partsfisher rebuilding 150cg five speed gear box manual for motorcycle

You search Auto repair manual PDF partsfisher rebuilding 150cg five speed gear box manual for motorcycle, if there are search results will appear below. If search results do not exist, please search by others keyword.



  partsfisher rebuilding 150cg five speed gear box manual for motorcycle Direct Download speed 5282 Kb/s

  partsfisher rebuilding 150cg five speed gear box manual for motorcycle Full Version speed 6162 Kb/s



Triumph Bonneville America And Speedmaster The Freak Installation Instructions and Parts List

0

Filed Under (Triumph) by admin on 29-10-2010

download
INSTALLATION In order to install The Freak, the factory air-box must be removed. Because of it’s design, the factory air-box is not an item that is easily removed. There are several parts that must be removed in order to get the air-box out of the bike in one piece. We recommend using the following method to remove your air box without having to cut it into smaller pieces in order to get it out of the frame. 1. PARTS REMOVAL In order to gain access to the air-box, it is necessary to remove certain parts of the motorcycle to gain access to the air-box area of the frame. Removing the following parts should be the first steps you take. A. Seats – Remove both seats starting with the passenger pillion, if applicable. B. Side cover and grommets – Remove the plastic side cover on the right side (throttle side) of your motorcycle. This is the faux oil-tank cover that has the name of your bike on it. Underneath the side cover there are three rubber grommets (1 on the frame tab, and two on the air-box) that support the side cover. Remove the two that are on the air-box and leave the one on the frame. You will attach the two that you removed to the right side bracket in Section 4C . C. Faux air filter covers – On the right side of the bike, remove the chrome faux air filter covers, by removing the one allen head screw that holds it onto the air-box. On the left hand side (clutch side) remove the faux air filter cover in the same manner, you removed the one on the right. D. Plastic shrouds – on the left side, remove the black plastic air-box shroud, by removing the two allen head screws holding it in place. Then remove the plastic shroud covering your fuse box (this is the piece that surrounds your ignition terminal next to the battery). E. Battery – Remove the battery by unscrewing the torx-head bolt that holds the chrome bracket in place. Remove the chrome bracket and the black plastic cap. Tilt the battery out of the box with the top towards you. Disconnect both battery terminal connectors, negative (-) terminal first. Remove the battery. F. Battery box – Remove the two bolts that hold the battery box to the frame. Pull the battery box out as far as you can, then remove the the ignition terminal from the battery box, by removing the two allen screws that hold it in place from the back. Next, remove the fuse box from the battery box, by pushing it out from the back. It is not necessary to disconnect any of the wiring going to the fuse box, or the ignition terminal. G. Rear fender – Remove the rear fender, by first disconnecting the taillight wires. Follow the wires from the tail light assembly on the inside of the rear fender (left side) towards the front of the bike until you come to the box connector. Disconnect the tail light wires at this connector, being careful not to break it. Once the wiring is disconnected, remove the 6 bolts that hold it to the struts. Have someone hold the fender for you while you are removing all of the bolts so that it does not drop once the bolts are removed. Slide the fender out the rear of the bike. 2. PREPARE THE MOTORCYCLE FOR AIR-BOX REMOVAL To remove the factory air-box without damaging it, it is necessary to lift the bike. We recommend the use of a multi-position ATV/motorcycle jack with a minimum lift height of 10″. A. Setting up the lift – Place the lift under your bike and secure your bike to the lift according to the lift manufacturer’s instructions. B. Raise slightly – Lift the motorcycle to the point where the rear springs are without tension, but NOT to where the rear tire is off the ground. C. Remove the rear springs – Take off each of the rear springs by removing the the two bolts on each spring. Once all the bolts are removed gently pull the springs out off of the studs. If they do not pull off easily, you can raise or lower the bike slightly with the lift to ease tension on the spring. Remember, you should not have the rear tire off the ground at this point. The bike should only be raised enough to relax the tension in the springs. D. Remove the mufflers – Remove the mufflers by loosening the clamp at the exhaust header, and by removing the rear foot peg hangers. If the mufflers are not removed, they can become damaged by the axles in Section 2H . E. Disconnect the carburetors – With a small flathead screwdriver, pull the retainer springs out of the channel of the carburetor intake tubes (the two large black tubes coming from the air box into the back of each carburetor), and simply push them towards the air box off of the carbs

Incoming search terms:

Harley-Davidson Motorcycle Reverse Gear Installation Instructions

0

Filed Under (Harley Davidson) by admin on 31-10-2010

download
2.1 Obtain a small tube of Loctite® #262 (red) for use later. 2.2 Drain the transmission oil. 2.3 Remove the clutch adjustment cover (left side). 2.4 Remove rear exhaust header pipe (cross over exhaust pipe). 2.5 Remove the muffler support bracket. 2.6 Remove the clutch release cover (right side). 2.7 Remove clutch push rod and oil slinger. To be disassembled and modified later. 2.8 Remove the two nuts from the main (rear) and counter (front) transmission shafts. 2.9 Remove the transmission bearing housing (puller available from Champion Sidecars). To be replaced with new reverse gear transmission bearing housing (Trap Door). 2.10 Cover the exposed gears in the transmission with a cloth in preparation to cut the shifter fork shaft. 3 Install New Main and Countershaft Gears NOTE: Gears and Tapered Split Rings are factory matched sets. Do not mix!. 3.1 Locate the shifter fork rod, mark fork rod flush at transmission case and pull out 1/4″. Figure 1 Figure 2. Exposed Shoulders Mark shifter fork rod flush with case Remove Spacers Vehicle Transmission Counter Shaft Main Shaft Front of Motorcycle Figure 1
Reverse Gear Installation Instructions For EVO / 5 Speed and Twin Cam Harley-Davidson® Motorcycle Page 3 of 6 Revision 7 © 2007 Champion Motorcycle Accessories International, Inc. dba Champion Sidecars 11841 Monarch Street Garden Grove, CA 92841 (800) 875-0949 (714) 847-0949 www.championsidecars.com www.championtrikes.com Figure 6 CAUTION: Do not pull the shifter fork rod out of the transmission more than 1/4″. If you pull the shifter fork rod out too far, it will be difficult to realign it with the internal shifter fork. 3.2 Cut the shaft at the mark and push it back in. The shaft end MUST NOT stick out of the transmission case. If the shaft is in deeper, fill the hole with silicone to prevent the shaft from moving in and out. NOTE: Shifter fork is made of non-tempered metal and may be cut with a hacksaw or Dremel® cutting tool. 3.3 Important: Remove stock spacers from main and counter shafts. Spray with silicon remover (Brake-Clean) then, using supplied cleaning pad, clean shafts, new counter and main shaft gears and tapered lock rings (inside and outside) Figure 1 3.4 With motorcycle in neutral, pull both the shafts out and simultaneously push the OEM outermost gears in until seated completely to expose the shoulders of both shafts. The countershaft shoulder should be flush with the gear face. For the main shaft the gear would “hang over” the shoulder a small bit. Figure 2 3.5 Apply supplied Champion Super-Lock retaining compound to the inside and outside surfaces of the large gear tapered split ring, to the inside of the new countershaft gear (large gear) and to the transmission countershaft (the forward most shaft). 3.6 Install new countershaft gear to the transmission countershaft. Insert tapered split ring (tapered end first) into the countershaft gear. Install ring seat tool and spring to counter shaft and new countershaft gear. Torque ring seat tool to 40 ft-lb’s. Figures 3 and 4

Incoming search terms:

Moto Guzzi Sport 1100i Owners Manual

0

Filed Under (Moto Guzzi) by admin on 29-11-2010

download
General features Identification data Instruments and controls Riding your motorcycle Break-in Maintenance and adjustments Wheel removal Service schedule Cleaning – Storing Cleaning the windscreen Lubrication Valve gear WEBER injectionignition system (I.A.W.) Electrical equipment Wiring diagram Illustrations Lubrication Pressure fed by gear pump. Oil filters: wire mesh inside sump and replaceable cartridge filter outside sump. Normal lubrication pressure 3.8Ö 4.2 [5] kg/cm2, pressure valve, thermostat and cooler. Low oil pressure sensor (electrical) on crankcase. Generator/Alternator On front of crankshaft (1 4V – 25A). Ignition “WEBER MARELLI” electronic digital induced discharge, with high efficiency coil. Spark plugs: Spark plug gap: 0,7 mm. SPORT 1100 DAYTONA R NGK BPR 6 ESI NGK DR9 E IMS Starting Electric starter (12V-1,2 kW) with solenoid engagement. Ring gear bolted on flywheel. Starter button (START) on right of handlebars. Driveline data Clutch Twin driven plates, dry type, on flywheel. Hand controlled by lever on left of handlebars. Primary drive By gears. Ratio: 1 to 1.3529 (tooth ratio 17/23). Gearbox 5-speed, with constantly meshed gears with front dog clutch. Incorporated cush drive. Pedal operated on the left side of the motorcycle. Gear ratios: Low gear = 1 to 1,812 (tooth ratio 16/29) 2nd gear = 1 to 1,250 (tooth ratio 20/25) 3rd gear = 1 to 1 (tooth ratio 23/23) 4th gear = 1 to 0,833 (tooth ratio 24/20) 5th gear = 1 to 0,730 (tooth ratio 26/19) Ratio: 1:4,125 (tooth ratio 8/33) Overall gear ratios (Engine-wheel): Low gear = 1 to 10,1150 2nd gear = 1 to 6,9761 3rd gear = I to 5,5809 4th gear = 1 to 4,6507 5th gear = 1 to 4,0783 Frame Rectangular section single-beam in NiCrMo steel. Semisupporting engine base. Suspensions Front: White Power upside-down hydraulic telescopic fork with individually adjustable rebound and compression; Rear: steel swing arm with oval cross section. Single shock absorber White Power with separate adjustment of spring preload and of hydraulic rebound and compression damping. Wheels Light alloy castings with 3 hollow spokes (rear wheel with cush drive unit). Rim sizes: – front: 3,50x 17 MT H2 – rear: 4,50×17 MT H2 Tires -front: 120/70 ZR 17 – rear: 160/70 ZR 17 [160/60 ZR 17] Type: Tubeless Front: two Brembo drilled semi-floating disc brakes in stainless steel for SPORT I 100; [two Brembo drilled floating discs, Racing type for DAYTONA RS] with fixed 4 differential piston calipers. Adjustable manual control lever on the right side of the handle-bar; – disc 320 mm;

ULTIMA 6 SPEED BUILDERS KIT INSTALLATION MANUAL

0

Filed Under (Tips and Review) by admin on 03-03-2011

download
DISASSEMBLY For 5 speed gear set removal refer to your factory service manual. You willneed to remove the main drive gear, main drive gear bearings, retaining clip & countershaft needle bearings. NOTE: Removal of the shifter arm is notnecessary for 99 & earlier transmissions. NOTE: Removal of the shifter arm isnecessary for 2000 & later transmissions. After trans. housing is disassembled thoroughly clean & inspect. ASSEMBLY For 2000 & later models removal of approximately 1/4 of an inch off of the shifter arm bushing is likely required. Doing so will allow installation of the retaining clip & washer onto the shifter arm. It is good practice to double check how much material should be removed before cutting the bushing. See fig. 1 & 2 Install supplied Main drive gear bearings & countershaft needle bearings using special tool # 97-164 NOTE: Lightly coat bearings with assembly lube or gear oil for easier installation. Install supplied Main drive gear retaining clip & verify that it is fully seated and cannot come out. Do not re-use old bearings or retaining clip. Install supplied Main drive gear into bearings using special tool # 97-166 See fig. 3 Install supplied trap door gasket & verify that it is on correctly. Install supplied 6 speed gear set making sure to align the countershaft with the needle bearing assembly. Slowly slide in gear set until the mainshaft & countershaft will not slide in any further. Lightly tapping on the trap door (while verifying that there is no interference) with a soft blow hammer will then fully seat the shafts & trap door. See fig. 4 Once gear set is installed use the supplied 5/16-18×1-1/2 & 1/4-20×1-1/2 bolts to secure the trap door. Torque the 5/16 bolts to 15 ft-lbs w/ red loctite (high strength) Torque the 1/4 bolts to 9 ft-lbs w/ red loctite (high strength) See fig. 5

KTM 125 EXC, EXC SIXDAYS 200 XC, XC-W, EXC 250 XC, XC-W, EXC, EXCSIXDAYS 300 XC, XC-W, EXC-E, EXC-ESIXDAYS OWNER'S MANUAL 2008

0

Filed Under (KTM) by admin on 02-12-2010

download
Chassis number The chassis number is stamped on the right side of the steering head tube. Enter this number in the field on page no 1. Engine number, engine type The engine number and the engine type are stamped into the left side of the engine below the engine sprocket. Enter this number on page 1. Clutch lever The clutch lever [1] is located on the left side of the handlebars. The adjusting screw [A] is used to change the original position of the clutch lever (see maintenance work on chassis and engine). The clutch is hydraulically actuated and adjusts itself automatically. Hand brake lever The hand brake lever [2] is mounted on the handlebars on the right and actuates the front wheel brake. The adjusting screw [B] can be used to change the basic position of the hand brake lever (see maintenance work on chassis and engine). OPERATION INSTRUMENTS » 1 2 A B
ENGLISH 6 OPERATION INSTRUMENTS » TEST All of the display segments briefly light up for the display function test. WS (wheel size) The display changes and the circumference of the front wheel is briefly displayed in millimeters (2205 mm corresponds to a front wheel circumference of 21″ with production tires). Afterwards the display will return to the previous display mode. Electronic speedometer The display in the electronic speedometer is activated as soon as you press a button on the speedometer or an impulse is received from the wheel sensor. The display lights up when the engine is running. The display is cleared if no button is pressed for 1 minute or no impulse is received from the wheel sensor. The button is used to change between display modes. The + and – buttons are used to control various functions. SPEED display mode / H (service hours) Only the SPEED / H and SPEED / ODO display modes are activated in the condition at delivery. SPEED/H is displayed whenever the display is activated and the front wheel is not turning. It automatically changes to the SPEED/ODO display mode as soon as the front wheel starts turning. SPEED displays the speed. H displays the engine’s service hours. The service hour counter starts to count as soon as you start the engine. The displayed figure cannot be changed. Service intervals are indicated in service hours for some KTM offroad motorcycles, making the service hour counter a very practical function. SPEED / ODO display mode (odometer) The SPEED/ODO mode displays the speed and the total distance traveled. The display automatically changes to the SPEED/H display mode when the front wheel stops turning. + button no function – button no function briefly press buttonchanges to the next display mode hold button 3 secs. changes to the next display mode The electronic speedometer has a number of display modes (functions) that you can also activate (reveal) (see: Activating and deactivating display modes).
ENGLISH 7 OPERATION INSTRUMENTS » SPEED / LAP (lap time) display mode You can use the manual stop watch to stop and store up to 10 lap times, which you can view in the LAP/LAP display mode (see below). LAP displays the lap times in hours, minutes and seconds. + button Starts and stops the stop watch, lap time is not reset to 0 – button Stops the stop watch, stores the lap time and restarts the stop watch again. The time is reset to 0. A total of 10 lap times can be stored. If the lap time continues to run after you press the – button, all 10 memory locations are occupied.To clear all of the stored lap times, hold the button for 3 seconds in the SPEED/LAP mode.Up to 10 lap times can be stored in this way. briefly press buttonChanges to the next display mode.If no lap time is stored or the motorcycle is driving, the LAP/LAP mode will be skipped. hold button 3 secs. Clears all LAP figures SPEED / CLK (time) display mode CLK displays the time in hours, minutes and seconds. + button no function – button no function briefly press buttonchanges to the next display mode hold button 3 secs. set the clock menu To set the clock, see „Setting the clock”. Activating and deactivating display modes In the display mode SPEED/H, press and hold the button for 3 seconds to access the SETUP menu. The active functions will be displayed. The blinking function can be activated by pressing the + button and deactivated by pressing the – button. Press and hold the button 3 seconds to store the settings. If no button is pressed for 20 seconds, the setting will be stored automatically and the display will return to the SPEED/H mode. + button activates the blinking display – button deactivates the blinking display briefly press buttonchanges to the next display without changing any settings hold button 3 secs. starts the SETUP stores the settings and changes to the SPEED/H mode

Incoming search terms:

URAL TOURIST / SPORTS Repair Manual

0

Filed Under (Ural) by admin on 18-11-2010

download
Maximum speed of motorcycle 108 km/h / 65 mph *119km/h / 74 mph 122 km/h / 77 mph Reference fuel consumption at 85% of maximum speed 12.5 km/l / 29 mpg 14 km/l / 32.5 mpg 16.7 km/l / 39 mpg Dry mass of motorcycle 700 lb. / *680 lb. 460 lb. Maximum load-carrying capacity 500 lb/485 lb/*400 lb 330 lb. Noise level below 80db OVERALL DIMENSIONS OF MOTORCYCLE Length 2500 mm / 8 ft 2200 mm / 7 ft Width 1700 mm / 5 ft 6 in 850 mm / 2 ft 8 in Height 1100 mm / 3 ft 6 in 1060 mm / 3 ft 8 in Road Clearance 125 mm / 5 in Seat height 840 mm / 33 in 810 mm / 32 in Wheel base 1470 mm / 55 in ENGINE Type 4 stroke, overhead valves, opposed twin-cylinder Displacement 649 cc Cylinder bore 78 mm / 3.07 in Piston stroke 68 mm / 2.68 in Compression ratio 8.5 Rated horsepower 35 Rated rotational speed 5600 RPM Rated torque, Nm 45 Nm / 398.7 in-pound Ignition system Contactless with electronic ignition timing Lubrication system Dual system of forced lubrication and by splashing Lubricant SAE 20W/50 (see Owner’s Manual Maintenance Section) CARBURETOR Carburetor type Keihin Seiki 32 CVK Number of carburetors 2 Air cleaner Pleated Paper Filter Fuel 91 octane premium unleaded gasoline PCV Valve Internal Breather ELECTRICAL EQUIPMENT Ignition system 12 V Ignition coil B204 Spark plugs NGK BP7HS or NDW20FP-1 Ignition timing Automatic spark timer Power supplies Alternator Storage battery (Russian supplied with new motorcycle) Recommended replacement: Interstate #12N9-4B-1 Voltage regulator (electronic) Internal to Alternator Horn C205B Headlight URAL  part no. UA-TB6014-017 Sylvania Incandescent 6014, 7″ round sealed beam TRANSMISSION Clutch Dry double-disk clutch Gearbox 4 speed box with reverse gear (no reverse for solo model) and gear shifting foot pedal GEAR RATIOS TOURIST / SPORTSMAN / UTILITY SOLO/CRUISER I gear 3.6 3.6 II gear 2.28 2.28 III gear 1.7 1.7 IV gear 1.3 1.3 Reverse gear 4.2 N/A on Solo 4.2 on -10 mdls Speedometer drive ratio 0.4 0.5 Final drive Pair of bevel gears with propeller shaft Final drive ratio 4.62 3.89 FLUID CAPACITIES TOURIST & -10 Models Sportsman Solo Gasoline tank 19 L / 5 Gal 19L / 5 Gal 18.5 L / 4.9 Gal Reserve 2L / 0.5 gal 2L / 0.5 gal 2L- / 0.5 Gal Engine crankcase 2 L / 2 qt. + 3.6 oz. 2.0L / 2.11 qt 2 L / 2 qt. + 3.6 oz. Gearbox 0.9L / 1 qt 0.9L / 1 qt 0.9L / 1 qt Final drive 110 ml / 3.85 oz. 150 ml / 5.25 oz. 110 ml / 3.85 oz. Telescopic Forks (-10 & solo models) N/A on Tourist N/A on Sportsman 135 ml / 4.56 oz. Shock Absorbers 105 ml / 3.55 105 ml / 3.55 oz 105 ml / 3.55 oz

LED Motorcycle Power Box Installation Instructions

0

Filed Under (Tips and Review) by admin on 29-01-2011

download
This box requires the presence of a mounting plate secured to the motorcycle’s luggage rack. If the bike in question is not equipped with a mounting plate, one must be fabricated prior to installation of this box. Five mounting holes (.281″ dia.) are required to mount this box. If the motorcycle is already equipped with a mounting plate, it may be necessary to drill the 5 mounting holes required for this installation. Use the diagram shown to determine the precise location of these holes. 1. Position the box onto the mounting plate. Align the 5 vibration dampeners with the 5 mounting holes in the mounting plate. 2. Using the illustrations shown, secure the box to the mounting plate using the provided hardware. Note: Your luggage rack may already have the correct mounting holes drilled. Check the measurements below and if these holes already exist at the proper distance, remove any existing mounting hardware from the holes and secure the box with the supplied mounting hardware. 3. Place the box into its mounting position on the deck and secure it with the supplied mounting hardware as shown in the diagram. Wiring: Diagrams for optional equipment are found below. Refer to the diagram on the following page for general motorcycle box wiring information

Harley Davidson 6- SPEED CONVERSION KIT FOR BIG TWIN 5- SPEED TRANSMISSIONS INSTALLATION

0

Filed Under (Harley Davidson) by admin on 05-03-2012

download
5/16 Bolt hole boss clearance This can easily be checked with the trap door gasket. Put the gasket on the dowel pins. AII material of the boss around the hole that “sticks outside” the gasket (60 degrees forward to 60 degree backwards) must be removed (see figure A). Primary fork clearance Place the gasket on the housing and remove material as indicated for clearing the shifter fork (see figure B). WWW . ZODIAC . NL PERFORMANCE PRODUCTS FOR HARLEY-DAVIDSON ® INSTALLATION INSTRUCTIONS FOR 6 SPEED CONVERSION KIT AND 6 SPEED BUILDER KIT speed transmission. Also make sure you have a 1990 or later Factory Service Manual available. Tools The conversion kit should only be used in new or low milage transmissions. If gears or bearings of a used Gear set Removal Refer to the Factory Service Manual Section for Mainshaft and Countershaft removal. When you get to the point of actually sliding the gear set out make sure you properly mark the 5th gear set as described in the Factory Service Manual (for used transmissions only). Further follow the factory removal procedure. Clearance Checks The 6 Speed conversion and builder kit will fit in most OEM or aftermarket transmission housings without may be needed. The following clearances must be checked before assembling the 6 speed transmission. 28-05-2008 We recommend the kits are installed by a qualified mechanic with knowledge of the Harley-Davidson 5 needed are the same as used for a 5 Speed transmission. 5 speed transmission are worn, new ones must be installed, or better, the builder kit should be used. any modification of the housing. However due to casting differences, in some instances some modification
WWW . ZODIAC . NL PERFORMANCE PRODUCTS FOR HARLEY-DAVIDSON ® Pillow block clearance (right side) Make sure there is clearance between the pillow block and the housing. Any clearance is O.K. (see figure C). Fork shaft support clearance Again use the gasket as the template and remove the material as indicated (see figure D). Shift drum end play The end play of the shift drum must be checked prior to final installation. Install the shift drum. Measure the end play with feeler gauges at the right pillow block (see figure E). End play should be between .004″ and .010″, some 1/2″ X 7/8″ 0.008″ thick shims are included to adjust the end play

Incoming search terms:

POLINI MINICROSS AND MlNlMOTARD OWNER'S AND MAINTENANCE MANUAL

0

Filed Under (Polini) by admin on 22-11-2010

download
Fit the stand using the M8x18 screw to fasten it and the spring provided (photo 1 6). A DANGER! We suggest you to remove the stand during competitions as it could be dangerous and bruising. 18- Fit the gear lever l~hoto 171. 19- Fill the fuel tank (See section 4.13). 20- Check the engine oil level (See section 4.3). INTRODUCTION Always ensure that the motorcycle has been efficiently serviced and check it over before riding it. Take your motorcycle to an authorised POIJNI MOTOR1 dealer for all maior servicing and repair. Because of the manufacturer’s policy OF continuous development, and because of constant innovations in technology, your motorcycle may differ in some details from that described in the illustrations and text in this manual. Original POLlNl MOTOR1 spare parts are always made from the same materials and in the same way as the parts originally fitted to your minicross motorcycle. Always insist on original POIJNI MOTOR1 spore parts. Their use ensures a longer life and improved efficiency for your motorcycle. 2. STARTING THE ENGINE FOR THE FIRST TIME Always check over your motorcycle thoroughly before starting the engine. To start the engine for the first time, as instructed below. 1 – Turn the fuel tap located under the fuel tank to #ON” position (photo 18) Run your new motorcycle in as instructed How to ensure that the engine and transmission bed in correctly and to ensure continuous reliability in Future. A CAUTION! The first time yw ride your new motorcycle, ride for about two hours at low engine speeds to ensure that it runs in correctly. Also respect the following precautions. 2- Once the engine starts, leave it idle until it warms up to normal temperature. If you switch the engine off for a short time, wait for it to cool down completely before you re-start it. – 3- During the running in period, always ride at constant 2- Before starting the engine put the gear in neutral position speeds. AVOID RAPID ACCELERATION. (photo 19, gear N). 4- Even when riding at low engine speeds, avoid extended A WARNING! IF the gear position is not neutral the bike could move when started. 3- If the engine is cold, lift the choke lever on the carburettor (photo 20). A WARNING! Lower the starter lever again as won as the engine starts to warm up. 4- Leove the throttle closed. Pivot the kick-start lever out wards and push energetically downwards with your foot to start the engine. 5- Return the kick-start lever to its rest position. Leave the engine idle for a few minutes to warm it up. A WARNING! Check that the engine stop button stops the engine effectively before yw begin riding the motorcycle. difficult sections of road or Lck that could cause the engine to become very hot. 5- Once you have run in your motorcycle following all these instructions, take it to a Polini Motori dealer for its post- running-in service. Apart from a change of spark plug and engine oil, this service also includes the disassembly

Incoming search terms:

HARLEY DAVIDSON SOFTAIL 6 SPEED TRANSMISSION – COMPLETE INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 13-04-2011

download
Removal of Original Transmission 1. Position motorcycle on a suitable lift. To prevent accidental vehicle start-up, which could cause death or serious injury, disconnect battery cables (negative (-) cable first) before proceeding. (00307a) Disconnect negative (-) battery cable first. If positive (+) cable should contact ground with negative (-) cable connected, the resulting sparks can cause a battery explosion, which could result in death or serious injury. (00049a) 2. Refer to the Service Manual and follow the instructions given to remove the seat and disconnect the battery cables, negative cable first. 3. Refer to the TRANSMISSION CASE REMOVAL in the Service Manual and follow the instructions given to remove the components with the following steps. 4. Refer to PRIMARY CHAINCASE COVER REMOVAL in the Service Manual and follow the instructions given to remove the primary chaincase cover. Wear safety glasses or goggles when removing or installing retaining rings. Retaining rings can slip from the pliers and could be propelled with enough force to cause serious eye injury. (00312a) 5. See the PRIMARY CHAIN and COMPENSATING SPROCKET REMOVAL in the Service Manual and use the instructions given to remove the primary drive assem- bly. 6. Refer to the STARTER REMOVAL in the Service Manual and remove the the starter. 7. See the VEHICLE SPEED SENSOR section and unplug the vehicle speedometer sensor connection and remove the mounting bolt. Lift sensor from the transmission case and set aside for later re-installation. 8. Refer to NEUTRAL SWITCH and disconnect the connectors from the neutral switch. 9. Refer to PRIMARY CHAINCASE in the Service Manual and follow the instructions given to remove the primary chaincase housing. 10. Refer to EXHAUST SYSTEM in the Service Manual and remove the exhaust. 11. See the REAR WHEEL REMOVAL and loosen but, do not remove rear axle to relieve drive belt tension and remove the belt from the sprocket from the transmission. 12. Refer to OIL TANK REMOVAL in the Service Manual and follow the instructions given to drain, remove the oil tank and detach the vent, feed and return lines. 13. Refer to CLUTCH CONTROL in the Service Manual and follow the instructions given to remove the clutch cover and disconnect the clutch cable end from the cover. Set the cable aside for later re-installation

Incoming search terms:

Incoming search terms: