how to take off voltage regulater off a 2003 suzuki an400 scooter

You search Auto repair manual PDF how to take off voltage regulater off a 2003 suzuki an400 scooter, if there are search results will appear below. If search results do not exist, please search by others keyword.



  how to take off voltage regulater off a 2003 suzuki an400 scooter Direct Download speed 5282 Kb/s

  how to take off voltage regulater off a 2003 suzuki an400 scooter Full Version speed 6162 Kb/s



SUZUKI SV 1000 RADIATOR (COOLING SYSTEM) SERVICE MANUAL

0

Filed Under (Suzuki) by admin on 26-02-2011

download
FI SYSTEM MALFUNCTION CODE AND DEFECTIVE CONDITION MALFUNCTION CODE DETECTED ITEM DETECTED FAILURE CONDITION CHECK FOR COO NO FAULT C11 Camshaft position sen- sor The signal does not reach ECM for more than 3 sec . after receiving the starter signal . The camshaft position sensor wiring and mechanical parts (Camshaft position sensor, intake cam pin, wiring/coupler con- nection) C12 Crankshaft position sensor The signal does not reach ECM for more than 2 sec . after receiving the starter signal . The crankshaft position sensor wiring and mechanical parts (Crankshaft position sensor, wiring/coupler connection) C13 Intake air pressure sensor The sensor should produce following voltage . (0.50 V < sensor voltage < 4 .85 V) Without the above range, C13 is indicated. Intake air pressure sensor, wiring/coupler connection C14 Throttle position sen- sor The sensor should produce following voltage . (0.20 V < sensor voltage < 4 .80 V) Without the above range, C14 is indicated. Throttle position sensor, wiring/coupler connection C15 Engine coolant temperature sensor The sensor voltage should be the following. (0.15 V <_ sensor voltage < 4 .5 V) Without the above range, C15 is indicated. Engine coolant temperature sensor, wiring/coupler connection C21 Intake air temperature sensor The sensor voltage should be the following. (0.15 V < sensor voltage < 4 .5 V) Without the above range, C21 is indicated. Intake air temperature sensor, wiring/coupler connection C22 Atmospheric pressure sensor The sensor voltage should be the following. (0.50 V < sensor voltage < 4 .5 V) Without the above range, C22 is indicated. Atm. pressure sensor, wiring/coupler connection C23 Tip over sensor The sensor voltage should be the following for more than 2 sec . after ignition switch turns ON . (0 .20 V < sensor voltage < 4 .80 V) Without the above value, C23 is indicated. Tip over sensor, wiring/coupler connection C24 or C25 Ignition signalCrankshaft position sensor signal is produced and ECM determines the ignition signal but signal from ignition coil is interrupted continuous by 4 times or more. In this case, the code C24 or C25 is indicated. Ignition coil, wiring/coupler connection, power supply from the battery SERVICING INFORMATION 8 .3 C28 Secondary throttle valve actuator No operating voltage is supplied from the ECM, C28 is indicated. STVA can not operate. STVA lead wire/coupler, STVA C29 Secondary throttle valve position sensor The sensor should produce following voltage . (0.10 V < sensor voltage < 4 .90 V) Without the above range, C29 is indicated . Secondary throttle position sensor, wiring/coupler connection C31 Gear position signalGear position signal voltage should be higher than the following for more than 2 seconds. (Gear position switch voltage >_ 0 .6 V) Without the above value, C31 is indicated. Gear position sensor, wiring/coupler connection, gearshift cam, etc. C32 or C33 Fuel injector Crankshaft position sensor signal is produced and ECM determines the injection signal but fuel injection signal is interrupted continuous by 4 times or more. In this case, the code C32 or C33 is indicated. Injector, wiring/coupler connection, power supply to the injector C41 Fuel pump relay No voltage is applied to fuel pump although fuel pump relay is turned ON, or voltage is applied to fuel pump although fuel pump relay is turned OFF . Fuel pump relay, connecting lead, power source to fuel pump relay C42 Ignition switchIgnition switch signal is not input in the ECM . Ignition switch, lead wire/coupler C44 Heated oxygen sensor (HO2S) [For E-02, 19] During 02 feedback control, 02 sensor voltage is higher or lower than the specification . No signal is detected during engine operation or no electrical power is supplied from the battery . HO2S lead wire/coupler connection Battery voltage supply to the HO2S C49 PAIR control solenoid valve (PAIR valve) When no operating voltage is supplied from the ECM, C49 is indicated. PAIR valve can not operate. PAIR valve lead wire/coupler

Incoming search terms:

HARLEY DAVIDSON SOFTAIL FRONT SPOILER KITS INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 09-03-2011

download
This instruction sheet references Service Manual information. A Service Manual for your model motorcycle is required for this installation and is available from a Harley-Davidson Dealer. Kit Contents See Figure 2 and Table 1. INSTALLATION 1. Position the vehicle on a motorcycle lift table. To prevent accidental vehicle start-up, which could cause death or serious injury, remove maxi-fuse before proceeding. (00251a) 2. Refer to the Service Manual and follow the instructions given to remove the Maxi® Fuse. 3. Raise the vehicle on the lift table to allow access to the lower front portion of the frame. 2008+ 2007 7 8 11 3 3 4 4 12 5 5 1 1 9 2 2 10 6 6 9 9 11 13 is02652c 8. 1. Two-pin voltage regulator connector (2007 only) Voltage regulator 2. 9. Voltage regulator attaching screws (2) Cable strap (2 for 2007, 1 for 2008 and later) 10. 3. Lower voltage regulator cover (2007 only) Voltage regulator bracket 4. 11. Bracket screw to engine crankcase (2) Oxygen sensor connector 12. 5. Crank position sensor connector (2007 only) Voltage regulator caddy 6. 13. Voltage regulator caddy cover Horn connectors (some 2008 and later models) 7. Four-pin voltage regulator connector (2007 only) Figure 1. Original Equipment Voltage Regulator  NOTE For 2007 models: The ground wire on the voltage regulator must be re-attached at the original location when re-installing the voltage regulator to ensure adequate ground. 4. For ALL models: See Figure 1. Remove and discard the voltage regulator caddy cover (6) from the regulator bracket (3) and caddy (5). For 2007 models: In addition, remove the lower voltage regulator cover (10). 5. Remove and retain the hex socket head screw (4) at the top left of the bracket For 2007 models: In addition, disconnect the ground wire. Free the cable straps (9) from the regulator bracket, beneath the regulator. 6. Remove the two hex socket head screws with washers (2) retaining the voltage regulator to the bracket. Remove and save the regulator, but discard the screws. 7. Remove and retain the screw (4) at the top right of the regulator bracket. Remove the bracket from the engine. 8. For 2008 and later models: Free the strap (9) that ties the jiffy stand wiring to the voltage regulator bracket. Unfasten the three-way jiffy stand sensor connector and the two-way crank position sensor connector [79] (12) from the T-studs on the back of the regulator bracket (3). Discard the bracket. Disconnect both plugs from the back of the voltage regulator (1). For 2007 models: Unfasten the four-way (7) and two-way (8) voltage regulator connectors from the T-studs on the back of the regulator bracket (3), and discard the bracket. Disconnect the voltage regulator (1) at both connectors. 9. For 2008 and later models: Unclip the two-way O 2 (oxygen) sensor electrical connector [138] (11) from the voltage regulator caddy (5). For 2007 models: Unfasten the two-way crank position sensor connector [79] (12) from the voltage regulator caddy (5). Remove the caddy from the vehicle frame. a. For 2007 models: Unclamp the bottom of the caddy from the engine mount spacers. b. For ALL models: Unhook the top clips from around the tabs on the front of the engine casting. Remove the original equipment (O.E.) caddy from the vehicle frame, and discard it.

Incoming search terms:

1994-2003 Suzuki GSXR750 and 1997-2004 Suzuki GSXR600 Superbike Kit INSTALLATION INSTRUCTIONS

0

Filed Under (Suzuki) by admin on 10-01-2011

download
Step 1: Identify the key components that complete our Superbike kit: You should have 2 lines (front kit), 1 double banjo bolt and 2 lower adapters. There are also a total of 7 washers. 5 will be used, and 2 are spares. We strongly suggest having a professional mechanic install these brake lines; all other installations VOID warranty. Inspect your brake system after every race. Step 2: To ensure no paint damage from a brake fluid spill, completely cover the front end of the bike. This process is messy, and brake fluid WILL drip! Step 3: Uninstall stock hoses; be aware of how the stock system was routed in case you need to re-install it. Step 4: Install the Galfer adapters onto the right and left calipers. Thread each adapter into the calipers with one washer, and torque at 12 to 13 ft pounds. (See picture S4) Step 5: Install the right and left lines to the calipers, using the shorter line on the right side. These lines will travel from the master cylinder to the calipers; a double banjo bolt (see picture S5) is included to run two lines down. The positioning sequence on the master cylinder is as follows: Master cylinder, washer, straight banjo (from right line), washer, 12-degree banjo (from left line), washer, and double banjo hex. Double banjo bolt torque level is 12 FT Pounds. ( See picture S6) Make sure that the 90-degree fittings on each caliper are pointing away from the bike just a little bit (see pictures S7 through S9 of calipers) . Thread each banjo end into the adapter, and torque to 6 ½ Ft pounds. Before you proceed to the next step, please check for clearance of the lines. Compress the front end to make sure that the lines are not binding with anything. When the front end is fully extended or fully compressed, double check that the lines are traveling correctly and clear from any obstructions. Once the lines have been checked for clearance, we recommend using a zip-tie to bring the lines together about an inch above the lower triple clamp area. (Picture S10) Step 6: Bleed brake system according to owner’s manual, and build appropriate pressure. Finishing with DOT 4-brake fluid is recommended.

Incoming search terms:

WILDFIRE WFH50-S2 Gas Scooter Owner's Manual

0

Filed Under (Tips and Review) by admin on 21-11-2010

download
Main Switches On Position: • Electrical circuits are switched on. The engine can be started and the key can not be removed. • Do not leave the main switch in the on position for an extended period of time if the engine is not running Off Position: • All electrical circuits are off and the engine is stopped. The key can be removed in this position. Steering Lock Position: • Turn the handlebars to the left as far as they will turn, turn the key to the lock position and remove. Steering Lock Position On Position Off Position Wildfire WFH50-S2 Maintenance Table The X indicates at how many miles you need to check the Item. Must change oil: change before riding, again at 500 miles and then 2500 or yearly which ever comes first. Capacities Fuel Capacity: 1 gallon Final drive oil capacity: 3.5 ounces Tire air pressure: Front 28 psi and rear 32 psi. ITEM 500 1000 20002500 3500 40004500 5000 60006500 Check Daily Engine Oil and Filter X X X X X X Gear Oil X X X X Valve Clearance X X Cam Chain X X Carburetor X X Air Cleaner Clean Every 1500 miles, Replace Every 3500 miles Fuel Filter Clean Every 1000 miles, Replace if Necessary Brake System X X X X X X X Drive Belt X Screws and Nuts X X X X X *When riding in a dusty environment, check and clean the air filter element more often. Battery • This scooter uses a sealed lead acid battery, it is unnecessary to check or add liquid. NOTE: Never open the electrolyte of a sealed battery. Remove the battery from the scooter and store separately in a well ventilated area when the scooter is not in operation for long periods of time Speedometer • Speed is measured in mph. Odometer • The total riding distance is indicated. Fuel gauge • The gauge indicates how much fuel is in the tank (the gauge does not work when the ignition switch is off). The needle moves from full “F” to empty “E” as your fuel decreases. Fill the tank with a good grade of 89-90 octane unleaded gasoline. High Beam Indicator LIght • The high beam light indicates that the high beam headlight is in use. NOTE: Apply the low beam to avoid obstructing the view of other drivers. Turn Signal Indication Light • The turn signals indicate that you are turning a chosen direction, push the button in the desired turning direction, it will return to the center, press the button in to turn off. Speedometer Odometer Turn Signal Indication Light High Beam Indication Light Fuel Gauge 4 General Safety Precaution • Scooters can be hazardous to operate. Please operate it with the following safety instruction. If you fail to take proper precautions, a collision or fall may quickly occur. If you have any questions as to the operating condition of your scooter, turn off the engine and walk your scooter. These scooters should be ridden by persons with good vision, balance, coordination, reflex, strength and decision making capability. • Please read this manual and all safety labels carefully, and follow correct operating procedures. • Before each time you ride make sure that the brakes work properly. • Never operate your scooter without wearing proper safety equipment that includes helmet, shoes, etc… • Never operate your scooter under influence of alcohol or drugs. • Always ride with both hands on the handle bars. • Never operate at excessive speeds. Proper speed is determined by terrain, visibility, operating condition and experience. • Never attempt wheelies, jumps or other stunts. • Always inspect your scooter prior to each use to make sure all bolts are tight, and is in safe operating condition.

Incoming search terms:

2003 SUZUKI SV 1000 Service Manual

0

Filed Under (Suzuki) by admin on 26-02-2011

download
HOW TO USE THIS MANUAL TO LOCATE WHAT YOU ARE LOOKING FOR : 1. The text of this manual is divided into sections . 2. The section titles are listed in the GROUP INDEX . 3 . Holding the manual as shown at the right will allow you to find the first page of the section easily . 4. The contents are listed on the first page of each section to help you find the item and page you need . COMPONENT PARTS AND WORK TO BE DONE Under the name of each system or unit, is its exploded view . Work instructions and other service information such as the tightening torque, lubricating points and locking agent points, are provided . Example: Front wheel SYMBOL Listed in the table below are the symbols indicating instructions and other information necessary for servicing. ENGINE OIL SUZUKIrecommends the use of SUZUKI PERFORMANCE 4 MOTOR OIL or an oil which is rated SF or SG under the API (American Petroleum Institute) service classification. The recommended viscosity is SAE 1 OW-40 . If an SAE 1 OW-40 oil is not available, select an altematice according to the right chart . BRAKE FLUID Specification and classification: DOT 4 A WARNING Since the brake system of this motorcycle is filled with a glycol-based brake fluid by the manufacturer, do not use or mix different types of fluid such as silicone-based and petroleum-based fluid for refilling the system, otherwise serious damage will result . Do not use any brake fluid taken from old or used or unsealed containers . Never re-use brake fluid left over from a previous servicing, which has been stored for a long period. FRONT FORK OIL Use fork oil L01 or an equivalent fork oil . GENERAL INFORMATION 1-5 ENGINE COOLANT Use an anti-freeze/engine coolant compatible with an aluminum radiator, mixed with distilled water only . WATER FOR MIXING Use distilled water only . Water other than distilled water can corrode and clog the aluminum radiator . ANTI-FREEZE/ENGINE COOLANT The engine coolant perform as a corrosion and rust inhibitor as well as anti-freeze . Therefore, the engine coolant should be used at all times even though the atmospheric temperature in your area does not go down to freezing point. Suzuki recommends the use of SUZUKI COOLANT anti-freeze/engine coolant. If this is not available, use an equivalent which is compatible with an aluminum radiator . LIQUID AMOUNT OF WATER/ENGINE COOLANT

Incoming search terms:

HARLEY DAVIDSON DYNA VOLTAGE REGULATOR KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 10-04-2011

download
INSTALLATION 1. Remove and discard the original voltage regulator mounting screws. 2. See Figure 1. Place a chrome washer (4) onto each of the button head screws (5) from the kit. Insert the screws into the mounting holes in the new voltage regulator cover (1). Place first a spacer (2), then a Nylon washer (3) over the screw threads on the inside of the cover. 3. Fasten the cover through the voltage regulator into the motorcycle frame. Tighten to 60-80 in-lbs (6.8-9.0 Nm) . SERVICE PARTS 5 3 4 5 1 4 2 2 is01725 Figure 1. Voltage Regulator Cover Components Table 1. Service Parts: Voltage Regulator Cover Components Part Number Description (Quantity) Item Not Sold Separately Regulator cover 1 Not Sold Separately Spacer, 1.0 inch (25 mm) long (2) 2 62917-01 Washer, Nylon (2) 3 Not Sold Separately Washer, Chrome (2) 4 Not Sold Separately Screw, button head, hex socket 1/4-20 x 2-1/4 inch long (2

SUZUKI MOTORCYCLES Gsxr 600, Gsxr 750, Gsxr 1000 teak the lead

0

Filed Under (Suzuki) by admin on 12-11-2010

download
The launch of the sixth generation of Gsxr marked a shift in Suzuki’s emphasis on two fronts. One, the Gsxr 1000 now took the upper hand in the development stakes. Historically, the Gsxr 750 led the march-arriving first, gaining the most recent technology, absorbing the lion’s share of corporate pride-but by 2003 the Gsxr 1000 was in the lead. Two, the Gsxr 1000 represents another, more subtle shift for Suzuki engineering, in which the designers-the lucky guys who get to clothe these amazing machines-have more freedom of expression. With this generation, the designs turned edgier, sharper, more aggressive looking than ever. What’s more, the Gsxr 1000 K3 would be the proving ground for a host of changes brought to the Gsxr 600 and Gsxr 750 for 2004. In fact, nearly every upgrade to the smaller bikes appeared on the Gsxr 1000 a year before. But the real impetus for driving the Gsxr 1000 to the head of development and, indeed, shortening its development cycle was competition both on the track and in the showroom. For the track, it was understood that Superbike racing would revert to allowing 1000 cc four-cylinder bikes in place of the 750s that had been the limit since 1982. In 2002, Yoshimura and Mat Mladin barely lost the AMA Superbike crown to Nicky Hayden aboard the Honda RC5!. But it would be the RC’s swan song of competitiveness with the change to 1000 cc fours. To keep speeds in check, the AMA Superbike rules would require 1000 cc fours to have some additional limitations compared to the twins and triples. For example, “Cylinder heads may be ported and machined, but altering of valve angles will not be permitted; aftermarket valves, springs, retainers, and other valve-train components will be permitted; valves must be stock size and same basic material as original equipment; aftermarket camshafts will be permitted, but earn lift and resulting valve lift must be no greater than stock. “In addition, the “stock crankshaft must be retained, The only allowable modifications are balancing, polishing of bearing surfaces and attachment of accessory drives. Homologated transmission gear sets (one optional set of ratios per approved model) will be permitted. Optional sets will be price-controlled and must be available to any legitimate AMA Superbike competitor. Homologated fuel-injection throttle-body assemblies (one optional type per approved model) and aftermarket airboxes will be permitted. Modifications to throttle bodies will not be permitted. Optional throttle bodies will be price-controlled and must be available to any legitimate AMA Superbike competitor.” The thinking was simple: keep the liter bikes from sucking through massive throttle bodies, and the horsepower might not (and, it was hoped, would not) go through the roof. In preparation for racing, Suzuki moto wanted to make a host of small changes to the Gsxr 1000, but its motivation was also to keep the bike at the forefront of open-class street bikes. Suzuki engineers knew that Honda and Kawasaki were readying all-new models-the CBR 954 RR and the ZX 9 R had long since been vanquished-and rumor had it that Yamaha was ready with yet another push with the R1.It was the right time to make alterations to the Gsxr 1000. Heading the list was, as one might expect, a revised engine.

Incoming search terms:

2003 SUZUKI SV 650 COOLING AND LUBRICATION SYSTEM SERVICE MANUAL

0

Filed Under (Suzuki) by admin on 26-02-2011

download
COOLING CIRCUIT INSPECTION Before removing the radiator and draining the engine coolant, inspect the cooling circuit for tightness. • * Remove the cowling. (SV650S) (C-7–7-6) • * Loosen the radiator cap stop screw 10 . (SV650) • * Remove the radiator cap O2 and connect the radiator tester to the filler. A WARNING Do not remove the radiator cap when the engine is hot. • * Give a pressure of about 120 kPa (1 .2 kgf/cm2,17.0 psi) and see if the system holds this pressure for 10 seconds . • * If the pressure should fall during this 10-second interval, it means that there is a leaking point in the system . In such a case, inspect the entire system and replace the leaking component or part. A WARNING When removing the radiator cap tester, put a rag on the filler to prevent spouting of engine coolant. CAUTION Do not allow the pressure to exceed specified pressure, or the radiator can be damaged. COOLING AND LUBRICATION SYSTEM 6-3 6-4COOLING AND LUBRICATION SYSTEM RADIATOR REMOVAL • * Remove the cowling. (SV650S) ( r- 7-7-6) • * Drain engine coolant. (r– 72-20) • * Disconnect the right and left radiator hoses from the radiator. • * Disconnect the siphon hose from the radiator. • * Disconnect the horn lead wires. rI .rr • * Remove the radiator lower mounting bolt. • * Disconnect the cooling fan motor and its thermo-switch lead wire coupler 10. • * Remove the radiator by upper mounting bolt. • * Remove the cooling fan. • * Disconnect the cooling fan thermo-switch. • * Remove the cooling fan thermo-switch. • * Remove the horn. CAUTION When removing the horn, hold the nut by spanner to prevent the horn bracket distortion. COOLING AND LUBRICATION SYSTEM 6-5 INSTALLATION • * Install the cooling fan and horn. 0 Cooling fan/horn mounting bolt: 8 N .m (0.8 kgf-m, 6 .0 Ib-ft) • * Install the cooling fan thermo-switch. ( l”76-9) • * Install the siphon hose to the radiator. • * Install the radiator in the reverse order of removal. • * Route the radiator hoses properly. (=9-22) 9-22) • * Install the drain plug with a new sealing washer and pour engine coolant. (=2-20) • * Bleed air from the cooling circuit. (r– 72-21) • * Install the cowling. (SV650S)

Incoming search terms:

2003 SUZUKI SV 650 FUEL SYSTEM AND THROTTLE BODY SERVICE MANUAL

0

Filed Under (Suzuki) by admin on 26-02-2011

download
FUEL PUMP The electric fuel pump is mounted at the bottom of the fuel tank, which consists of the armature, magnet, impeller, brush, check valve and relief valve . The ECM controls its ON/OFF operation as controlled under the FUEL PUMP CONTROL SYSTEM . When electrical energy is supplied to the fuel pump, the motor in the pump runs and together with the impel- ler . This causes a pressure difference to occur on both sides of the impeller as there are many grooves around it . Then the fuel is drawn through the inlet port, and with its pressure increased, it is discharged through the outlet port . The fuel pump has a check valve to keep some pressure in the fuel feed hose even when the fuel pump is stopped . Also, the relief valve is equipped in the fuel pump, which releases pressurized fuel to the fuel tank when the outlet of the fuel pressure has increased up to 450 -600 kPa (4.5- 6.0 kgf/cm2,64- 85 psi) . Relief valve Brush , ∎ I,’ Check valve Magnet L Armature When the impeller is driven by the motor, pressure differential occurs between the front part and the rear part of the blade groove as viewed in angular direction due to fluid friction . This process continuously takes place causing fuel pressure to be built up . The pressurized fuel is then let out from the pump chamber and discharged through the motor section and the check valve . FUEL SYSTEM AND THROTTLE BODY 5- 3 Inlet port I I Impeller 5-4 FUEL SYSTEM AND THROTTLE BODY FUEL PRESSURE REGULATOR The fuel pressure regulator consists of the spring and valve . It keeps absolute fuel pressure of 300 kPa (3.0 kgf/cm2,43 psi) to be applied to the injector at all times . When the fuel pressure rises more than 300 kPa (3 .0 kgf/cm2, 43 psi), the fuel pushes the valve in the regulator open and excess fuel returns to the fuel tank . 90 Spring 02 Valve FUEL INJECTOR The fuel injector consists of the solenoid coil, plunger, needle valve and filter . It is an electromagnetic type injection nozzle which injects fuel in the throttle body according to the signal from the ECM. When the solenoid coil of the injector is energized by the ECM, it becomes an electromagnet and attracts the plunger. At the same time, the needle valve incorporated with the plunger opens and the injector which is under the fuel pressure injects fuel in conic dispersion . As the lift stroke of the needle valve of the injector is set constant, the volume of the fuel injected at one time is determined by the length of time during which the solenoid coil is energized (injection time)

Incoming search terms:

2001 – 2003 Prius 2003 4Runner, Camry, Land Cruiser and Sequoia VEHICLES EQUIPPED WITH TRANSPONDER ECU

0

Filed Under (Toyota Manuals) by admin on 07-10-2011

download
When replacing the ECM (SAE term: PCM) or the Transponder ECU a “handshake” procedure must be performed. This ECU ID communication is necessary to enable the Transponder ECU and the ECM to recognize each other before the vehicle will start. Complete ECU communication using the following steps: 1. Insert a Master key into the ignition cylinder. 2. Turn the ignition ON (engine OFF). 3. Short Tc and CG terminals of DLC3 using the Diagnostic Check Wire (SST 09843-18020 or equivalent) and leave for 30 minutes. 4. After 30 minutes, turn the ignition OFF and remove check wire from DLC3. 5. Register any additional keys as necessary. 6. Start the vehicle to confirm successful ECU communication. Key Programming: To program or delete a key, a registered Master key is necessary unless the Transponder ECU has been reset or replaced. The Transponder ECU system incorporates a black “Master” key and a gray “Sub” key. The process during registration of these two keys is identical. The key itself now determines if it functions as Master or Sub, not the registration procedure. The maximum number of allowable Master and Sub keys vary by model. Refer to the chart below.

Incoming search terms:

Incoming search terms: