harley five speed main drive gear removal instructions

You search Auto repair manual PDF harley five speed main drive gear removal instructions, if there are search results will appear below. If search results do not exist, please search by others keyword.



  harley five speed main drive gear removal instructions Direct Download speed 5282 Kb/s

  harley five speed main drive gear removal instructions Full Version speed 6162 Kb/s



Harley Davidson 6- SPEED CONVERSION KIT FOR BIG TWIN 5- SPEED TRANSMISSIONS INSTALLATION

0

Filed Under (Harley Davidson) by admin on 05-03-2012

download
5/16 Bolt hole boss clearance This can easily be checked with the trap door gasket. Put the gasket on the dowel pins. AII material of the boss around the hole that “sticks outside” the gasket (60 degrees forward to 60 degree backwards) must be removed (see figure A). Primary fork clearance Place the gasket on the housing and remove material as indicated for clearing the shifter fork (see figure B). WWW . ZODIAC . NL PERFORMANCE PRODUCTS FOR HARLEY-DAVIDSON ® INSTALLATION INSTRUCTIONS FOR 6 SPEED CONVERSION KIT AND 6 SPEED BUILDER KIT speed transmission. Also make sure you have a 1990 or later Factory Service Manual available. Tools The conversion kit should only be used in new or low milage transmissions. If gears or bearings of a used Gear set Removal Refer to the Factory Service Manual Section for Mainshaft and Countershaft removal. When you get to the point of actually sliding the gear set out make sure you properly mark the 5th gear set as described in the Factory Service Manual (for used transmissions only). Further follow the factory removal procedure. Clearance Checks The 6 Speed conversion and builder kit will fit in most OEM or aftermarket transmission housings without may be needed. The following clearances must be checked before assembling the 6 speed transmission. 28-05-2008 We recommend the kits are installed by a qualified mechanic with knowledge of the Harley-Davidson 5 needed are the same as used for a 5 Speed transmission. 5 speed transmission are worn, new ones must be installed, or better, the builder kit should be used. any modification of the housing. However due to casting differences, in some instances some modification
WWW . ZODIAC . NL PERFORMANCE PRODUCTS FOR HARLEY-DAVIDSON ® Pillow block clearance (right side) Make sure there is clearance between the pillow block and the housing. Any clearance is O.K. (see figure C). Fork shaft support clearance Again use the gasket as the template and remove the material as indicated (see figure D). Shift drum end play The end play of the shift drum must be checked prior to final installation. Install the shift drum. Measure the end play with feeler gauges at the right pillow block (see figure E). End play should be between .004″ and .010″, some 1/2″ X 7/8″ 0.008″ thick shims are included to adjust the end play

Harley-Davidson Six Speed Transmissions FLH 2009 Up Champion Reverse Gear Installation Instructions

0

Filed Under (Harley Davidson) by admin on 17-02-2011

download
Preparation Remove Original Parts From Vehicle. 2.1 Purchase a small tube of Loctite #262 (red) for use later. 2.2 To torque the large gear: 2.2.1 Purchase Snap-On (or equivalent) filter tool. Part #: FWA62121. OR 2.2.2 Purchase Champion special tool – Part # RG-100-100 2.3 Drain the transmission oil. 2.4 Remove front and rear exhaust header pipe. 2.5 Remove the clutch release cover (right side). 2.6 Remove throw out bearing assembly. (to be reinstalled later without modification) 2.7 Remove the two nuts from the main and counter transmission shafts. WARNING : Do not attempt to push shafts into gearbox or remove the trap door – This can cause spacers inside the gearbox to be miss-aligned and lock up the gearbox when gears are installed and tightened. 2.8 Remove clutch push rod (to be replaced w/ Champion supplied rod) Note: For hydraulic clutch bikes, obtain Champion Part # RG-100-082, a longer push rod) Snap-On Part No: FWA62121 Snap-On Part No: FWA62121 Champion Part No: RG-100-100 Reverse Gear Installation Instructions Harley-Davidson Six Speed Transmission HD FLH 2009 Up Page 3 of 5 Revision 2 Boring Tool 3 Installation 3.1 Thoroughly clean threads of main and counter shafts using a silicon remover. 3.2 Apply the green thread locking compound (supplied) to main shaft threads and screw the small gear onto the main shaft. Figure 1 3.3 Install the supplied (ear)plug into the main shaft hole. To be removed later. 3.4 Install the supplied special tool to the small gear. Ensure the holes of the special tool align with the holes in the small gear. Figure 2 3.5 Install torque wrench to special tool and torque the small gear to 80 lb. ft. 3.6 Remove torque wrench from special tool. Do not remove special tool from small gear. 3.7 Using the supplied boring tool and the special tool as a guide, drill the main shaft through two holes of the special tool as shown. Stop when cutter contacts bearing race. Figure 3 3.8 Remove special tool, leaving main shaft plug in place, and thoroughly clean out the holes. Use care to ensure debris does not enter transmission. 3.9 Remove plug from main shaft hole. Figure 1 Figure 2 Figure 3 Note: To prevent gears from rotating during torque procedures, engage transmission into 1st gear and apply brakes Note: Frequently stop cutting and remove bit from hole to clean bit and vacuum debris from hole

ULTIMA 6 SPEED BUILDERS KIT INSTALLATION MANUAL

0

Filed Under (Tips and Review) by admin on 03-03-2011

download
DISASSEMBLY For 5 speed gear set removal refer to your factory service manual. You willneed to remove the main drive gear, main drive gear bearings, retaining clip & countershaft needle bearings. NOTE: Removal of the shifter arm is notnecessary for 99 & earlier transmissions. NOTE: Removal of the shifter arm isnecessary for 2000 & later transmissions. After trans. housing is disassembled thoroughly clean & inspect. ASSEMBLY For 2000 & later models removal of approximately 1/4 of an inch off of the shifter arm bushing is likely required. Doing so will allow installation of the retaining clip & washer onto the shifter arm. It is good practice to double check how much material should be removed before cutting the bushing. See fig. 1 & 2 Install supplied Main drive gear bearings & countershaft needle bearings using special tool # 97-164 NOTE: Lightly coat bearings with assembly lube or gear oil for easier installation. Install supplied Main drive gear retaining clip & verify that it is fully seated and cannot come out. Do not re-use old bearings or retaining clip. Install supplied Main drive gear into bearings using special tool # 97-166 See fig. 3 Install supplied trap door gasket & verify that it is on correctly. Install supplied 6 speed gear set making sure to align the countershaft with the needle bearing assembly. Slowly slide in gear set until the mainshaft & countershaft will not slide in any further. Lightly tapping on the trap door (while verifying that there is no interference) with a soft blow hammer will then fully seat the shafts & trap door. See fig. 4 Once gear set is installed use the supplied 5/16-18×1-1/2 & 1/4-20×1-1/2 bolts to secure the trap door. Torque the 5/16 bolts to 15 ft-lbs w/ red loctite (high strength) Torque the 1/4 bolts to 9 ft-lbs w/ red loctite (high strength) See fig. 5

HARLEY-DAVIDSON 5 Speed Transmissions 1984 – 1999 EVO / 5 Speed & 1999 – 2006 Twin Cam Installation Instructions

0

Filed Under (Harley Davidson) by admin on 26-11-2010

download
Remove Original Parts From Vehicle. 2.1 Obtain a small tube of Loctite® #262 (red) for use later. 2.2 Drain the transmission oil. 2.3 Remove the clutch adjustment cover (left side). 2.4 Remove rear exhaust header pipe (cross over exhaust pipe). 2.5 Remove the muffler support bracket. 2.6 Remove the clutch release cover (right side). 2.7 Remove clutch push rod and oil slinger. To be disassembled and modified later. 2.8 Remove the two nuts from the main (rear) and counter (front) transmission shafts. 2.9 Remove the transmission bearing housing (puller available from Champion Sidecars). To be replaced with new reverse gear transmission bearing housing (Trap Door). 2.10 Cover the exposed gears in the transmission with a cloth in preparation to cut the shifter fork shaft. 3 Install New Main and Countershaft Gears NOTE: Gears and Tapered Split Rings are factory matched sets. Do not mix!. 3.1 Locate the shifter fork rod, mark fork rod flush at transmission case and pull out 1/4″. Figure 1 3.2 Cut the shaft at the mark and push it back in. The shaft end MUST NOT stick out of the transmission case. If the shaft is in deeper, fill the hole with silicone to prevent the shaft from moving in and out. NOTE: Shifter fork is made of non-tempered metal and may be cut with a hacksaw or Dremel® cutting tool. 3.3 Important: Remove stock spacers from main and counter shafts. Spray with silicon remover (Brake-Clean) then, using supplied cleaning pad, clean shafts, new counter and main shaft gears and tapered lock rings (inside and outside) Figure 1 3.4 With motorcycle in neutral, pull both the shafts out and simultaneously push the OEM outermost gears in until seated completely to expose the shoulders of both shafts. The countershaft shoulder should be flush with the gear face. For the main shaft the gear would “hang over” the shoulder a small bit. Figure 2 3.5 Apply supplied Champion Super-Lock retaining compound to the inside and outside surfaces of the large gear tapered split ring, to the inside of the new countershaft gear (large gear) and to the transmission countershaft (the forward most shaft). 3.6 Install new countershaft gear to the transmission countershaft. Insert tapered split ring (tapered end first) into the countershaft gear. Install ring seat tool and spring to counter shaft and new countershaft gear. Torque ring seat tool to 40 ft-lb’s. Figures 3 and 4

HARLEY DAVIDSON SECURITY SYSTEM SMART SIREN KIT REMOVAL AND INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 09-02-2011

download
REMOVAL 1. Refer to the owner’s manual and follow the instructions to disarm the security system. To prevent accidental vehicle start-up, which could cause death or serious injury, disconnect negative (-) battery cable before proceeding. (00048a) To prevent accidental vehicle start-up, which could cause death or serious injury, remove main fuse before proceeding. (00251b) 2. For All Models except 2002-2003 Touring and 2003- Later Softail: Refer to the owner’s manual and follow the instructions to disconnect the battery, negative (-) cable first or remove the main fuse. For 2002-2003 Touring and 2003-Later Softail Models: Remove seat following the instructions in the service manual and disconnect the battery, negative (-) cable first. Save seat hardware for installation. INSTALLATION 2002-2006 VRSCA, VRSCB, VRSCD Models 1. Open the seat. 2. See Figure 1. Remove the splash guard (mud flap) nuts. 3. See Figure 2. Lower the mud flap from the installed position and allow it to rest on the rear tire 3. Slide the siren into place on the left side of the electrical caddy so the sounder disc (6) faces out. 4. Refer to the owner’s manual and follow the instructions to install the main fuse. 5. Align the barbed studs on the side cover with the grommets in the frame and push side cover firmly into place. 6. Install the left side saddlebag per the instructions in the owner’s manual. 2003 and later Softail Models EXCEPT FXCW/C 1. Remove the right side saddlebag (if equipped) per the instructions in the owner’s manual. NOTE The siren connector is installed on an electrical panel under the rear fender on all Softail models. The rear of the motorcycle may have to be raised slightly to allow removal of the splash guard. 2. Remove the two bolts at the bottom of the splash guard. Bend the upper right corner of the splash guard toward the rear tire and lift upward to unhook the splash guard from the tab on the rear fork. Remove the guard from beneath the fender. 2 1 3 is01316 1. Siren mounting area 2. Siren connector [142B] 3. Harness clip Figure 16. Siren Connector (Softail Models EXCEPT FXCW/C) (Rear Fender View with Rear Wheel Removed) 3. See Figure 16. Remove the siren connector [142B] (2) from the receptacle in the siren mounting area (1) of the electrical panel. 4. See Figure 17. Insert security siren (1) connector [142B] into the siren box receptacle until the connector latches securely. 5. Orient the siren (1) as shown, with the harness connector (2) toward the bottom and the sounder disc (5) facing out. Carefully snap the siren into the electrical panel. 6. Insert the siren harness lead (4) into the harness clip (3) to keep the harness clear of other components. 7. If necessary, secure the connector wiring to the electrical panel wiring with a cable strap (not provided). 8. Hook the slot at the top of the splash guard over the tab on the rear fork and install the guard with the two screws removed earlier. Tighten securely. 9. Install the right side saddlebag (if equipped) per the instructions in the owner’s manual. 10. Refer to the owner’s manual and follow the instructions given to connect the battery cables or install the main fuse

Related Item : 17997-99A instructions (2)yhs-baixaki_br_solimba_01 (1)ultima 53-660 instruction manual (1)progressive suspension 10-2003 instructions (1)jd jetting instructions (1)honda xr650l hotcam install (1)Hegar Front Wheel Disc (1)Harley davidson softail deluxe owners manual 2011 (1)Harley 53968 06C instructions (1)deutsch connector removal and installation (1)