harley Davidson) by admin on 22-12-2010

download
REMOVING THE STOCK EXHAUST SYSTEM 1. Loosen the heat shield clamps on both front and rear exhaust pipes. 2. Remove the two mounting nuts from each head pipe, located at the cylinder head. 3. Remove both front and rear head pipe clamp bolts. 4. Remove the entire exhaust system and set it aside. 5. Carefully remove the flanges and circlips from the stock exhaust system using snapring pliers. Note: If circlips look bent or twisted replace them with new circlips. 6. Remove the rear head pipe clamp bracket from the transmission cover. Save the bolts, two will be reused. INSTALLING YOUR NEW VANCE & HINES EXHAUST SYSTEM 1. Locate the muffler mounting bracket (stamped 239). Mount the bracket to the engine case, to the rear of the transmission cover using the two stock bolts. Refer to figure 1. Tighten the bolts at this time. Install the mounting bar (supplied) to the transmission housing using the stock hardware. Refer to figure 1 . Note: The mounting bracket should mount flatagainst the transmission housing. Some motorcycles use a stud to mount the stock rear head pipe clamp, be sure to remove the stud from the transmission housing and replace it when mounting the bracket, this will insure that the bracket is flat against the housing. 2. Locate the muffler clamp bracket (stamped 240). Install the bracket to the outside of bracket 239, using the 5/16″x 1 1/4″ bolt and 5/16″ flat washer (supplied). Refer to figure 1. Leave the bracket loose, it will be adjusted later. 3. Unscrew all of the hose clamps (supplied) until they are completely loose. Feed the tail end of the hose clamp into the clips on the inside of both heat shields. Note: The screw end of the hose clamp should be accessible, but not visible when pipe is mounted on the bike. 4. Install the circlips and flanges from the stock system onto both the new head pipes. 5. Slide the new pipe clamp (supplied) onto the muffler end of the front head pipe. Position the clamp in the approximate mounting location on the pipe. 6. Place the front head pipe into the heat shield, wrap the hose clamp around the head pipe and give the screw three to four turns, leaving heat shield loose on the head pipe. Repeat this step with the rear head pipe.

YAMAHA VIRAGO 700/ 1100 2 into 2 EXHAUST SYSTEM REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 20-12-2010

download
REMOVING THE STOCK EXHAUST SYSTEM 1. Loosen the slip joint clamp on the front and rear head pipe, which are located at the muffler box. 2. Remove the two nuts that hold the front head pipe to the engine. Slip the head pipe out of the muffler box and set it aside. Note: Do not remove the rear head pipe, it has been incorporated in the design of the new exhaust system. 3. Remove the muffler box mounting bolt located in front of the passenger foot rest on the left side. 4. Remove two bolts from the right passenger foot rest assembly and set the foot rest aside. 5. Slide the muffler box off of the rear head pipe and set it aside. 6. Replace the muffler box mounting bolt (from step #3) using the washer and nut (supplied) on the back side. INSTALLING YOUR NEW VANCE & HINES EXHAUST SYSTEM 1. Attach the mounting bar to the motorcycle frame behind the right passenger foot rest. Align the two holes in the largest bracket on the mounting bar with the two holes on the frame, be sure the bend in the mounting bar is pointing to the center of the motorcycle. 2. Install the round steel spacer (supplied) to the rear most hole in the bracket. 3. Attach the foot rest using the two 8mm x 1.25 x 25mm bolts (supplied). 4. Slide the new exhaust flange (supplied) onto the front head pipe. 5. Install the two heat shields to the front head pipe using the four hose clamps (supplied). Unscrew all of the hose clamps (supplied) until they are completely loose. Feed the tail end of the hose clamp into the clips on the inside of both heat shields. Place the heat shields onto the front head pipe. Note: Be sure the bend in the heat shield matches the bend in the head pipe exactly. Wrap the hose clamp around the head pipe and give the screw three to four turns, leaving heat shield loose on the head pipe. Repeat this step with the heat shield on the rear head pipe. Note: The screw end of the hose clamp should be accessible, but not visible when pipe is mounted on the bike. 6. Check the stock exhaust gaskets to be sure they are in good shape. If you have any doubts as to their condition, replace them. 7. Slide a chrome pinch clamp (supplied) onto the expanded end of the new rear head pipe. Install a 3/8″ x 1″ bolt with a flat washer on either side of the clamp followed by a lock nut (hardware supplied). Repeat this step on the inlet end of each muffler using the two muffler clamps with 5/16″ x 1 1/4″ bolts (hardware supplied) but leave the clamp loose at this time. 8. Slip the new rear head pipe with the heat shield attached, over the stock rear pipe and gasket, but leave the clamp loose at this time. 9. Install the front head pipe, with the heat shield attached and stock gasket in place, to the front cylinder using the stock nuts, leave them loose at this time

Incoming search terms:

Kawasaki 900/1100 Billet Head Installation And REMOVAL Instructions

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
1) Remove stock head and clean the top surface of the cylinder. 2) Remove the stock water fitting from the stock head and install it in the ADA Racing® billet head in the center cylinder location. Install the 1/8″ npt brass plugs in the 2 outer cylinder locations. 3) Install all o’rings in the ADA Racing® billet head, use small amounts of grease to hold them in place, do not use super glue or silicone. 4) Apply a small amount of grease to the small (OR020) o’ring at the top of the dome. This will allow the dome to easily slip into the head shell. Be careful when turning the head upside down to install onto the cylinder, as the domes can slide out of the head shell. 5) Make sure all the o’rings are in place and place the head on top of the cylinder with the water outlet on the intake side. You must be sure that none of the o’rings slip out of their groove, as this will cause an o’ring to get pinched and a water or compression leak could result. 7) Torque all of the nuts to 15ft/lbs, in a center-out criss-cross pattern. Now, torque them again to 18ft/lbs. 8) After the 1st time out riding the head should be re-torqued. 9) The 2 additional 1/8″ npt holes in the ADA Racing® billet head come with brass plugs, but barbed fittings can be installed for custom water routing applications.

Incoming search terms:

Harley Davidson Sportster Straightshots HS Slip-on Exhaust system

0

Filed Under (Harley Davidson) by admin on 19-12-2010

download
STOCK EXHAUST SYSTEM REMOVAL 1. Loosen the heat shield clamps on both the front and rear exhaust pipes. This allows easier access to the head pipe mounting nuts. 2. Loosen, but do not remove, the two head pipe mounting nuts from each flange located at the cylinder head. 3. Remove the clamp bolt which mounts the rear head pipe to the belt drive cover bracket. 4. Loosen the clamp holding the mufflers onto the head pipes. Page 1 of 4 D480IN Rev. 1.0 Sportster Straightshots HS Slip-on Exhaust system Part #16819 U S A Congratulations, you have purchased the finest exhaust system available for your motorcycle. Your VANCE & HINES exhaust system is designed and crafted for maximum performance, a perfect fit, a great sound and unbeatable style! Please follow the installation instructions below and if you have any questions, feel free to call our technical help line (562) 926-5291. Attention Installer: (if other than owner): Please forward this instruction sheet to the purchaser of this product. These instructions contain valuable information necessary to the end user. Tools required for installation: 1/2″ combination wrench 3/8″ drive ratchet and 9″ extension 9/16″ and 1/2″ sockets 5/16″ Nutdriver/flat blade screwdriver 5. Remove the two bolts from each muffler which attach the mufflers to the mounting bar. 6. Remove the mufflers by sliding them off the head pipes. 7. Remove the clamp from the nose of each muffler (these will be re-used when installing the new mufflers). 8. Remove the gaskets from the crossover ports on the stock mufflers. Inspect the gaskets and replace if damaged or worn (H-D part #65927-00). 9. Install crossover gaskets onto mounting bar on motorcycle. VANCE & HINES EXHAUST SYSTEM INSTALLATION 1. Remove mufflers and heat shields from protective packaging. 2. Slide the nut plate inside the bracket that is welded to the backside of each muffler body and attach the muffler bodies to the mounting brackets (stamped 379-P) using four 5/16″ x 5/8″ flange head bolts (supplied). Leave them loose at this time (Figure 1). 3. Slide stock exhaust clamp onto nose of each muffler. 4. Slide mufflers onto head pipes and align crossover port with gasket on mounting bar (Figure 2). Press into place on gasket. 5. Attach the muffler brackets to the stock mounting bar using four 5/16″ x 3/4″ hex head bolts, washers, and nuts (supplied). Leave them loose at this time (Figure 3). 6. Tighten cylinder port exhaust flange nuts on front and rear cylinders. 7. Install and tighten the clamp bolt which mounts the rear head pipe to the belt drive cover bracket. 8. Align muffler and bracket so they sit level. Tighten the muffler mounting bolts and the bracket mounting bolts. 9. Tighten the clamp holding the muffler onto the head pipe.

HARLEY DAVIDSON AUTOMATIC COMPRESSION RELEASE TOOLS INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 05-03-2011

download
INSTALLATION Compressed air can pierce the skin and flying debris from compressed air could cause serious eye injury. Wear safety glasses when working with compressed air. Never use your hand to check for air leaks or to determine air flow rates. (00061a) Wear safety glasses or goggles while drilling. Flying debris could result in serious eye injury. (00565b) 4 3 6 5 6 1 2 7 is05443 1. Drill, 1.250 inch 2. Drill stop collar, 1.250 inch 3. Drill stop gauge 4. Socket head screw, 5/16 inch 5. Socket head screw, 1/4 inch 6. Dowel pin 7. Top plate Figure 1. Top Plate and Drill Bit Stop Collar Installation 1. Remove valves from cylinder heads. NOTE Do not allow the threaded studs to damage the gasket sealing surface of the cylinder head. 2. See Figure 7 and Table 1. Mount a cylinder head to the tooling plate (1). 3. Place a head bolt spacer (7) over each stock head bolt and lubricate threads and thrust faces, dowels and studs. Tighten head bolts in a crisscross pattern to 10 ft-lbs (13.5 Nm) . 4. See Figure 1. Align the top plate (7) bolt and dowel holes with the head hole pattern, Screamin’ Eagle logo towards the spark plug. This plate will only fit one way for the cylinder head it is being installed on. If the plate does not align with the head, turn it over keeping the logo towards the spark plug and install the cylinder head. 5. Lubricate the two dowel pins (6) and insert in the top plate and into the cylinder head. 6. Apply lubricant to the two socket head screws (4 and 5). Insert into their respective holes in the plate to the cylinder head and tighten to 5 ft-lbs (6.8 Nm)

Incoming search terms:

Kawasaki Ultra/ STX-R Billet Head Installation Instructions

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
1) Remove stock head and clean the top surface of the cylinder. 2) Remove the stock water fittings from the stock head and install them in the ADA head in the same order. 3) Install all o’rings in the ADA billet head, use small amounts of grease to hold them in place, do not use super glue or silicone. 4) Apply a small amount of grease to the small (OR020) o’ring at the top of the dome. This will allow the dome to easily slip into the head shell. Be careful when turning the head upside down to install onto the cylinder, as the domes can slide out of the head shell. 5) Make sure all the o’rings are in place and place the head on top of the cylinder with the water outlets on the top side. You must be sure that none of the o’rings slip out of their groove, as this will cause an o’ring to get pinched and a water or compression leak could result. 6) Use the additional 8mm flat washers on the taller studs, along with the stock wash- ers. 7) Torque all of the nuts to 15ft/lbs, in a center-out criss-cross pattern. Now, torque them again to 18ft/lbs. 8) After the 1st time out riding the head should be re-torqued

Yamaha Road Star 1600/ 1700 Exhaust kit bill of materials Installation Instructions

0

Filed Under (Yamaha) by admin on 08-11-2010

download
1. Remove left side cover, by removing allen bolt as shown (Fig 1). Once bolt is removed, push cover to motor and push back carefully to your upper body. Figure 1 2. Once left side cover is removed, remove 6mm bolt to opposite side cover as shown (Fig. 2). Also remove allen bolt on right side as shown (Fig 3) and remove carefully . Figure 2 Figure 3 . Remove two allen bolts to the muffler bracket, and also loosen hose clamp to bottom head pipe. (Fig 4 & 5) Figure 4 Figure 5 4. Remove bolt next to rear O/2 sensor bracket as shown (Fig 6), also remove Phillips head bolt from O/2 bracket and slide O/2 sensor off bracket as shown (Fig 7). Once bracket is removed mount just bracket on with Phillips head bolt back on. Figure Figure 7 5. Disconnect O/2 by using a pick on inside switch on opposite side of O/2 bracket. With pick on inside push to you and unplug. (Fig 8 & 9) Figure 8 Figure 9 6. Remove two socket cap nuts from rear head pipe flange as shown (Fig 10). Once removed, remove both mufflers and rear head pipe carefully. Slide muffler back and shift rear head pipe to you. (Fig 11) Figure 10 Figure 11 7. Slide wire off bracket from the front O/2 sensor as shown (Fig 12). Also use pick to remove O/2 sensor, push to you and unplug. Figure 12 Figure 13
8. Remove two allen bolts from foot rest/ brake to give you access to head pipe. (Fig 14) Figure 14 9. Remove two allen socket cap nuts off front head flange and remove head pipe. (Fig 15) Figure 15 10. Remove stock muffler bracket by removing two alien bolts as shown (Fig 16). Also remove bolt that holds stock bracket to the brake line (Fig 17). Once that is done remove brake line from caliper and slide though muffler bracket and re-install. Figure 16 Figure 17
Assembly 11. Remove O/2 sensor from stock pipe and install O/2 sensor in Roadhouse front head pipe and mount front head pipe with stock socket cap nuts on bike as shown. (Fig 18 & 19) Figure 18 Figure 19 12. Mount rear head pipe as shown (Fig 20), including stock socket cap nuts. Also mount y-collector with rear head pipe. Y-collector must slide into front head pipe in one. Install Roadhouse O/2 sensor wire lead from hardware kit into y-collector. (Fig 21) Figure 20 Figure 21

Incoming search terms:

Incoming search terms: