diagram virago petcock xv500

You search Auto repair manual PDF diagram virago petcock xv500, if there are search results will appear below. If search results do not exist, please search by others keyword.



  diagram virago petcock xv500 Direct Download speed 5282 Kb/s

  diagram virago petcock xv500 Full Version speed 6162 Kb/s



1981-1983 Yamaha Virago 750 & 920 Installation Instructions

0

Filed Under (Yamaha) by admin on 11-02-2012

download
Start by loosening the rear cylinder down tube bolt located on the top of the old mufflers center collector in front of the rear tire. 2. Remove both of the front cylinder exhaust pipe head nuts and set them to the side for reuse with the MAC exhaust system. 3. Remove the right side passenger’s foot peg. Set the foot peg aside as you will need to reinstall it. 4. Remove the left side passenger’s foot peg. Set this foot peg aside as it will also need to be reinstalled. Note: When you remove this bolt the entire exhaust system will be loose and may fall. You will need to support the old exhaust at this point to keep from injuring yourself. Gently move the old exhaust system side to side to remove it from the rear cylinder down tube. Once the exhaust system is loose from the down tube remove the system from under the Virago. 5. Remove the bolt holding the rear brake pedal in place and remove the brake pedal from the motorcycle. Note: Set both the bolt and the pedal aside for reinstallation. 6. Next loosen the nut on the drivers right foot peg, 1 full turn to start with. Then remove the rear nut on the same foot peg. (Note: The bolt that this nut is on goes completely through the motorcycle. This is the center stand mounting bolt.) Now remove the front nut and set both aside for reuse with the MAC system. 7. Install the center stand stop bracket under the left passenger foot peg. Install this bracket with the 90° bend facing down and towards the rear tire. (Note: Center stand sop bracket in provided in the hardware kit and is approx. 5″ long with a 90° bend in it.) Adjust the bracket by one of the large bolts through the foot peg then through the bracket and then install it into the stock location. Put on one of the washers and a nut and snug up the nut. Lower the center stand until the center stand come in to contact with the bottom of the bracket. Tighten the nut until it will hold the bracket securely. 8. Install the rear down tube clamp onto the rear muffler and install the medium sized nut/bolt/washer onto the clamp just finger tight. 9. Install the (2) small bolts into the channel bracket on the rear muffler. Install the rear mounting bracket onto the two bolts and then install the washers and nuts onto each. Tighten the (2) nuts only slight amount so that you can slide the bracket front to rear to insure that when you install the bracket you position it properly. 10. Slide the rear pipe onto the rear down tube about ¼”to ¾” past the pre-cut slots on the rear muffler pipe. Slightly snug the clamp making sure that the position of the bolt and nut will not interfere with any moving parts. The final position of this bolt can hit the tire if it is not positioned properly. 11. Install the other large bolt into the right passenger and then through the top hole in the rear muffler mounting bracket. Insert the bolt into the stock location and install the washer and the nut. 12. Align the rear muffler and you can then tighten the nuts on the rear muffler mounting bracket, the cylinder down tube and the right side passenger foot peg.
13. Install the front muffler on the rear most mounting bolt of the drivers foot peg and put the stock nut back onto the bolt. Hand tighten the bolt only at this time. Note: Install the nut at this time is only to support the muffler and to insure that the pipe does not fall on the ground while you complete the next step. 14. Lift the front head pipe into position and start the stock nuts onto the studs. It is strongly recommended that you install new exhaust gasket at this time. Note: The new exhaust gaskets are not included in the kit but are available at your local Yamaha Dealer. After gaskets are installed hand tighten the front head pipe. 15. Remove the nut from the drivers foot peg bolt and reinstall the drivers foot peg. Note: Hand tighten only at this time. 16. Finish tightening the nuts on the front head pipes. (Install these nuts according to Yamaha’s Factory specifications.) Once the nuts are tightened on the head pipe you can then tighten the drivers foot peg nuts. 17. Reinstall the rear brake pedal and tighten the bolt that holds it on to factory specifications. 18. Check all of the bolts that you have installed of removed to insure that they are tight. 19. Start the motorcycle and check for any leaks. 20. You are finished with your new MAC Exhaust System.

Incoming search terms:

1992 Toyota Cressida Vehicle Wiring Chart and Diagram

0

Filed Under (Toyota Manuals) by admin on 18-06-2011

Download
Listed below is the vehicle specific wiring diagram for your car alarm, remote
starter or keyless entry installation into your 1992 Toyota Cressida . This
information outlines the wires location, color and polarity to help you identify the
proper connection spots in the vehicle. Please be sure to test all of your wires
with a digital multimeter before making any connections. More information on
using a multimeter and testing wires please see our Technical Support Area.

Incoming search terms:

YAMAHA CRANKSHAFT LOWER END REMOVAL AND INSTALLATION TOOLS

0

Filed Under (Yamaha) by admin on 08-01-2012

download
90 LOWER END REMOVAL & INSTALLATION TOOLS SHOP EQUIPMENT & TOOLS 35-8399 35-8513 35-8516 35-8508 35-8504 35-8507 YAMAHA CRANKSHAFT PROTECTORS Sold each. 35-8504 YM-4063-A, XV750/920 Virago, XT550, YFP350, YFM660R Raptor 35-8399 YM-1382, XT250/XT350, RZ350, YFP350, YFZ350 35-8507 YM-33282, XV500 Virago, XZ550 Vision, XVZ12/13 Venture & Venture Royale, VMX12 V-Max 35-8508 YM-38145, XV750/XV1000 Virago YAMAHA CRANKSHAFT INSTALLATION SET Sold as a set. Consists of the following: Qt1-Installing Pot, Qt1-Pot Spacer, Qt1-Bolt. 35-8509 YU-90050 Crankshaft Installation Set OPTIONAL POT SPACERS 35-8513 YU-90070-A, XV750/920 Virago, XT550, TT600 35-8515 YU-91044, YFM350, SRX600, XT550/600 35-8516 YU-1202, SR500, TT/XT500 CRANKCASE PRESSURE TESTER An accurate method for checking possible air leaks on two-stroke engines. Complete with air pressure gauge, pump-up bulb and all fittings and adapters for single and multi-cylinder two-cycle engines. 35-5962 Crankcase Pressure Tester CRANKSHAFT INSTALLING JIG TOOL Supports and centers crankshaft webs while assembling two-stroke engine cases and rebuilding crankshafts. Prevents rod misalignment. Adjustable tang ends. 35-9804 Crankshaft Installing Jig Tool CRANKCASE SEPARATOR TOOL This tool will work on most two and four stroke engines that have a vertically split crankcase. Moveable fingers allow a multitude of bolt patterns to be used so it will work on a variety of models. Includes 6mm and 8mm mounting bolts, center pulling bolt and a three leg frame that is appropriate for many applications. 35-9642 Crankcase Separator Tool 35-9637 Replacement 6mm and 8mm mounting bolts. Each

Incoming search terms:

Yamaha Virago 750/ 1100 InstaTrike REMOVAL AND INSTALLATION MANUALS

0

Filed Under (Yamaha) by admin on 26-12-2011

download
Remove any aftermarket accessories (saddle bags, back rests, etc) before hitch installation. After installation remount accessories. NOTE: Some aftermarket accessories may not be compatible with InstaTrike hitch. 1) Place motorcycle on a smooth level surface on center stand. 2) Attach Bracket A (left) to outside of rear passenger foot peg mount. Place spacers between Bracket A and foot peg mount. Use new bolts provided. 3) Attach Bracket B (right) to outside of rear passenger foot peg. Place spacers between Bracket B and foot peg mount. Use new bolts provided. Bracket will extend over top of mufflers. 4) Attach Brackets C (left) and D (right) to rear frame bolts on
motorcycle. Located near rear turn signals Use new bolts provided. (10M x 25mm long) It may be necessary to loosen or remove backrest covers or hardware in order to easily access rear frame bolts. After Bracket C and D installation, reattach and/or tighten backrest mounts. 5) Attach Bracket E(left) / F(right) to bottom of Brackets A & B and to the TOP of the forward hitch arms. Ensure hitch is square on motorcycle and snug bolts for Brackets A, B, and E,F at this time. 6) Raise rear of hitch so bottom of Brackets C & D are flush with top of rear hitch plate. Ensuring that hitch is square with motorcycle, carefully mark hole locations for bottom of Brackets C&D on rear hitch plate. Drill rear hitch plate holes with 3/8 inch drill. This step ensures proper alignment and spacing of hitch on the motorcycle. 7) Tighten all bolts ensuring that hitch is square on motorcycle. Periodically check bolts for tightness. Bracket Identification
INSTALLATION OF THE TOW-PAC HITCH CART.
1. Place your motorcycle on a smooth flat surface, like a garage floor, and rest it on its center stand. 2. Assemble the axles, tires and wheels, and fenders onto the tow- pac hitch cart. 3. Carefully align the tow-pac hitch cart’s hitch mount with the receiver hitch on the motorcycle. Now push the hitch mount into the receiver hitch. (this might be a little difficult until you get use to doing it. Removing the paint from the hitch mount and applying a little grease will help.) 4. Place the hitch pin through the receiver hitch and hitch mount ( alignment plate ). Install and tighten the tension bo

Incoming search terms:

YAMAHA VIRAGO 700/ 1100 2 into 2 EXHAUST SYSTEM REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 20-12-2010

download
REMOVING THE STOCK EXHAUST SYSTEM 1. Loosen the slip joint clamp on the front and rear head pipe, which are located at the muffler box. 2. Remove the two nuts that hold the front head pipe to the engine. Slip the head pipe out of the muffler box and set it aside. Note: Do not remove the rear head pipe, it has been incorporated in the design of the new exhaust system. 3. Remove the muffler box mounting bolt located in front of the passenger foot rest on the left side. 4. Remove two bolts from the right passenger foot rest assembly and set the foot rest aside. 5. Slide the muffler box off of the rear head pipe and set it aside. 6. Replace the muffler box mounting bolt (from step #3) using the washer and nut (supplied) on the back side. INSTALLING YOUR NEW VANCE & HINES EXHAUST SYSTEM 1. Attach the mounting bar to the motorcycle frame behind the right passenger foot rest. Align the two holes in the largest bracket on the mounting bar with the two holes on the frame, be sure the bend in the mounting bar is pointing to the center of the motorcycle. 2. Install the round steel spacer (supplied) to the rear most hole in the bracket. 3. Attach the foot rest using the two 8mm x 1.25 x 25mm bolts (supplied). 4. Slide the new exhaust flange (supplied) onto the front head pipe. 5. Install the two heat shields to the front head pipe using the four hose clamps (supplied). Unscrew all of the hose clamps (supplied) until they are completely loose. Feed the tail end of the hose clamp into the clips on the inside of both heat shields. Place the heat shields onto the front head pipe. Note: Be sure the bend in the heat shield matches the bend in the head pipe exactly. Wrap the hose clamp around the head pipe and give the screw three to four turns, leaving heat shield loose on the head pipe. Repeat this step with the heat shield on the rear head pipe. Note: The screw end of the hose clamp should be accessible, but not visible when pipe is mounted on the bike. 6. Check the stock exhaust gaskets to be sure they are in good shape. If you have any doubts as to their condition, replace them. 7. Slide a chrome pinch clamp (supplied) onto the expanded end of the new rear head pipe. Install a 3/8″ x 1″ bolt with a flat washer on either side of the clamp followed by a lock nut (hardware supplied). Repeat this step on the inlet end of each muffler using the two muffler clamps with 5/16″ x 1 1/4″ bolts (hardware supplied) but leave the clamp loose at this time. 8. Slip the new rear head pipe with the heat shield attached, over the stock rear pipe and gasket, but leave the clamp loose at this time. 9. Install the front head pipe, with the heat shield attached and stock gasket in place, to the front cylinder using the stock nuts, leave them loose at this time

Incoming search terms:

HONDA GL1100 AM/FM RADIO INSTALLATION MANUAL/ WIRING DIAGRAM

0

Filed Under (Honda) by admin on 22-04-2011

download
INSTALLATION ■ Outline Procedures This section gives general information needed for mounting the individual radio components on and in the fairing. A) Fairing 1) Install radio on fairing before mounting fairing on motorcycle. (Remove fairing from your motorcycle when already mounted). 2) Remove fairing parts. 3) Drill unit mount holes. 4) Install six wire clips. 5) Install windshield on fairing before install- ing speakers. 6) Install radio indicator I on indicator panel II , then install indicator panel on fairing. 7) Install speakers III. 8) Install nutplate IV. 9) Install Power Amplifier in fairing. 10) Install radio funer VI. 11) Install the radio controller VII. 12) Install controller base panel VIII 13) Install radio switch sub-wire. 14) Connect adapter harness and wires inside fairing by working through left turn signal lens hole. B) Motorcycle frame and handlebar 1) Remove travel trunk and seat. Unscrew four shelter bolts (M6, one on each side at front and rear) to route antenna feeder. 2) Install antenna mount and antenna IX. 3) Route antenna feeder along the frame tube. 4) Install radio switch X on left handlebar lever bracket and route the wires. 3 of 11 Page 4 C) Fairing instllation 1) Install fairing on motorcycle. 2) Connect motorcycle wire harness 9-P coupler to fairing wire 9-P coupler. 3) Connect radio switch wire to switch sub- wire.4) Connect antenna feeder. 5) Confirm that radio operates properly. Reinstall parts removed in step 2 or (A) and in step 1 of (B). REWORKING ■ Remove Fairing and Fairing Parts (Fig.10) 1) Install radio on fairing before mounting fairing on motorcycle. (Remove fairing from your motorcycle when already mounted). 2) Remove right and left fairing pockets, right and left turn signal lenses, right and left nutplates, left hole cover and indi- cator base panel from fairing. (Fig.10) Fig. 10 LEI-1 NU I PLATE 4 of 11■ Reworking on Fairing — Speaker mounting holes- 1) Remove 18 mm grommet. 2) Lightly roll template so that it will follow contour of fairing snugly. 3) Position template on fairing with its upper and outer edges aligned with those offairing as indicated by arrows. 4) Attach template to fairing using adhesive tape where shown. 5) Punch mark centers of four holes with a
drift and hammer. 6) Drill 6 mm holes through marked centers. To obtain a more balanced response with richer, deeper bases, drill two 50 mm holes in the fairing so as to link the speaker box with the inside of the fairing. Fig. 11-1
—Power amplifier mounting holes- 7) Drill two 5.5 mm holes through concaves in fairing. Fig. 11-2 RIGHT HAND SHOWN, LEFT SIMILAR ADHESIVE TAPE

Incoming search terms:

AIR / HYDRAULIC MOTORCYCLE LIFT REMOVABLE INSPECTION PLATE

0

Filed Under (Tips and Review) by admin on 19-11-2010

download
For best service, you should incorporate an oiler, regulator, and inline filter, as shown in the diagram on the next page. Hoses, couplers, oilers, regulators, and filters are all available at Harbor Freight Tools. NOTE: If an automatic oiler is not used, put 3-5 drops of pneumatic Tool Oil (not included) in the Motorcycle Lift’s Quick Coupler (38A) before each use. (See Figure B, next page.) To Check The Level Of Hydraulic Oil: 1. The Motorcycle Lift already contains some hydraulic oil in its Hydraulic Pump Reservoir (32P). Even so, it is recommended that you check the oil level in the Reservoir and, if necessary, top off the Reservoir with the proper amount of 15/40 hydraulic oil (not included). (See Assy. Diagram, page 15.) 2. Make sure to screw the two Adjusting Screws clockwise enough to lift the two Caster Wheels (14) off the floor so as to provide stability for the Motorcycle Lift. (See Figure A.) 3. To check the level of hydraulic oil, remove the Sliding Plate (36) from the Platform (35) to expose the Hydraulic Pump Reservoir (32P). (See Assy. Diagrams, pages 13 and 15.) 4. Remove the rubber Filler Plug (33P) located on the top of the Reservoir (32P). If necessary, top off the Reservoir with hydraulic oil. (See Assy. Diagram, page 15.) 5. Connect the air compressor’s hose to the to the Air Motor assembly. Then turn on the air compressor and set its regulator at 120 PSI. (See Assy. Diagram, page 14.) 5. Insert the Lift Foot Pedal (11) onto the Pump Piston Spindle (9), and slowly pump the Lift Foot Pedal until a slight amount of hydraulic oil begins to leak out of the Reservoir (32P). Discontinue pumping the Lift Foot Pedal. Then, replace the Filler Plug (33P) on the top of the Reservoir. (See Assy. Diagram, page 15.) REGULATOR OILER FILTER TO QUICK COUPLER (38A) OF MOTORCYCLE LIFT FIGURE B 6. Insert the Release Foot Pedal (10) onto the Release Valve Spindle (5). Pump the Lift Foot Pedal (11) until the Platform (35) of the Motorcycle Lift reaches its maximum height. Then press down slightly on the Release Foot Pedal until the Platform is fully collapsed to the floor. Repeat this procedure several times to ensure the Motorcycle Lift is operating properly. (See Figure E, page 10.)

Incoming search terms:

YAMAHA FZR 400 ELECTRICAL CIRCUIT DIAGRAM

0

Filed Under (Yamaha) by admin on 29-11-2010

download
CHECKING OF SWITCHES Check the switches for the continuity between the terminals to determine correct connection. Read the following for switch inspection. SWITCH CONNECTION AS SHOWN IN MANUAL The manual contains a connection chart as shown left showing the terminal connections of the switches (e.g., main switch, handlebar switch, brake switch, lighting switch, etc.) The extreme left column indicates the switch positions and the top line indicates the colors of leads connected with the terminals in the switch component. “C’&-0″ indicates the terminals between which there is a continuity of electricity; i.e., a cl.osed circuit at the respective switch positions. In this chart: “R and Br” and “L/W and L/R” are continuous with the “ON” switch position. “B and B/W” is continuous with the “OFF” switch position. “B and B/W” is continuous with the “LOCK” switch position. “B and B/W” and “R and L/R” are continuous with the “P” switch position. CHECKING SWITCH FOR TERMINAL CONNECTION Before checking the switch, refer to the connection chart as shown above and check for the correct terminal connection (closed circuit) by the color combination. To explain how to check the switch, the main switch is taken for example in the following

Incoming search terms:

Yamaha 1998 XVS1100 REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 03-01-2012

download
EXPLODED DIAGRAMS To help identify parts and clarify procedure steps, there are exploded diagrams at the start of each removal and disassembly section. 1. An easy-to-see exploded diagram 4 is provided for removal and disassembly jobs. 2. Numbers 5 are given in the order of the jobs in the exploded diagram. A number that is enclosed by a circle indicates a disassembly step. 3. An explanation of jobs and notes is presented in an easy-to-read way by the use of symbol marks 6 . The meanings of the symbol marks are given on the next page. 4. A job instruction chart 7 accompanies the exploded diagram, providing the order of jobs, names of parts, notes in jobs, etc. 5. For jobs requiring more information, the step-by-step format supplements 8 are given in addition to the exploded diagram and the job instruction chart.
24 21 18 15 16 17 10 12 13 11 14 1 3 5 7 9 2 4 8 6 19 20 22 23 25 EB003000 ILLUSTRATED SYMBOLS Illustrated symbols 1 to 9 are printed on the top right of each page and indicate the subject of each chapter. 1 General information 2 Specifications 3 Periodic inspections and adjustments 4 Engine 5 Cooling system 6 Carburetion 7 Chassis 8 Electrical 9 Troubleshooting Illustrated symbols 10 to 17 are used to identify the specifications appearing in the text. 10 Can be serviced with engine mounted 11 Filling fluid 12 Lubricant 13 Special tool 14 Torque 15 Wear limit, clearance 16 Engine speed 17 Ω, V, A Illustrated symbols 18 to 23 in the exploded diagrams indicate the types of lubricants and lubrication points. 18 Apply engine oil 19 Apply gear oil 20 Apply molybdenum disulfide oil 21 Apply wheel bearing grease 22 Apply lightweight lithium-soap base grease 23 Apply molybdenum disulfide grease Illustrated symbols 24 to 25 in the exploded diagrams indicate where to apply locking agent 24 and when to install new parts 25. 24 Apply locking agent (LOCTITE) 25 Replace

Incoming search terms:

HONDA TRX 650 RINCON 4X4, TRX 680 Rincon BLADE HARDWARE MOUNTING REMOVAL AND INSTALLATION MANUALS

0

Filed Under (Honda) by admin on 26-12-2011

download
Push tube/ Swivel/ Blade Assembly Instructions 1. Install the blade swivel (15) onto the front of the push tube (14) using the 1/2″ shoulder bolt (4), two 1/2″ washers (5), and a 3/8″ Nylock nut (3) from the bolt bag per diagram #1. Make sure the flat washers seat properly on the bottom of the shoulder bolt while tightening the nut. Make sure the blade turns freely. 2. Remove the 2 bottom flanged nuts (I) from the u-bolt (D) and 2 from the 3/8″ bolts (H) on the blade position pin assembly (23). Run the 2 top flanged nuts up the threads of the u-bolt. Place the blade position pin assembly on the push tube as shown in the Diagram, sliding the blade position pin through one of the oval holes on the swivel and through the rear blade position pin support bracket on the push tube. 3. Re-install the u-bolt and 3/8″ bolts and flanged nuts per the Diagram. On the u-bolt, thread the bottom nuts up until they are flush with the bottom of the threads then run the top ones down, making sure the bottom nuts remain flush with the bottom of the u-bolt. Tighten all 4 bottom nuts. 4. Remove the two shoulder bolts (18) from the pivot point brackets on the back of the blade (1). Attach the blade to the swivel by sliding the ears on each side of the swivel into the pivot point brackets on the blade, reinstall the two shoulder bolts and Nylock nut (3) and tighten. 5. Hook the blade springs (6) to the two round holes on either side of the 5 oval holes on the swivel. Hook the eyebolts through the other end of the springs, push the eyebolts through the spring attaching points on the back of the blade and install 3/8″ Nylock nuts (3). Spring tension may be increased by tightening both Nylock nuts on the eyebolts evenly. 6. Install the blade stops (16) with the two 3/8″ x 1″ bolts (17) and 3/8″ nuts (3) per the Diagram. Rotating the stops allows you to change the blade pitch to suit changing conditions or materials

Incoming search terms:

Incoming search terms: