diagram of cobra 50cc kick starter

You search Auto repair manual PDF diagram of cobra 50cc kick starter, if there are search results will appear below. If search results do not exist, please search by others keyword.



  diagram of cobra 50cc kick starter Direct Download speed 5282 Kb/s

  diagram of cobra 50cc kick starter Full Version speed 6162 Kb/s



Cobra Motorcycle and ATV Specifications CX65 CX50 Sr. (The King) CX50 Jr. ECX 70 ECX 50 ECX80AC

0

Filed Under (Cobra) by admin on 14-11-2010

download
Dry Weight 122 lbs 91 lbs 81 lbs 210 lbs 206 lbs 210 lbs Engine Cobra 65cc 2-stroke Cobra 50cc 2-stroke Cobra 50cc 2-stroke Cobra 70cc 2-stroke Cobra 50cc 2-stroke Cobra 80cc 2-stroke Bore x Stroke 44.5mm x 41.7mm 39mm x 41.7mm 39mm x 41.7mm 44.5mm x 44.7mm 39mm x 41.7mm 47.6 mm x 44.7mm Induction Case Reed V-Force® Reed Valve- 24mm Mikuni carb Case Reed Carbon Pedal 19mm carb Case Reed Carbon Pedal 14mm carb Case Reed V-Force® Reed Valve- 24mm Mikuni carb Case Reed Carbon Pedal 21mm carb Case Reed V-Force® Reed Valve- 24mm Mikuni carb Cooling Water cooled Cylinder and Case Water cooled Water cooled Water cooled Cylinder and Case Water cooled Water cooled Cylinder and Case Clutch Hydraulic ally actuated Cobra 3Gx 3-Shoe Cobra 3Gx 3-Shoe Hydraulic ally actuated – (auto option) Cobra 3Gx 3-Shoe Rekluse Z-ball auto-clutch Transmission Six-speed sequential Single-speed auto Single-speed auto Six-speed sequential Single-speed auto Six-speed sequential Exhaust Tuned pipe and silencer Tuned pipe and silencer Tuned pipe and silencer Tuned pipe and silencer Tuned pipe and silencer Tuned pipe and silencer Lubrication Mixture lubrication Mixture lubrication Mixture lubrication Mixture lubrication Mixture lubrication Mixture lubrication Fuel Capacity 1.06 Gallons .85 Gallons .70 Gallons 1.9 Gallons 1.9 Gallons 1.9 Gallons Frame Twin Spar Oval HSLA Double Cradle 4130 ChrMo Steel Double Cradle 4130 ChrMo Steel Arens design twin spar Arens design twin spar Arens design twin spar Wheelbase 1140mm 990 mm 908 mm 1067mm (track 915mm) 1067mm (track 915mm) 1067mm (track 915mm) Seat Height 762mm 680 mm 607 mm 762 mm 737 mm 762mm Ground Clearance 250mm 240 mm 216 mm 205 mm 205 mm 205mm Front Brakes Hydraulic Disk (205mm) Hydraulic Disk (160mm) Hydraulic Disk (160mm) Hydraulic Disk (160mm) Hydraulic Disk (160mm) Hydraulic Disk (160mm) Rear Brakes Hydraulic Disk (165mm) Hydraulic Disk (140mm) Adjustable Drum Hydraulic Disk (180mm) Hydraulic Disk (180mm) Hydraulic Disk (180mm) Front Suspension Marzocchi 35mm USD Adjustable 220mm travel Cobra 30mm USD 210mm travel Marzocchi 32mm 168mm travel Dual A-Arm with SVO™ patented steering design. 248mm travel Dual A-Arm with SVO™ patented steering design. 248mm travel Dual A-Arm with SVO™ patented steering design. 248mm travel Rear Suspension Öhlins Fully Adjustable 270mm travel Fox Piggyback Fully Adjustable 248mm travel Öhlins Piggyback 170mm travel Fox Piggyback 220mm travel Solid axle Fox Piggyback 220mm travel Lightweight tube axle Fox Piggyback 220mm travel Solid axle Wheel Front / Rear 14″ spoke / 12″ spoke (Al rims, Billet hubs, 9ga. spokes) Cobra 12″ Billet Cobra 10″ Billet Cobra 10″ Billet Cobra 10″ Billet ITP 10×5 (4 x1) Al Douglas 8×6.5 (4×2.5) Al ITP 10×5 (4 x1) Al Douglas 8×6.5 (4×2.5) Al ITP 10×5 (4 x1) Al Douglas 8×6.5 (4×2.5) Al Tires Front / Rear 60-100×14 Dunlop 80-100×12 Dunlop 2.5×12 / 2.75×10 2.5×10 / 2.75×10 ITP Holeshot 19/6 ITP 16/6.50-9 ITP Holeshot 19/6 ITP 16/6.50-9 ITP Holeshot 19/6 ITP 16/6.50-9

Express ATVS -250cc Cobra Setup/ Installation Manual

0

Filed Under (Cobra) by admin on 10-11-2010

download
Unpacking your Cobra Installing the front shock Installing the front tires Installing rear shocks Installing the rear tires Installing seats and harnesses Steering wheel installation Roll cage installation Safety checks / Adjustments General maintenance Unpacking your Cobra First off you should pull the carton off from your new 250 Cobra cart. Inspect the cart thoroughly to make sure that your new Cobra has not been heavily damaged. You will notice that the product has a metal frame holding it in place; you may want to start removing bolts from the shipping steel frame. The next step is to remove the metal frame and lift it off of the cart. Remove any of the metal frame that may afford resistance when working on the cart it self. Be careful the metal frame may be heavy and sharp. Now would also be a good time to inspect your Cobra a little more thoroughly. In the box with the Cobra you should have found a box containing miscellaneous hardware. Installing the front shock Using some of the bolts you found in your box, install the front shocks sliding the bolt through the brackets and tighten the nut down. Next, you will need to place the ball head into the turning arm, then tighten the castle nut and insert a cotter pin so that the castle nut doesn’t loosen and become a hazard. Installing the front tires
Find the front tires and place them on the front hub and place the lug nuts on the studs. Tighten them down. Make sure that all of the lug nuts are on tightly. Installing the rear shocks Moving to the rear of the Cobra you will notice the rear shocks are not inserted. Place the rear shocks into the bracket on the rear of the Cobra. Slide one of the provided bolts through the bracket and shock eyelet and tighten the bolt down. Installing the rear tires Now that the shocks have been placed properly you can install the rear tires, place the tires onto the axle then place the rear rim lined up onto the axle and tighten the provided castle nut down. Place the cotter pin through the axle and bend off to the side. This is so the castle nut does not loosen under load. Installing the seats and harnesses
(The arrow points to an example of where the seat bolts mount) Find the two racing seats shipped in the box with the Cobra. You will need to affix them to the frame by sliding the bolts up through the bottom of the frame. This can be tricky so have patience. Once both seats have been placed in the cart and tightened find the harnesses. Once found the harnesses mount to a bracket behind the seats. Place a bolt through the bracket and bolt the harnesses down tightly. Installing the steering wheel Find the steering wheel and place it onto the steering wheel mount. Grab the six small screws and place them through the steering wheel and mount, tighten them down but also make sure the top of the wheel is facing up. Installing the roll cage

2006 King Cobra Service Procedure

0

Filed Under (Cobra) by admin on 10-11-2010

download
Cobra CX50 SR is a close-tolerance high performance machine and break- in time is very important for maximum life and performance. The CX50 SR can be ridden hard after the first ½ hour break-in time but it is recommended that no adjustments are made to the carburetion or suspension until the full 8 hours of bike break-in has elapsed. Also, after the engine, transmission, and drive train have been broken-in for the full 8 hours, the bike will be faster! Use a fuel / oil mixture of 32:1 for the full 8 hour break-in period. Be sure to use high-octane pump gas, with Cobra’s specially formulated Cobra Venom 2-cycle Race Oil . (Part # MCMUOL02) CAUTION: Failure to use proper fuel, oil, or fuel/oil mixture may result in premature engine wear or damage to the machine. Adhering to the following break-in schedule will result in long lasting high performance machine. • Start bike on stand • First 5 minute period, operate the bike on the stand with a combination of idle and high RPM operation. (avoid prolonged high RPM but spin the rear wheel good at least once or twice per minute) • Allow bike to cool • Ride for 15 minutes maximum (avoid prolonged high RPM operation and avoid abusing the clutch with throttle blipping. • Cool and inspect bike for loose fasteners. • Next ½ hour of operation, avoid prolonged operation at Wide Open Throttle. • After 1 hour of operation o Check for loose bolts and nuts on the bike and retighten as necessary (proper toque values are listed under Specifications). o Clean the carburetor bowl. o Change the transmission / clutch lubricant. • After 8 hours of operation o Change the fork oil. o Have a Certified Cobra Mechanic change the shock oil. • Your bike is now ready for the highest level of competition! NOTE: During break-in the bike will likely lose some engine coolant through the radiator overflow hose. Losing up to 4 oz (120 ml, ½ cup) is normal. Proper coolant level will cover the top of the radiator cores. Removing the radiator cap and looking inside is the only way to check the coolant level. 8
Never open the radiator cap of a machine that has a hot or warm engine or one that has recently been ridden. Burning and scalding could occur. CAUTION: It is important that the radiator cap is installed correctly and completely otherwise engine damage could occur. Starting Procedure Before starting the machine inspect the following: • Check for proper tire pressure in both tires. • Observe the chain tension and adjust if necessary. • Observe the coolant level and fill if necessary. • Verify that the chain rollers and sliders do not have improper wear. • Verify that the handlebars are tight. • Check the throttle for smooth operation and that it ‘clacks’ shut properly. • Check for loose bolts and nuts, and re-torque as necessary. • Verify that the air filter is clean and properly saturated with oil. • Insure that the fuel tank contains an adequate volume of fuel / oil mixture to complete the distance required. (High octane pump gas with Cobra’s specially formulated Cobra Venom 2-cycle Race Oil ) • Turn the fuel on by rotating the fuel petcock knob to the vertically downward position (reserve position is horizontally forward) CAUTION: For best results from your Cobra Motorcycle use only the recommended fuels. Testing has shown that most ‘race’ fuels actually degrade performance. Always wear a helmet and other protective riding gear. When your pre-ride inspection is complete the bike may be started. For a cold engine follow this procedure. 1. Place the motorcycle on a stand of sufficient strength that positions the motorcycle in a level upright position with the rear wheel off the ground. 2. Pull up the choke knob and turn it to lock it. 3. Kick start the engine. 4. Rev the engine in short spurts, turning the throttle no more than 1/4 open until the engine will run without the choke.

KTM Starter Gear Maintenance Instructions

0

Filed Under (KTM) by admin on 26-11-2010

download
Checking the electric starter motor for wear -Check Bendix 1 for smooth operation and signs of wear. -Check the sprocket of the electric starter for wear and radial clearance. -Replace O-ring 2 of the electric starter. -Replace gasket 3 . -Check starter idler gear 4 for smooth operation and wear, check that the bearing bushings are seated firmly. Electric starter motor – checking for and adjusting play -Mount the electric starter and the starter idler gear. -Mount the tighten cover 5 . -Move starter idler gear 4 back and forth in the direction of rotation, the maximum play may not exceed half the width of a tooth. -If play is larger, cover 5 must be removed and as many shims 6 with a thickness of 0.10 mm as necessary must be added to eliminate all play. Then remove one shim again. -Check the play again; the maximum play may not exceed more than half of the width of a tooth. 1 2 3 4 5 4 5 6

Vespa GTS Super Specification

0

Filed Under (Vespa) by admin on 11-11-2010

download
Gts super 300 ie Gts super 125 ie s 125cc s 50cc Gts 250 ie Gts 125cc LX 125cc LX 50cc 2 stroke Engine Single-cylinder, catalised, QUASAR 4 stroke, 4 valve electronic injection Single-cylinder LEADER 4 stroke with electronic injection Single-cylinder LEADER 4 stroke Single-cylinder HI-PER 2 stroke Single-cylinder, catalised, QUASAR 4 stroke, 4 valve electronic injection Single-cylinder, catalised, LEADER 4 stroke, 4 valve Single-cylinder LEADER 4 stroke Single-cylinder HI-PER 2 stroke Capacity 278cc 124cc 124cc 50cc 249cc 124cc 124cc 49cc Power 16.4 kW / 7500 rpm 10.5 Kw / 9500 rpm 7.65 Kw / 8250 rpm 3.2 Kw / 7500 rpm 15.7 Kw / 8500 rpm 7.65 Kw / 8250 rpm 7.65 Kw / 8250 rpm 2.5 Kw / 8500 rpm Max Torque 22Nm / 6500 rpm 12 Nm / 8000rpm 9.6 Nm / 7250 rpm 4.4 Nm / 6500 rpm 20.1 Nm / 6500 rpm 9.6 Nm / 7250 rpm 9.6 Nm / 7250 rpm 3.3 Nm / 6500 rpm Cooling Liquid Liquid Forced Air Forced Air Liquid Liquid Forced Air Forced Air Starter Electric Electric Electric and kick starter Electric and kick starter Electric Electric Electric and kick starter Electric and kick starter Transmission Automatic twist and go Automatic twist and go Automatic twist and go Automatic twist and go Automatic twist and go Automatic twist and go Automatic twist and go Automatic twist and go Front Suspension Single arm, dual chamber hydraulic shock absorber with coaxial spring Single arm link with coil spring and double hydraulic shock absorber Single arm link with coil spring and double hydraulic shock absorber Single arm link with coil spring and double hydraulic shock absorber Single sided trailing link with hydraulic shock absorber Single sided trailing link with hydraulic shock absorber Single sided trailing link with hydraulic shock absorber Single sided trailing link with hydraulic shock absorber Rear Suspension Two dual effect shock absorbers with adjustable preload Coil spring and double hydraulic shock absorber Coil spring and double hydraulic shock absorber Coil spring and double hydraulic shock absorber Twin hydraulic shock absorbers with preload adjuster Twin hydraulic shock absorbers with preload adjuster Hydraulic shock absorbers with preload adjuster Hydraulic shock absorber Front Brake ø 220mm disc brake 220mm disc brake ø 200mm disc brake ø 200mm disc brake ø 220mm disc brake ø 220mm disc brake ø 200mm disc brake ø 200mm disc brake Rear Brake ø 220mm disc brake 220mm disc brake ø 110mm drum brake ø 110mm drum brake ø 220mm disc brake ø 220mm disc brake ø 110mm drum brake ø 110mm drum brake Front Tyre Tubeless 120/70-12″ Tubeless 120/70 – 12″ Tubeless 110/70 – 11″ Tubeless 110/70 – 11″ Tubeless 120/70-12″ Tubeless 120/70-12″ Tubeless 110/70 – 11″ Tubeless 110/70-11″ Rear Tyre Tubeless 130/70-12″ Tubeless 130/70 – 12″ Tubeless 120/70 – 10″ Tubeless 120/70 – 10″ Tubeless 130/70-12″ Tubeless 130/70-12″ Tubeless 120/70 – 10″ Tubeless 120/70-10″ Running weight 158kg 158kg 114kg 96kg 151kg 145kg 114kg 96kg Length/Width/Height 2230mm / 755mm / 1170mm 1930mm / 755mm / 1930mm 1770mm / 740mm / 1140mm 1755mm / 740mm / 1140mm 1930mm / 755mm / 1170 mm 1940mm / 755mm / 1180 mm 1770mm / 740mm / 1140mm 1755mm / 740mm / 1140mm Fuel Tank Capacity 9 litres 9 litres 8.5 litres 8.5 litres 9.2 litres 10 litres 8.5 litres 8.5 litres Emmissions Euro 3 Euro 3 Euro 3 Euro 2 Euro 3 Euro 3 Euro 3 Euro 2 Colours Rosso Dragon Nero Lucido Montebianco Rosso Dragon Nero Lucido Montebianco Taormina Nero Lucido Montebianco Taormina Nero Lucido Montebianco Marrone Terra Di Toscana Bronzo Perseo Nero Vulcano Blu Midnight

Related Item : 1 cylinder rpm limiter (1)max cruising rpm shovelhead (1)mono shock sportster (1)most powerful single cylinder engine (1)nitrogen gas shock fill tool (1)single piston bobbers (1)singlecylinderbobbermotorcycles (1)small cc 4 stroke engine double cylinder (1)Testing Ultima single fire coil (1)tmx 155 lowered front shock (1)