markland floorboard mounting hardware

You search Auto repair manual PDF markland floorboard mounting hardware, if there are search results will appear below. If search results do not exist, please search by others keyword.



  markland floorboard mounting hardware Direct Download speed 5282 Kb/s

  markland floorboard mounting hardware Full Version speed 6162 Kb/s



HARLEY DAVIDSON RIDER BACKREST MOUNTING HARDWARE KIT INSTALLATION INTSRUCTIONS

0

Filed Under (Harley Davidson) by admin on 29-01-2011

download
INSTALLATION 1. Remove seat according to the instructions in the service manual. 2. Remove the ECM caddy/battery cover by removing two screws. 3. See Figure 1 and Figure 2 for the mounting locations of the brackets. NOTE Some seats may limit the fore/aft mounting location of the backrest bracket. 4. See Figure 3 and Table 1. Remove plastic protective cap and locknut from stud. Leave the small plastic washer in place or the stud plate will fall out. With the backrest mounting bracket tab facing forward, attach the backrest mounting bracket (1) to stud plate with stock locknuts from the stud plate. 5. Tighten locknuts to 5-8 ft-lbs (6.8-10.8 Nm) . 6. Attach the front mounting bracket (6) to the frame cross- member using using two flange screws (8) and flange nuts (7). Tighten screws to 72 in-lbs (8.1 Nm) . 7. Attach the bracket support (2) to the front mounting bracket (6) with screw (8) and nut (7). 8. Install screw (5) and nut (9) to bracket support and backrest tab and tighten to 15 ft-lbs (20.3 Nm) . 1 2 is05475 1. Backrest mounting bracket 2. Front mounting bracket Figure 1. Bracket Mounting Locations 3 2 1 is05476 1. Backrest mounting bracket 2. Front mounting bracket 3. Bracket support Figure 2. Backrest mounted After installing seat, pull upward on seat to be sure it is locked in position. While riding, a loose seat can shift causing loss of control, which could result in death or serious injury. (00070b) -J04733 1 of 2
9. Install the ECM caddy/battery cover using two screws previously removed and tighten to 6-8 ft-lbs (8.1-10.8 Nm) . 10. Install seat according to service manual instructions. 11. Hold slit between rider and passenger seat open. On rider backrest, compress backrest rods and spring. Insert rods into backrest mounting bracket. Backrest Pad Adjustment 1. Adjust fore/aft position of backrest pad. Use 3/16 inch hex wrench to adjust set screw that is accessible through eyelet opening on rear of pad. If possible, do not remove set screw because it is difficult to install.

Incoming search terms:

LED Motorcycle Power Box Installation Instructions

0

Filed Under (Tips and Review) by admin on 29-01-2011

download
This box requires the presence of a mounting plate secured to the motorcycle’s luggage rack. If the bike in question is not equipped with a mounting plate, one must be fabricated prior to installation of this box. Five mounting holes (.281″ dia.) are required to mount this box. If the motorcycle is already equipped with a mounting plate, it may be necessary to drill the 5 mounting holes required for this installation. Use the diagram shown to determine the precise location of these holes. 1. Position the box onto the mounting plate. Align the 5 vibration dampeners with the 5 mounting holes in the mounting plate. 2. Using the illustrations shown, secure the box to the mounting plate using the provided hardware. Note: Your luggage rack may already have the correct mounting holes drilled. Check the measurements below and if these holes already exist at the proper distance, remove any existing mounting hardware from the holes and secure the box with the supplied mounting hardware. 3. Place the box into its mounting position on the deck and secure it with the supplied mounting hardware as shown in the diagram. Wiring: Diagrams for optional equipment are found below. Refer to the diagram on the following page for general motorcycle box wiring information

V-Star 1100 Floorboard/ Foot peg Extension Kit Installation Manual

0

Filed Under (Yamaha) by admin on 08-11-2010

download
1. Take notice of the position of the shift peg positions relative to the floorboard or foot-peg. You will be adjusting it back to these locations upon installation of the extended linkage. 2. Loosen the shifter rod jam nuts and remove the OEM shift linkage. 3. Loosen the floorboard/foot-peg assembly by removing the mounting bolts (14mm wrench) 4. Install the Extension Bracket using the OEM bolts and torque to 46 ft. lbs. Figure 1 shows how to orient the bracket relative to the front of the motorcycle. 5. Mount the floorboard/foot-peg assembly to the Extension Bracket using the SS hardware provided and torque to 46 ft. lbs. It is always a good idea to apply thread-locking compound such as lock- tite to ensure that the hardware does not vibrate loose while riding. 6. Remove the jam nuts from the OEM shift linkage and thread them gently on to the new shift linkage. 7. Install the new shift linkage by aligning the control swivel and the shifter swivel and turning the linkage. Be careful not to cross thread the linkage. The linkage will thread into both swivels simultaneously. Adjust to the desired position and tighten the jam nuts that you removed from the OEM linkage. Do not over-tighten or damage will occur to the threads. Right Side Installation: 1. Take notice of the Brake pedal position relative to the floorboard/foot-peg before removal, as it will need to be readjusted upon installation of the kit. 2. Remove the cotter pin from the brake linkage and remove the clevis pin. The brake linkage will now be separate from the brake pedal assembly. Do not discard anything. 3. Loosen the floorboard/foot-peg assembly by removing the mounting bolts (14mm wrench) 4. Install the Extension Bracket using the OEM bolts and torque to 46 ft. lbs. Figure 1 shows how to orient the bracket relative to the front of the motorcycle. 5. Mount the floorboard/foot-peg assembly to the Extension Bracket using the SS hardware provided and torque to 46 ft. lbs. It is always a good idea to apply thread-locking compound such as lock- tite to ensure that the hardware does not vibrate loose while riding. 6. Loosen the jam nut from the brake linkage and remove the linkage bracket. 7. Assemble the threaded brake linkage extension to the coupling nut and tighten using one of the provided jam nuts. Don’t forget the thread locking compound if your using it. 8. Thread the coupling onto the brake cylinder linkage and install the other end of the assembly into the brake pedal end. Tighten the jam nuts. You should be able to adjust the linkage for proper brake pedal location before tightening the jam nuts. 9. Readjust the brake light switch and your ready to roll

Incoming search terms:

1994 HARLEY DAVIDSON FXD (DYNA) PASSENGER FLOOR BOARDS AND RELOCATION ARMS INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 01-04-2012

download
1. Beginning on the RIGHT side, use a 9/16″ wrench to remove the bolt from the back of the passenger peg mount. Remove entire peg assembly. 2. Remove the new floorboards and mounts from their packaging. Notice the Left and Right markings on the backside of the floorboard mounting plates. 3. Install the supplied Right floorboard support (the longer one) with the round mounting face for the floorboard towards the upper-right using the supplied 7/16 x 1 º” long bolt. Apply blue Loctite to the threads. Insert the bolt from the backside where the original peg was mounted. Use a 5/8″ wrench & tighten securely. Note: If also installing with optional Relocation Arms (#FXD005-5) skip step 4 and go onto step 5. 4. Installation of Right Floorboard only. There are two sets of alignment holes on the floorboard support. Insert two of the four dowel-pins into the dowel pinholes at six and twelve o’clock. Place the right floorboard onto the mount and dowel pins so that it is parallel (horizontal) to the ground. Insert the supplied 5/16 X 1″ socket head cap screw through the floorboard mount & thread into the floorboard support. Use a º” hex key wrench & tighten securely. 5. Remove Right Floorboard – Installation of Right Floorboard with Relocation Arm. There are two sets of alignment holes on the floorboard support. Insert two of the four dowel pins into the dowel holes 180 degrees apart. Notice the L & R markings on the backside of the relocation arms. Install the Right relocation arm so marking (R) is facing inward and the threaded hole is facing toward the front of the motorcycle. There are two sets of alignment holes on the relocation arms. Place the arm onto the mount (Match dowel pin holes) in desired upper or lower position. Insert the supplied 5/16 X 1″ socket head cap screw through the relocation arm & thread into the floorboard support. Use a º” hex key wrench & tighten securely. 6. At the other end of the relocation arm there are two sets of alignment holes. Insert two of the supplied dowel pins into the set of dowel pin holes 180 degrees apart that will allow the floorboard to be horizontal or parallel to the ground. Insert the supplied 5/16 X 3/4″ socket head cap screw through the floorboard mount & thread into the link arm. Use a º” hex key wrench & tighten securely.

Incoming search terms:

YAMAHA ROAD STAR PASSENGER FLOORBOARD RELOCATION ARMS INSTALLATION INSTRUCTONS

0

Filed Under (Yamaha) by admin on 23-12-2010

download
1. If you are installing Relocation Arms and Passenger Floorboards, install the floorboards first per their instructions. When installing the Relocation Arms with Passenger Floorboards already installed proceed as follows. 2. Starting on the LEFT side, fold the floorboard up. Remove the socket head bolt which secures the floorboard to the motorcycles stock peg support and remove the floorboard taking notice of which pinholes the dowel pins are located in. 3. Locate the Relocation Arm that has an “L” stamped on the backside of it. Place two of the supplied dowel pins into one of the two sets of the pinholes in the backside of the arm that are directly across from one another. (180 degrees apart.) Place the arm onto the mounting block and align the pins in the arm with the holes closest to the desired height you wish the floorboard to be at. Bolt the arm to the mounting block loosely using one of the supplied 5/16″ X 1″ button head bolts. 4. Place the Passenger Floorboard with its two dowel pins into the set of pinholes at the other end of the relocation arm that allows the floorboard to be parallel (horizontal) to the ground. Use one of the supplied 5/16″ X 3/4″ socket head bolts to mount the floorboard to the relocation arm and make finger tight. 5. Install the RIGHT side in the same manner. Check to see that the right arm is at the same height and/or position as the left. Bolt the floorboard to the other end of the arm using the remaining dowel pins and socket head bolt. Tighten all four bolts on both sides securely. NOTE: Four other height positions are possible by using the other sets of holes on the front side of the mounting block and backside of the relocation arm

HARLEY DAVIDSON MOUNTING BRACKET SERVICE MANUAL

0

Filed Under (Harley Davidson) by admin on 12-04-2011

download
INSTALLATION 1. See Figure 1. Note position of mounting brackets (1). Remove old mounting brackets and discard. NOTE On 1997-2000 models, the air fittings are installed to the two mounting holes on the right-hand right side bracket. On 2003 and later models, the single air fitting is installed to mounting hole on the left-hand side bracket. 2. See Figure 2. Install new mounting brackets from kit on each side of the motorcycle using new locknuts as follows: a. Use the 5/16-18 x 1 inch screws (5) in the upper two holes with 2 chrome washers (3) placed between the mounting bracket and the saddlebag support at each of the two locations. Install a 5/16-18 flange locknut (2) behind the screw that does not screw into a weld nut. Tighten to 15-19 ft-lbs (20-26 Nm). b. On each side, install a 1/4-20 x 7/8 inch screw (9) through the bottom hole of the mounting bracket and the saddlebag bracket as shown, with a chrome washer (3) placed between the mounting bracket and the saddlebag bracket. Tighten to 10-14 ft-lbs (13.5- 19.0 Nm). On 1997-2002 models, install the air line fittings to the lowest two holes drilled in the right side bracket. On 2003 and later models, install the single air line fitting to the lower front hole drilled on the left side bracket. c. See Figure 2. On each side, attach docking points (6) in their proper location on mounting bracket with 3/8- 16 x 1-1/2 in. buttonhead screws (7), washers (3) and locknuts (8) but leave locknuts slightly loose so docking points can be adjusted for proper fit. On 1997and later models, the docking point will attach through the front hole of the mounting bracket as shown. On 1994-1996 models, the docking point will attach through the rear hole of the mounting bracket. d. Place detachable passenger backrest into docking points as described in the Backrest Instruction Sheet. Make sure that the forward notches of the sideplates are pushed completely into the forward docking points, then tighten the rear docking points securely to 45-47 ft/lbs (61.0-64.0 Nm

Incoming search terms:

HARLEY DAVIDSON FXD (DYNA) PASSENGER FLOOR BOARDS AND RELOCATION ARMS INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 21-12-2010

download
1. Beginning on the RIGHT side, use a 9/16″ wrench to remove the bolt from the back of the passenger peg mount. Remove entire peg assembly. 2. Remove the new floorboards and mounts from their packaging. Notice the Left and Right markings on the backside of the floorboard mounting plates. 3. Install the supplied Right floorboard support (the longer one) with the round mounting face for the floorboard towards the upper-right using the supplied 7/16 x 1 º” long bolt. Apply blue Loctite to the threads. Insert the bolt from the backside where the original peg was mounted. Use a 5/8″ wrench & tighten securely. Note: If also installing with optional Relocation Arms (#FXD005-5) skip step 4 and go onto step 5. 4. Installation of Right Floorboard only. There are two sets of alignment holes on the floorboard support. Insert two of the four dowel-pins into the dowel pinholes at six and twelve o’clock. Place the right floorboard onto the mount and dowel pins so that it is parallel (horizontal) to the ground. Insert the supplied 5/16 X 1″ socket head cap screw through the floorboard mount & thread into the floorboard support. Use a º” hex key wrench & tighten securely. 5. Remove Right Floorboard – Installation of Right Floorboard with Relocation Arm. There are two sets of alignment holes on the floorboard support. Insert two of the four dowel pins into the dowel holes 180 degrees apart. Notice the L & R markings on the backside of the relocation arms. Install the Right relocation arm so marking (R) is facing inward and the threaded hole is facing toward the front of the motorcycle. There are two sets of alignment holes on the relocation arms. Place the arm onto the mount (Match dowel pin holes) in desired upper or lower position. Insert the supplied 5/16 X 1″ socket head cap screw through the relocation arm & thread into the floorboard support. Use a º” hex key wrench & tighten securely

HARLEY DAVIDSON FL ADJUSTABLE RIDER BACKREST MOUNTING KIT REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 13-02-2011

download
REMOVAL 1. Remove existing seat and grab strap (if equipped) following instructions in the service manual. 2. Refer to the service manual and remove the left side cover and battery. 3. See Figure 5. Pull plastic spark plug wire clip out of the hole in the frame plate at the location where the adjustment handle bracket is going to mount. Discard plastic hose clip. 4. Remove the mid-frame air deflector upper left mounting bolt and washer. Save for installation. 5. If equipped with a grab rail: See Figure 1. Remove grab rail screws (1) and discard. 6. Remove wire harness retention clip located above the bank angle sensor. Discard clip. 7. Remove screws (3) holding the bank angle sensor (4). 1 3 2 4 is06104 1. Grab rail screw (2) 2. Grab rail 3. Bank angle sensor screw (2) 4. Bank angle sensor Figure 1. Remove Bank Angle Sensor Screws INSTALLATION 1. See Figure 2. Install clip nut (1) in mounting hole (2). Align the clip nut hole with alignment hole (3). Follow the instructions included with the Mid-Frame Air Deflector Kit to install the four self-clinching special nuts. 2. Move the electrical connector so that the backrest mounting base does not interfere with it. 3. See Figure 3. Install mounting bracket (8) to mounting base (4) with screw (6) and flange nut (7). Tighten screw to 72-96 in-lbs (8-11 Nm) . NOTE Only use the specified screw to install the mounting bracket to the bank angle sensor. 4. Secure the mounting bracket (8) to the bank angle sensor bracket with 1/4-20 x 5/8 inch screws (5). 5. If installing grab strap (9), install backrest mounting base and grab strap with screws (1) and washers (2). If grab rail is installed, install backrest mounting base with screws (1) and washers (2)

HARLEY DAVIDSON DYNA SPRING SEAT MOUNTING KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 11-03-2011

download
INSTALLATION 1. Refer to service manual and remove the existing seat. 2. See Figure 2. Install the frame cover (9) to the frame and secure with fastener (4). Orient the frame cover to so that it covers the seat pan. 3. Install two springs (2) to the mounting bracket (1), oriented as shown, with screws (3). Tighten screws to 25-30 ft-lbs (34-41 Nm) . 4. Install mounting bracket to frame as follows: a. Remove two screws from the rear of the seat pan area where the spring seat mounting bracket (1) will be mounted. Save washers for later installation. b. Install mounting bracket (1) to the frame over the frame cover. Orient the frame cover so that it will be retained by the mounting bracket when secured. c. Secure the left side of the mounting bracket to the frame with a screw (7), stock washer (B) and spacer (8). Do not tighten. d. Secure the right side of the mounting bracket to the frame with a screw (7) and stock washer (B). e. Tighten mounting bracket screws to 90-108 in-lbs (10-12 Nm) . 5. Install seat pivot bracket (10), washers (15) and screws (5) to the seat. Tighten screws to 48-72 in-lbs (5.5-8.0 Nm) . 6. Remove the rear fuel tank mounting screw, washers, nut and thread protector. Save washers for later installation

YAMAHA ROADLINER AND STRATOLINER PASSENGER FLOOBOARD RELOCATION ARMS

0

Filed Under (Yamaha) by admin on 23-12-2010

download
1. When installing floorboards at the same time first refer to their instructions and using the longer right side black floorboards mounting block supplied with this set of relocation arms. Leave the final floorboards mounting bolt installed loosely at this time. 2. If installing the relocation arms after installing the floorboards at an earlier date proceed as follows. 3. On the left side remove the Allen screw below the floorboards pivot and remove the floorboard from the black mounting block. Remove the dowel pins from their holes on the block. Locate the left relocation arm (stamped “L” and “R” on their backsides). On the end with the clearance hole (not threaded) Place the two dowel pins into one of the two sets of holes which are directly across from each other (180 degrees apart). Hold the arm with the dowel pins up to the mounting block. Align the dowel pins with each of the three sets of holes in the block one at a time noting the height of the opposite end of the arm where the floorboard will mount. Move the dowel pins to the other set of holes on the arm and again hold the arm with the dowel pins up to the blocks three sets of holes. Choose the set of holes in both the block and arm which will set the floorboard to the desired height and place the arm with the dowel pins onto the block. Using one of the button head Allen screws supplied bolt the arm to the block and tighten securely. 4. Locate two of the dowel pins supplied and one of the Allen screw removed earlier. Place the dowel pins into the holes of the arm which allow the floorboard to be level or parallel to the ground. Place a drop of loctite on the threads of the screw and tighten securely. Install the right floorboard in the same manner. 5. On the right side remove the floorboard from the mounting block. Remove the mounting block and replace it with the longer one supplied. Install the right arm in the same manner as the left using the set of dowel pin holes to match the height or angle of the left arm. Install the right floorboard and tighten securely. Recheck all fasteners for tightness.

Incoming search terms: