how to install a voltage regulator on a 1998 suzuki gsxr 600

You search Auto repair manual PDF how to install a voltage regulator on a 1998 suzuki gsxr 600, if there are search results will appear below. If search results do not exist, please search by others keyword.



  how to install a voltage regulator on a 1998 suzuki gsxr 600 Direct Download speed 5282 Kb/s

  how to install a voltage regulator on a 1998 suzuki gsxr 600 Full Version speed 6162 Kb/s



HARLEY DAVIDSON SOFTAIL FRONT SPOILER KITS INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 09-03-2011

download
This instruction sheet references Service Manual information. A Service Manual for your model motorcycle is required for this installation and is available from a Harley-Davidson Dealer. Kit Contents See Figure 2 and Table 1. INSTALLATION 1. Position the vehicle on a motorcycle lift table. To prevent accidental vehicle start-up, which could cause death or serious injury, remove maxi-fuse before proceeding. (00251a) 2. Refer to the Service Manual and follow the instructions given to remove the Maxi® Fuse. 3. Raise the vehicle on the lift table to allow access to the lower front portion of the frame. 2008+ 2007 7 8 11 3 3 4 4 12 5 5 1 1 9 2 2 10 6 6 9 9 11 13 is02652c 8. 1. Two-pin voltage regulator connector (2007 only) Voltage regulator 2. 9. Voltage regulator attaching screws (2) Cable strap (2 for 2007, 1 for 2008 and later) 10. 3. Lower voltage regulator cover (2007 only) Voltage regulator bracket 4. 11. Bracket screw to engine crankcase (2) Oxygen sensor connector 12. 5. Crank position sensor connector (2007 only) Voltage regulator caddy 6. 13. Voltage regulator caddy cover Horn connectors (some 2008 and later models) 7. Four-pin voltage regulator connector (2007 only) Figure 1. Original Equipment Voltage Regulator  NOTE For 2007 models: The ground wire on the voltage regulator must be re-attached at the original location when re-installing the voltage regulator to ensure adequate ground. 4. For ALL models: See Figure 1. Remove and discard the voltage regulator caddy cover (6) from the regulator bracket (3) and caddy (5). For 2007 models: In addition, remove the lower voltage regulator cover (10). 5. Remove and retain the hex socket head screw (4) at the top left of the bracket For 2007 models: In addition, disconnect the ground wire. Free the cable straps (9) from the regulator bracket, beneath the regulator. 6. Remove the two hex socket head screws with washers (2) retaining the voltage regulator to the bracket. Remove and save the regulator, but discard the screws. 7. Remove and retain the screw (4) at the top right of the regulator bracket. Remove the bracket from the engine. 8. For 2008 and later models: Free the strap (9) that ties the jiffy stand wiring to the voltage regulator bracket. Unfasten the three-way jiffy stand sensor connector and the two-way crank position sensor connector [79] (12) from the T-studs on the back of the regulator bracket (3). Discard the bracket. Disconnect both plugs from the back of the voltage regulator (1). For 2007 models: Unfasten the four-way (7) and two-way (8) voltage regulator connectors from the T-studs on the back of the regulator bracket (3), and discard the bracket. Disconnect the voltage regulator (1) at both connectors. 9. For 2008 and later models: Unclip the two-way O 2 (oxygen) sensor electrical connector [138] (11) from the voltage regulator caddy (5). For 2007 models: Unfasten the two-way crank position sensor connector [79] (12) from the voltage regulator caddy (5). Remove the caddy from the vehicle frame. a. For 2007 models: Unclamp the bottom of the caddy from the engine mount spacers. b. For ALL models: Unhook the top clips from around the tabs on the front of the engine casting. Remove the original equipment (O.E.) caddy from the vehicle frame, and discard it.

Incoming search terms:

SUZUKI MOTORCYCLES Gsxr 600, Gsxr 750, Gsxr 1000 teak the lead

0

Filed Under (Suzuki) by admin on 12-11-2010

download
The launch of the sixth generation of Gsxr marked a shift in Suzuki’s emphasis on two fronts. One, the Gsxr 1000 now took the upper hand in the development stakes. Historically, the Gsxr 750 led the march-arriving first, gaining the most recent technology, absorbing the lion’s share of corporate pride-but by 2003 the Gsxr 1000 was in the lead. Two, the Gsxr 1000 represents another, more subtle shift for Suzuki engineering, in which the designers-the lucky guys who get to clothe these amazing machines-have more freedom of expression. With this generation, the designs turned edgier, sharper, more aggressive looking than ever. What’s more, the Gsxr 1000 K3 would be the proving ground for a host of changes brought to the Gsxr 600 and Gsxr 750 for 2004. In fact, nearly every upgrade to the smaller bikes appeared on the Gsxr 1000 a year before. But the real impetus for driving the Gsxr 1000 to the head of development and, indeed, shortening its development cycle was competition both on the track and in the showroom. For the track, it was understood that Superbike racing would revert to allowing 1000 cc four-cylinder bikes in place of the 750s that had been the limit since 1982. In 2002, Yoshimura and Mat Mladin barely lost the AMA Superbike crown to Nicky Hayden aboard the Honda RC5!. But it would be the RC’s swan song of competitiveness with the change to 1000 cc fours. To keep speeds in check, the AMA Superbike rules would require 1000 cc fours to have some additional limitations compared to the twins and triples. For example, “Cylinder heads may be ported and machined, but altering of valve angles will not be permitted; aftermarket valves, springs, retainers, and other valve-train components will be permitted; valves must be stock size and same basic material as original equipment; aftermarket camshafts will be permitted, but earn lift and resulting valve lift must be no greater than stock. “In addition, the “stock crankshaft must be retained, The only allowable modifications are balancing, polishing of bearing surfaces and attachment of accessory drives. Homologated transmission gear sets (one optional set of ratios per approved model) will be permitted. Optional sets will be price-controlled and must be available to any legitimate AMA Superbike competitor. Homologated fuel-injection throttle-body assemblies (one optional type per approved model) and aftermarket airboxes will be permitted. Modifications to throttle bodies will not be permitted. Optional throttle bodies will be price-controlled and must be available to any legitimate AMA Superbike competitor.” The thinking was simple: keep the liter bikes from sucking through massive throttle bodies, and the horsepower might not (and, it was hoped, would not) go through the roof. In preparation for racing, Suzuki moto wanted to make a host of small changes to the Gsxr 1000, but its motivation was also to keep the bike at the forefront of open-class street bikes. Suzuki engineers knew that Honda and Kawasaki were readying all-new models-the CBR 954 RR and the ZX 9 R had long since been vanquished-and rumor had it that Yamaha was ready with yet another push with the R1.It was the right time to make alterations to the Gsxr 1000. Heading the list was, as one might expect, a revised engine.

Incoming search terms:

SUZUKI Hayabusa, GSXR 1000, GSXR 750, GSXR 600 Sport Brake Lever INSTALLATION MANUAL

0

Filed Under (Suzuki) by admin on 21-02-2012

download
Before you install your new ASV brake lever, you MUST choose the correct brake light switch tab to install. You will find in the package with this lever one plastic bag with four smaller bags inside of it. One bag has two small phillips screws. The other three bags have small black aluminum blocks (light switch tabs) with labels on them. Part# BRC511-H is ONLY for HONDA motorcycles. Part# BRC511-STK is for all SUZUKI, TRIUMPH and 05-06 KAWASAKI ZX636R motorcycles ONLY. Part# BRC511-K is for all KAWASAKI motorcycles EXCEPT the 05-06 ZX636R . Choose the correct tab for your bike and install it onto the lever as shown in photo 2b using the two small Phillips head screws provided. It is recommended that you use locktite or another type of thread locking adhesive to make sure these screws do not come loose. Be sure to tighten these screws as tight as you can without stripping them. The brake stop / light tab is required for your ASV brake lever to work properly Carefully place the lever into the master cylinder while inserting the plunger rod into the barrel hole as shown in photo 4. Install the main pivot bolt, and tighten it until it is snug against the master cylinder. Do not over-tighten, as it could cause the lever to bind in the master cylinder

SUZUKI SV 1000 RADIATOR (COOLING SYSTEM) SERVICE MANUAL

0

Filed Under (Suzuki) by admin on 26-02-2011

download
FI SYSTEM MALFUNCTION CODE AND DEFECTIVE CONDITION MALFUNCTION CODE DETECTED ITEM DETECTED FAILURE CONDITION CHECK FOR COO NO FAULT C11 Camshaft position sen- sor The signal does not reach ECM for more than 3 sec . after receiving the starter signal . The camshaft position sensor wiring and mechanical parts (Camshaft position sensor, intake cam pin, wiring/coupler con- nection) C12 Crankshaft position sensor The signal does not reach ECM for more than 2 sec . after receiving the starter signal . The crankshaft position sensor wiring and mechanical parts (Crankshaft position sensor, wiring/coupler connection) C13 Intake air pressure sensor The sensor should produce following voltage . (0.50 V < sensor voltage < 4 .85 V) Without the above range, C13 is indicated. Intake air pressure sensor, wiring/coupler connection C14 Throttle position sen- sor The sensor should produce following voltage . (0.20 V < sensor voltage < 4 .80 V) Without the above range, C14 is indicated. Throttle position sensor, wiring/coupler connection C15 Engine coolant temperature sensor The sensor voltage should be the following. (0.15 V <_ sensor voltage < 4 .5 V) Without the above range, C15 is indicated. Engine coolant temperature sensor, wiring/coupler connection C21 Intake air temperature sensor The sensor voltage should be the following. (0.15 V < sensor voltage < 4 .5 V) Without the above range, C21 is indicated. Intake air temperature sensor, wiring/coupler connection C22 Atmospheric pressure sensor The sensor voltage should be the following. (0.50 V < sensor voltage < 4 .5 V) Without the above range, C22 is indicated. Atm. pressure sensor, wiring/coupler connection C23 Tip over sensor The sensor voltage should be the following for more than 2 sec . after ignition switch turns ON . (0 .20 V < sensor voltage < 4 .80 V) Without the above value, C23 is indicated. Tip over sensor, wiring/coupler connection C24 or C25 Ignition signalCrankshaft position sensor signal is produced and ECM determines the ignition signal but signal from ignition coil is interrupted continuous by 4 times or more. In this case, the code C24 or C25 is indicated. Ignition coil, wiring/coupler connection, power supply from the battery SERVICING INFORMATION 8 .3 C28 Secondary throttle valve actuator No operating voltage is supplied from the ECM, C28 is indicated. STVA can not operate. STVA lead wire/coupler, STVA C29 Secondary throttle valve position sensor The sensor should produce following voltage . (0.10 V < sensor voltage < 4 .90 V) Without the above range, C29 is indicated . Secondary throttle position sensor, wiring/coupler connection C31 Gear position signalGear position signal voltage should be higher than the following for more than 2 seconds. (Gear position switch voltage >_ 0 .6 V) Without the above value, C31 is indicated. Gear position sensor, wiring/coupler connection, gearshift cam, etc. C32 or C33 Fuel injector Crankshaft position sensor signal is produced and ECM determines the injection signal but fuel injection signal is interrupted continuous by 4 times or more. In this case, the code C32 or C33 is indicated. Injector, wiring/coupler connection, power supply to the injector C41 Fuel pump relay No voltage is applied to fuel pump although fuel pump relay is turned ON, or voltage is applied to fuel pump although fuel pump relay is turned OFF . Fuel pump relay, connecting lead, power source to fuel pump relay C42 Ignition switchIgnition switch signal is not input in the ECM . Ignition switch, lead wire/coupler C44 Heated oxygen sensor (HO2S) [For E-02, 19] During 02 feedback control, 02 sensor voltage is higher or lower than the specification . No signal is detected during engine operation or no electrical power is supplied from the battery . HO2S lead wire/coupler connection Battery voltage supply to the HO2S C49 PAIR control solenoid valve (PAIR valve) When no operating voltage is supplied from the ECM, C49 is indicated. PAIR valve can not operate. PAIR valve lead wire/coupler

Incoming search terms:

HARLEY DAVIDSON FRONT THUNDERSTAR WHEELS INSTALLATION

0

Filed Under (Harley Davidson) by admin on 08-11-2010

download
Remove existing front wheel assembly. Save axle, axle nut, brake disc, and wheel spacers for kit installation. Refer to FRONT WHEEL in service manual. For FLSTC and FLSTN Models: Discard moon-style hub cap. -J04065 1 of 8 For FXSTD Models: Discard the tapered r ight side wheel spacer. Do not re-use brake disc/rotor screws. Re-using these screws can result in torque loss and damage to brake components. (00319c) NOTE • For Kits 43573-08, 43575-08, 43703-08, 43978-07, 43771- 07, 43609-07, 44323-07, 44282-07, 44322-07, 43975-07, 43602-07 and 43773-07 install short valve stem (43157- 83A) included in the installation kit. • For Kits 40943-09, 40966-09 and 40996-09 install long valve stem (43206-01) included in the installation kit. 2. See Figure 2. Install valve stem assembly (L, M or N) on wheel. Refer to TIRES in service manual. 3. Assemble wheel installation kit components and brake disc(s) to wheel, using the appropriate service parts table. Refer to FRONT WHEEL in Service Manual. NOTES Install the primary bearing first using appropriate service manual and WHEEL BEARING REMOVER/INSTALLER. For Kits 43573-08, 43575-08, 43703-08, 43978-07, 43771-07, 43609-07, 40943-09, 40966-09 and 40996-09: • The left side of the wheel has a machined groove (item 5, Figure 2) in the hub face and/or DOT markings to identify it as the brake disc and primary bearing side. • Install the wheel so that the valve stem is on the right side of the motorcycle. For Kits 44323-07, 44322-07 and 44282-07: • Install the wheel so that the hub markings are on the left side of the motorcycle. The left side of the wheel has a machined groove (item 5, Figure 2) in the hub face and hub markings to identify it as the primary bearing side. • These kits include one or two hub plates (43985-00) to install between the brake disc and the wheel and a chrome hub cap (43986-00) to install on the wheel opposite the brake disc side. Hub covers must be installed to prevent water intrusion, which could cause an imbalance condition. Dual brake disc models: Install one stainless steel hub plate (3) between each brake disc and wheel hub. Discard chrome hub cap (2). Install brake discs according to service manual procedures. Single brake disc models: Install one stainless steel hub plate (3) between the brake disc and wheel hub. Install the brake disc according to service manual procedures. Install the chrome hub cap (2) on the side opposite the brake disc. Discard extra stainless steel hub plate (3). • The gross axle weight ratings is unaffected by the installation of this wheel on a vehicle equipped with a 21-inch wheel. For Kits 43975-07, 43773-07, and 43602-07: • The wheel has a machined groove (item 5, Figure 2) in the hub face to identify the right side. • For 2007 and later FX Softail Models and 2008 and later FXDWG: The left side of the wheel is the primary bearing side. For all other models the right side of the wheel is the primary bearing side. • For Kit 43602-07: An arrow is engraved into the right side hub to indicate the direction of rotation. • For Kits 43975-07 and 43773-07: An arrow is cast between the spokes on the right side to indicate the direction of rotation. • These kits include one or two hub plates (43985-00) to install between the brake disc and the wheel and a chrome hub cap (43986-00) to install on the wheel opposite the brake-disc side. Hub covers must be installed to prevent water intrusion, which could cause an imbalance condition. Dual brake disc models: Install one stainless steel hub plate (3) between each brake disc and wheel hub. Discard chrome hub cap (2). Install brake discs according to service manual procedures. Single brake disc models: Install one stainless steel hub plate (3) between the brake disc and wheel hub. Install the brake disc according to service manual procedures. Install the chrome hub cap (2) on the side opposite the brake disc. Discard extra stainless steel hub plate (3). 4. Install wheel assembly parts from the appropriate Service Parts table for this fitment and stock brake disc. Discard parts from the installation kit that are not required. Refer to FRONT WHEEL in Service Manual. 5. For FLSTC and FLSTN Models: Install wheel kit and right side wheel spacer provided in installation kit. For FXSTD Models: Install wheel kit, stock left wheel spacer and right side wheel spacer from installation kit in place of the tapered right side wheel spacer discarded in Step 1. Refer to FRONT WHEEL in service manual. For FXSTS Models: Install the left side wheel spacer provided in the kit between the stock left wheel spacer and the left fork. All other models: Install wheel spacers previously removed. 6. Install front wheel (1), stock axle and stock axle nut. Refer to FRONT WHEEL in service manual

Incoming search terms:

HARLEY DAVIDSON DYNA VOLTAGE REGULATOR KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 10-04-2011

download
INSTALLATION 1. Remove and discard the original voltage regulator mounting screws. 2. See Figure 1. Place a chrome washer (4) onto each of the button head screws (5) from the kit. Insert the screws into the mounting holes in the new voltage regulator cover (1). Place first a spacer (2), then a Nylon washer (3) over the screw threads on the inside of the cover. 3. Fasten the cover through the voltage regulator into the motorcycle frame. Tighten to 60-80 in-lbs (6.8-9.0 Nm) . SERVICE PARTS 5 3 4 5 1 4 2 2 is01725 Figure 1. Voltage Regulator Cover Components Table 1. Service Parts: Voltage Regulator Cover Components Part Number Description (Quantity) Item Not Sold Separately Regulator cover 1 Not Sold Separately Spacer, 1.0 inch (25 mm) long (2) 2 62917-01 Washer, Nylon (2) 3 Not Sold Separately Washer, Chrome (2) 4 Not Sold Separately Screw, button head, hex socket 1/4-20 x 2-1/4 inch long (2

XR 600 Dual Sport Kit Installation Manual

0

Filed Under (Pulsar) by admin on 27-10-2010

download
1. Get a degree in Mechanical and Electrical Engineering. (Just kidding!) 2. Remove the side panels, seat, and gas tank. 3. Unplug the headlight and taillight from the stock wiring and remove. 4. Locate the AC voltage regulator mounted on the left side of the frame backbone, (Fig.1) unplug from wiring harness, and remove the regulator. This regulator is located above the air box on ’87 and earlier XR 600′s and 500′s. AC Regulator (Remove) Pulsar Coil Alternator (Stator) Wiring Alternator (Stator) Contains both exciter coil and lighting coils Figure 1: If you are colorblind or even think you might be a little color blind, now is the time to get someone to assist you. Successful installation of the kit requires good color recognition. You want to go riding this weekend, don’t you? 5. A three wire group consisting of a black/red wire, a green wire, and a white/yellow wire (may appear light gray/yellow) are the output leads from the stator. 1990 and earlier models only have two wires coming up from the alternator, a black/red wire and a blue wire. On 1991 – 1999 XR 600′s, unplug the green wire and the white/yellow wire. (This should have already been done 3 when you removed the voltage regulator in Step 4.) On 1990 and earlier XR 600′s see the Stator Modification Instructions enclosed. 6. Temporarily disconnect the black/red wire and remove the rubber boot that shields the wire bundle. Reconnect the black/red wire making sure that it plugs in tightly, as this lead is responsible for powering the bike’s ignition. 7. Voltage Regulator Installation: The voltage regulator/rectifier mounts to the top right rear corner of the air box (Photo 1). Use the template provided to determine the location at which to drill the two 1/4 inch mounting holes in the air box lid. The outside edge of the regulator should be nearly flush with the outside edge of the air box when mounted properly.

2008 Suzuki GSXR 600-750 Super bike Kit INSTALLATION INSTRUCTIONS

0

Filed Under (Suzuki) by admin on 29-01-2011

download
Step 1: Identify the key components that complete our SUPERBIKE brake line kit: You should have two (2) hoses, one (1) double banjo bolt, and two (2) male adapters with two 1.55mm thick washers. There are also a total of (7) washers. five (5) will be used, and two (2) are spares. We strongly suggest having a professional mechanic install these brake lines; all other installations VOID warranty. Step 2: To ensure no paint damage from a brake fluid spill, completely cover the front end of the bike. This process is messy, and brake fluid WILL drip! Step 3: Uninstall stock hoses; be aware of how the stock system was routed in case you need to re-install it. Step 4: Install the Galfer adapters onto the right and left calipers. Thread each adapter with the two thick crush washers provided into the calipers with one washer, and torque at 12 to 13 ft pounds. Step 5: Install the right and left lines to the calipers, using the shorter line on the right side. These lines will travel from the master cylinder to the calipers; a double banjo bolt is included to run two lines down. The positioning sequence on the master cylinder is as follows: Master cylinder, washer, 90 degree banjo from left line, washer, 90 banjo from right line, washer and double banjo hex. Double banjo bolt torque level is 12 FT Pounds. (For positioning see picture A) Make sure that the 90-degree fittings on each caliper are pointing away from the bike just a little bit (see picture B) . Thread each female end into the adapter, and torque to 6 ½ Ft pounds. Before you proceed to the next step, please check for clearance of the lines. Compress the front end to make sure that the lines are not binding with anything. When the front end is fully extended or fully compressed, double check that the lines are traveling correctly and clear from any obstructions. Once the lines have been checked for clearance, we recommend using (GALFER’S C-CLIP) to bring the lines together about the same level as the lower triple clamp.

HONDA GL1100 AM/FM RADIO INSTALLATION MANUAL/ WIRING DIAGRAM

0

Filed Under (Honda) by admin on 22-04-2011

download
INSTALLATION ■ Outline Procedures This section gives general information needed for mounting the individual radio components on and in the fairing. A) Fairing 1) Install radio on fairing before mounting fairing on motorcycle. (Remove fairing from your motorcycle when already mounted). 2) Remove fairing parts. 3) Drill unit mount holes. 4) Install six wire clips. 5) Install windshield on fairing before install- ing speakers. 6) Install radio indicator I on indicator panel II , then install indicator panel on fairing. 7) Install speakers III. 8) Install nutplate IV. 9) Install Power Amplifier in fairing. 10) Install radio funer VI. 11) Install the radio controller VII. 12) Install controller base panel VIII 13) Install radio switch sub-wire. 14) Connect adapter harness and wires inside fairing by working through left turn signal lens hole. B) Motorcycle frame and handlebar 1) Remove travel trunk and seat. Unscrew four shelter bolts (M6, one on each side at front and rear) to route antenna feeder. 2) Install antenna mount and antenna IX. 3) Route antenna feeder along the frame tube. 4) Install radio switch X on left handlebar lever bracket and route the wires. 3 of 11 Page 4 C) Fairing instllation 1) Install fairing on motorcycle. 2) Connect motorcycle wire harness 9-P coupler to fairing wire 9-P coupler. 3) Connect radio switch wire to switch sub- wire.4) Connect antenna feeder. 5) Confirm that radio operates properly. Reinstall parts removed in step 2 or (A) and in step 1 of (B). REWORKING ■ Remove Fairing and Fairing Parts (Fig.10) 1) Install radio on fairing before mounting fairing on motorcycle. (Remove fairing from your motorcycle when already mounted). 2) Remove right and left fairing pockets, right and left turn signal lenses, right and left nutplates, left hole cover and indi- cator base panel from fairing. (Fig.10) Fig. 10 LEI-1 NU I PLATE 4 of 11■ Reworking on Fairing — Speaker mounting holes- 1) Remove 18 mm grommet. 2) Lightly roll template so that it will follow contour of fairing snugly. 3) Position template on fairing with its upper and outer edges aligned with those offairing as indicated by arrows. 4) Attach template to fairing using adhesive tape where shown. 5) Punch mark centers of four holes with a
drift and hammer. 6) Drill 6 mm holes through marked centers. To obtain a more balanced response with richer, deeper bases, drill two 50 mm holes in the fairing so as to link the speaker box with the inside of the fairing. Fig. 11-1
—Power amplifier mounting holes- 7) Drill two 5.5 mm holes through concaves in fairing. Fig. 11-2 RIGHT HAND SHOWN, LEFT SIMILAR ADHESIVE TAPE

Incoming search terms:

2006-up Harley-Davidson Single Bore Induction System Installation Instructions

0

Filed Under (Harley Davidson) by admin on 10-11-2010

download
Remove the stock fuel induction system, including the manifold and disconnecting all wire connections. It is up to the technician as to whether the gas tank should be removed or just raised up in the rear. Picture 1 2- You will need to disassemble the stock induction system to remove the pre-listed parts for re-use. 3- Verify the new manifold size is appropriate for your motorcycle by sliding it in place. Picture 2 Picture 3 4 5- Slide the MAP sensor in place, being sure not to pinch the orange rubber seal—some clean engine oil may make this easier. Install the cable guide and verify it is aligned with the throttle cable actuator. Once alignment is satisfactory, apply Loctite® 222 to the 10-24 x 1/4″ screws and tighten to 18-22 in-lbs. 4- Install the new O-ring into the throttle body. A light film of clean engine oil can be used to help hold the O-ring in place. Align the manifold to the throttle body, use purple 222 Loctite® on the 10-24 x 1″ socket-head assembly screws (with flat washers) and tighten them to 35-40 in-lbs. 6- Using the new S&S® supplied gasket, slide the S&S supplied intake air temperature (IAT) sensor in place. Use Loctite 222 on the T10 Torx button head M3 x .5 x 10mm screws and tighten to 6-8 in-lbs. Picture 4 Picture 5 Picture 6 5 7- For the stock throttle position sensor attach the “C” shaped spacer to the end of the throttle shaft, put a 4mm flat washer on each T20 Torx button head M4 x .7 x 12mm screw, apply some Loctite® 222 and torque screws to 18-23 in-lbs. 8- Install the new O-ring on the IAC motor. Lubricate the OD of the O-ring with a light film of clean engine oil. Put a 4mm flat washer on each T20 Torx button head M4 x .7 x 12mm screw, coat the threads with Loctite 222. Install the IAC motor and tighten the screws to 18-23 in-lbs. 9- Partially install the fuel injectors in the fuel rail. Be sure to orient the black O-rings to the rail and align the clocking tabs with their holes. It may be helpful to lubricate the O-rings with clean engine oil. See Picture 9. NOTE : These are special O-rings that seal pressurized gasoline. If you see one with damage or an abrasion—replace it immediately. Picture 7 Picture 8 Picture 9 6 10- Connect the Injectors to the manifold with a light squeezing action. Lubricate the O-rings with clean engine oil. Once in place, use Loctite® 222 on the threads of two 8-32 x 5/8″ slotted panhead screws and tighten to 15-20 in-lbs. 11- Install the backing washer and O-ring on the fuel supply tube. Lubricate the O-ring with clean engine oil. When the tube is in place, position the Y-shaped clip on the fuel rail and tighten the Loctite 222 coated T20 Torx button head M4 x 7 x 12mm screw to 18-23 in-lbs – Gently push the injectors downward toward the manifold to increase clearance for connecting the wire connectors. Cut the existing injector connectors from the motorcycle harness. Slide the sleeveing onto the injector harness. Slide heat shrink tubing on to each wire of the injector harness wires. Crimp the butt splices to the motorcycle harness. Move the heat shrinks over the splices and shrink with a heat gun. Slide the sleeve into place. Picture 10 Picture 11a Picture 11b Picture 12 Picture 12a 7 13- Put the stock manifold flanges on the manifold. YOU MUST USE THE S&S® RUBBER GASKETS ON THEM. Be sure to orient the tapered end towards the manifold and the flat end to the heads. 14- Hold the manifold up in its basic mounting position and connect all of the wiring harness connectors at this time. Install the manifold using the stock mounting flange bolts (from the primary side of the motorcycle) coated with Loctite® 242 and the new S&S cam side screws (1/4″ socket head, 5/16-18 x 3/4″). If a screw longer than 3/4″ is used, damage to the heads will result. Lightly snug all four manifold mounting bolts but DO NOT TIGHTEN AT THIS TIME. Connect the throttle cables and cruise control bracket (if applicable) at this time. NOTE: The Harley-Davidson® service manual for your model motorcycle will be helpful during this step. 15- Install the breather system now. On 4.00-inch bore or smaller engines the breather uses banjo fittings with hollow bolts and connects across the heads to the intake with a T-hose. This hose will need to be trimmed and have spring clamps attached as shown in photo. Torque the hollow bolts to 10-12 ft-lbs. On 41/8-inch bore or larger engines, install the sharp bent hose on the rear head and install the check valve with the white end towards the head. Mount the other hose on the black end of the check valve and connect it to the throttle body using spring clamps to secure the connections. Picture 13 Picture 14 Picture 15 8 16- Once the breathers are secure, install the fuel line per the factory service manual you are working with. Connect the battery and verify the fuel pump turns on to pressurize the system and there are no gas leaks, but DO NOT START THE ENGINE. At this time, PC software may also be used to verify sensor readings and adjust the throttle position sensor voltage if necessary. 17- Install two 242 Loctite® coated pipe plugs (included in kit) in the air cleaner backplate as shown in Picture 16. Torque to 35-45 in-lbs. Also, two pan screws coated with Loctite® 222 must be installed in the backplate in place of the enrichment device. See Picture 16a. Torque them to 12-18 in-lbs. Failure to install these screws could allow dirt and debris into the intake system. 18- Use a new gasket on the backplate and put it in place noting the number of shims required. Once you select the appropriate shims (included) mount the backing plate to the engine but DO NOT INSTALL THE SCREWS YET

Incoming search terms:

Incoming search terms: