manufacturers suppliers secretaries managers ceo of hot sale small water bottled production line mail

You search Auto repair manual PDF manufacturers suppliers secretaries managers ceo of hot sale small water bottled production line mail, if there are search results will appear below. If search results do not exist, please search by others keyword.





HARLEY DAVIDSON XL BRAIDED FRONT BRAKE LINE KITS INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 30-03-2011

download
REMOVAL Direct contact of D.O.T. 5 brake fluid with eyes can cause eye irritation, swelling, and redness. Avoid eye contact. In case of eye contact flush with large amounts of water and get medical attention. Swallowing large amounts of D.O.T. 5 brake fluid can cause digestive discomfort. If swallowed, obtain medical attention. Use in well ventilated area. KEEP OUT OF REACH OF CHILDREN. (00144a) Direct contact of D.O.T. 4 brake fluid with eyes can cause irritation. Avoid eye contact. In case of eye contact flush with large amounts of water and get medical attention. Swallowing large amounts of D.O.T. 4 brake fluid can cause digestive discomfort. If swallowed, obtain medical attention. Use in well ventilated area. KEEP OUT OF REACH OF CHILDREN. (00240a) D.O.T. 4 brake fluid will damage painted and body panel surfaces it comes in contact with. Always use caution and protect surfaces from spills whenever brake work is performed. Failure to comply can result in cosmetic damage. (00239b) 1. Drain the brake fluid following the instructions in the service manual. Dispose of waste properly. To prevent accidental vehicle start-up, which could cause death or serious injury, disconnect negative (-) battery cable before proceeding. (00048a) To prevent accidental vehicle start-up, which could cause death or serious injury, remove main fuse before proceeding. (00251b) 2. Disconnect the battery, negative (-) cable first or remove the main fuse. Follow the instructions in the service manual 3. Remove bolt and two sealing washers to disconnect brake line fitting from master cylinder. Discard sealing washers, but save bolt for installation. 4. Remove bolt and two sealing washers to disconnect brake line fitting from front brake caliper. Discard sealing washers, but save bolt for installation. 5. Carefully make note of brake line routing, then remove existing brake line. NOTE This kit contains clamps and cable straps to either replace the original equipment clamps and cable straps being removed or to add additional brake line support. INSTALLATION Install proper length brake lines. Incorrect brake line length can adversely affect motorcycle operation, which could cause loss of control resulting in death or serious injury. (00325a) Replace brake line gaskets. Re-using original gaskets can cause brake failure and loss of vehicle control, which could result in death or serious injury. (00318a) Avoid leakage. Be sure gaskets, banjo bolt(s) and brake line are clean and undamaged before assembly. (00323a) 1. Position new sealing washers from kit on each side of hydraulic brake fittings (banjo fittings). Small ID washers are for caliper end, large ID washers are for master cylinder end. 2. Insert bolts (removed earlier) through washers and fittings. 3. Hold new braided brake line in position and install bolts into master cylinder and caliper. Tighten only enough to keep banjo fitting in the same orientation as the stock banjo fitting. 4. Verify there is no twist in the brake line. Adjust brake line if necessary. 5. Install clamps from kit by wrapping clamp around braided brake line at each of the clamp mounting locations. Verify clamps are oriented the same as the stock clamps. Install clamp screws but do not tighten. 6. Check entire length of braided brake line: a. Be sure brake line is not twisted. b. Turn handlebars fully-left and right while checking to make sure brake line does not contact any vehicle components. c. Be sure brake line length between clamps is sufficient. 7. Adjust brake line if necessary. 8. Tighten caliper and master cylinder banjo bolts to 20-25 ft-lbs (27-34 Nm) .

Incoming search terms:

2008 Kawasaki ZG1400 Concours ABS Front 3-Line Kit and FK003D625R Single Line Rear INSTALLATION INSTRUCTIONS

0

Filed Under (Kawasaki) by admin on 29-01-2011

download
Step 1: Identify the key components that complete our front brake line kit: You should have three (3) hoses, one (1) double banjo bolt, and two (2) single banjo bolts There are also a total of nine (9) washers and (3) brass conic inversors. Seven (7) washers and two (2) inversors will be used; the rest are spares. If you have purchased a rear kit as well, locate the following additional pieces: One (1) hose with bracket and c-clip attached, one (1) single banjo bolt, two (2) brass inversors and three (3) washers. You will use one (1) “olive” conic inversor and two (2) washers, the rest are spares. Step 2: To ensure no paint damage from a brake fluid spill, completely cover the front end of the bike. This process can be messy, and brake fluid WILL drip! Step 3: After drying out the OEM brake system, uninstall stock hoses. On the front brake line kit, we are replacing three hoses and their respective blocks (see pictures 1-2 for blocks) . For the rear, we are replacing one hose from the master cylinder to the ABS hard line. Take note of how the stock system was routed, in case you need to reinstall it. Step 4: Locate Line A – This will travel from the master cylinder to the ABS Junction. (See picture 3) You will use a single banjo bolt and two washers at the master cylinder, and an “olive” inversor to thread female end to hard pipe for incoming ABS (right side). * We have replaced the block at the upper triple clamp with a c-clip; please use your stock bolt to thread this in. (See picture 4) Locate Line B – This will travel from the ABS Junction to the right caliper. First, thread the female end to the hard pipe for outgoing ABS (left side). There will be a bolt from the OEM blocks at ABS Junction; please use this to thread c-clips into frame as shown in picture 5 . There is another bolt/OEM block located at the lower triple clamp; please use this to thread the c-clip in as seen in picture 6. Locate Line C – This will cross over the front fender using OEM holders, from right caliper to left caliper. Thread caliper banjos from Line B and C using the following sequence: double banjo hex, washer, 40- degree banjo from Line C, washer, 20-degree banjo from Line B, washer, caliper. Please see pictures 7 and 8 for reference. Thread single banjo bolt into left caliper, using two washers and 40-degree banjo. If applicable, locate rear Line D – this will travel from the rear master cylinder to the hard line for ABS. Thread the hard pipe into female end using a “olive” inversor, and attach bracket to swingarm as seen in picture 9 . Use the bolt from the holder for ABS hose, and sit our bracket on top of the OEM holder. Using the bolt from the OEM ABS hose holder in location shown in picture 10 , attach the c-clip on top of holder and tighten. Finally, thread 30-degree banjo in caliper using the following sequence: single banjo hex, washer, banjo, washer, caliper

HARLEY DAVIDSON SOFTAIL BRAIDED REAR BRAKE LINE KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 04-02-2011

download
INSTALLATION Direct contact of D.O.T. 4 brake fluid with eyes can cause irritation. Avoid eye contact. In case of eye contact flush with large amounts of water and get medical attention. Swallowing large amounts of D.O.T. 4 brake fluid can cause digestive discomfort. If swallowed, obtain medical attention. Use in well ventilated area. KEEP OUT OF REACH OF CHILDREN. (00240a) Direct contact of D.O.T. 5 brake fluid with eyes can cause eye irritation, swelling, and redness. Avoid eye contact. In case of eye contact flush with large amounts of water and get medical attention. Swallowing large amounts of D.O.T. 5 brake fluid can cause digestive discomfort. If swallowed, obtain medical attention. Use in well ventilated area. KEEP OUT OF REACH OF CHILDREN. (00144a) D.O.T. 4 brake fluid will damage painted and body panel surfaces it comes in contact with. Always use caution and protect surfaces from spills whenever brake work is performed. Failure to comply can result in cosmetic damage. (00239b) Drain Brake Fluid 1. Pop off bleeder nipple cap on the rear brake caliper. 2. Install one end of a length of plastic tubing over the caliper bleeder valve. Place the free end of the tubing into a suitable container. 3. Open the bleeder valve about 1/2-turn and pump the brake pedal to drain the brake fluid out of the rear brake system. Do not reuse brake fluid. Remove brake line components carefully. Damage to seating surfaces can cause leakage. (00320a) Remove Existing Rear Brake Line 1. Disconnect wiring harness connectors from brake light switch spade terminals. Avoid leakage. Be sure gaskets, banjo bolt(s) and brake line are clean and undamaged before assembly. (00323a) 2. Disconnect existing brake line from rear brake caliper and rear brake master cylinder assembly. Save banjo bolts, but discard brake line gaskets. NOTE This kit contains all gaskets needed for replacement. 3. Carefully make note of rear brake line routing and orientation of banjo fittings, then remove existing brake line. Save hex head screw holding brake light switch manifold to tab on frame, but discard brake line and attaching parts. 4. Unthread brake light switch from brake line. Save switch for later use.

Incoming search terms:

2002-2007 HONDA VFR 800 WITH ABS GALFER BRAKE LINE KIT INSTALLATION MANUAL

0

Filed Under (Honda) by admin on 03-03-2011

download
Prep the motorcycle for this job A. Park motorcycle on the center stand in a well-lit shop (Fig.A) B. Note: it is not absolutely necessary to remove the fuel tank and body panels. However, brake fluid is VERY CORROSIVE TO PAINT. We decided to be safe (Fig. B) and removed the lower fairing left and right rear sides, fuel tank, front fender, seat, and black A B plastic inner fairing front parts, battery cover, and rear master cylinder cover according to the owner’s manual. This also gives better access to the fittings. (Fig C) C. After safely storing the body panels and fuel tank, remove wind shield, (brake fluid, even a drop, will permanently mark any clear plastic), cover the dash and all gauges with a towel. II. Draining the brake fluid from the systems. A. A copy of the factory instructions has been included with this kit on how to properly and safely drain, fill and bleed the brake fluid from the brake systems. Follow the directions closely and remove the fluid according to the instructions. Dispose of the old fluid properly—DO NOT REUSE. B. If you purchased the clutch line, then perform the following steps (Fig D): In the bag marked Clutch Line: remove the left side lower body panels. Remove vehicle speed sensor, and remove the coolant C D tank. Remove the clutch fluid from the master cylinder on the left clip-on. Remove the fluid from the clutch line and slave cylinder. This factory line is NOT attached along the inner frame spar so here is a little trick that made this a 20- minute job including the bleed: 1. Remove the banjo bolts from the master cylinder and the clutch slave ends. 2. With a nice heavy wire tie, attach the slave end of the new braided line to the lever end of the factory line. Snip off the tail of the wire tie. Wrap this “joint” with electrical tape. 3. Pull from the factory slave end until you get the braided line end to the clutch slave. If it gets caught on something, try turning the end you are pulling from. 4. Remove the tape, carefully cut off the wire tie, install new sealing washers and bolts at both ends and torque to 17-21 foot/lbs. maximum. Bleed the clutch. III. Removing the factory front brake hoses and calipers – Front A. With the fluid drained and disposed of properly, loosen the bolts that hold the right caliper to the right fork leg (Fig E). Also remove the two 8mm bolts from the ABS front wheel speed sensor. Loosen all of the hose mounting blocks on the front forks on both sides; also loosen the blocks for the crossover pipe (Fig F) between the fork legs. Also loosen the frame pipe mounts and the mount for the front lever line that is also E attached to the right side of the frame. Loosen the left caliper mounting bolts (Fig G). B. Remove the calipers and remove the hose mounts under the lower triple tree. Remove the hard pipes from both the left and right hard pipe to soft line frame mounts on the frame (Fig. H). On the front ABS modulator remove the short soft line that is connected to the mount block. (Fig I.a. & I.b.) C. Carefully remove the

HARLEY DAVIDSON XL PULLBACK HANDLEBAR KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 31-03-2011

download
Installation Removing the Existing Front Brake Line To prevent accidental vehicle start-up, which could cause death or serious injury, disconnect negative (-) battery cable before proceeding. (00048a) 1. Refer to the Service Manual and follow the instructions given to remove the seat and disconnect the negative battery cable. Retain all seat mounting hardware. Direct contact of D.O.T. 5 brake fluid with eyes can cause eye irritation, swelling, and redness. Avoid eye contact. In case of eye contact flush with large amounts of water and get medical attention. Swallowing large amounts of D.O.T. 5 brake fluid can cause digestive discomfort. If swallowed, obtain medical attention. Use in well ventilated area. KEEP OUT OF REACH OF CHILDREN. (00144a) 2. See Figure 1. Open the bleeder nipple cap on the front brake caliper. Obtain a length of plastic tubing. Install one end of the tubing over the caliper bleeder valve (1). Place the free end of the tubing into a suitable container. Open the bleeder valve about 1/2-turn and pump the front-brake hand lever to drain the fluid out of the front brake system. Do not reuse brake fluid. NOTE Cover the front fender and the front of the fuel tank with clean shop towels to prevent scratching. Damage to the finish could result. Avoid leakage. Be sure gaskets, banjo bolt(s) and clutch line are clean and undamaged before assembly. (00329a) 3. Disconnect the brake line from the front brake caliper and the front brake master cylinder assembly. Discard the brake line sealing washers, but retain the banjo bolts. The brake line kit contains all new sealing wash- ers. CAUTION 1 CAUTION 1 WARNING 1 WARNING 1 WARNING ® Kit Number 56021-04B 1 of 6 Figure 1. Draining Brake Fluid i01986 i05811.tif 1 1. Caliper bleeder valve NOTE Carefully compare the new brake line to the old line before removing the old linefrom the motorcycle. Make sure the banjo fittings on the new brake line will be oriented the same as the fittings on the old line. 4. Make note of the front brake line routing and the orientation of the banjo fittings, then unfasten the brake line clamps at the right side of the front fork upper bracket and the underside of the front fork lower bracket, and remove the brake line assembly from the vehicle. Save the upper clamp and all attaching parts, but discard the brake line.

1998-2001 HONDA VFR 800 Complete Brake Line Kit INSTALLATION

0

Filed Under (Honda) by admin on 14-12-2011

download
Identify the key components that complete our brake line kit: You should have nine (9) hoses, one (1) double banjo bolt, fourteen (14) single banjo bolts, (1) single bleeder bolt three (3) drawings, and a picture CD. There are also a total of forty (40) washers and two (2) “olive” conic inversors. Thirty six washers will be used, and two olives. The rest are spares.Step 2: Familiarize yourself with the brake lines, which are labeled for application. Lettered brake hoses A, B, C, D, E, F, G are installed on the front of the motorcycle, while brake hoses (H and I) are installed on the rear. Each label will reference a different drawing, which will show you the location of the key brake system
components.Step 3: To ensure no paint damage from a brake fluid spill, completely cover the bike. This process can be messy, and brake fluid WILL drip! Step 3: Dry out (bleed) your OEM hoses, and take note of how the stock system is installed. You may want to take a couple pictures, in case you need to re-install. Step 4:Remove the stock hoses on the front of the motorcycle, and replace with Galfer hoses labeled A,B,C,D,E,F,G. Locate lines A. this hose will run from the master cylinder down to the right caliper and across the fender through the C-CLIP down to the left caliper. Line D. will run from the (DELAY VALVE) up through the C-CLIP to the right side upper frame female fitting will thread into the male with a (OLIVE) this O.E.M tubing travels to the proportion valve. Line F will run from the left caliper up through the C-CLIP to the left upper frame female fitting and thread to the male with a (OLIVE) this tubing travels to the rear master cylinder. Locate and install line E; this hose will run from the lower delay valve down to the right caliper. locate and install line C& G; line G will travel from the bottom (left) mounting point on the left caliper, to the upper inner mounting point of the left caliper this line joins line C with a double banjo bolt. line C will travel from the inner left caliper through the C-CLIP across the front fender to the inner mounting point of the delay valve

Yamaha WR motorcycle ProEFX 12V Hot Start Installation

0

Filed Under (Yamaha) by admin on 06-01-2012

download
1. Remove seat, tank and shrouds. Remove existing hot start lever, cable and valve from the carburetor. 2. Tip: Clean all dirt from hot start bore and mating surfaces on the carburetor body with gas and a q-tip. 3. Tip: Use a small amount of Teflon tape (one wrap) on the threads of the aluminum mounting nut to ensure a water tight seal. 4. Install the Pro EFX hot start valve in the hot start bore (as shown in picture), with return spring, impact washer and delrin plunger in place. • Tip: Installation of the solenoid valve may require temporary rotation of the carburetor away from the top engine mount bracket. • Install with the solenoid valve assembly disconnected from wiring harness. • Screw in by hand and finish tightening with needle nose pliers. Do not over-tighten. Solenoid valve assembly: 5. Mount activation switch on preferred handle bar location. Pictured on clutch side, in place of the stock kill switch.
6. Route wiring harness around steering column and down frame backbone. Insert battery leads through slot in rubber protective boot. (follow existing wiring to battery) 7. Connect positive (red) and negative (black) leads to motorcycle battery. 8. Connect male and female terminals to wiring harness on previously installed solenoid valve assembly. 9. Depress activation button and listen for valve actuation. Plunger should freely “snap” between open and closed position in hot start bore, as activation button is depressed and released. If you don’t hear the valve “snap” open and closed, follow the trouble shooting guidelines or call /email for support. 10. Maintenance: Periodically ensure proper tightness of solenoid valve in carburetor body as part of standard motorcycle maintenance. Keep the battery terminal connections free from corrosion.

Incoming search terms:

1994-1998 HONDA RVF400RR Racing Kit INSTALLATION

0

Filed Under (Honda) by admin on 01-12-2011

download
(1)Fuel High Octane white gasoline (2)Engine Oil Recommended Oil: HONDA Ultra-GP (for four-cycle Motorbike) SAE20W-50 or 10W-40
Full Capacity: 3.0Liter (5.28pt) Oil Exchange: 2.5Liter (4.4pt) Filter Exchange: 2.4Liter (4.224pt) (3)Spark Plug NGK R 847-10(11)(4)Cooling Water Highly recommend checking the water level on each ignition/riding. Ingredient: Tapped water or Drinking water I. Unscrew a radiator cap. Apply water up to limb of intake. II. Hold steering and heave the body two or three times to let air out. III.Add water if necessary. IV. Screw the cap tighten.V. Start Engine then check water level again. Add water if necessary. < Notes for racing condition> • Keep your attention when you re-check the water level since the water would spill out of intake. Also cover the body with wastes. • Drain cooling water in a catch-tank before riding. • Drain whole water in a radiator after riding. It avoids corrosion or clog of components. • It is admitted adding coolant in winter season. Handle carefully when you apply them. It makes the circuit slippery if it drops or spilled.

Incoming search terms:

HARLEY DAVIDSON SPORTSTER BRAIDED REAR BRAKE LINE KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 24-02-2011

download
This kit fits 1988-2003 XL models. INSTALLATION Direct contact of D.O.T. 5 brake fluid with eyes can cause eye irritation, swelling, and redness. Avoid eye contact. In case of eye contact flush with large amounts of water and get medical attention. Swallowing large amounts of D.O.T. 5 brake fluid can cause digestive discomfort. If swallowed, obtain medical attention. Use in well ventilated area. KEEP OUT OF REACH OF CHILDREN. (00144a) Drain Brake Fluid 1. Remove bleed screw cap on rear brake caliper. 2. Install one end of a length of plastic tubing over caliper bleeder valve. Place free end of the tubing in a suitable container. 3. Open the bleeder valve about one-half turn and pump the brake pedal to drain the brake fluid out of the rear brake system. Do not re-use brake fluid. Remove brake line components carefully. Damage to seating surfaces can cause leakage. (00320a) Remove Existing Rear Brake Line 1. Disconnect wiring harness connectors from brake light switch spade terminals. 2. See Figure 1. Remove screws from the three P-clamps and one bracket used to secure brake line to motorcycle. a. Save all screws except bracket screw and save stock P-clamp, located at the right side sprocket cover, for later use. b. Do not mix up the screws. The screws must go back into the same threaded hole in which they were removed. c. Discard remaining two P-clamps. 3. Note brake line routing, then remove existing brake line. NOTE This kit contains clamps to replace the original equipment clamps removed, except for the small clamp on the right side sprocket cover.

HARLEY DAVIDSON FLTR DETACHABLE TOUR-PAK ANTENNA RELOCATION KIT

0

Filed Under (Harley Davidson) by admin on 19-02-2011

download
Drilling Instructions for Antenna Base Mounting and Cable Routing 1. See Figure 1. Measure and determine the center of the outside rear Tour-Pak wall. 2. Lay a strip of 2 inch wide masking tape from top to bottom over the approximate center. 3. Very carefully measure again and mark the center near the top of the tape strip. Measure and mark the center near the bottom of the strip. 4. Draw a line from the top mark to the bottom mark. 5. Facing the centerline you have drawn, measure 9-1/4 inches from the center line to the left side. 6. At the 9-1/4 inch dimension, lay a vertical strip of 2 inch masking tape from the top to approximately the middle of the Tour-Pak wall. 7. Very carefully measure again and mark 9-1/4 inches from the top of center line to the top of the tape strip. Measure and mark 9-1/4 inches from the bottom of the center line to the bottom of the strip. 8. Draw a vertical line from the top mark to the bottom mark. 9. Measure 1-1/4 inches from the top edge, down the vertical line you have drawn and draw a short horizontal line across the vertical line. 10. Measure 1-1/2 inches down the vertical line you have drawn from your FIRST short horizontal line and draw another short horizontal line across the vertical line

Incoming search terms:

Incoming search terms: