bore and stroke105 harley

You search Auto repair manual PDF bore and stroke105 harley, if there are search results will appear below. If search results do not exist, please search by others keyword.



  bore and stroke105 harley Direct Download speed 5282 Kb/s

  bore and stroke105 harley Full Version speed 6162 Kb/s



HARLEY DAVIDSON SCREAMIN' EAGLE TWIN CAM 110 (1800 CC) CONVERSION KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 19-02-2011

download
REMOVAL Prepare for Service 1. Position motorcycle on a suitable lift. NOTE If vehicle is equipped with Harley-Davidson Smart Security System, see owner’s manual for instructions to disarm the system. To prevent accidental vehicle start-up, which could cause death or serious injury, disconnect negative (-) battery cable before proceeding. (00048a) 2. Disconnect battery cables, negative (-) battery cable first. 3. Remove seat according to the instructions in the service manual. 4. Refer to service manual to remove left saddlebag and side cover. When servicing the fuel system, do not smoke or allow open flame or sparks in the vicinity. Gasoline is extremely flammable and highly explosive, which could result in death or serious injury. (00330a) 5. Remove fuel tank according to the instructions in the service manual. Remove Engine Components 1. Remove existing air cleaner assembly. Discard backplate but save remaining parts. Refer to AIR CLEANER REMOVAL in service manual. 2. Remove existing exhaust system. Refer to EXHAUST SYSTEM REMOVAL in service manual. 3. Remove engine from chassis following the instructions in the service manual. 4. Disassemble engine top end and bottom end. Refer to appropriate ENGINE sections in service manual. 5. Remove existing clutch diaphragm spring. Refer to CLUTCH REMOVAL in service manual. The procedures in this instruction sheet should be performed by one experienced in precision measuring techniques. Failure to meet tolerances called for in this instruction sheet can result in engine damage. (00511b) -J04793 1 2 is03517 1. O-ring counterbore 2. Spigot bore Figure 1. Spigot Bore and O-Ring Counterbore Dimensions Table 1. Spigot Bore and O-Ring Counterbore Dimensions Depth Bore Description 1.625 +/- 0.010 in. (41.3 +/- 0.25 mm) 4.205 +/- 0.010 in. (107 +/- 0.25 mm) Spigot Bore 0.085 +/- 0.003 in. (2.16 +/- 0.08 mm) 4.415 +/- 0.002 in. (112 +/- 0.05 mm) O-Ring Counter- bore is03456 Figure 2. Cylinder Wall MACHINE CRANKCASE Crankcase Boring Preparation NOTE During final assembly of the engine, Harley-Davidson recommends replacing the OE cylinder studs with Screamin’ Eagle High Tensile Studs (16505-01). 1. Remove cylinder studs from the engine crankcase. 2. Mask off all bearings and oil holes to prevent debris and contaminants from entering those areas. 3. Inspect and clean engine case mating surfaces. 4. See Figure 6. Reassemble engine case with OE screws, except the top center screw between the cylinders, and tighten to specifications listed in service manual. NOTE To prevent damage to crankcase boring tool, it is important to replace the top center screw with a modified top center screw (1093). This screw is included in the Crankcase Boring Tool Kit (94419-06) and can be purchased separately from a Harley- Davidson dealer. 5. Install modified top center screw (1093) between the cylinders and tighten to 50-90 in-lbs (5.6-10.2 Nm). 6. See Figure 1 and Table 1. Machine crankcase cylinder spigot bore and O-ring counterbore to the dimensions shown. Modify Crankcase

Incoming search terms:

HARLEY-DAVIDSON V-ROD BIG BORE KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 31-10-2010

download
The cylinder sleeves provided with the Wiseco V-Rod big bore kit have been finished honed to size and the piston to cylinder clearance has been set. Prior to installation, the sleeves must be washed in hot soapy water (not parts washer solvent) and dried. Coat the bore surface with motor oil and wipe it with a white towel. If the towel shows any remaining grit, repeat the hot soapy water washing process until the towel will only show clean motor oil. CAUTION: Test fit the cleaned sleeve (without O-Rings installed) into the engine block. Sleeve should drop into position. If sleeve will not easily drop into position, warm the engine block with a hair dryer until sleeve will drop into position. Remove sleeve, then continue installation procedures. From the bottom side of the sleeve, gently roll the 2-cylinder sleeve O-rings into the two grooves on each sleeve. Apply motor oil to the O-rings and gently install the sleeves into the block until bottomed. CAUTION: DO NOT ATTEMPT TO INSTALL SLEEVES WITHOUT LUBRICATING THE O-RINGS. FAILURE TO LUBRICATE O-RINGS COULD RESULT IN TORN OR DAMAGED O-RINGS THAT WOULD NOT BE EVIDENT UNTIL ENGINE WAS STARTED. INCORRECTLY INSTALLED O-RINGS CAN RESULT IN CATASTROPHIC ENGINE DAMAGE. NOTE: REFER TO THE OEM SERVICE MANUAL FOR ALL TORQUE SPECIFICATIONS PISTON RING PREPARATION Wiseco V-Rod pistons incorporate an advanced 2 ring system • The top ring is file-fit, and as such, requires that the end gap must be clearanced. The proper end gap clearance is .016-.018″ with the ring installed squarely in the bore. The top ring must be installed on the piston with the dot marking toward the top of the piston. • The oil ring is comprised of the expander and two rails. Install the expander first, and then the rails. Check to make sure the expander tips have not overlapped. It is not necessary to clearance the end gaps on the oil rails. The rails should be installed without modification. PISTON INSTALLATION The Wiseco V-Rod big bore kit is supplied with pistons that are front and rear cylinder specific. Install the front piston 4792M10795 in the front cylinder with the arrow facing the front of the engine. Install the rear piston 4793M10795 in the rear cylinder with the arrow facing the front of the engine. A piston ring compressor is required to install the pistons into the cylinders. Front of engine ➔ 4792M10795 ( Front piston) 4793M10795 ( Rear piston) FWD 4793M10795 FWD 4792M10795 For further information call the Wiseco Tech Line:

Incoming search terms:

HARLEY DAVIDSON EFI SCREAMIN' EAGLE BIG BORE EFI STAGE 2 KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 29-01-2011

download
INSTALLATION Installation of this kit is divided into six steps: 1. Big-Bore Cylinder and Piston Conversion 2. High Performance Camshafts 3. High Performance Clutch Diaphragm Spring 4. High Performance Air Cleaner 5. Calibrate the ECM 6. Exhaust NOTES This Big-Bore Stage 2 kit is intended for High Performance applications only. This engine-related performance part is legal for sale or use in California on pollution-controlled motor vehicles. Engine-related performance parts are intended for the experienced rider only. -J04173 1 of 5 The air cleaner contained in these kits is designed to perform with these kits only. Any other combination of components is not confirmed to be legal for street use. The Product Information Label contained in this kit is required in the state of California only. This label is required to aid in passing the California Smog Check Program. Place the Product Information Label on the right side of the frame, directly beneath the VIN sticker. Do not place the label on motorcycles other than those specified in the Instruction Sheet. Gaskets provided in the 1690 conversion kit eliminate the need for original head gasket O-rings. For this reason, DO NOT install the Original Equipment (OE) O-rings (Part Number 11273) to the top of cylinder dowels, or severe engine damage may occur. Big-Bore Cylinder and Piston Conversion NOTE Installation of this kit requires removal of the cylinder heads, cylinders and pistons. Refer to Section 3, ENGINE: STRIPPING MOTORCYCLE FOR SERVICE and TOP END OVERHAUL of the applicable Service Manual for instructions. High Performance Camshafts NOTE Installation of this kit requires removal and re-installation of the cam support plate. Refer to Section 3, ENGINE: BOTTOM END Cam Support Plate, Removal and Disassembly/Assembly (Camshaft, Camshaft Bearings) of the applicable Service Manual for instructions. Measuring Piston-to-Valve Clearance After installing non-stock cams, check piston-to-valve clear- ance. 1. Apply 1/8-inch (3 mm) layer of clay to crowns of pistons in areas where valves meet pistons. 2. Refer to the appropriate Service Manual and assemble the heads and valve train, and tighten cylinder studs to torque specified. 3. Turn engine through two complete revolutions by hand. 4. Remove heads and measure clay at its thinnest point. NOTE Clay must measure 0.080 inch (2.03 mm) at its thinnest point. If this measurement does not meet minimum thickness, depth of valve notches must be increased. The depth of the notches must not exceed 0.135 inch (3.43 mm). Measuring Valve-to-Valve Clearance NOTE Wait ten minutes before turning the engine after installing push rods. This allows tappets to bleed down and prevents you from bending push rods or valves. 1. Rotate the engine so that both valves of the front cylinder are partially open. Shine a light through the exhaust port and look through the spark plug hole to view the valves. Turn engine, if required, to the point where the exhaust evel sensor to the fuel pump with screw (3). Tighten the screw enough to seat the fuel sensor against the mounting tab e. Route fuel level sensor wiring under the fuel hose and connect the fuel level sensor to the low fuel switch connector on the fuel pump module. If necessary use the jumper harness (Figure 4, item 5). f. See Figure 2. Secure the fuel pump wires and con- nectors

Incoming search terms:

2006-up Harley-Davidson Single Bore Induction System Installation Instructions

0

Filed Under (Harley Davidson) by admin on 10-11-2010

download
Remove the stock fuel induction system, including the manifold and disconnecting all wire connections. It is up to the technician as to whether the gas tank should be removed or just raised up in the rear. Picture 1 2- You will need to disassemble the stock induction system to remove the pre-listed parts for re-use. 3- Verify the new manifold size is appropriate for your motorcycle by sliding it in place. Picture 2 Picture 3 4 5- Slide the MAP sensor in place, being sure not to pinch the orange rubber seal—some clean engine oil may make this easier. Install the cable guide and verify it is aligned with the throttle cable actuator. Once alignment is satisfactory, apply Loctite® 222 to the 10-24 x 1/4″ screws and tighten to 18-22 in-lbs. 4- Install the new O-ring into the throttle body. A light film of clean engine oil can be used to help hold the O-ring in place. Align the manifold to the throttle body, use purple 222 Loctite® on the 10-24 x 1″ socket-head assembly screws (with flat washers) and tighten them to 35-40 in-lbs. 6- Using the new S&S® supplied gasket, slide the S&S supplied intake air temperature (IAT) sensor in place. Use Loctite 222 on the T10 Torx button head M3 x .5 x 10mm screws and tighten to 6-8 in-lbs. Picture 4 Picture 5 Picture 6 5 7- For the stock throttle position sensor attach the “C” shaped spacer to the end of the throttle shaft, put a 4mm flat washer on each T20 Torx button head M4 x .7 x 12mm screw, apply some Loctite® 222 and torque screws to 18-23 in-lbs. 8- Install the new O-ring on the IAC motor. Lubricate the OD of the O-ring with a light film of clean engine oil. Put a 4mm flat washer on each T20 Torx button head M4 x .7 x 12mm screw, coat the threads with Loctite 222. Install the IAC motor and tighten the screws to 18-23 in-lbs. 9- Partially install the fuel injectors in the fuel rail. Be sure to orient the black O-rings to the rail and align the clocking tabs with their holes. It may be helpful to lubricate the O-rings with clean engine oil. See Picture 9. NOTE : These are special O-rings that seal pressurized gasoline. If you see one with damage or an abrasion—replace it immediately. Picture 7 Picture 8 Picture 9 6 10- Connect the Injectors to the manifold with a light squeezing action. Lubricate the O-rings with clean engine oil. Once in place, use Loctite® 222 on the threads of two 8-32 x 5/8″ slotted panhead screws and tighten to 15-20 in-lbs. 11- Install the backing washer and O-ring on the fuel supply tube. Lubricate the O-ring with clean engine oil. When the tube is in place, position the Y-shaped clip on the fuel rail and tighten the Loctite 222 coated T20 Torx button head M4 x 7 x 12mm screw to 18-23 in-lbs – Gently push the injectors downward toward the manifold to increase clearance for connecting the wire connectors. Cut the existing injector connectors from the motorcycle harness. Slide the sleeveing onto the injector harness. Slide heat shrink tubing on to each wire of the injector harness wires. Crimp the butt splices to the motorcycle harness. Move the heat shrinks over the splices and shrink with a heat gun. Slide the sleeve into place. Picture 10 Picture 11a Picture 11b Picture 12 Picture 12a 7 13- Put the stock manifold flanges on the manifold. YOU MUST USE THE S&S® RUBBER GASKETS ON THEM. Be sure to orient the tapered end towards the manifold and the flat end to the heads. 14- Hold the manifold up in its basic mounting position and connect all of the wiring harness connectors at this time. Install the manifold using the stock mounting flange bolts (from the primary side of the motorcycle) coated with Loctite® 242 and the new S&S cam side screws (1/4″ socket head, 5/16-18 x 3/4″). If a screw longer than 3/4″ is used, damage to the heads will result. Lightly snug all four manifold mounting bolts but DO NOT TIGHTEN AT THIS TIME. Connect the throttle cables and cruise control bracket (if applicable) at this time. NOTE: The Harley-Davidson® service manual for your model motorcycle will be helpful during this step. 15- Install the breather system now. On 4.00-inch bore or smaller engines the breather uses banjo fittings with hollow bolts and connects across the heads to the intake with a T-hose. This hose will need to be trimmed and have spring clamps attached as shown in photo. Torque the hollow bolts to 10-12 ft-lbs. On 41/8-inch bore or larger engines, install the sharp bent hose on the rear head and install the check valve with the white end towards the head. Mount the other hose on the black end of the check valve and connect it to the throttle body using spring clamps to secure the connections. Picture 13 Picture 14 Picture 15 8 16- Once the breathers are secure, install the fuel line per the factory service manual you are working with. Connect the battery and verify the fuel pump turns on to pressurize the system and there are no gas leaks, but DO NOT START THE ENGINE. At this time, PC software may also be used to verify sensor readings and adjust the throttle position sensor voltage if necessary. 17- Install two 242 Loctite® coated pipe plugs (included in kit) in the air cleaner backplate as shown in Picture 16. Torque to 35-45 in-lbs. Also, two pan screws coated with Loctite® 222 must be installed in the backplate in place of the enrichment device. See Picture 16a. Torque them to 12-18 in-lbs. Failure to install these screws could allow dirt and debris into the intake system. 18- Use a new gasket on the backplate and put it in place noting the number of shims required. Once you select the appropriate shims (included) mount the backing plate to the engine but DO NOT INSTALL THE SCREWS YET

Incoming search terms:

Harley Davidson 1990 and later HSR Choke Cable Installation Manual

0

Filed Under (Harley Davidson) by admin on 28-02-2012

download
The majority of HSR42/45 installations use the Harley cable. Installation is simple when the installation instructions are followed, step by step. Those steps are: • Remove the stock Harley choke cable assembly. • Remove the spring and plunger from the stock cable. • Remove the Mikuni “Starter Nut” from the HSR. • Remove the Mikuni spring and plunger from the HSR. • Install the Mikuni spring and plunger on the Harley choke cable. • Install the Harley choke cable with the fitted Mikuni spring and plunger into the HSR carburetor. • DO NOT use the Mikuni Starter Nut; discard it. • DO NOT use the Harley spring or plunger; discard them. Note: If you do not have installation instructions, you may download them from the www.mikuni.com website in the “manuals” section. If the Mikuni Starter Nut is fitted to the Harley cable, the choke plunger is held off its seat and the choke is open all the time. If the Harley spring and plunger are used, the plunger does not seal and the choke is open all the time. The result, in both cases, is very poor fuel mileage (30 mpg or less). Another possible cause of poor mileage, rough idle and fouled spark plugs is incorrect cable routing. The stock Harley choke cable is very stiff and may not be fully seated in the metal elbow at the carburetor end of its run. This condition is easily corrected. On occasion, one of these errors may have been made by someone else at another location. The unfortunate mechanic who inherits the task of correcting the rich condition, poor idle and poor fuel mileage may have no clue as to the mismatch of parts. For this reason, we include the photos and text to help you discover if your installation is correct.

Incoming search terms:

HARLEY DAVIDSON ADVANCED AUDIO CB RADIO KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 11-03-2011

download
2006 models: communication switch 77173-06 2007 models: communication switch 77173-07 2008 models: communication switch 77173-08 FLHT models will require prior installation of: •Advanced Audio AM/ FM/ CD Radio Kit (76412-06) •AM/ FM Antenna Kit (76325-06 or 76317-06) Unless one has already been fitted as part of another Advanced Audio kit installation: 2006-2007 FLHX models will require the separate purchase of: •fuel tank console (61270-98A), •tank console gasket (71294-89), •a button-head screw (3652), •nut (7964) •clip (10103 and 10120). •tank pod mounting screws (2462) quantity 3 •FLHT trim piece (52447-96) and cb pod trim badge 2008 FLHX models: •fuel tank console (61270-08) •clips (10103 and 10120) NOTE The console screws, fuel door, gasket, mounting bracket will all need to be reused. FLTR models will require the separate purchase of: •a Console Pod Assembly (77136-03), and •three pan-head screws (2462). NOTE See a Harley-Davidson dealer for availability of optional decorative inserts for the Console Pod Assembly. ALL models will require the additional purchase of: •a Non-Ultra Overlay Harness (70169-06), and EITHER : •a Premium Stereo Helmet Headset (77147-98) OR a Hand-Held CB Microphone Kit (76312-98), All of these items are available from a Harley-Davidson Dealer. If two modules are already installed on top of the radio, two Dual-LockTM mounts, (76434-06), will be needed. Models WITHOUT a Tour-Pak installed will require the additional purchase of a Frame Mount CB Antenna Kit (76415- 06). Models WITH a Tour-Pak installed will require the additional purchase of a Tour-Pak Mount CB Antenna Kit (76414-06). All of these items are available from a Harley-Davidson Dealer. The rider’s safety depends upon the correct installation of this kit. Use the appropriate service manual procedures. If the procedure is not within your capabilities or you do not have the correct tools, have a Harley-Davidson dealer perform the installation. Improper installation of this kit could result in death or serious injury. (00333a) NOTE This instruction sheet references Service Manual information. A Service Manual for your model motorcycle is required for this installation and is available from a Harley-Davidson Dealer. Electrical Overload It is possible to overload your motorcycle’s charging system by adding too many electrical accessories. If your combined electrical accessories operating at any one time consume more electrical current than your vehicle’s charging system can produce, the electrical consumption can discharge the battery and cause vehicle electrical system damage. See a Harley-Davidson dealer for advice about the amount of current consumed by additional electrical accessories, or for necessary wiring changes. (00211b)

Incoming search terms:

2010 Harley-Davidson FLHR Road King front and rear 4-piston braking system Installation

0

Filed Under (Harley Davidson) by admin on 31-10-2010

download
in Vivid Black with blue and silver pinstripes, six-speed. Air-cooled, Twin Cam 96™ engine with Electronic Sequential Port Fuel Injection (ESPFI), ABS, security system, cast wheels with independent front and rear 4-piston braking system. Motorcycle generously donated by Harley-Davidson Motor Company Police & Fleet Sales. MSRP excludes all taxes title/documentary fees, registration, tags, dealer prep, labor and installation charges, insurance, optional equipment and accessories, certificate of compliance or non-compliance fees, and finance charges. Delivery must be coordinated through Rockville Harley-Davidson by November 30, 2010. Winner is responsible for any applicable fees above. 6,000 tickets printed. Odds of winning are 1:6,000. Ticket holder need not be present to win. Licensed by the D.C. Lottery and Charitable Games Control Board. Must be 18 years or older to win. No substitutes, return for cash, or other models. As per IRS tax code, amounts paid for chances in a raffle do not qualify as a deductible charitable contribution. Taxes on prizes are the responsibility of the winner. Harley-Davidson is proud to be a sponsor of the National Law Enforcement Officers Memorial Fund. Harley-Davidson Motor Company is a prize provider only, and Harley-Davidson, Inc., and Harley-Davidson Motor Company have no responsibility regarding conduct or administration of the raffle.

Incoming search terms:

1984-1999 Harley-Davidson Evolution Engines Replacement Cylinder Heads Installation Instructions

0

Filed Under (Harley Davidson) by admin on 28-10-2010

download
Installation of an S&S Super Stock cylinder head kit is easy and can be performed by any Harley-Davidson®repair shop equipped to do engine overhauls. No special tools other than those used in normal overhaul repair work are required. Read instructions thoroughly before starting work. When they are completely understood proceed with installation. 1. Remove Components and Inspect Parts Follow procedures outlined in appropriate Harley-Davidson® service manual to prepare motorcycle for top end service. NOTE: Disconnect batteryand drain all gasoline from gas tanks beforedoing any work. Gasoline is extremely flammable and explosive under certain conditions and toxic when breathed. Do not smoke. Perform installation in a well ventilated area away from open flames or sparks. A. Remove gas tanks and all other parts required to perform top end service. B. Remove carburetor, rocker covers, pushrods and pushrod tube assemblies, cylinder heads and cylinders. Also remove piston rings from piston. Do not remove pistons. NOTE: Be careful not to introduce any dirt or other foreign material into crankcase during disassembly of engine. Metal filings, dirtand any other foreign contamination in engine may cause premature wear and/or irreversible damage to bearings and other internal engine components. C. Thoroughly clean and inspect all parts that are to be reused. Any parts that show signs of wear or damage should be replaced. WARNING CAUTION 2. Check Piston Alignment in Cylinder Bore The purpose of this procedure is to check for and correct possible piston misalignment in the cylinder bore. During normal manufacturing, engine components such as crankcases, cylinders, and connecting rods can be machined to dimensions within factory specifications but on the extreme ends of the tolerance range. Sometimes these components when combined together form an assembly that is borderline or actually “out of print”. The worst result isthat the pistons can run cocked in the cylinder bores causing the connecting rods to thrust to the sides exerting unnecessary stress on the pistons, rings, rod bearings and other related parts. This procedure is not the same as blue printing, but it provides almost the same result. We feel that not enough emphasis is given to checking the piston alignment in the cylinder bore.

HARLEY DAVIDSON REAR ROAD WINDER WHEELS INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 11-03-2011

download
This instruction sheet references service manual information. A service manual for your model motorcycle is required for this installation and is available from a Harley-Davidson dealer. Kit Contents See Figure 1 and Service Parts Tables. INSTALLATION 1. Remove existing rear wheel assembly. Save axle, axle nut, brake disc and wheel spacers for kit installation. Refer to the service manual. NOTES Prior to removing or installing the wheel, the rear brake caliper must be removed. The cotter pin or spring clip for the axle nut must be replaced. They are available for purchase from you dealer. See your dealer for the correct part number for your model motorcycle. Do not re-use brake disc screws. Re-using disc screws can result in torque loss and damage to rotor and/or brake assembly. (00319b) Do not re-use sprocket mounting screws. Re-using sprocket mounting screws can result in torque loss and damage to the sprocket and/or belt assembly. (00480b) 2. See Figure 1. Install valve stem assembly (E) on wheel. Refer to the service manual. 3. Assemble wheel installation kit components, stock brake disc, and sprocket to wheel using the appropriate service parts table. Refer to the service manual. NOTES Install the primary bearing first using appropriate service manual and WHEEL BEARING REMOVER/INSTALLER. The machined grooves in the hub face indicate the primary bearing side. 4. Install rear wheel (1), stock axle and stock spacers to motorcycle. Refer to the service manual. MAINTENANCE AND CLEANING Chrome parts must be maintained regularly to keep their original shine and luster. 1. Clean heavily-soiled wheel surfaces using Harley-Davidson Wheel and Tire Cleaner, applied with Harley Wheel and Spoke Brush. 2. Thoroughly clean chrome with a good quality chrome cleaner, such as Harley Bright Chrome Cleaner. 3. After cleaning and polishing, seal the finish with a good quality sealer, such as Harley Glaze Polish and Sealant

Incoming search terms:

HARLEY DAVIDSON CHROME 1.25 INCH (31.75 MM) DIAMETER HANDLEBAR KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 10-03-2011

download
CHROME 1.25 INCH (31.75 MM) DIAMETER HANDLEBAR KIT GENERAL Kit Number 56032-08 Models For model fitment information, see the P&A retail catalog or the Parts and Accessories section of www.harley-davidson.com (English only). This kit does not fit models equipped with a hydraulic clutch, handlebar mounted gauges or the Road Tech® Radio. Additional Parts or Accessories Required Separate purchase of additional parts or accessories is required for proper installation of this Handlebar Kit on this model motorcycle. Please see the P&A retail catalog or the Parts and Accessories section of for a list of required parts or accessories for this model. For Australia, Brazil, England, Europe and Japan, two special screws (Part Number 2935A) will also be required. Tools and Supplies Required Loctite® 271 Threadlocker and Sealant – Red (H-D Part Number 99671-97) is required for the proper installation of this kit. Fresh, uncontaminated DOT 4 brake fluid from a sealed container will also be needed. Replace brake line gaskets. Re-using original gaskets can cause brake failure and loss of vehicle control, which could result in death or serious injury. (00318a) For models that retain the original brake line, the two brake- line gaskets found at each banjo fitting must be replaced . Refer to the appropriate parts catalog or see a Harley-Davidson dealer for the correct part numbers. Motorcycles equipped with a glued left-side hand grip will also require a new grip, sold separately. Refer to the parts catalog for replacement stock hand grips. Ask a Harley-Davidson dealer about the selection of Genuine Motor Accessory hand grips that are available. The rider’s safety depends upon the correct installation of this kit. Use the appropriate service manual procedures. If the procedure is not within your capabilities or you do not have the correct tools, have a Harley-Davidson dealer perform the installation. Improper installation of this kit could result in death or serious injury. (00333a) NOTE This instruction sheet references service manual information. A service manual for this year and model motorcycle is required for this installation and is available from a Harley-Davidson dealer. Kit Contents See Figure 6 and Table 1. INSTALLATION Preparation To prevent accidental vehicle start-up, which could cause death or serious injury, disconnect battery cables (negative (-) cable first) before proceeding. (00307a) Disconnect negative (-) battery cable first. If positive (+) cable should contact ground with negative (-) cable connected, the resulting sparks can cause a battery explosion, which could result in death or serious injury. (00049a) 1. Refer to the service manual and follow the instructions given to remove the seat and disconnect the battery cables, negative cable first. Retain all seat mounting hardware. Direct contact of D.O.T. 4 brake fluid with eyes can cause irritation. Avoid eye contact. In case of eye contact flush with large amounts of water and get medical attention. Swallowing large amounts of D.O.T. 4 brake fluid can cause digestive discomfort. If swallowed, obtain medical attention. Use in well ventilated area. KEEP OUT OF REACH OF CHILDREN. (00240a) D.O.T. 4 brake fluid will damage painted and body panel surfaces it comes in contact with. Always use caution and protect surfaces from spills whenever brake work is performed. Failure to comply can result in cosmetic damage. (00239b) NOTE Immediately wipe up any brake fluid spillage with a clean, dry, soft cloth. Follow up by thoroughly wiping affected area with a clean, damp, soft cloth (small spills) or washing with a large quantity of soapy water (large spills)

Incoming search terms:

Incoming search terms: