how to install harley handlebar damper

You search Auto repair manual PDF how to install harley handlebar damper, if there are search results will appear below. If search results do not exist, please search by others keyword.



  how to install harley handlebar damper Direct Download speed 5282 Kb/s

  how to install harley handlebar damper Full Version speed 6162 Kb/s



HARLEY DAVIDSON FRONT THUNDERSTAR WHEELS INSTALLATION

0

Filed Under (Harley Davidson) by admin on 08-11-2010

download
Remove existing front wheel assembly. Save axle, axle nut, brake disc, and wheel spacers for kit installation. Refer to FRONT WHEEL in service manual. For FLSTC and FLSTN Models: Discard moon-style hub cap. -J04065 1 of 8 For FXSTD Models: Discard the tapered r ight side wheel spacer. Do not re-use brake disc/rotor screws. Re-using these screws can result in torque loss and damage to brake components. (00319c) NOTE • For Kits 43573-08, 43575-08, 43703-08, 43978-07, 43771- 07, 43609-07, 44323-07, 44282-07, 44322-07, 43975-07, 43602-07 and 43773-07 install short valve stem (43157- 83A) included in the installation kit. • For Kits 40943-09, 40966-09 and 40996-09 install long valve stem (43206-01) included in the installation kit. 2. See Figure 2. Install valve stem assembly (L, M or N) on wheel. Refer to TIRES in service manual. 3. Assemble wheel installation kit components and brake disc(s) to wheel, using the appropriate service parts table. Refer to FRONT WHEEL in Service Manual. NOTES Install the primary bearing first using appropriate service manual and WHEEL BEARING REMOVER/INSTALLER. For Kits 43573-08, 43575-08, 43703-08, 43978-07, 43771-07, 43609-07, 40943-09, 40966-09 and 40996-09: • The left side of the wheel has a machined groove (item 5, Figure 2) in the hub face and/or DOT markings to identify it as the brake disc and primary bearing side. • Install the wheel so that the valve stem is on the right side of the motorcycle. For Kits 44323-07, 44322-07 and 44282-07: • Install the wheel so that the hub markings are on the left side of the motorcycle. The left side of the wheel has a machined groove (item 5, Figure 2) in the hub face and hub markings to identify it as the primary bearing side. • These kits include one or two hub plates (43985-00) to install between the brake disc and the wheel and a chrome hub cap (43986-00) to install on the wheel opposite the brake disc side. Hub covers must be installed to prevent water intrusion, which could cause an imbalance condition. Dual brake disc models: Install one stainless steel hub plate (3) between each brake disc and wheel hub. Discard chrome hub cap (2). Install brake discs according to service manual procedures. Single brake disc models: Install one stainless steel hub plate (3) between the brake disc and wheel hub. Install the brake disc according to service manual procedures. Install the chrome hub cap (2) on the side opposite the brake disc. Discard extra stainless steel hub plate (3). • The gross axle weight ratings is unaffected by the installation of this wheel on a vehicle equipped with a 21-inch wheel. For Kits 43975-07, 43773-07, and 43602-07: • The wheel has a machined groove (item 5, Figure 2) in the hub face to identify the right side. • For 2007 and later FX Softail Models and 2008 and later FXDWG: The left side of the wheel is the primary bearing side. For all other models the right side of the wheel is the primary bearing side. • For Kit 43602-07: An arrow is engraved into the right side hub to indicate the direction of rotation. • For Kits 43975-07 and 43773-07: An arrow is cast between the spokes on the right side to indicate the direction of rotation. • These kits include one or two hub plates (43985-00) to install between the brake disc and the wheel and a chrome hub cap (43986-00) to install on the wheel opposite the brake-disc side. Hub covers must be installed to prevent water intrusion, which could cause an imbalance condition. Dual brake disc models: Install one stainless steel hub plate (3) between each brake disc and wheel hub. Discard chrome hub cap (2). Install brake discs according to service manual procedures. Single brake disc models: Install one stainless steel hub plate (3) between the brake disc and wheel hub. Install the brake disc according to service manual procedures. Install the chrome hub cap (2) on the side opposite the brake disc. Discard extra stainless steel hub plate (3). 4. Install wheel assembly parts from the appropriate Service Parts table for this fitment and stock brake disc. Discard parts from the installation kit that are not required. Refer to FRONT WHEEL in Service Manual. 5. For FLSTC and FLSTN Models: Install wheel kit and right side wheel spacer provided in installation kit. For FXSTD Models: Install wheel kit, stock left wheel spacer and right side wheel spacer from installation kit in place of the tapered right side wheel spacer discarded in Step 1. Refer to FRONT WHEEL in service manual. For FXSTS Models: Install the left side wheel spacer provided in the kit between the stock left wheel spacer and the left fork. All other models: Install wheel spacers previously removed. 6. Install front wheel (1), stock axle and stock axle nut. Refer to FRONT WHEEL in service manual

Incoming search terms:

HARLEY DAVIDSON FLAME HANDLEBAR GRIPS REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 12-02-2011

download
REMOVE AND INSTALL THE LEFT GRIP 1. See Figure 1. Using a T27 TORX® drive head, remove the two screws with flat washers securing the handebar clamp (3) to the clutch lever bracket. Remove the clamp and position the clutch hand lever assembly away from the handlebar 2. Using a T25 TORX® drive head, loosen but do not remove the upper and lower switch housing screws (1). 3. Remove the end cap from the existing left handlebar grip if so equipped. Remove the grip by carefully cutting it away from the handlebar using a sharp blade or knife. Do not lubricate left handlebar grip before installation. Lubricating grip can cause it to come off while riding, which could result in loss of control and death or serious injury. (00315a) NOTE Make sure that the handlebar surface and the inside of the grip are smooth, dry and thoroughly cleaned of all dirt or adhesive residue. 4. Position the new left grip (4) so the larger flange (5) is at the bottom. Push the grip fully onto the handlebar. 5. Fit the grooves (2) on the outboard side of the upper and lower switch housing over the flanges on the end of the grip, then loosely fasten the two screws. 6. Position the clutch hand lever assembly inboard of the switch housing assembly, engaging the tab on the lower switch housing in the groove at the bottom of the clutch lever bracket. 7. Align the holes in the handlebar clamp with those in the clutch lever bracket, and loosely fasten the two screws with flat washers. Adjust the switch housing and clutch hand control position for rider comfort. 8. Using a T27 TORX® drive head, tighten first the upper, then the lower handlebar clamp screws to 60-80 in-lbs (6.8-9 Nm) . 9. Using a T25 TORX® drive head, tighten first the lower, then the upper switch housing screws to 35-45 in-lbs (4- 5.4 Nm) . 5 3 1 1 4 2 2 is00735 1. Switch housing screws 2. Grooves 3. Handlebar clamp 4. Left handlebar grip 5. Larger flange Figure 1. Left Handlebar Switch Housing REMOVE AND INSTALL THE RIGHT GRIP NOTE Right handlebar switch removal requires a Service Manual for your model and year of motorcycle. A Service Manual can be purchased from your Harley-Davidson Dealer. 1. Refer to the RIGHT HANDLEBAR SWITCH section of the Service Manual for removal of the switch housing assembly. This is necessary to access the throttle cables. 2. Refer to the THROTTLE CONTROL section of the Service Manual to disconnect the throttle cables and remove the existing right grip/throttle sleeve assembly. After removal, make sure that the handlebar end is clean and smooth. 3. Follow instructions in the Service Manual to install the new right grip/throttle sleeve to the handlebar and connect the throttle cables. 4. Verify that the right grip/throttle sleeve rotates and returns freely and does not bind on the handlebar or switch housing.

Incoming search terms:

Victory V92SC Sport Cruiser COMFORT SPORT HANDLEBAR REMOVAL AND INSTALLATION

0

Filed Under (Victory) by admin on 13-11-2010

download
1. Remove wiring harness dart clips. 2. Disconnect clutch switch connector. 3. Remove 2screwsforclutch lever bracket clamp, remove clutch lever bracket from handlebar. 4. Remove screws for left handlebar switch assembly. Disconnect fast idle cable from lever. Remove switch assembly. 5. Grasp left grip end firmly. While twisting grip end back&forth, pull grip end off and discard. 6. Remove left grip by insertingathin screwdriver between the grip and handlebar end. Spray as mall amount of water/soap solution into the area between the grip and handlebar end. Aggressively twist the grip back-and-forth while simultaneously pulling the grip off. 1. Locate accessory handlebar. 2. Clean inside of throttle grip assembly and throttle cable flange grooves. Ill. 1. 3. Clean throttle grip area. Ill. 1. 4. Slide throttle assembly onto right handlebar end (cableshavenot been removed and should still be attached to the throttle tube). 5. Position the handlebar over the top of the triple clamp and reinstall using bolts removed instep 10. of handlebar removal. Torque to 30 ft. lbs. 6. Install right handlebar switch housing onto handlebar. NOTE: Make sure that locating pin of switch assembly aligns with hole in handlebars. 7. Install right handlebar switch housing screws, make sure locating pin properly aligns with hole in handlebar. Tighten screws to specified torque. 8. Install master cylinder and clamp, install screws. 9. Torque screws to specification. 10. Connect front brake switch wiring harness. 11. Install fast idle cable onto fast idle lever. 12. Clean inside of left grip and handlebar grip surfaces

Incoming search terms:

HARLEY DAVIDSON SLOTTED HANDLEBAR RISER KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 02-02-2011

download
INSTALLATION NOTE Cover the fuel tank with a clean shop towel to prevent scratching. Damage to the finish could result. 1. Remove the two hex head cap screws and split lock- washers on the underside of the upper fork bracket that hold the currently installed risers in place. Discard the screws, but retain the lockwashers for re-assembly. Retain all additional hardware components that become dislodged from the riser when the screws are removed. 2. Remove and discard the four screws that fasten the currently installed handlebar upper clamp(s) to the risers. Remove and discard the clamp(s). Remove the handlebar from the risers, and carefully allow the handlebar to rest on the fuel tank. 3. Obtain the new slotted risers (1) and hex head cap screws (2) from the kit, and the split lockwashers and hardware components removed in Step 1. NOTE The upper cup washer (A) must be oriented with the flat side up , and the lower cup washer (D) with the flat side down . The ground wire (G) and internal tooth lockwasher (H) are mounted to the right-side riser. 4. Refer to Figure 1 for the correct orientation and reassembly sequence. Install the new risers onto the upper fork bracket using the saved hardware and new screws. Snug the riser screws, but do not fully tighten at this time. 5. Center the handlebar on the risers. To make sure that the handlebar is centered, verify that the knurled areas on the outboard side of each riser are equal. 6. Position the new handlebar upper clamps (3) from the kit, and install with new hex socket head screws (4). Snug the upper screws, but do not fully tighten. Improperly aligned handlebars can contact the fuel tank when turned to the left or right. Contact with the fuel tank can cause cosmetic damage. (00372a) 7. Slowly turn the front wheel to the full right fork stop and then the full left fork stop to be sure the handlebar does not contact the fuel tank. If contact occurs and the handlebars are properly centered, raise the handlebar angle as necessary until proper clearance is attained. 8. Tighten the upper handlebar-clamp screws as follows: a. Tighten the front screws to 12-15 ft-lbs (16-20 Nm) . b. Tighten the rear screws to 12-15 ft-lbs (16-20 Nm) . c. Tighten the front screws to 12-15 ft-lbs (16-20 Nm) . NOTE The gap between the upper clamps and the risers should be equal at the front and rear of the handlebar after tightening. 9. One at a time, remove the riser bolts installed in Step 4. Apply two drops of Loctite® 271 (Red) to the bolt threads and re-install. Tighten the riser bolts to 50-60 ft-lbs (68-81 Nm)

Incoming search terms:

HARLEY DAVIDSON CHROME HANDLEBAR CLAMP BOLT KITS INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 02-02-2011

download
INSTALLATION Improperly aligned handlebars can contact the fuel tank when turned to the left or right. Contact with the fuel tank can cause cosmetic damage. (00372a) NOTES Check that the handlebar is centered on the risers. To make sure that the handlebar is centered, verify that the knurled areas on the outboard side of each riser are equal. Slowly turn the front wheel to the full right fork stop and then the full left fork stop to be sure the handlebar does not contact the fuel tank. If contact with the fuel tank occurs or the handlebars are not properly centered, see Figure 1. Slightly loosen the four upper clamp screws, and center the handlebar or raise the handlebar angle as necessary until proper clearance is obtained, then temporarily snug the screws, but do not fully tighten. 4 1 2 3 4 is00868 1. Upper clamp 2. Screw (4) 3. Handlebar 4. Handlebar risers (2) Figure 1. Handlebar Clamp Hardware 1. Remove and discard screws (2) that fasten upper clamps (1) to handlebar risers (4). Save washers under screw head for later use. 2. For Kit 94453-04: Select new chrome screws from the kit that match the length of the screws removed. For all other Kits: Select new chrome screws from the kit. 3. Slide washers previously removed onto screws, and thread screws through the upper clamps into risers. -J03586 1 of 2 4. If handlebar adjustments were made, snug screws but do not fully tighten. a. The bottom surfaces of upper clamps are offset, creating a gap between the clamp and riser on one side. b. Tighten clamps so the gaps appear to the rear of the handlebar, then tighten screw to 12-15 ft-lbs (16.3- 20.3 Nm). 5. If handlebar adjustments were not made, tighten screws to 12-15 ft-lbs (16.3-20.3 Nm). SERVICE PARTS

HARLEY DAVIDSON FAT HANDLEBAR RISER KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 22-03-2011

download
INSTALLATION NOTES The upper cup washer (A) must be oriented with the flat side up and the lower cup washer (D) with the flat side down. See Figure 1 for the following procedure. 1. Align the components as shown, and install the risers (2) to the upper fork bracket. The ground wire (G) and the internal tooth lock washer (H) are located on the right side only. Do not tighten the riser mounting screws (I) at this time. 2. If an appropriate Harley-Davidson 1-1/4 inch handlebar has not been installed, install one according to the Instruction Sheet included with the kit, or re-install the handlebar assembly onto the risers. 3. Loosely install riser caps (1) onto the handlebars and risers using four socket head screws (3) as shown. 4. Ensure that the risers stay properly aligned with the handlebar and tighten the riser mounting screws (I) to 50-60 ft-lbs (68-81 Nm) . 5. Adjust handlebar to the desired position, ensure that it is centered on the risers, then, starting with the front screws, tighten the four socket head screws (3) to 12-15 ft-lbs (16- 20 Nm) . 6. Turn the handlebars full right and left. Check that: •The handlebars and triple tree clamps do not contact the fuel tank. •The steering stops function properly. •The wiring and brake line are not pinched or kinked in the steering assembly. •Throttle returns from full open to close at both fork stops. Install proper length brake lines. Incorrect brake line length can adversely affect motorcycle operation, which could cause loss of control resulting in death or serious injury. (00325a) •If you are installing different handlebars, measure the change in distance that will be required from the end of the stock brake line to the brake master cylinder. •Compare this revised length to the brake line provided in your kit. •If the line is more than 2.0 in. (50.8 mm) longer or more than 1.0 in. (25.4 mm) shorter than the above measured distance, see a Harley-Davidson dealer for the correct brake line length

Incoming search terms:

HARLEY DAVIDSON PULLBACK RISER KIT FOR 1.25-INCH HANDLEBARS REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 12-02-2011

download
REMOVAL NOTES Cover the fuel tank with clean shop towels to prevent scratching. If replacing the handlebar, refer to the service manual to remove controls, hand levers, handlebar and risers. If only the risers are being replaced, proceed as follows: 1. Remove the two hex head cap screws and split lock- washers on the underside of the upper fork bracket that hold the currently installed risers in place. Discard the screws, but retain the lockwashers for assembly. Retain all additional components from the riser assembly when the screws are removed. 2. Remove and discard the four screws that fasten the currently installed handlebar upper clamp(s) to the risers. Remove and discard the clamp(s). Remove the handlebar from the risers and carefully set the handlebar on the fuel tank. INSTALLATION NOTES See Figure 3. The upper cup washer (A) must be oriented with the flat side up and the lower cup washer (D) with the flat side down. 1. See Figure 3. Align the components as shown, and install the risers (2) to the upper fork bracket. The ground wire (G) and the lock washer (F) are located on the right side only. Do not tighten the riser mounting screws (4) at this time. 2. If an appropriate Harley-Davidson 1-1/4 inch handlebar has not been installed, install one according to the Instruction Sheet included with the kit, or install the handlebar assembly onto the risers. 3. Loosely install riser caps (1) onto the handlebars and risers with the Bar & Shield toward the front of the motorcycle (Figure 1, Item 1). Install four socket head screws (3) with four washers (6). 1 is05253 1. Bar & Shield (install toward front of motorcycle) Figure 1. Bar & Shield on Riser and Cap 4. Check that the risers stay properly aligned with the handlebar and tighten the riser mounting screws following the instructions in the service manual. 5. Adjust handlebar to the desired position, verify that it is centered on the risers, then tighten the front socket head screws (3) to 12-15 ft-lb (16-20 Nm) . There should be no gap at the front of the risers.

Incoming search terms:

Harley Davidson Road Rod Saddle Bag System Kit INSTALLATION Instructions

0

Filed Under (Harley Davidson) by admin on 16-04-2012

download
Use locktite on all fasteners!! 2. Put bike on lift and place jack under frame. Raise bike to lift rear wheel. 3. If swing arm pivot shaft is drilled and tapped on each end, they need to be redrilled and tapped to 3/8-16 to a depth of _” deep. If you are unable to drill & tap your swing arm pivot shaft, you can purchase one from Cycle Visions (part #CV6121), See Harley Davidson® V-Rod® Service Manual Section 2, Page 2.89 for removal and installation instructions. 4. Remove seat, passenger seat, turn signal module, rear fender cover, turn signal license plate assembly, and rear foot peg assemblies. NOTE: Our bag system will not work with stock exhaust system… we recommend the 2-into-1 Supertrap, or you may use any exhaust system that is lower than the rear axle bolt. 5. Remove the two upper shock bolts. Relocate the shock spacer from the right side to the left side, and use the new spacer supplied on the right side. 6. Install front bag mount between frame and spacer (see Figure 1), reinstall shock bolts and torque to 31-50 lbs. 7. Install lower bag support frame to swing arm pivot shaft using the 3/8″ bolt through rear foot peg clevis and cover (see in Figure 2). NOTE: There is a right and left covers and bag support, install accordingly. Torque to 35 foot lbs. 8. Install rear fender front mounting tabs using 8mm 1.25 x _ and flat washers (supplied in kit) (see Figure 3). 9. Install upright saddlebag support brackets to the lower bag mount assembly and lower fender extension crossover mount. (see Figure 4). Torque to 25 lbs. NOTE: Install crossover mount with gusset facing down. 10. Remove license plate light from your rear turn signal bracket license plate assembly. Install license plate light on our license plate light bracket (see Figure 5). 11. Install the license plate bracket on the inside of the rear fender extension using the top holes of the license plate frame (see Figure 6 & 7). 12. Install fender washers on the inside of the fender extension (see Figure 8). 13. Install upper fender bracket to rear fender extension with a _-20 bolt supplied in kit (see Figure 9). 14. Install rear fender extension with chrome button fitted bolts. (see Figure 10 & 11). 15. To check alignment and fit of rear fender extension reinstall original rear fender. Once you have everything lined up and fitted, remove original rear fender, drill & tap (2) two 5/16 x 18 holes in rear fender support bracket (see Figure 12). 16. Install Harley Davidson® Part #70909-95 and 47449-97 bracket and receptacle on front and rear bag supports (see Figure 13 & 14). 17. Install Harley Davidson® Part #47449-97 bracket with receptable (see Figure 14). Make sure the bolts come from the inside out. This bracket is adjustable for location.

Incoming search terms:

2006-up Harley-Davidson Single Bore Induction System Installation Instructions

0

Filed Under (Harley Davidson) by admin on 10-11-2010

download
Remove the stock fuel induction system, including the manifold and disconnecting all wire connections. It is up to the technician as to whether the gas tank should be removed or just raised up in the rear. Picture 1 2- You will need to disassemble the stock induction system to remove the pre-listed parts for re-use. 3- Verify the new manifold size is appropriate for your motorcycle by sliding it in place. Picture 2 Picture 3 4 5- Slide the MAP sensor in place, being sure not to pinch the orange rubber seal—some clean engine oil may make this easier. Install the cable guide and verify it is aligned with the throttle cable actuator. Once alignment is satisfactory, apply Loctite® 222 to the 10-24 x 1/4″ screws and tighten to 18-22 in-lbs. 4- Install the new O-ring into the throttle body. A light film of clean engine oil can be used to help hold the O-ring in place. Align the manifold to the throttle body, use purple 222 Loctite® on the 10-24 x 1″ socket-head assembly screws (with flat washers) and tighten them to 35-40 in-lbs. 6- Using the new S&S® supplied gasket, slide the S&S supplied intake air temperature (IAT) sensor in place. Use Loctite 222 on the T10 Torx button head M3 x .5 x 10mm screws and tighten to 6-8 in-lbs. Picture 4 Picture 5 Picture 6 5 7- For the stock throttle position sensor attach the “C” shaped spacer to the end of the throttle shaft, put a 4mm flat washer on each T20 Torx button head M4 x .7 x 12mm screw, apply some Loctite® 222 and torque screws to 18-23 in-lbs. 8- Install the new O-ring on the IAC motor. Lubricate the OD of the O-ring with a light film of clean engine oil. Put a 4mm flat washer on each T20 Torx button head M4 x .7 x 12mm screw, coat the threads with Loctite 222. Install the IAC motor and tighten the screws to 18-23 in-lbs. 9- Partially install the fuel injectors in the fuel rail. Be sure to orient the black O-rings to the rail and align the clocking tabs with their holes. It may be helpful to lubricate the O-rings with clean engine oil. See Picture 9. NOTE : These are special O-rings that seal pressurized gasoline. If you see one with damage or an abrasion—replace it immediately. Picture 7 Picture 8 Picture 9 6 10- Connect the Injectors to the manifold with a light squeezing action. Lubricate the O-rings with clean engine oil. Once in place, use Loctite® 222 on the threads of two 8-32 x 5/8″ slotted panhead screws and tighten to 15-20 in-lbs. 11- Install the backing washer and O-ring on the fuel supply tube. Lubricate the O-ring with clean engine oil. When the tube is in place, position the Y-shaped clip on the fuel rail and tighten the Loctite 222 coated T20 Torx button head M4 x 7 x 12mm screw to 18-23 in-lbs – Gently push the injectors downward toward the manifold to increase clearance for connecting the wire connectors. Cut the existing injector connectors from the motorcycle harness. Slide the sleeveing onto the injector harness. Slide heat shrink tubing on to each wire of the injector harness wires. Crimp the butt splices to the motorcycle harness. Move the heat shrinks over the splices and shrink with a heat gun. Slide the sleeve into place. Picture 10 Picture 11a Picture 11b Picture 12 Picture 12a 7 13- Put the stock manifold flanges on the manifold. YOU MUST USE THE S&S® RUBBER GASKETS ON THEM. Be sure to orient the tapered end towards the manifold and the flat end to the heads. 14- Hold the manifold up in its basic mounting position and connect all of the wiring harness connectors at this time. Install the manifold using the stock mounting flange bolts (from the primary side of the motorcycle) coated with Loctite® 242 and the new S&S cam side screws (1/4″ socket head, 5/16-18 x 3/4″). If a screw longer than 3/4″ is used, damage to the heads will result. Lightly snug all four manifold mounting bolts but DO NOT TIGHTEN AT THIS TIME. Connect the throttle cables and cruise control bracket (if applicable) at this time. NOTE: The Harley-Davidson® service manual for your model motorcycle will be helpful during this step. 15- Install the breather system now. On 4.00-inch bore or smaller engines the breather uses banjo fittings with hollow bolts and connects across the heads to the intake with a T-hose. This hose will need to be trimmed and have spring clamps attached as shown in photo. Torque the hollow bolts to 10-12 ft-lbs. On 41/8-inch bore or larger engines, install the sharp bent hose on the rear head and install the check valve with the white end towards the head. Mount the other hose on the black end of the check valve and connect it to the throttle body using spring clamps to secure the connections. Picture 13 Picture 14 Picture 15 8 16- Once the breathers are secure, install the fuel line per the factory service manual you are working with. Connect the battery and verify the fuel pump turns on to pressurize the system and there are no gas leaks, but DO NOT START THE ENGINE. At this time, PC software may also be used to verify sensor readings and adjust the throttle position sensor voltage if necessary. 17- Install two 242 Loctite® coated pipe plugs (included in kit) in the air cleaner backplate as shown in Picture 16. Torque to 35-45 in-lbs. Also, two pan screws coated with Loctite® 222 must be installed in the backplate in place of the enrichment device. See Picture 16a. Torque them to 12-18 in-lbs. Failure to install these screws could allow dirt and debris into the intake system. 18- Use a new gasket on the backplate and put it in place noting the number of shims required. Once you select the appropriate shims (included) mount the backing plate to the engine but DO NOT INSTALL THE SCREWS YET

Incoming search terms:

HARLEY DAVIDSON HANDLEBAR GRIPS INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 30-01-2011

download
INSTALLATION Remove and Install the Left Grip 1. See Figure 1. Remove the two screws with flat washers securing the handlebar clamp (3) to the clutch lever bracket. Remove the clamp and position the clutch hand lever assembly away from the handlebar. 2. Loosen, but do not remove, the upper and lower switch housing screws (1). 3. Remove the end cap from the existing left handlebar grip if equipped. Remove the grip by carefully cutting it away from the handlebar using a sharp blade or knife. Do not lubricate left handlebar grip before installation. Lubricating grip can cause it to come off while riding, which could result in loss of control and death or serious injury. (00315a) NOTE Make sure that the handlebar surface and the inside of the grip are smooth, dry and thoroughly cleaned of all dirt or adhesive residue. 4. Position the new left grip (4) so the larger flange (5) is at the bottom. Push the grip fully onto the handlebar. 5. Fit the grooves (2) on the outboard side of the upper and lower switch housing over the flanges on the end of the grip, then loosely fasten the two screws. 6. Position the clutch hand lever assembly inboard of the switch housing assembly, engaging the tab on the lower switch housing in the groove at the bottom of the clutch lever bracket. 7. Align the holes in the handlebar clamp with those in the clutch lever bracket, and loosely fasten the two screws with flat washers. Adjust the switch housing and clutch hand control position for rider comfort. 8. Tighten first the upper, then the lower handlebar clamp screws to 60-80 in-lb (6.8-9 Nm) . 9. Tighten first the lower, then the upper switch housing screws to 35-45 in-lb (4-5.4 Nm)

Incoming search terms: