kawasaki mule 4010 drive belt change

You search Auto repair manual PDF kawasaki mule 4010 drive belt change, if there are search results will appear below. If search results do not exist, please search by others keyword.



  kawasaki mule 4010 drive belt change Direct Download speed 5282 Kb/s

  kawasaki mule 4010 drive belt change Full Version speed 6162 Kb/s



Harley-Davidson EMERGENCY DRIVE BELT REPLACEMENT KIT Installation Manual

0

Filed Under (Harley Davidson) by admin on 24-10-2010

download
1. Shift transmission to neutral. Before installation of the emergency belt, to avoid personal injury and/or vehicle damage, secure the motorcycle. Both stand and motorcycle must be on solid, level ground. Failure to follow instructions could result in death or serious injury. 2. See Figure 1. Remove spring clip (4) (if present) and loosen rear axle nut (1). 3. Loosen rear axle adjuster (3) (or adjuster nut, if so equipped) on each side of motorcycle, and move rear wheel to full forward position. 4. Remove the damaged/broken belt. 5. Inspect sprockets and belt guard (2) for damage and/or debris. Remove any debris. If sprockets and belt guard are not damaged, proceed with the installation. 6. Remove belt guard. 40171-97,40146-00 1 WARNING i06186 Figure 1. Axle 1. Axle nut 2. Belt guard 3. Adjuster 4. Spring clip 2 4 1 3 7. See Figure 2. Install feeder strip on emergency belt. 8. Feed strip around transmission sprocket in a counterclockwise direction over frame cross support. 9. See Figure 3. Interlock the “v” ends of the emergency belt. a. Insert a hex socket key in the fourth (4) and ninth (6) tooth holes. b. Place the splice block (2) over the seventh (5) tooth hole. c. Install a socket head set screw (3) in the seventh tooth. Tighten using another hex socket key. d. Move the block to the next tooth, and repeat installation steps (b) and (c) in each tooth until all 12 screws are installed. NOTE There are 16 screws included in this kit. However, only 12 screws will actually be installed in the belt. The remaining four screws are spares. 10. See Figure 4. Grasp the emergency belt at the mid point of the lower run between your thumb and forefinger and lift the belt up to take up any slack in the belt. Measure the distance that the belt deflects (2) under tension (1). When two pounds of tension is applied to the lower run of the emergency belt, the belt deflection should be within the following measurements

Incoming search terms:

BMW R850, R1100, R1150, R1200 Oilhead Maintenance Manual

0

Filed Under (BMW) by admin on 16-11-2010

download
cold Engine and Drivetrain Procedures Check Alternator Belt Tools Parts T-handle hex – 4mm none Note: In most cases the alternator belt does not need to be checked any more. Early models should have the pulley and belt upgrade that came out a few years ago. Current recommendations are that the belt is installed and adjusted, then not disturbed until 36K when replacement is specified. 1. Remove the four bolts holding the black plastic alternator belt cover at the front of the engine, 4mm T-handle hex. 2. Remove the cover by sliding it straight down. 3. Check the belt for cracks or shredding. 4. Check the belt tension, quite tight, ~1/4″ deflection when you press on the center. Note: Paul Glaves suggests that proper belt tension is when you can twist the belt ~90 degrees, midway between the pulleys. If you can twist it more than 90 degrees, it is too loose. If you cannot twist it 90 degrees, then it is too tight. 5. Leave the cover off for the valve adjustment procedure on the next page. Change Alternator Belt Tools Parts T-handle hex – 4mm alternator belt socket – 13mm ratchet wrench – 13mm torque wrench 1. Remove the four bolts holding the black plastic alternator belt cover at the front of the engine, 4mm T-handle hex. 2. Remove the cover by sliding it straight down. 3. Loosen the 2 nuts and 1 bolt, 13mm, that hold the alternator – one is on top and one is on each side, thus allowing the alternator to pivot down. 4. Remove the old belt. (Some bikes have a pipe that traps the belt – loosen it enough to get the old belt out and the new belt in) 5. Install the new belt being sure it is properly seated. 6. BMW calls for a tensioning torque of 5.9 ft.lb. (8 Nm) on the adjuster bolt on the left side of the bike. You have to get at this bolt from the alternator side and you may have to lift the tank. Alternatively, you can pry the alternator up with a large screwdriver to tension the belt. 7. Once the belt is under proper tension, tighten the 2 nuts and 1 bolt, 13mm, to 15 ft.lb. (20 Nm). 8. Check the belt for proper tension (see above) and proper seating alignment

Incoming search terms:

Kawasaki Mule Roof 600, 610 and 4010 Trans Crew, Roof Installation Manual

0

Filed Under (Kawasaki) by admin on 02-05-2012

download
INSTALLTION INSTRUCTIONS – Mule 600/610 (4010 Trans skip to pg 4) 1. Place Roof Panel on top of UTV Roll cage and center front to back, and left to right. 2. Using Figure 1 Below – place UTV Roof Mounting Brackets around roll cage bar and using a marker, mark the position of the holes needed in the roof for each Roof Mounting bracket . Figure 1 Copyright 2007 DiamondBack Automotive Accessories, Inc. Page 3 3. Next, remove the roof from the roll cage and using a drill with 1/4″ bit, drill holes using the marks as a guide. 4. Cut (4) 3″ strips of adhesive foam and apply to roof in where mounting brackets are positioned to prevent roof rattling once mounted. Foam should run in the direction of the roll cage as shown in Figure 1 above. 5. Next, reposition the roof on the roll cage according to step 1. 6. Prior to attaching the roof mount brackets, cut the remaining adhesive foam in half and apply one section to the roof in the center of the roof where roof and each roll cage bar meet as shown in Figures 1 above. If additional tape is required to prevent rattling it can be purchased from any hardware store as window sealant foam tape. 7. Next, attach the roof mount brackets according to Figure 2. Use channel locks or pliers to hold top of carriage bolt and turn nut with 7/16″ socket.

Incoming search terms:

BMW Poly-V Belt – R 1100 Models

0

Filed Under (BMW) by admin on 16-11-2010

download
Information: In an effort to reduce service volume, a maintenance-free ribbed Poly-V belt was adopted on all R1100 models from engine number 38946130 onwards (09/94 production onwards). This belt does not need to be retentioned (even at the 600 mile service). The old belt required replacement every 24,000 miles. The new style belt is to be replaced every 36,000 miles. Use the same torque procedure as the old belt. Replacement of an old style belt with the new maintenance free belt requires the use of the new parts below: Parts Kit: 12 31 1 342 086 (kit consists of the following) In addition to the Poly-V belt, the following parts were also changed: 1. Top pulley new: steel old: Aluminum 2. Bottom pulley new no spot welds: old: steel w/three spot welds on front 3. Belt new: Ribbed, printing on belt (1342059 Fa. Dayco) or (1341779 Fa. Conti) Slight squeaking may be heard for a short time after a cold start when temperature is below 50°F. The belt should reach it’s correct operating tension soon after the start up. The belt only needs retentioned if the slight squeaking does not stop after warm up.

HARLEY DAVIDSON SECONDARY BELT EMERGENCY KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 21-02-2011

download
The 40101-80 kit, with a 126 tooth belt, fits: •1980-1986 FXB and 1984-1986 FXWG models This kit may also be used on 1989-1992 international Softail models with a 127 tooth belt. The 40171-97 kit, with a 130 tooth belt, fits: •1995 and later domestic Softail models •1994 and later international Softail models •1994 and later international Dyna models The 40109-86 kit, with a 132 tooth belt, fits •1986-1992 and 1994 domestic Softail models •1989-1993 international FLT and FXR models This kit may also be used on the following models with 133 tooth belts: •1991 and later domestic Dyna models •1991-1992 international Dyna models •1994-1995 international FLT models The 40100-85 kit, with a 136 tooth belt, fits: •1985-1994 domestic FXR models •1985-1996 domestic FLT models •1996 international FLT models The 40112-97 kit, with a 139 tooth belt fits •1997 FLT models Installation 1. Put transmission in ‘Neutral’. 2. Loosen rear axle nut. Loosen rear axle adjuster nut on each side of motorcycle, and move rear wheel to full forward position. 3. Remove the damaged/broken belt. 4. Inspect sprockets and belt guard for damage and/or debris. Remove any debris. If sprockets and belt guard are not damaged, proceed with the installation. 5. See Figure 1. Remove belt guard. 6. See Figure 2. Install feeder strip on emergency belt. Feed strip around transmission sprocket in a counterclockwise direction over frame cross support.

Incoming search terms:

HARLEY DAVIDSON SOFTAIL CHROME LOWER BELT GUARD INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 13-04-2011

download
REMOVING STOCK PLASTIC LOWER BELT GUARD 1. See Figure 1. Remove the hex head bolt (2), washer (3), acorn nut (5), hex head screw (4) and acorn bolt (8) attaching plastic belt guard to rear fork. 2. Remove the plastic belt guard. Save fasteners (2), and (4), washer (3), acorn nut (5) and acorn bolt (8) for installing new chrome belt guard. INSTALLING CHROME LOWER BELT GUARD 1. See Figure 2. Position the new chrome belt guard from kit over belt. Align the holes in guard with mounting lugs on rear fork. Install acorn bolt (9) through mounting lug and fasten to belt guard. Finger tighten only. 2. Install screw (4) with washer (5, from kit) through belt guard and fasten to threaded mounting lug. Position the guard for adequate clearance and finger tighten screw. 3. At the upper belt guard, install the original forward hex bolt (2) and original washer (3) through the upper guard (1), then through the upper hole in chrome belt guard and through mounting lug on rear fork. Secure with original acorn nut. 4. Tighten all hardware to 110 in-lbs (12.4 Nm)

Harley-Davidson BIG-TWIN 8mm BELT DRIVES (OPEN OR CLOSED) INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 16-04-2012

download
INSTALLATION : The spacer behind the front pulley should be removed prior to installing the belt drive. This spacer may or may not be required to correctly align the pulleys. If a spacer is needed for alignment, various sizes are available from your local Primo Belt Drives dealer (part number PX-1 =package of 6 various sizes). With all supporting components installed, install front pulley, lubricate and reinstall the clutch hub. Loop the belt around the front and rear pulleys, and gently push into place. Use the washer and nut supplied with the kit on the front motor shaft, (always use an impact wrench on splined shaft motors) tighten to 80-100 foot pounds of torque. After installing and adjusting clutch, track the belt by turning the pulleys. If needed us a straight edge between the front and rear pulleys to check alignment. Improper alignment of the pulleys will result in reduced belt life. Spacing the motor pulley outward will cause the belt to track towards the outer primary cover. If spaced too far out the belt will rub on the inside of the clutch shell. ENCLOSED INSTALLATIONS: The same disassembly is required, with the exception of the clutch hub and inner primary. We recommend using our PC-1000-Acomplete clutch assembly. Loop the belt around both pulleys to insure that you have the proper belt for your pulleys, then gently push the unit into place. Use the washer and nut supplied with the kit on the motor shaft. Torque the motor nut to 80-100 foot pounds . Adjust the clutch & check belt / pulley alignment. Before installing the primary cover be sure that everything inside clears both the outer and inner covers. In some cases a small amount of metal may need to be removed from one or more of the bosses on the inner or outer primary covers

BMW F 650 CS Rear belt wheel cracks Removal And Installation Manual

0

Filed Under (BMW) by admin on 12-11-2010

download
Relieve the tension of the toothed belt and lift the belt off the belt wheel (refer to F 650CS Repair Manual, 00.57). 2) Remove 6 screws (see arrow in photo at right). 3) Remove the rear belt wheel. 4) Clean and degrease the tapered bores and the threads of the mounting screws 5) Carefully place the new belt wheel in position on the damper, coat the screw threads with Loctite 243 and hand tighten the securing screws. 6) Tighten the securing screws to the specified torque maintaining a diagonally opposite tightening sequence throughout (Torque to 28 NM, curing time 12 hours). 7) Measure the vertical runout of the belt wheel (refer to F 650 CS Repair Manual, 33.15). 8) Install and adjust the rear drive belt (refer to F 650 CS Repair Manual 00.57 – 00.58) 2.1 Removal of the front belt wheel Remove the front belt wheel in accordance with the instructions detailed in the F 650 CS Repair Manual. Remove the securing screw of the activated charcoal filter and let the filter canister hang by one side by the hoses, or remove it and lay it aside. Clean the splines and threads of the main shaft in order to remove all traces of Loctite. If necessary, remove corrosion from the main shaft spline (use only a brass bristle brush). 2.2 Visual inspection Check the splines of the main shaft for damage. Replace the main shaft if the splines are damaged (broken, chipped, bent or damaged teeth). Refer to the F 650 CS Repair Manual for this procedure.

Incoming search terms:

2004 King And CM50 water pump drive belt And pulley alignment & inspection

0

Filed Under (Cobra) by admin on 10-11-2010

download
It is important to inspect three things on the water pump drive pulley and belt. Inspect 1. That the belt and pulleys are in proper alignment and that the belt is not rubbing on flywheel or edges of the pulleys 2. That the pulleys are not cracked 3. That the water pump impeller pulley fastener is tight and has adequate high strength thread lock agent applied. Below is the proper orientation of the water pump drive pulley, cover, and spacers.

Kawasaki Mule Lift Kit Installation Manual

0

Filed Under (Kawasaki) by admin on 04-05-2012

download
Front Lift Installation 1. Ensuring that the parking brake is set, place jack under center of the Mule front end and lift until front wheels clear the ground. Be careful to support Mule properly so that it is secure, but so that the A-arms and struts can droop to full extension. 2. Remove front wheels. 3. If applicable, remove the heater to allow access to the strut mount behind the heater coil. Heater 4. Starting with the left side (driver side), remove the cotter pin and castle nut that secures the strut to the strut mount. Castle Nut & Pen 5. Push bolt through the bolthole, taking care not to damage the brake line that is attached to the bolt. If you are having difficulty removing the bolt, you may have to remove the brake lines that are attached to the front brakes. In this case refer to owners manual for removing brake lines. Screwdriver NOTE: Keep in mind that if you remove the brake lines you must bleed your brakes according to operator’s manual. 6. Once the bottom of the strut has been loosened, then unbolt the top of the strut. The nuts securing the top strut can be located in the dash of the Mule on the left and right sides. In most cases these nuts are easily accessible, but you may have to remove the glove box or heater coils, depending on the model and options purchased with the Mule.

Incoming search terms:

Incoming search terms: