final gear ratio formula kawasaki zx1400

You search Auto repair manual PDF final gear ratio formula kawasaki zx1400, if there are search results will appear below. If search results do not exist, please search by others keyword.



  final gear ratio formula kawasaki zx1400 Direct Download speed 5282 Kb/s

  final gear ratio formula kawasaki zx1400 Full Version speed 6162 Kb/s



Moto Guzzi Sport 1100i Owners Manual

0

Filed Under (Moto Guzzi) by admin on 29-11-2010

download
General features Identification data Instruments and controls Riding your motorcycle Break-in Maintenance and adjustments Wheel removal Service schedule Cleaning – Storing Cleaning the windscreen Lubrication Valve gear WEBER injectionignition system (I.A.W.) Electrical equipment Wiring diagram Illustrations Lubrication Pressure fed by gear pump. Oil filters: wire mesh inside sump and replaceable cartridge filter outside sump. Normal lubrication pressure 3.8Ö 4.2 [5] kg/cm2, pressure valve, thermostat and cooler. Low oil pressure sensor (electrical) on crankcase. Generator/Alternator On front of crankshaft (1 4V – 25A). Ignition “WEBER MARELLI” electronic digital induced discharge, with high efficiency coil. Spark plugs: Spark plug gap: 0,7 mm. SPORT 1100 DAYTONA R NGK BPR 6 ESI NGK DR9 E IMS Starting Electric starter (12V-1,2 kW) with solenoid engagement. Ring gear bolted on flywheel. Starter button (START) on right of handlebars. Driveline data Clutch Twin driven plates, dry type, on flywheel. Hand controlled by lever on left of handlebars. Primary drive By gears. Ratio: 1 to 1.3529 (tooth ratio 17/23). Gearbox 5-speed, with constantly meshed gears with front dog clutch. Incorporated cush drive. Pedal operated on the left side of the motorcycle. Gear ratios: Low gear = 1 to 1,812 (tooth ratio 16/29) 2nd gear = 1 to 1,250 (tooth ratio 20/25) 3rd gear = 1 to 1 (tooth ratio 23/23) 4th gear = 1 to 0,833 (tooth ratio 24/20) 5th gear = 1 to 0,730 (tooth ratio 26/19) Ratio: 1:4,125 (tooth ratio 8/33) Overall gear ratios (Engine-wheel): Low gear = 1 to 10,1150 2nd gear = 1 to 6,9761 3rd gear = I to 5,5809 4th gear = 1 to 4,6507 5th gear = 1 to 4,0783 Frame Rectangular section single-beam in NiCrMo steel. Semisupporting engine base. Suspensions Front: White Power upside-down hydraulic telescopic fork with individually adjustable rebound and compression; Rear: steel swing arm with oval cross section. Single shock absorber White Power with separate adjustment of spring preload and of hydraulic rebound and compression damping. Wheels Light alloy castings with 3 hollow spokes (rear wheel with cush drive unit). Rim sizes: – front: 3,50x 17 MT H2 – rear: 4,50×17 MT H2 Tires -front: 120/70 ZR 17 – rear: 160/70 ZR 17 [160/60 ZR 17] Type: Tubeless Front: two Brembo drilled semi-floating disc brakes in stainless steel for SPORT I 100; [two Brembo drilled floating discs, Racing type for DAYTONA RS] with fixed 4 differential piston calipers. Adjustable manual control lever on the right side of the handle-bar; – disc 320 mm;

Incoming search terms:

2011 Kawasaki W800 Specifications

0

Filed Under (Kawasaki) by admin on 17-11-2010

ENGINE

* Engine type Air-cooled, 4-stroke Vertical Twin
* Displacement 773 cm³
* Bore x stroke 77.0 x 83.0 mm
* Compression ratio 8.4:1
* Valve/Induction system SOHC, 8 valves
* Fuel system Fuel injection:?34 mm x 2 with sub-throttles
* Ignition Digital
* Starting Electric
* Lubrication Forced lubrication, wet sump

DRIVETRAIN

* Transmission 5-speed, return
* Final Drive Chain
* Primary reduction ratio 2.095 (88/42)
* Gear ratios: 1st 2.353 (40/17)
* Gear ratios: 2nd 1.590 (35/22)
* Gear ratios: 3rd 1.240 (31/25)
* Gear ratios: 4th 1.000 (28/28)
* Gear ratios: 5th 0.851 (23/27)
* Final reduction ratio 2.467 (37/15)
* Clutch Wet multi-disc, manual

FRAME

* Frame type Double-cradle, high-tensile steel
* Wheel travel, front 130 mm
* Wheel travel, rear 105 mm
* Tyre, front 100/90-19M/C 57H
* Tyre, rear 130/80-18M/C 66H
* Rake/Trail 27° / 108 mm
* Steering angle, left / right 37° / 37°

SUSPENSION

* Suspension, front 39 mm telescopic fork
* Suspension, rear Twin shocks
* Type: Twin shocks
* Spring preload: 5-way

BRAKES

* Brakes, front Type: Single 300 mm disc
* Caliper: Twin-piston
* Brakes, rear Type: Drum, 160 mm

DIMENSIONS

* Dimensions (L x W x H) 2,180 x 790 x 1,075 mm
* Wheelbase 1,465 mm
* Ground Clearance 125 mm
* Seat height 790 mm
* Curb Mass 216 kg
* Fuel capacity 14 litres

2007 Ural Models Gear Up Patrol Tourist Installation Manual

0

Filed Under (Ural) by admin on 02-11-2010

download
Font Brake Control Lever Clutch control lever: When the clutch lever is squeezed, the engine is disengaged from the gearbox. When the lever is released, the engine and gearbox are engaged. WARNING: MAKE SURE FINGERS ARE NOT POSITIONED BETWEEN HAND CONTROL LEVERS AND HANDLEBAR GRIPS OR OPERATION OF VEHICLE COULD BE IMPAIRED . WARNING: B EFORE STARTING ENGINE , ALWAYS SHIFT TRANSMISSION TO NEUTRAL TO PREVENT ACCIDENTAL MOVEMENT WHICH COULD CAUSE POSSIBLE DAMAGE TO MOTORCYCLE AND PERSONAL INJURY . Caution: Always engage the clutch release lever when shifting. Serious internal damage may result to the transmission if the clutch release lever is not engaged. Front brake control lever: When the lever is squeezed, the front wheel brake is actuated. The front brake should be used together with rear brake. When the brake lever is squeezed, the stop signal lights are switched on. 19 Kickstart lever : Designed to start the engine. Upon kicking the lever the crankshaft is actuated through the gearbox. The lever is returned to its initial position by the spring inside the gearbox. Gear shift lever: This is a heal shift type of lever. To shift up from a low gear to a high gear the rear arm(heal shift) is pressed. To shift down from a high gear to a low gear the from arm is depressed. Since the heel-toe shift lever is short-coupled, it is much easier to shift up using the heal shift, and to shift down using the toe shift with the ball of your foot. The neutral gear is between the 1st and 2nd gears. It is important to shift smoothly with a constant force, and not to kick the gear shift pedal. Serious damage may result to the shifting mechanism if the gear shift pedal is kicked, rather than pressed. NOTE: The neutral lamp will illuminate when the transmission is in neutral. (see “Starting the Engine”). Gear Shift Foot Pedal Kick Lever 20 Parking Brake Sidecar Drive Lever Rear Brake Pedal Parking Brake: Used to hold the bike when parked. To engage, press the rear brake pedal, push down and twist the parking brake lever counter clockwise. Sidecar drive engagement lever: Used to engage the drive axle to the sidecar wheel on the Patrol and Gear Up model motorcycles. WARNING: Never engage sidecar drive on concrete or hard surface. Severe damage to drivetrain will result if the sidecar drive is engaged on pavement. Rear brake lever: Actuates the rear brakes on both the motorcycle and sidecar. WARNING: DO NOT APPLY EITHER BRAKE STRONGLY ENOUGH TO LOCK THE WHEELS BECAUSE THIS MAY CAUSE POSSIBLE LOSS OF CONTROL OF THE MOTORCYCLE . ALWAYS USE BOTH BRAKES . NEVER STOP WITH FRONT OR REAR BRAKE ONLY . WARNING: AN IMPROPERLY ADJUSTED REAR BRAKE PEDAL COULD INTERFERE WITH PROPER REAR BRAKE OPERATION RESULTING IN POOR BRAKE ACTION

Incoming search terms:

Harley-Davidson Motorcycle Reverse Gear Installation Instructions

0

Filed Under (Harley Davidson) by admin on 31-10-2010

download
2.1 Obtain a small tube of Loctite® #262 (red) for use later. 2.2 Drain the transmission oil. 2.3 Remove the clutch adjustment cover (left side). 2.4 Remove rear exhaust header pipe (cross over exhaust pipe). 2.5 Remove the muffler support bracket. 2.6 Remove the clutch release cover (right side). 2.7 Remove clutch push rod and oil slinger. To be disassembled and modified later. 2.8 Remove the two nuts from the main (rear) and counter (front) transmission shafts. 2.9 Remove the transmission bearing housing (puller available from Champion Sidecars). To be replaced with new reverse gear transmission bearing housing (Trap Door). 2.10 Cover the exposed gears in the transmission with a cloth in preparation to cut the shifter fork shaft. 3 Install New Main and Countershaft Gears NOTE: Gears and Tapered Split Rings are factory matched sets. Do not mix!. 3.1 Locate the shifter fork rod, mark fork rod flush at transmission case and pull out 1/4″. Figure 1 Figure 2. Exposed Shoulders Mark shifter fork rod flush with case Remove Spacers Vehicle Transmission Counter Shaft Main Shaft Front of Motorcycle Figure 1
Reverse Gear Installation Instructions For EVO / 5 Speed and Twin Cam Harley-Davidson® Motorcycle Page 3 of 6 Revision 7 © 2007 Champion Motorcycle Accessories International, Inc. dba Champion Sidecars 11841 Monarch Street Garden Grove, CA 92841 (800) 875-0949 (714) 847-0949 www.championsidecars.com www.championtrikes.com Figure 6 CAUTION: Do not pull the shifter fork rod out of the transmission more than 1/4″. If you pull the shifter fork rod out too far, it will be difficult to realign it with the internal shifter fork. 3.2 Cut the shaft at the mark and push it back in. The shaft end MUST NOT stick out of the transmission case. If the shaft is in deeper, fill the hole with silicone to prevent the shaft from moving in and out. NOTE: Shifter fork is made of non-tempered metal and may be cut with a hacksaw or Dremel® cutting tool. 3.3 Important: Remove stock spacers from main and counter shafts. Spray with silicon remover (Brake-Clean) then, using supplied cleaning pad, clean shafts, new counter and main shaft gears and tapered lock rings (inside and outside) Figure 1 3.4 With motorcycle in neutral, pull both the shafts out and simultaneously push the OEM outermost gears in until seated completely to expose the shoulders of both shafts. The countershaft shoulder should be flush with the gear face. For the main shaft the gear would “hang over” the shoulder a small bit. Figure 2 3.5 Apply supplied Champion Super-Lock retaining compound to the inside and outside surfaces of the large gear tapered split ring, to the inside of the new countershaft gear (large gear) and to the transmission countershaft (the forward most shaft). 3.6 Install new countershaft gear to the transmission countershaft. Insert tapered split ring (tapered end first) into the countershaft gear. Install ring seat tool and spring to counter shaft and new countershaft gear. Torque ring seat tool to 40 ft-lb’s. Figures 3 and 4

Incoming search terms:

1985-1990 Kawasaki 454LTD EN450 Specifications

0

Filed Under (Kawasaki) by admin on 05-11-2010

download
Minimum Turning Radius 2.5 m (98.43 in) Braking Distance 12.5 m from 50 km/h (41 ft from 31 mph) DIMENSIONS Overall Length 2,205 mm (86.81 in) Overall Width 820 mm (32.3 in) Overall Height 1,220 mm (48.03 in) Wheelbase 1,485 mm (58.46 in) Road Clearance 130 mm (5.12 in) Dry Weight 180 kg (397 lbs) / 180.5 (398 lbs) ENGINE Type DOHC, 2-cylinder, 4-stroke, liquid-cooled Displacement 454 mL (27.7 cu in) Bore & Stroke 72.5 x 55.0 mm (2.85 x 2.17 in) Compression Ratio 10.7 : 1 Starting System Electric Starter Cylinder Numbering Method Left to Right, 1-2 Firing Order 1-2 Carburetors Keihin CVK34 x2 Ignition System Battery and coil (transistorized ignition) Ignition Timing (Electronically advanced) 10° BTDC @ 1,200 r/min (rpm) – 37.5° BTDC @ 10,000 r/min (rpm) Spark Plugs NGK D9EA or ND X27ES-U NGK DR8ES or ND X27ESR-U Lubrication System Forced lubrication (wet sump) Engine Oil SE or SF class SAE 10W40, 10W50, 20W40, or 20W50 Engine Oil Capacity 3.4 L (3.6 US qt) Coolant Capacity 1.4 L (1.5 US qt) Kawasaki 1985-90 454LTD EN450 Specifications Page 2 of 2 TRANSMISSION Transmission Type 6-speed, constant mesh, return shift Clutch Type Wet, multi disc Driving System Belt Drive Primary Reduction Ratio 2.952 (62/21) Final Reduction Ratio 2.720 (68/25) Overall Drive Ratio 6.840 (Top gear) Gear Ratio: 1st 2.571 (36/14) 2nd 1.777 (32/18) 3rd 1.380 (29/21) 4th 1.125 (27/24) 5th 0.961 (25/26) 6th 0.851 (23/27) FRAME Castor 31.5° Trail 139 mm (5.47 in) Tire Size Front: 100/90-19 57S Rear: 140/90-15 70S Fuel Tank Capacity 11 L (2.9 US gal) ELECTRICAL EQUIPMENT Battery 12 V 12 AH Headlight 12 V 60/55 W Tail/Brake Light 12 V 8/27 W x2

Incoming search terms:

URAL TOURIST / SPORTS Repair Manual

0

Filed Under (Ural) by admin on 18-11-2010

download
Maximum speed of motorcycle 108 km/h / 65 mph *119km/h / 74 mph 122 km/h / 77 mph Reference fuel consumption at 85% of maximum speed 12.5 km/l / 29 mpg 14 km/l / 32.5 mpg 16.7 km/l / 39 mpg Dry mass of motorcycle 700 lb. / *680 lb. 460 lb. Maximum load-carrying capacity 500 lb/485 lb/*400 lb 330 lb. Noise level below 80db OVERALL DIMENSIONS OF MOTORCYCLE Length 2500 mm / 8 ft 2200 mm / 7 ft Width 1700 mm / 5 ft 6 in 850 mm / 2 ft 8 in Height 1100 mm / 3 ft 6 in 1060 mm / 3 ft 8 in Road Clearance 125 mm / 5 in Seat height 840 mm / 33 in 810 mm / 32 in Wheel base 1470 mm / 55 in ENGINE Type 4 stroke, overhead valves, opposed twin-cylinder Displacement 649 cc Cylinder bore 78 mm / 3.07 in Piston stroke 68 mm / 2.68 in Compression ratio 8.5 Rated horsepower 35 Rated rotational speed 5600 RPM Rated torque, Nm 45 Nm / 398.7 in-pound Ignition system Contactless with electronic ignition timing Lubrication system Dual system of forced lubrication and by splashing Lubricant SAE 20W/50 (see Owner’s Manual Maintenance Section) CARBURETOR Carburetor type Keihin Seiki 32 CVK Number of carburetors 2 Air cleaner Pleated Paper Filter Fuel 91 octane premium unleaded gasoline PCV Valve Internal Breather ELECTRICAL EQUIPMENT Ignition system 12 V Ignition coil B204 Spark plugs NGK BP7HS or NDW20FP-1 Ignition timing Automatic spark timer Power supplies Alternator Storage battery (Russian supplied with new motorcycle) Recommended replacement: Interstate #12N9-4B-1 Voltage regulator (electronic) Internal to Alternator Horn C205B Headlight URAL  part no. UA-TB6014-017 Sylvania Incandescent 6014, 7″ round sealed beam TRANSMISSION Clutch Dry double-disk clutch Gearbox 4 speed box with reverse gear (no reverse for solo model) and gear shifting foot pedal GEAR RATIOS TOURIST / SPORTSMAN / UTILITY SOLO/CRUISER I gear 3.6 3.6 II gear 2.28 2.28 III gear 1.7 1.7 IV gear 1.3 1.3 Reverse gear 4.2 N/A on Solo 4.2 on -10 mdls Speedometer drive ratio 0.4 0.5 Final drive Pair of bevel gears with propeller shaft Final drive ratio 4.62 3.89 FLUID CAPACITIES TOURIST & -10 Models Sportsman Solo Gasoline tank 19 L / 5 Gal 19L / 5 Gal 18.5 L / 4.9 Gal Reserve 2L / 0.5 gal 2L / 0.5 gal 2L- / 0.5 Gal Engine crankcase 2 L / 2 qt. + 3.6 oz. 2.0L / 2.11 qt 2 L / 2 qt. + 3.6 oz. Gearbox 0.9L / 1 qt 0.9L / 1 qt 0.9L / 1 qt Final drive 110 ml / 3.85 oz. 150 ml / 5.25 oz. 110 ml / 3.85 oz. Telescopic Forks (-10 & solo models) N/A on Tourist N/A on Sportsman 135 ml / 4.56 oz. Shock Absorbers 105 ml / 3.55 105 ml / 3.55 oz 105 ml / 3.55 oz

HARLEY-DAVIDSON BIG TWINS COMPUFIRE 1084 GEAR SETS INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 26-11-2010

download
1. Remove the seat and disconnect the cables at the battery. Remove the ground cable first and then the positive (+) cable. 2. Drain the oil in the outer primary case and remove the outer primary cover following instructions in the Factory Shop manual. 3. Bend the tab on the jackshaft bolt away from the bolt head. Remove the starter pinion gear with the jackshaft bolt, lock plate and washer. 4. Remove the clutch assembly using the procedure found in the Factory Shop manual. 5. Remove the original equipment ring gear from the clutch basket by drilling out the rivets with a 5/16-inch drill bit. Drill through the rivet head and tap the ring gear off the clutch basket using a hammer. 6. Drill out the six holes in the clutch basket with the 5/16-inch drill bit. RING AND STARTER PINION GEAR INSTALLATION 1. Attach the new 84-tooth ring gear to the clutch basket using the six 5/16×24 socket head cap screws supplied. NOTE… The bevel side of the ring gear (identified by the three dots) faces away from the starter motor. Torque the socket head cap screws to 29 ft lbs. 2. Assemble and install the primary drive assembly following the instructions in the factory Shop manual. 3. Install the new 10-tooth pinion gear with the jackshaft bolt, lock plate and thrust washer. Torque the jackshaft bolt to 7 – 9 ft lbs. Bend the lock tab on the lock plate against a flat on the jackshaft bolt head. 4. Measure and adjust the air gap between the ring gear and the pinion gear. See Fig-1 . The correct gap is .075 – .125 inch. If the gap is larger than .125 inch, use the supplied shim washers inside the jackshaft coupler. See Fig-2 . If the air gap is smaller than .075 inch, the jackshaft must be shortened by removing material from the splined end of the shaft. See Fig-3 . 5. Install the outer primary cover following instructions in the Factory Shop manual and refill the primary case with the proper amount of primary oil. 6. Re-install the battery cables in the reverse order they were removed. Re-install the seat

Incoming search terms:

COMPUFIRE 1084 GEAR SETS INSTALLATION INSTRUCTIONS

0

Filed Under (Tips and Review) by admin on 26-11-2010

download
1. Remove the seat and disconnect the cables at the battery. Remove the ground cable first and then the positive (+) cable. 2. Drain the oil in the outer primary case and remove the outer primary cover following instructions in the Factory Shop manual. 3. Bend the tab on the jackshaft bolt away from the bolt head. Remove the starter pinion gear with the jackshaft bolt, lock plate and washer. 4. Remove the clutch assembly using the procedure found in the Factory Shop manual. 5. Remove the original equipment ring gear from the clutch basket by drilling out the rivets with a 5/16-inch drill bit. Drill through the rivet head and tap the ring gear off the clutch basket using a hammer. 6. Drill out the six holes in the clutch basket with the 5/16-inch drill bit. RING AND STARTER PINION GEAR INSTALLATION 1. Attach the new 84-tooth ring gear to the clutch basket using the six 5/16×24 socket head cap screws supplied. NOTE… The bevel side of the ring gear (identified by the three dots) faces away from the starter motor. Torque the socket head cap screws to 29 ft lbs. 2. Assemble and install the primary drive assembly following the instructions in the factory Shop manual. 3. Install the new 10-tooth pinion gear with the jackshaft bolt, lock plate and thrust washer. Torque the jackshaft bolt to 7 – 9 ft lbs. Bend the lock tab on the lock plate against a flat on the jackshaft bolt head. 4. Measure and adjust the air gap between the ring gear and the pinion gear. See Fig-1 . The correct gap is .075 – .125 inch. If the gap is larger than .125 inch, use the supplied shim washers inside the jackshaft coupler. See Fig-2 . If the air gap is smaller than .075 inch, the jackshaft must be shortened by removing material from the splined end of the shaft. See Fig-3 . 5. Install the outer primary cover following instructions in the Factory Shop manual and refill the primary case with the proper amount of primary oil. 6. Re-install the battery cables in the reverse order they were removed. Re-install the seat

Incoming search terms:

KAWASAKI ZX1400 A6F/ B6F SPECIFICATIONS

0

Filed Under (Kawasaki) by admin on 05-11-2010

download
the all new 1352 cm3 engine is the most powerful production engine that Kawasaki has ever built. ! The engine is designed to deliver the perfect balance of power, torque and driveability. ! The torque delivery is very linear, so there is no powerband, as such, but riders will notice an extra push once the rev counter passes 6,000 r/min. ! The sheer amount of torque available makes pulling away in almost any gear possible (at 2,000 r/min the engine produces over 98 N. m of torque) . ! The layout of the engine was carefully designed to maintain a compact engine. The engine width is approximately the same as the ZX-12R. ! Gear driven secondary balancers virtually eliminate vibration for a smooth vibration free engine and aid rider comfort. FUEL SYSTEM ! Idle speed control system contributes to easy starting and ensures the catalysers reach their optimum operating temperature quickly. ! The fuel reservoir is located at the rear of the tank and extends below the seat, contributing to the centralised mass. TRANSMISSION ! Hydraulically operated clutch with a radial mounted clutch master cylinder for smooth clutch operation. CHASSIS ! The next generation aluminium monocoque frame is an advance on Kawasakiís unique ZX-12R frame. The aluminium box section runs over the engine minimising the width of the bike. Lightweight and very stiff, this sophisticated frame gives the bike both responsive handling qualities and incredible stability. ! Already more rigid than a twin spar design, with the engine solidly mounted the monocoqueís torsional rigidity is further increased. Using the engine as a stressed member allows the engineers to make the frame lighter. The air box and battery are housed inside the frame contributing to the compact layout. ! Our engineers made full use of the design freedom given to them by the engineís compact size. The engineís forward position in the frame, the wheelbase and front/rear wheel weight balance were all carefully chosen to achieve both high speed stability and lightweight, responsive handling. The wheelbase is shorter than the ZZR1200 but longer than the ZX-12R. SUSPENSION ! Inverted 43 mm front cartridge forks and Uni-Trak linkage rear suspension complement the highly rigid frame, offering both controllability at speed and superb road holding when sport riding. BRAKE SYSTEM ! Petal disc brakes, radial mounted front calipers and a radial mount front brake master cylinder ensure excellent stopping power and feel.

URAL 2004 Model Retro Solo SPECIFICATIONS And Owner's Manual

0

Filed Under (Ural) by admin on 11-11-2010

download
SPECIFICATIONS GENERAL Retro Maximum speed of motorcycle 120 km/h 74 mph Reference fuel consumption at 85% of 14 km/L 33 mpg Dry mass of motorcycle 680 lb. Maximum load-carrying capacity 400 lb. Noise level below 80db OVERALL DIMENSIONS Length 2500 mm / 8 ft Width 1700 mm / 5 ft 6 in Height 1100 mm / 3 ft 6 in Road Clearance 125 mm / 5 in Seat height 840 mm / 33 in Wheel base 1470 mm / 58 in ENGINE Type 4 stroke, overhead valves, opposed twin-cylinder Displacement 745 cc Cylinder bore 78 mm Piston stroke 78 mm Compression ratio 9.0 :1 Rated horsepower 33 KW / 44.2 BHp Rated rotational speed 5600 RPM Rated torque 36 ft.-lbs @ 3750 RPM Lubrication system Dual system of forced lubrication and splashing Lubricant SAE 20W/50 CARBURETOR Carburetor type 32 CVK Keihin Number of carburetors 2 Air cleaner Paper Filter Element Lifetime JR Fuel 91 octane premium unleaded gasoline PCV Valve Internal Breather 8 ELECTRICAL Ignition system 135.3734.COM-2 (CDI) Ignition coil 135.3705-2 Spark plugs NGK BP7H Ignition timing Automatic spark timer Alternator 35 amp / 12 Volt Battery Interstate #YB18L-A or equivalent Headlight Sylvania Halogen 6024, 7″ round sealed beam TRANSMISSION Clutch Dry double-disk clutch Gearbox 4 speed gearbox with reverse gear lever GEAR RATIOS I gear 3.6 II gear 2.28 III gear 1.56 IV gear 1.19 Reverse gear 4.36 Speedometer drive ratio 0.4 Final drive ratio 3.86 FLUID CAPACITIES Fuel tank 5 Gal / 19L Reserve .5 Gal / 2L Engine 68 oz / 2L Transmission 30.6 oz / .9 L Final drive 3.74 oz / 110 ml Shock Absorbers 3.5 oz / 105 ml RUNNING GEAR FrameTubular welded Rear wheel suspension Swing arms with spring shock absorbers Front fork Telescopic Brakes Hydraulic Disk on front, Hydraulic Drum on rear Tires 110 / 90 – 18″ Front 22 psi cold (1.5 Bar / 150 kPa) Front 22 psi cold Rear 36 psi cold (2.5 Bar / 250 kPa) Rear 36 psi cold

Incoming search terms: