how to rr camshaft on yama 1600

You search Auto repair manual PDF how to rr camshaft on yama 1600, if there are search results will appear below. If search results do not exist, please search by others keyword.



  how to rr camshaft on yama 1600 Direct Download speed 5282 Kb/s

  how to rr camshaft on yama 1600 Full Version speed 6162 Kb/s



Harley Davidson Big Twin EVO Engines Edelbrock Performer-Plus Camshaft , Performer RPM Camshaft , & Performer RPM Camshaft INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 03-03-2012

download
Disconnect the battery. Secure the motorcycle on a suitable stand with the rear wheel off the ground. Remove components necessary for easy access to rocker covers, pushrod covers, and gear case cover, i.e., exhaust system, gas tank, air cleaner, foot rest, etc. Remove spark plugs. 2. Remove top and middle sections of rocker boxes, then rotate engine so both valves are closed on the cylinder head being worked on (put transmission in high gear and move rear wheel to slowly rotate engine). Remove the two 5/16″ bolts nearest the rocker arm shafts (keep all shafts, rocker arms, and pushrods in order so they can be installed in their original position). Remove the pushrod covers and pushrods. NOTE: The use of adjustable time-saver pushrods will simplify installation. Follow the manufacturer’s recommendations for installation of those parts. 3. It is not necessary to remove the tappet guides if you use a cam installation tool such as Crane #9-0020 to hold the tappets in place during cam installation. If you remove the tappet guides, you must use a tappet block alignment tool such as Crane #9- 0021 to re-install the tappet guides. Tappets can be held up in place during removal of guides by using U-shaped piece of safety wire or paper clip hooked to the tappets. 4. Remove ignition covers on gearcase cover by drilling out rivets to gain access to sensor plate. Remove the inner cover, sensor plate and rotor. NOTE: For re-installation, use new rivets H-D #8699 or drill and tap for 10-32 screws. 5. Remove the gearcase cover screws and remove cover while holding end of cam inward. Now remove the camshaft, spacing washer and thrust plate

Incoming search terms:

Honda XR600/ XR650L Camshaft Installation and removal Instructions

0

Filed Under (Honda) by admin on 05-12-2011

download
Remove the tappet covers. Remove the crankshaft cap and timing hole cap on the left engine case cover. Remove the spark plug. Rotate the engine in a counter clockwise direction. Position the engine at true top dead center (TDC) using the mark on the flywheel. True top dead center occurs when both the intake and exhaust valve are closed when the piston is at TDC. This is technically the end of the compression stroke and the beginning of the power stroke. The “artificial” TDC is during the overlap when both the intake and exhaust valves would be open. Since the rocker arms are located in the valve cover on an XR600, true TDC occurs when the cam lobes are pointed downward when the piston is at TDC. Remove the cylinder head cover. Warning, do not drop the locating dowels into the cam chain cavity. There are two dowels, one on either side of the cover. Remove and discard the gasket. Note the positioning of the cam lobes, this will help during installation of your new Hot Cams camshaft. Note also the location of the sealed bearing on the end of the camshaft and the direction in which it is facing. Loosen the bolts that hold the camshaft sprocket. Remove the lower camshaft sprocket bolt first, it will be necessary to rotate the engine. Rotate the engine back to TDC. Release the spring tension on the cam chain tensioner by lifting the end of the spring out of its hole in the tensioner block. A spring tool is a good method. Be careful not to scar the cylinder head’s gasket surface for the cylinder head cover. Remove the allen bolt that holds the end of the tensioner block shaft
just to the inside of the tensioner block. Note the location of the tensioner block shaft cap ridge. Using a pair of pliers pull the shaft out by grasping the ridge and using a clockwise rotation of the shaft while pulling outward. Pull the tensioner block upwards, out of the cylinder head. Remove the top camshaft sprocket bolt. Pull the sprocket off the camshaft but maintain upward tension, do not allow the chain to sag, it is possible for the chain to “slip” on the bottom sprocket of the crankshaft and change the cam timing. Remove the camshaft. Remove the cam bearings. Set the stock camshaft with the auto-decompression aside. It is not possible to use the auto-
decompression on the Hot Cams so do not attempt to re-install. Use a manual decompression. Install the bearings onto the new Hot Cam

Incoming search terms:

Kawasaki KVF650/ 700, KSV 700 Camshaft Installation Instructions

0

Filed Under (Kawasaki) by admin on 29-04-2012

download
Liberally apply assembly lube to every surface of the camshaft. Install the camshaft into the cylinder head (the lobes should be pointed down) and align the decompressor shaft dowels with the weight arms. Install one of the camshaft sprocket holder bolts and tighten to less than finger tight, you should be able to move the camshaft very slightly back and forth, roll the crank over until the other bolt hole is exposed and insert the sprocket bolt and tighten to less than finger tight. Install the cam chain tensioner assembly, do not install the spring, spring dowel, washer, and bolt. Using the spring from the cam chain tensioner very slowly push the tensioner shaft in until the cam chain slack has just been taken out, this is witnessed by the very slight lifting of the opposite end of the cam out of the cylinder head cam journal, do not over tighten the cam chain at this point, if you do, remove the tensioner assembly and retract the plunger again and start over. (If it stays too tight it will stretch the cam chain prematurely and cause cam sprocket damage when the engine is assembled) Roll the camshaft toward the back of the machine (clockwise) loading the sprocket bolts against the back of the sprocket bolt holes, while holding the camshaft in that direction, tighten the sprocket mounting bolt to 14 ft/lb of torque. Rotate the engine in the opposite direction that you rotated it earlier and align the TDC mark, tighten the other sprocket-mounting bolt to 14 ft/lb of torque. Verify the cam timing and crankshaft TDC marks are in alignment

KAWASAKI VULCAN 1600 / NOMAD 1600 INSTALLATION INSTRUCTIONS

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
Remove seat and fuel tank. Consult service manual for proper removal of tank. 2. Remove left side cover and loosen the four bolts inside. Route the two 6-pin connectors between the side cover and frame as shown by the dotted line. Tighten the four bolts. (Fig 1) 3. Route 6-pin connectors under frame and up left side of engine. (Fig 2) 4. Locate the 6-pin connector next to the ignition coil. Disconnect and connect the Fuelpak 6-pin connectors in-line on the stock connector. (Fig 3) 5. Route single black wire to the front of engine and down to the horn. (Fig 4) 6. Disconnect the factory black/white wire from horn. Plug Fuelpak into horn and plug Fuelpak black/white wire to Fuelpak connector. Be sure Fuelpak connector cannot short to frame or radiator. 7. Route black and green wires to battery negative. 8. Attach Fuelpak to Fuelpak harness and mount in left side cover. (Fig 5a 49 State) (Fig 5b Caliornia Models) 9. Before reassembling the bike, make sure handlebar switch is in the engine off position and turn the key on. Fuelpak should light up. Sound the horn. If Fuelpak turns off when the horn is sounded, recheck the black wire connection on the horn and that it is connected to the correct wire from the factory harness. 10. Use supplied zip ties to hold Fuelpak wire harness away from engine. 11. Follow the service manual to reinstall the gas tank

Incoming search terms:

2009 Daytona 675 Motorcycle Race Kit Manual

0

Filed Under (Triumph) by admin on 29-10-2010

download
1. Remove the existing cylinder head gasket in line with the procedures detailed in the Daytona 675 service manual. 2. Position a piece of solder (with a diameter approximately 1.3 mm) on the four squish surfaces of each piston. Position the solder in line with the corresponding squish surfaces on the cylinder head and hold in place with a small amount of grease. 3. Refit the cylinder head with the head gasket. 4. Slowly turn the engine over, by hand, to compress the solder to the same height as the squish clearance. 5. Remove the cylinder head and head gasket. 6. Measure the compressed thickness of the solder. The squish clearance must be a minimum of 0.65 mm. If the thickness of the solder is less than 0.65 mm repeat steps 2 to 6 with a thicker head gasket until the squish clearance is at an acceptable level. NOTE •In some cases, it may be necessary to use a standard cylinder head gasket to achieve the correct squish clearance. 7. Fit the chosen cylinder head gasket following the procedures detailed in the Daytona 675 service manual. Warning Running the engine at less than the minimum recommended squish height can lead to the pistons contacting the cylinder head, causing major engine damage. This could cause loss of motorcycle control and an accident. Triumph Designs Ltd 2009. Camshaft, Valve Spring & Camshaft Sprocket Kits Parts Supplied Camshaft, Inlet – A9618055 Camshaft, Exhaust – A9618056 Valve Spring Kit – A9618086 Camshaft Sprocket Kit – A9618095 Warning The Race Kit camshaft, valve Spring and camshaft sprockets must be fitted as a complete set. If they are not fitted as a complete set a failure may result which could cause loss of motorcycle control and an accident. Caution The use of The Race Kit camshaft, valve Spring and camshaft sprockets detailed below will require changes to the fuelling and ignition settings. To alter these settings, a Triumph Programmable Race ECU combined with Triumph TRACS Race Calibration Software will be required. Failure to correct the fuelling and ignition settings will result in poor engine performance and could result in engine damage.

Yamaha YZ 250F Camshafts REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 30-12-2011

download
Remove the 4 bolts that hold the exhaust cam cap in place, lift the cam cap off. It may be necessary to pry very lightly on the cap to lift it off its dowel pins. Do not use the cam lobes as the pry point. Be careful not to drop the dowels and also be careful to not lose the half moon shaped retainer for the bearing under the cam cap. Remove the 6 bolts that hold the intake camshaft cap and lift the cam cap off the camshaft, again, be careful to not drop the retainer or dowels. Lift the intake camshaft out of its pocket in the cylinder head casting. Remove the cam chain from the sprocket, set the stock camshaft aside. Lift the exhaust cam out of its pocket in the cylinder head casting and remove the chain from the sprocket. Do not drop the cam chain, dangle it over the side of the engine while keeping slight upward pressure on the chain to maintain its position on the drive sprocket on the crankshaft. Fit the half moon shaped retainers in the grooves of the Hot Cams camshaft bearings to ensure good fit, set retainers aside for the time. Using assembly lube, lube the shim buckets, bearing surfaces for the camshafts in the cylinder head, and pack some in the camshaft bearings. Set the exhaust cam into the cylinder head casting while at the same time fitting the cam chain over the sprocket. Make sure that you keep all the cam chain slack to the back of the engine. The cam chain pulls the camshaft sprockets in a counter clockwise direction and the slack of the chain must be kept on the cam chain tensioner side of the engine. The exhaust cam has two timing marks on it. When correctly installed one mark will be at the 9 o’clock position and the other mark will be at the 12 o’clock position. When correctly timed the mark at 9 o’clock will be aligned with the valve cover gasket surface. Repeat the above process for the intake camshaft. Again, make sure you keep the chain slack to the cam chain tensioner side of the engine. Check to be sure the crankshaft is still at TDC. The intake cam has two timing marks also. One at 12 o’clock and the other at 3 o’clock. When both cams are installed correctly, the valve cover gasket surface will form a straight line through the exhaust timing mark at 9 o’clock and the intake timing mark at 3 o’clock

Incoming search terms:

Honda CRF/ TRX 450R Camshaft Installation

0

Filed Under (Honda) by admin on 19-11-2011

download
Break-in of this camshaft is important and you should adhere to all of the following instructions. It is also very important to use plenty of engine assembly lubricant, recommended is Coastal Engine Assembly Lube or Clevite 77, both are available from most automotive supply companies. We recommend you change the engine oil before the initial start-up of the engine after the assembly. Then change the oil again after the break-in of the cams to remove the excess
phosphate from the coated cams. These steps will help ensure that the camshaft breaks-in properly and that you have a long lasting product. Using full synthetic engine oil during break-in is not recommended but, is OK to use after the one-hour break-in period is over. Following a regular maintenance schedule is the best way to ensure durability and performance over the long run. Cleanliness is always a good place to start. Make sure the motorcycle is cleaned thoroughly before you start. It would be advisable to use an engine degreaser on the frame and the engine. Remove the fuel tank and thoroughly clean the inside of the frame rails, around the carburetor, and behind the radiators. Be sure to remove the ignition coil assembly and using high-pressure air, clean the spark plug hole out before the plug is removed. This will ensure a clean engine during the assembly process and less of a chance of thread damage and/or dirt contamination in the engine during reassembly

1998 YAMAHA YZF-R6 SERVICE MANUAL

0

Filed Under (Yamaha) by admin on 25-11-2010

download
Camshafts Drive system Camshaft cap inside diameter Camshaft journal diameter Camshaft-journal-to-camshaftcap clearance Intake camshaft lobe dimensions Measurement A Measurement B Measurement C Exhaust camshaft lobe dimensions Measurement A Measurement B Measurement C Max. camshaft runout Chain drive (right) 23.000 23.021 mm 22.967 22.980 mm 0.020 0.054 mm 33.05 33.15 mm 25.14 25.24 mm 7.81 8.01 mm 32.55 32.65 mm 25.07 25.17 mm 7.38 7.58 mm 0.08 mm 33.0 mm 25.09 mm 32.50 mm 25.02 mm 0.06 mm
2-5 ENGINE SPECIFICATIONS SPEC Head Diameter Face Width Seat Width Margin Thickness Item Standard Limit Timing chain Model/number of links Tensioning system RH2015/120 Automatic Valves, valve seats, valve guides Valve clearance (cold) Intake Exhaust Valve dimensions 0.11 0.20 mm 0.21 0.30 mm Valve head diameter A Intake Exhaust Valve face width B Intake Exhaust Valve seat width C Intake Exhaust Valve margin thickness D Intake Exhaust Valve stem diameter Intake Exhaust Valve guide inside diameter Intake Exhaust Valve-stem-to-valve-guide clearance Intake Exhaust Valve stem runout Valve seat width Intake Exhaust 24.9 25.1 mm 21.9 22.1 mm 1.14 1.98 mm 1.14 1.98 mm 0.9 1.1 mm 0.9 1.1 mm 0.6 0.8 mm 0.6 0.8 mm 3.975 3.990 mm 3.960 3.975 mm 4.000 4.012 mm 4.000 4.012 mm 0.010 0.037 mm 0.025 0.052 mm 0.9 1.1 mm 0.9 1.1 mm 1.6 mm 1.6 mm 0.5 mm 0.5 mm 3.950 mm 3.935 mm 4.042 mm 4.042 mm 0.08 mm 0.1 mm 0.04 mm 1.6 mm 1.6 mm
2-6 ENGINE SPECIFICATIONS SPEC Item Standard Limit Valve springs Free length Intake (inner) (outer) Exhaust Installed length (valve closed) Intake (inner) (outer) Exhaust Compressed spring force (installed) Intake (inner) (outer) Exhaust Spring tilt Intake (inner) (outer) Exhaust Winding direction (top view) Intake Exhaust 37.0 mm 38.4 mm 41.7 mm 30.0 mm 32.5 mm 36.1 mm 69 79 N (7.0 8.0 kgf) 114 132 N (11.6 13.4 kgf) 160 184 N (16.3 18.7 kgf) Clockwise Clockwise 35 mm 36.5 mm 39.5 mm 2.5/1.6 mm 2.5/1.7 mm 2.5/1.8 mm Cylinders Cylinder arrangement Bore stroke Compression ratio Bore Max. taper Max. out-of-round Forward-inclined, parallel 4-cylinder 65.5 45.5 mm 12.4 : 1 65.50 65.51 mm 0.05 mm 0.05 mm

Yamaha YZ250F 2001-2080 Wiseco High Performance Camshaft INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 15-01-2012

download
Wiseco’s new Camshafts are made from premium materials, state-of-the-art forgings, machined to exact tolerances, and specifically engineered for high performance and maximum durability. Brought to you by one of the most trusted names in the industry… Wiseco. Wiseco Cam- blue OEM Cam- red Wiseco’s new high-performance camshafts for the Yamaha YZ250F produce 3% horsepower and 3% torque gain over the stock OEM camshaft across the entire RPM range.

Incoming search terms:

Yamaha Road Star 1600/ 1700 Exhaust kit bill of materials Installation Instructions

0

Filed Under (Yamaha) by admin on 08-11-2010

download
1. Remove left side cover, by removing allen bolt as shown (Fig 1). Once bolt is removed, push cover to motor and push back carefully to your upper body. Figure 1 2. Once left side cover is removed, remove 6mm bolt to opposite side cover as shown (Fig. 2). Also remove allen bolt on right side as shown (Fig 3) and remove carefully . Figure 2 Figure 3 . Remove two allen bolts to the muffler bracket, and also loosen hose clamp to bottom head pipe. (Fig 4 & 5) Figure 4 Figure 5 4. Remove bolt next to rear O/2 sensor bracket as shown (Fig 6), also remove Phillips head bolt from O/2 bracket and slide O/2 sensor off bracket as shown (Fig 7). Once bracket is removed mount just bracket on with Phillips head bolt back on. Figure Figure 7 5. Disconnect O/2 by using a pick on inside switch on opposite side of O/2 bracket. With pick on inside push to you and unplug. (Fig 8 & 9) Figure 8 Figure 9 6. Remove two socket cap nuts from rear head pipe flange as shown (Fig 10). Once removed, remove both mufflers and rear head pipe carefully. Slide muffler back and shift rear head pipe to you. (Fig 11) Figure 10 Figure 11 7. Slide wire off bracket from the front O/2 sensor as shown (Fig 12). Also use pick to remove O/2 sensor, push to you and unplug. Figure 12 Figure 13
8. Remove two allen bolts from foot rest/ brake to give you access to head pipe. (Fig 14) Figure 14 9. Remove two allen socket cap nuts off front head flange and remove head pipe. (Fig 15) Figure 15 10. Remove stock muffler bracket by removing two alien bolts as shown (Fig 16). Also remove bolt that holds stock bracket to the brake line (Fig 17). Once that is done remove brake line from caliper and slide though muffler bracket and re-install. Figure 16 Figure 17
Assembly 11. Remove O/2 sensor from stock pipe and install O/2 sensor in Roadhouse front head pipe and mount front head pipe with stock socket cap nuts on bike as shown. (Fig 18 & 19) Figure 18 Figure 19 12. Mount rear head pipe as shown (Fig 20), including stock socket cap nuts. Also mount y-collector with rear head pipe. Y-collector must slide into front head pipe in one. Install Roadhouse O/2 sensor wire lead from hardware kit into y-collector. (Fig 21) Figure 20 Figure 21

Incoming search terms: