how to adj the valves on a 1999 kawasaki praire 300

You search Auto repair manual PDF how to adj the valves on a 1999 kawasaki praire 300, if there are search results will appear below. If search results do not exist, please search by others keyword.





1999-2004 Kawasaki 1500 Drifter Power Commander Installation Instructions

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
1 Remove the seat. 2 Remove the left side cover. 3 Remove the speedometer assembly. 4 Unbolt the fuel tank. NOTE: It is not necessary to remove the fuel tank. It does however make the installation easier. If you do remove the tank, pay attention to the vent hose routing. Pressing the tabs on the black fuel line connector will allow the fuel line to be disconnected (Fig. A) 5 Remove the battery/ECU hold down bracket (Fig. B). 6 Unbolt and move the bank angle (tip over) sensor out of the way (Fig. C). Fig. A Fig. B Fig. C i201-411 www.powercommander.com 1999-2004 Kawasaki 1500 Drifter – PCIII USB – 2 Bank angle sensor (tip over switch) Remove these 2 bolts 7 Loosen the bolts holding the plastic tray on the left side of the bike (under the left side cover) (Fig. D). 8 Route the wire from the PCIII behind the plastic tray and under the frame side rail (Fig. E). 9 Retighten the bolts holding the plastic tray. 10 Continue routing the wires from the PCIII under the frame near the lower fuel tank mount and go up to the throttle body area (Fig. F). Fig. D Fig. E Fig F i201-411 www.powercommander.com 1999-2004 Kawasaki 1500 Drifter – PCIII USB – 3 Route PCIII harness between plastic tray and frame Route wires under frame Loosen these bolts 11 Disconnect the injector connector from the rear injector (Fig. H). 12 Plug the female PCIII connector with ORANGE/WHITE wire onto the rear injector (Fig. H). 13 Connect the male PCIII connector with ORANGE wire onto the stock injector connector (Fig. H). 14 Repeat steps 11 thru 13 for front injector using the PCIII connectors with the YELLOWcolored wires. 15 Locate the wires coming from the throttle position sensor. (Fig. H). The throttle position sensor is located on the right hand side of the throttle body. It is between the frame and engine

Incoming search terms:

Kawasaki Ninja 650R (ER-6F) & ER-6N Resource Upgrading the Suspension on the Kawasaki ER6-F/ N

0

Filed Under (Kawasaki) by admin on 30-11-2010

download
Top fork is as removed. Kawasaki Ninja 650R (ER-6F) & ER-6N Resource Before removing the fork from the clamps on the yokes I loosened the fork top. Before removing the fork top the fork-slider was placed in a vice and the bottom bolt loosened….. … before finally being removed with the fork upside down. Because the springs were still in situ this gave sufficient tension on the damper-rod to prevent it from turning and allow the bolt to be removed. When I turned the fork the right-way up to remove the fork-top I did it over a container to catch the oil. Kawasaki Ninja 650R (ER-6F) & ER-6N Resource All the OE components that will no longer be required. Left to right. Fork-top, spacer tube, washer, spring, damper-rod. Bottom bolts get re-used. Old and new, laid-out for comparison. The damper unit, minus spring and fork-top, drops inside the stanchion and slider. Kawasaki Ninja 650R (ER-6F) & ER-6N Resource Then the bolt goes back in, as tight as possible, to secure it. Top fork is done, second one awaits. Note the spring seat on the right, just below the spring. This drops over the damping rod after the oil has been added. The small locking-nut screws over the threaded part of the damping-rod next, all the way to the bottom. Spring drops in and then the fork-top screws on to the damping-rod as well, all the way down to the lock-nut which is used to secure it. At this point the stanchion is extended to the fork-top which is screwed in. Job done.

Incoming search terms:

KYMCO MAXXER 300/ 250 MONGOOSE 300/ 250 SERVICE MANUAL

0

Filed Under (Kymco) by admin on 26-10-2010

download
apply or add designated greases and lubricants to the specified lubrication points. ÑAfter reassembly, check all parts for proper tightening and operation. ÑWhen two persons work together, pay attention to the mutual working safety. ÑDisconnect the battery negative (-) terminal before operation. ÑWhen using a spanner or other tools, make sure not to damage the motorcycle surface. ÑAfter operation, check all connecting points, fasteners, and lines for proper connection and installation. ÑWhen connecting the battery, the positive (+) terminal must be connected first. ÑAfter connection, apply grease to the battery terminals. ÑTerminal caps shall be installed securely. 1 . GENERAL INFORMATION 1-6 ATV 300/250 ÑIf the fuse is burned out, find the cause and repair it. Replace it with a new one according to the specified capacity. ÑAfter operation, terminal caps shall be installed securely. ÑWhen taking out the connector, the lock on the connector shall be released before operation. ÑHold the connector body when connecting or disconnecting it. ÑDo not pull the connector wire. ÑCheck if any connector terminal is bending, protruding or loose. Confirm Capacity 1 . GENERAL INFORMATION 1-7 ATV 300/250 ÑThe connector shall be inserted completely. ÑIf the double connector has a lock, lock it at the correct position. ÑCheck if there is any loose wire

Incoming search terms:

Kawasaki Exhausts – ZX-6 ZX-10 Zx-14 Exhaust – Slip-ons INSTALLATION MANUAL

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
Our favorite exhaust options for Kawasaki ZX Ninjas – ZX-10,ZX-6r, and the new horsepower king, Zx-14.. Grab your horsepower today. We love Rob Muzzy and Muzzy Exhausts.Going back to Doug Chandler and Scott Russell, Muzzy has been synonomous with Kawasaki and performance – and for years, if you rode Kawasaki,and you were on the podium, Muzzy was on your exhaust. We also feature Arrow and Yoshimura exhausts for your ZX-6R, ZX-10 and ZX-14. We love the sound of a Yosh exhaust on any Kawasaki Ninja. Yoshimura Oval (RS-3) Race Slip-On for Kawasaki ZX14R 2006 The easiest and least expensive way to experience Yoshimura performance is with our Slip-On/Bolt-On lines. Bolt-On style bolts to the O. E. M. mid-pipe Slip-On style with its stainless steel easily attaches to the mid-pipe RS-1 is available where noted Usually, no jetting or re-programming is required and installation is a snap Hindle Stainless Exhaust High Head Pipes – Kawasaki ZX6R-RR 03-04 The worlds lightest stainless steel exhaust system. Increase horsepower and torque throughout the entire rpm range. Lightweight, strong stainless steel header design looks great and weighs less than stock headers. Available in low- and high-mo North Denver News http://northdenvernews.com Powered by Joomla! Generated: 19 October, 2010, 12:28 Hindle Stainless Exhaust Low Head Pipes – Kawasaki ZX9R 00-03 The worlds lightest stainless steel exhaust system. Increase horsepower and torque throughout the entire rpm range. Lightweight, strong stainless steel header design looks great and weighs less than stock headers. Available in low- and high-mo

Incoming search terms:

KAWASAKI ZZR 1400 SPECIFICATIONS/ FEATURES AND BENEFITS

0

Filed Under (Kawasaki) by admin on 04-12-2010

download
Engine type . …………………….. 4-stroke, liquid-cooled, in-line 4 Displacement . ………………….. 1352 cm3 Bore x stroke . ………………….. 84.0 x 61.0 mm Compression ratio . ………….. 12.0: 1 Valve system . ………………….. DOHC, 16 valves, 4 valves per cylinder Maximum power . ……………… 140 kW (190 PS) / 9,500 r/min (Fr. 78.2 kW (106 PS) / 8,500 r/min) Maximum power + ram air . .. 147 kW (200 PS) / 9,500 r/min Maximum torque . …………….. 154 N•m / 7,500 r/min (Fr. 114 N. m / 4,500 r/min) Fuel system . ……………………. EFI with 4 x 44 mm Mikuni throttle bodies Ignition . …………………………… digital TCBI (ECU controlled) Starting system . ………………. electric Transmission . ………………….. 6-speed Frame type . ……………………… aluminium monocoque Rake / trail . ………………………. 23″ / 94 mm Suspension, front . ……………. 43 mm inverted fork Suspension, rear . …………….. Uni-Trakfi with gas-charged shock absorber Wheel travel, front / rear . ….. 117 / 122 mm Tyre, front / rear . ………………. 120/70 ZR 17 / 190/50 ZR 17 Brake, front . …………………….. 310 mm dual discs with radial mount 4-piston calipers Brake, rear . ……………………… 250 mm disc with single piston caliper L x W x H . ………………………… 2,170 x 760 x 1,170 mm Wheelbase . ……………………… 1,460 mm Seat height . ……………………… 800 mm Fuel capacity . ………………….. 22 L Dry weight . ………………………. ZX1400A6F 215 kg / ZX1400B6F 218 kg Colours . …………………………… Pearl Meteor Grey or Candy Thunder Blue Kawasaki 2006 SUPER SPORTS 5 ZZR1400 (ZX1400A6F/B6F) FEATURES AND BENEFITS ENGINE 1352cm3 4-cylinder DOHC engine ! The most powerful production Kawasaki motorcycle engine ever. ! All new compact 4-cylinder engine. ! Gear-driven dual secondary balancers cut vibration, minimising engine wear, noise and rider fatigue. ! Chrome composite plated cylinders are lightweight, durable, and quickly carry heat away from the combustion chamber and piston for supreme durability at high power output. Fuel system ! Electronic fuel injection feeds the engine exactly the right amount of fuel giving excellent power, fuel economy, driveability and starting. ! High atomising injectors are used to maximise combustion efficiency and minimise emissions. ! Dual throttle valves are fitted to significantly improve driveability. The sub throttle valves are controlled by the ECU to provide precise response. ! An oval throttle pulley improves throttle control, opening less initially but increasing as more throttle is applied. ! ECU is a 32 bit unit to provide the control circuit required to operate the dual throttles. ! The ram air induction system takes cooler, high- pressure air from in front of the cowling and pushes it through the air cleaner and into the engine for maximum power output. ! To minimise emissions, honeycomb-type catalysers are used.

HARLEY-DAVIDSON 5 Speed Transmissions 1984 – 1999 EVO / 5 Speed & 1999 – 2006 Twin Cam Installation Instructions

0

Filed Under (Harley Davidson) by admin on 26-11-2010

download
Remove Original Parts From Vehicle. 2.1 Obtain a small tube of Loctite® #262 (red) for use later. 2.2 Drain the transmission oil. 2.3 Remove the clutch adjustment cover (left side). 2.4 Remove rear exhaust header pipe (cross over exhaust pipe). 2.5 Remove the muffler support bracket. 2.6 Remove the clutch release cover (right side). 2.7 Remove clutch push rod and oil slinger. To be disassembled and modified later. 2.8 Remove the two nuts from the main (rear) and counter (front) transmission shafts. 2.9 Remove the transmission bearing housing (puller available from Champion Sidecars). To be replaced with new reverse gear transmission bearing housing (Trap Door). 2.10 Cover the exposed gears in the transmission with a cloth in preparation to cut the shifter fork shaft. 3 Install New Main and Countershaft Gears NOTE: Gears and Tapered Split Rings are factory matched sets. Do not mix!. 3.1 Locate the shifter fork rod, mark fork rod flush at transmission case and pull out 1/4″. Figure 1 3.2 Cut the shaft at the mark and push it back in. The shaft end MUST NOT stick out of the transmission case. If the shaft is in deeper, fill the hole with silicone to prevent the shaft from moving in and out. NOTE: Shifter fork is made of non-tempered metal and may be cut with a hacksaw or Dremel® cutting tool. 3.3 Important: Remove stock spacers from main and counter shafts. Spray with silicon remover (Brake-Clean) then, using supplied cleaning pad, clean shafts, new counter and main shaft gears and tapered lock rings (inside and outside) Figure 1 3.4 With motorcycle in neutral, pull both the shafts out and simultaneously push the OEM outermost gears in until seated completely to expose the shoulders of both shafts. The countershaft shoulder should be flush with the gear face. For the main shaft the gear would “hang over” the shoulder a small bit. Figure 2 3.5 Apply supplied Champion Super-Lock retaining compound to the inside and outside surfaces of the large gear tapered split ring, to the inside of the new countershaft gear (large gear) and to the transmission countershaft (the forward most shaft). 3.6 Install new countershaft gear to the transmission countershaft. Insert tapered split ring (tapered end first) into the countershaft gear. Install ring seat tool and spring to counter shaft and new countershaft gear. Torque ring seat tool to 40 ft-lb’s. Figures 3 and 4

Incoming search terms:

HARLEY-DAVIDSON 1984 – 1999 Evo/ 5-Speed & 1999 – 2004 Twin Cam Transmissions Installation Instructions

0

Filed Under (Harley Davidson) by admin on 04-04-2012

download
Illustrated Parts List Main Shaft Gear (Small Gear) (1) Special Tools (1 set): • 3/4″ Socket Adapter • Ring-Seat Tool • Spring Tapered Split Ring (2) Counter Shaft Gear (Large Gear) (1) Trap Door Gasket (1) Trap Door (1) .010 Shim /Spacer (20) Delrin Crush Washer (2) Wavy Washer (2) Bearing Lock Nut (2) Nylon Set Screws (4+1 spare) Trap Door Cover Gasket (1) * Not illustrated : Champion Super-lock compound : 0-ring for clutch cable (if needed) : .010″ feeler gauge (3/16″ wide) : Scotch Brite Pad

Incoming search terms:

1999-2002 Kawasaki ZX6R Engine Protection Cage installation instructions

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
1. Follow installation instructions for extended frame sliders. (See page 1) Note: Do not attach delron tips or tighten extended frame sliders until all components are installed. 2. Place the cage loop inside short telescoping tubes on sliders (See fig. G) , push the º”-20 x 1 Ω” bolts through the bolt holes on the telescoping tubes from the outside and start the º”-20 lock nuts to hold cage loop in place. Do not tighten lock nuts at this time. 3. Remove the lower sub frame bolt on the left side of the motorcycle. Install the M10- 1.5 X 88mm stud in place of the sub frame bolt. Place an M10 flat washer and M10-1.5 hex nut on the stud on the interior side of the sub frame. Slide the following components over the stud on the outside of the sub frame in this order: 1.1″ spacer, side strut, (marked with “L”) and M10-1.5 hex nut. (See fig. I) Do not tighten the hex nuts at this time. Repeat for other side using side strut marked with “R”. 4. Push the bottom of the cage loop towards the rear of the motorcycle while pulling the bottom of the left side strut towards the front until the bolt hole on the side strut meets the threaded hole on the tab welded to the cage loop. Attach the side strut to the outside of the tab on the cage loop with a 3/8″-24 x æ” bolt. (See fig J) Do not tighten the bolt at this time. Repeat for other side. 5. Once all components are attached tighten all bolts and nuts. Be sure to torque all engine mount bolts to factory specifications.

Incoming search terms:

KAWASAKI STX-12F, STX-15F Riva/Vortech Supercharged STX-15F Engine INSTALLATION MANUAL

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
Our race bred Supercharger System for the Kawasaki STX-15F contains all necessary engine components to produce the ultimate 80mph closed course race craft. Kit contains the same specifications that Team Kawasaki won two 2004 Pro Runabout World Titles with. System produces over 300hp using VP MS109 race fuel (Jet X). Kit includes Vortech Supercharger & Intercooler Forged Racing Pistons, Free flow Exhaust Kit, Race programmed ECU, High volume Injectors & Fuel Pump along with all necessary hardware and detailed installation instructions. Riva/Vortech Supercharged STX-15F Engine (Team Kawi Spec) PERFORMANCE DATA Stock 61 MPH @ 7,600 RPM Supercharged 80+ MPH @ 8,300 RPM RIVA STX-15F OFFSHORE RACE KIT Our Offshore Racing Kit for the Kawasaki STX-15F contains the same components and specifications that Team Kawasaki developed to dominate the international racing circuit. This modification delivers over 200hp producing awesome acceleration and a top speed of over 700mph using VP MS109 race fuel (Jet X). Kit includes high compression racing pistons, performance intake & exhaust cam shafts, Race programmed ECU along with all necessary gaskets and detailed installation instructions

Incoming search terms:

KTM OM-2 Split Body Floating Ball Valves Installation and Maintenance Instructions

0

Filed Under (KTM) by admin on 26-01-2012

download
Remove the valve from the shipping package (box or pallet) with care taken to avoid any damage to the valve and actuator (plus accessories where applicable). •Before installation, remove the seal discs from the flange. Clean the inside of the valve using an air line that includes an appropriate air-filter. Ensure that there are no solid objects such as pieces of wood, plastic or packing materials within the valve or on the valve seat. •Confirm that the materials of construction listed on the valve nameplates are appropriate for the service intended for and are as specified. When in doubt contact KTM, or your local Tyco facility. •Define the preferred mounting orientation with respect to the system pressure. The arrow on the body helps to identify the upstream side (high pressure) and downstream side (low pressure). •Ensure that all stud bolts and nuts of the body joint are firmly fastened. Caution •Verify that the direction of the flow in the line corresponds to the arrow indicated on the valve body. Valves without the arrow are bi-directional. •See the Actuator User Manual for the actuator preparation. 2.2. Installation Instructions •Ball valves are normally installed in horizontal pipes with the stem facing up. However, there are no limitations regarding the pipe or stem orientation. •Unless otherwise recommended by KTM, the valve should be installed with the ball in the open position, to ensure that the seat rings are not damaged during installation. •Particular care should be taken for valves equipped with “fail-close” actuators. •For operating temperatures above 200°C (392°F), thermal insulation of the valve body is recommended to protect the actuator/accessories from heat beyond the recommended temperature range. •Handling and lifting of the valves during installation MUST be performed following the same criteria and instructions described in points 1.2. and 1.3

Incoming search terms:

Incoming search terms: