picture of a 2003 vtx 1800 ml motorcycle cell annoyed and starter location

You search Auto repair manual PDF picture of a 2003 vtx 1800 ml motorcycle cell annoyed and starter location, if there are search results will appear below. If search results do not exist, please search by others keyword.



  picture of a 2003 vtx 1800 ml motorcycle cell annoyed and starter location Direct Download speed 5282 Kb/s

  picture of a 2003 vtx 1800 ml motorcycle cell annoyed and starter location Full Version speed 6162 Kb/s



2006-up Harley-Davidson Single Bore Induction System Installation Instructions

0

Filed Under (Harley Davidson) by admin on 10-11-2010

download
Remove the stock fuel induction system, including the manifold and disconnecting all wire connections. It is up to the technician as to whether the gas tank should be removed or just raised up in the rear. Picture 1 2- You will need to disassemble the stock induction system to remove the pre-listed parts for re-use. 3- Verify the new manifold size is appropriate for your motorcycle by sliding it in place. Picture 2 Picture 3 4 5- Slide the MAP sensor in place, being sure not to pinch the orange rubber seal—some clean engine oil may make this easier. Install the cable guide and verify it is aligned with the throttle cable actuator. Once alignment is satisfactory, apply Loctite® 222 to the 10-24 x 1/4″ screws and tighten to 18-22 in-lbs. 4- Install the new O-ring into the throttle body. A light film of clean engine oil can be used to help hold the O-ring in place. Align the manifold to the throttle body, use purple 222 Loctite® on the 10-24 x 1″ socket-head assembly screws (with flat washers) and tighten them to 35-40 in-lbs. 6- Using the new S&S® supplied gasket, slide the S&S supplied intake air temperature (IAT) sensor in place. Use Loctite 222 on the T10 Torx button head M3 x .5 x 10mm screws and tighten to 6-8 in-lbs. Picture 4 Picture 5 Picture 6 5 7- For the stock throttle position sensor attach the “C” shaped spacer to the end of the throttle shaft, put a 4mm flat washer on each T20 Torx button head M4 x .7 x 12mm screw, apply some Loctite® 222 and torque screws to 18-23 in-lbs. 8- Install the new O-ring on the IAC motor. Lubricate the OD of the O-ring with a light film of clean engine oil. Put a 4mm flat washer on each T20 Torx button head M4 x .7 x 12mm screw, coat the threads with Loctite 222. Install the IAC motor and tighten the screws to 18-23 in-lbs. 9- Partially install the fuel injectors in the fuel rail. Be sure to orient the black O-rings to the rail and align the clocking tabs with their holes. It may be helpful to lubricate the O-rings with clean engine oil. See Picture 9. NOTE : These are special O-rings that seal pressurized gasoline. If you see one with damage or an abrasion—replace it immediately. Picture 7 Picture 8 Picture 9 6 10- Connect the Injectors to the manifold with a light squeezing action. Lubricate the O-rings with clean engine oil. Once in place, use Loctite® 222 on the threads of two 8-32 x 5/8″ slotted panhead screws and tighten to 15-20 in-lbs. 11- Install the backing washer and O-ring on the fuel supply tube. Lubricate the O-ring with clean engine oil. When the tube is in place, position the Y-shaped clip on the fuel rail and tighten the Loctite 222 coated T20 Torx button head M4 x 7 x 12mm screw to 18-23 in-lbs – Gently push the injectors downward toward the manifold to increase clearance for connecting the wire connectors. Cut the existing injector connectors from the motorcycle harness. Slide the sleeveing onto the injector harness. Slide heat shrink tubing on to each wire of the injector harness wires. Crimp the butt splices to the motorcycle harness. Move the heat shrinks over the splices and shrink with a heat gun. Slide the sleeve into place. Picture 10 Picture 11a Picture 11b Picture 12 Picture 12a 7 13- Put the stock manifold flanges on the manifold. YOU MUST USE THE S&S® RUBBER GASKETS ON THEM. Be sure to orient the tapered end towards the manifold and the flat end to the heads. 14- Hold the manifold up in its basic mounting position and connect all of the wiring harness connectors at this time. Install the manifold using the stock mounting flange bolts (from the primary side of the motorcycle) coated with Loctite® 242 and the new S&S cam side screws (1/4″ socket head, 5/16-18 x 3/4″). If a screw longer than 3/4″ is used, damage to the heads will result. Lightly snug all four manifold mounting bolts but DO NOT TIGHTEN AT THIS TIME. Connect the throttle cables and cruise control bracket (if applicable) at this time. NOTE: The Harley-Davidson® service manual for your model motorcycle will be helpful during this step. 15- Install the breather system now. On 4.00-inch bore or smaller engines the breather uses banjo fittings with hollow bolts and connects across the heads to the intake with a T-hose. This hose will need to be trimmed and have spring clamps attached as shown in photo. Torque the hollow bolts to 10-12 ft-lbs. On 41/8-inch bore or larger engines, install the sharp bent hose on the rear head and install the check valve with the white end towards the head. Mount the other hose on the black end of the check valve and connect it to the throttle body using spring clamps to secure the connections. Picture 13 Picture 14 Picture 15 8 16- Once the breathers are secure, install the fuel line per the factory service manual you are working with. Connect the battery and verify the fuel pump turns on to pressurize the system and there are no gas leaks, but DO NOT START THE ENGINE. At this time, PC software may also be used to verify sensor readings and adjust the throttle position sensor voltage if necessary. 17- Install two 242 Loctite® coated pipe plugs (included in kit) in the air cleaner backplate as shown in Picture 16. Torque to 35-45 in-lbs. Also, two pan screws coated with Loctite® 222 must be installed in the backplate in place of the enrichment device. See Picture 16a. Torque them to 12-18 in-lbs. Failure to install these screws could allow dirt and debris into the intake system. 18- Use a new gasket on the backplate and put it in place noting the number of shims required. Once you select the appropriate shims (included) mount the backing plate to the engine but DO NOT INSTALL THE SCREWS YET

Incoming search terms:

2003-2007 Victory Motorcycles Installation Instructions for S&S Freedom Performance Tuner

0

Filed Under (Victory) by admin on 31-10-2010

download
Once the download of S&S Freedom Performance Tuner has been installed on your PC, double click the icon on your desk top. Picture 3 illustrates the S&S Freedom Performance Tuner icon. 2- Enter in your Username and Password and click the login button. Your Username and Password for logging in will be the same as your login for Picture 1 Picture 2 Picture 3 3 3 – Once you’re logged onto S&S® Freedom® Performance Tuner, click on the Year and Model of the bike you’re performing the work on in the middle of the page as illustrated in Picture 4. 4 – Click on the Select Vehicle tab at the bottom of the page as illustrated in Picture 5. The tabs on the left side of the page will now be illuminated. Picture 4 Picture 5 4 5- Click on the ECU Reprogramming tab on the left side of the screen as illustrated in Picture 6. 6- In the center of the screen you will now be prompted to enter in customer information, VIN number of the motorcycle you are performing calibration download on, and calibration card number. Select a re-flash file from the drop down list that you want to download into the motorcycle. All the fields must be filled out for you to continue with the download. Picture 7 illustrates the information screen with required fields filled out. Picture 6 Picture 7 5 Note: Due to the limited description space available in the drop down list in S&S® Freedom® Performance Tuner, a detailed list of available calibrations and part numbers can be viewed on the S&S dealer web. Go to ® Calibrations on the left side of the home page. Here you will find a detailed list of calibrations and part numbers for reference only. Picture 8 illustrates the home page and location for the S&S/Victory Calibrations. Picture 9 illustrates the calibrations for reference

Honda VTX 1800 Motorcycles EZ-Steer Installation Manual

0

Filed Under (Honda) by admin on 16-02-2011

download
Honda VTX 1800 EZ-Steer Instruction Installation of the Champion EZ-Steer system is similar to the installation of the OEM triple clamps of your Honda VTX 1800 Motorcycle. We strongly recommend that you use your OEM service manual and follow the prescribed disassembly, installation and torque specifications (except where noted below) for the upper and lower clamp assembly. Recommended Procedures • Disconnect all wiring to headlight and remove headlight, windscreen (if so equipped) and brackets from motorcycle. • Remove handle bars from top clamp. • Remove brake caliper and brackets; disconnect all mounting points on brake lines. Secure calipers to frame being careful not to damage brake lines. • The wheel and fork tube assembly can be removed as one complete unit. • Remove steering lock fromOEM bottom clamp and install on Champion’s bottom clamp. • Replacing the upper OEM bearing and race with the Champion supplied bearing and race, install Champion’s lower triple clamp to motorcycle reusing original hardware as removed. Torque bearing lock nut to 35 lb. ft.. • Install covers to bottom forks if supplied with OEM motorcycle. • Install Champion upper clamp with OEM washer and dome nut. Leave loose. • Slide forks up and into the upper clamp until top of forks are flush with top surface of clamp. • Torque dome nut to 75 lb. ft.. • Ensure that fork tube extensions are flush with top of upper clamp. Torque lower 8mm bolts to 20 lb.ft. and upper 10 mm clamp bolts to 30 lb. ft.. • Install handle bars to upper clamp using OEM nut and flat washers. • Reinstall brake line holders to the lower triple clamp. • Reinstall all other OEM parts as removed. • Bleed brakes. • OEM windshield # 08R80-MCH-100 can be used on this kit

Incoming search terms:

2003-2004 HONDA GL 1800/A Frame Weld Safety Recall

0

Filed Under (Honda) by admin on 15-12-2010

download
there is no punch mark on the VIN plate as specified in this Service Bulletin, proceed to the REPAIR PROCEDURE section of this Service Bulletin. IMPORTANT: Due to the complexity of this campaign it is imperative that you check iN and your Dealer Responsibility Report before you begin repairs. If iN or your Dealer Responsibility Report indicate the Safety Recall has been performed, but you confirm the unit is not punched and the repair has actually been done (by inspecting the weld), please contact the Warranty HelpLine at (800) 421-1900, option 7. IMPORTANT: For complete Dealer and Welder Repair procedures, refer to the following items: • 2002-2003 GL1800/A Frame Weld Safety Recall Dealer Booklet (S0510)  Frame Weld Inspection Chart (S0516) You MUST provide your TIG welder with the following items:  2002-2003 GL1800/A Frame Weld Safety Recall Welding Manual (S0511)  2002-2003 GL1800/A Frame Weld Safety Recall Cracked Weld Repair Manual (S0515) Welding Template Box (S0512) All of the above items were shipped to you with Service Bulletin GL1800 #14. If you need additional copies of these materials, you may order them from Resolve at (440) 572-0725. For your reference, a brief repair procedure overview is provided below. DISASSEMBLY OVERVIEW You will be removing the following components from the vehicle as instructed in the Dealer Booklet : Handlebar weights Rear view mirrors Swingarm pivot covers Rider foot pegs Seat Side covers/Engine side covers Fairing pockets Fairing molding Meter panel Top shelter Battery Fuel tank Main wiring harness ground Front lower fairing Front exhaust pipe protector Muffler/exhaust pipe Antenna Whip(s) Coolant reserve tank Center stand NOTE: You will need to remove any accessories that may contact the ground during the Welding and Re-assembly procedures. IMPORTANT: Before you send the motorcycle to the welder, you MUST check for lower crossmember frame weld cracks.  If your inspection reveals no cracks in or on either the Left or Right lower cross- member frame welds, proceed to the REPAIR PROCEDURE OVERVIEW section of this Service Bulletin.  If your inspection identifies a crack or cracks in or on either the Left or Right lower crossmember frame welds, perform the following procedure: Place the grinding template (S0512) on the crossmember. Using a suitable felt marker, draw a line on the weld with the crack, drawing the line along the entire edge of the the template (this line will be 89 mm long). If the crack falls within the length of this line (89 mm) , prepare the motorcycle for welding per the Dealer Procedures and advise the welder to use the Cracked Weld Repair Manual (S0515). After the bike has returned from the welder, prepare the frame and re-assemble the motorcycle per the Dealer Procedures . Then, proceed

S&S Super E and G Series "Shorty" Carburetors REMOVAL, Installation and Jetting Instructions

0

Filed Under (S&S) by admin on 29-10-2010

download
Remove Old Carburetor WARNINGS ● Gasoline is extremely flammable and explosive under certain conditions. Do not smoke around gasoline. Gasoline fumes are toxic when inhaled. Perform installation in a well ventilated area away from open flames or sparks. Any gasoline leak or spill constitutes a health and fire hazard. ● If motorcycle has been running, wait until engine and exhaust have cooled to avoid getting burned during installation. ● Electrical sparks can ignite explosive gasoline fumes. Failure to disconnect battery while working on motorcycle can also result in inadvertent engagement of starter and personal injury. A. Shut off fuel petcock and disconnect battery. B. Remove air cleaner assembly. Drain fuel from existing carburetor. Remove carburetor, manifold, choke cable and any carburetor mounting hardware NOTE – Removing and tightening hard to reach Allen bolts such as carb-manifold mounting bolts and V2 manifold flange bolts can be greatly simplified by the use of Allen ball-end drivers. These tools are available at most automotive and tool supply houses. See Picture 9. Additionally, Performance Plus of Evansville, Indiana, produces a hex wrench specially modified for accessibility of V 2 manifold bolts. Call 812-963-8854 for further information. As alternative, standard hex wrench can be shortened for convenience. NOTE – Some Buell motorcycles have a breather fitting with 90° elbow on rear head. Due to proximity of frame, elbow must be removed before fitting can be taken off engine. Loosen fitting and rotate to position convenient for cutting elbow. Secure fitting by tightening against cylinder head. Elbow may be inaccessible to hacksaw. In most instances, a die grinder with cutoff wheel will remove elbow with little difficulty. If die grinder is unavailable, grasp elbow firmly with pliers and snap off, then remove fitting. CAUTION – Extreme care must be taken to prevent metal chips from entering engine when elbow is removed. S&S recommends packing breather fitting with gease before removing elbow. Metal chips inside engine will cause extensive damage. Installer bears all responsibility for containment of chips and other debris. Picture 2 Picture 4 Picture 3
5 2. Prepare Air Cleaner Backplate NOTE – Fast idle lever screws, part #11-2384, must not be overtightened. Loctite or other thread locking compound may be used sparingly on threads to prevent screws from vibrating loose. CAUTION – Overtightening fast idle screws may damage backplate. A. All engines except V2s 1. Knuckles & Pans, 1936 to 1965 – Press plugs, part #50-8312, into holes in air cleaner backplate. See Picture 2 . 2. Shovels, 1966 to 1979, and Ironhead (IH) XLs, 1957 to 1979 – Press plug, part #50-8312, into hole in air cleaner backplate. See Picture 3 . 3. Shovels 1980 to 1984 and IH XLs 1980 to 1985 – Screw crankcase breather vent elbow fitting, part #50-8110, into hole in air cleaner backplate and angle downward as shown in Picture 4 . On 1983 and 1984 Shovels press plug, part #50-8312, into other hole on left. 4. Assemble fast idle mechanism as shown in Figure A . B. FL V2s 1984 to 1992 1. Press plug, part #50-8312, into hole on left in air cleaner backplate as shown in Picture 5 . 2. Screw vent hose elbow fitting, part #50-8110, into remaining hole at right. See Picture 5 . 3. Assemble fast idle mechanism as shown in Figure A . C. XL V2s 1986 to 1990 1. Press plug, part #50-8312, into hole on right in air cleaner backplate as shown in Picture 6 . 2. Screw vent hose nipple fitting, part #50-8111, into remaining hole at left. See Picture 6 . Elbow fitting, part #50-8110, supplied in kit may also be used in this location if required. 3. Assemble fast idle mechanism as shown in Figure A . D. FL V2s 1993 and up and XL V2s 1991 and up 1. Press plugs, part #50-8312, into both holes in air cleaner backplate as shown in Picture 7 . 2. Assemble fast idle mechanism as shown in Figure A . E. Buell motorcycles, 1994 and up 1. Assemble fast idle mechanism as shown in Figure A. 3. Throttle Preparation NOTE – Throttle grip assembly must be assembled correctly and work freely to prevent possible sticking during operation. Throttle must snap closed when released. Cable routing must be free of tight bends to minimize friction between cable and housing

2002 Honda VTX 1800 R & S 3” BIG Straights Installation Instructions

0

Filed Under (Honda) by admin on 17-11-2011

download
Remove right side Foot peg assembly or Floorboard. (Whichever is applicable to your model.) 2. Remove O2 sensors from each muffler and cover with supplied cap plug. 3. Loosen clamps at mufflers. 4. Remove bolts that are holding mufflers at rear mounting bracket. 5. Remove mufflers. 6. Remove the two nuts that secure the rear exhaust header pipe to the rear cylinder head. 7. Remove rear pipe assembly. 8. Remove the two nuts that secure the front exhaust header pipe to the front cylinder head. 9. Remove front pipe assembly. Hard-Krome Exhaust System Installation
NOTE: Take care when fitting this Hard-Krome aftermarket exhaust system on your motorcycle. It has been designed to
replace a STOCK exhaust system on a motorcycle with its engine, frame and other components in their STOCK design,
configuration and location. WARNING: Re-check and re-tighten ALL fasteners and supports after 50 miles, then re-check and tighten as necessaryon a periodic basis to ensure proper operation and performance. NOTE: All fasteners should be loose during initial installation to ensure proper fit and location of the new exhaust system. 1. Install new exhaust gaskets. 2. Install mounting bracket using Bolts with flat & lock washers. (See Illustration) 3. Install Front exhaust header pipe, taking care to not scratch chrome surfaces on pipe, engine or motorcycle — use masking tape as needed

HARLEY-DAVIDSON Starter Relay Location Guide

0

Filed Under (Harley Davidson) by admin on 18-04-2012

download
Touring 1998 – 2007 Additional Notes: Relay Location: Under Seat in rubber Boot Battery Connection: Under Seat,Visiable Installation Notes: No Access Issues Factory Relay Type: FULL SIZE Factory Relay Part #: 31504-91A Connection Type: Ground Lug to Battery + Terminial System Relay Replacement: R-S-1 Circuit: Cold C Copywrite 2005 Identity Inv. LLC As of: 11.05 ***2004 – 2007 FLHR series bikes & 2007 FLHX require additional Adaptor AD-1 & DGD-1. Start Relay is in Power Distribution box. Replaces H-D Relay part# 31579-04 Softails 2000 – 2007 Additional Notes: 2000 is when the Softails changed to Twin Cams. Relay Location: Under Seat in covered Power Distribution Box. Battery Connection: Under Seat,Visiable Installation Notes: No Access Issues Factory Relay Type: 1/2 SIZE Factory Relay Part #: 31522-00B Connection Type: Ground Lug to Battery + Terminial System Relay Replacement: R-S-3 Circuit: Cold C Copywrite 2005 Identity Inv. LLC As of: 11.05 Softails 1996 – 1999 Additional Notes: Relay Location: Under Seat in covered Power Distribution Box. Battery Connection: Under Seat,Visiable Installation Notes: No Access Issues Factory Relay Type: FULL SIZE Factory Relay Part #: 31504-91A Connection Type: Ground Lug to Battery + Terminial System Relay Replacement: R-S-1 Circuit: Cold C Copywrite 2005 Identity Inv. LLC As of: 11.05
Dyna 2007 Additional Notes: Relay Location: Under Side Panel Cover. Battery Connection: Replace Batt 15A Fuse with Supplied Fuse Holder Installation Notes: No Access Issues Factory Relay Type: 1/2 SIZE Factory Relay Part #: 31522-00B Connection Type: Tap 12v Fuse (Batt 15A) System Relay Replacement: R-S-3 Circuit: Cold C Copywrite 2005 Identity Inv. LLC As of: 11.05 Dyna 2000 – 2005 Additional Notes: Relay Location: Under Side Panel Cover. Battery Connection: Battery connection is made direct to Battery Buss to right of Relay * see Pic3 Installation Notes: Remove Outer Cover, then Remove 4 bolts holding secondary protector plate in place. Relay is on the upper left. Factory Relay Type: 1/2 SIZE Factory Relay Part #: 31522-00B Connection Type: Ground Lug to Battery Buss + Terminial System Relay Replacement: R-S-3 Circuit: Cold C Copywrite 2005 Identity Inv. LLC As of: 11.05 Pic3 Sportster 2004-2007

Incoming search terms:

Motorcycle stand Wheel chock set up and operating instructions

0

Filed Under (Tips and Review) by admin on 22-11-2010

download
1. can be adjusted to fit the wheel length. The Motorcycle Stand will fit most standard motorcycles currently on the market. However, some models with especially wide tires or custom low-profile front fenders will not fit. Mount the Support Arm (4) to the front of the Base using 2 Bolts (12), Washers 2. (5), and Nuts (6). Insert Pin (9) through the mounting holes and Cradle Stop (3); secure with Wash- 3. er (10) and R Pin (11). Insert Pin (9) through the mounting holes and Wheel Adapter (2); secure with 4. Washer (10) and R Pin (11). Securely tighten all hardware before use. 5. the Motorcycle stand must be mounted securely before use. 6. Page 5 SKU 97841 For technical questions, please call 1-800-444-3353. Mounting in concrete Choose a location to install the Motorcycle Stand that is flat, level, and capable of 1. bearing the combined weight of the Motorcycle Stand and the motorcycle being secured. The location should not obstruct walkways and provide enough room to retrieve the motorcycle after it is mounted. The surface of the location should be one suitable for the mounting of heavy equipment. Use the mounting holes in the Base (1) of the Stand as a template. Arrange the 2. Base in the chosen location and mark where the holes are to be drilled. You will need concrete anchors (not included) to secure the Base to the concrete 3. floor. Using the correct size concrete drill bit (not included), drill the mounting holes to secure the Base. Attach the concrete anchors to the floor. Secure the Base to the floor using con- 4. crete anchors.

Vengeance Motorcycle Specification And Owner's Manual

0

Filed Under (Vengeance) by admin on 20-11-2010

download
Vengeance Maxis • Vengeance Raven • Vengeance Banshee • Vengeance Whiplash • Hotrod Drifter • Hotrod CalChop • Hotrod Teacher • Hotrod Bone Shifting Gears Starting off and changing gears requires coordination of the clutch and throttle and gearshift lever. If you don’t do things right, the amount of control you have over the bike is lessened. To start off, pull in the clutch, shift into first gear, roll on the throttle a little, and ease out the clutch. You will become familiar with the friction zone (that’s where the clutch begins to take hold and move the bike), and you add a bit more throttle. You don’t want to stall the engine, nor do you want to over-rev it. There’s a sweet spot in there; find it. Shift while traveling in a straight line. Shifting in a curve is not good practice, and something to be avoided. Become familiar with the sound of your engine, so you can tell when you should shift without looking at your instruments. When you downshift to a lower gear, you should (in one swift, smooth movement) be able to squeeze the clutch, rev the engine a little to let it catch the lower gear smoothly, and shift down. When you come to a stop in traffic, leave the bike in first gear with the clutch disengaged (just in case you want to accelerate out of there in a hurry). Who knows what may be coming up behind you. Braking Don’t ever forget: The front brake on your motorcycle can supply as much as 70 percent or more of your stopping power. The single most important thing you can learn about braking is to use that front brake every single time you want to slow down. Turning When you are riding along the road, you lean a motorcycle into a turn. Learning to lean is an essential part of riding a motorcycle. It is a normal function of the bike when you are changing its path of travel – and quite different from turning the steering wheel of your car. To get the motorcycle to lean in a normal turn, press the handlebar in the direction of the turn and maintain slight pressure on that handlebar to take you smoothly through that particular turn. In other words: press right to go right; press left to go left. Your instincts to keep the motorcycle on a smooth path while keeping it from falling over usually take care of this without you even noticing it. (Demonstrate to yourself how a motorcycle moves by pressing a handlebar slightly while traveling in a straight line. The motorcycle will move in the direction of the handlebar you pushed.) • Slow down before you enter the turn; look as far ahead as possible through the turn. • Keep your feet on the pegs, and grip the gas tank with your knees. • Lean with the motorcycle; don’t try to sit perpendicular to the road while the motorcycle is leaning over. • Keep an even throttle through the turn, or even accelerate a little bit. Checking the Bike before the Ride It’s not fun to have things go wrong on a motorcycle, but if you spend a minute before you go off on a ride, you can increase the chances that nothing will.

Incoming search terms:

1300 Yamaha V-Star Installation Manual

0

Filed Under (Yamaha) by admin on 07-11-2010

download
1) Place motorcycle on a firm level surface and secure in a upright position. 2) Remove saddle bags and saddle bag hardware (Tourer model only) Also remove rear riders pegs (Tourer model requires removal of rear footpeg offset hardware as well) 3) Attach bracket A (right) / B (left) to rear footpeg attachment point using new bolts provided. Remount footpegs/saddlebag hardware over top of brackets A/B. NOTE: Do not attach leveling stand bracket at this time 4) Attach bracket C(right) / D(left) to rear fender sub frame using new bolts provided. (Tourer model only – Saddle bag hardware mounts to the outside of brackets C/D. Brackets C/D mount between chrome side rail and saddlebag hardware.) NOTE: Brackets C/D have welded spacers which attach in toward rear fender 5) Attach top of Bracket E(right) / F(left) to rear of brackets C/D. Brackets E/F mount to the inside of brackets C/D. NOTE: Use ½ inch spacer between brackets E/F and C/D on Tourer model ONLY
6) Attach rear of brackets A/B to TOP of forward hitch arms. Attach bottom to brackets E/F to rear hitch plate. 7) Carefully tighten all bolts at this time ensuring hitch is square with motorcycle. Hitch Bracket Identification Leveling stand screw jack installation 1) Attach leveling stand brackets to brackets A and B 2) Thread right side screw jack into threaded hole on leveling stand bracket attached to bracket A sand adjust leveling jack bolt out. 3) Push motorcycle over from left side until right screw jack is touching floor. 4) Thread left side screw jack into threaded hole on leveling stand bracket attached to bracket B and adjust out until motorcycle will rest upright on both screw jacks. 5) Adjust screw jacks until motorcycle is level. 6) After InstaTrike is attached to or removed from receiver hitch, be sure to remove leveling stands and leveling stand brackets. CAUTION – Use screw jacks to hold motorcycle upright and level ONLY. Do not lift motorcycle with screw jacks. CAUTION – Use care when installing screw jacks. Be certain that motorcycle is always in a stable balanced position.
INSTALLATION OF THE TOW-PAC HITCH CART. 1. Place your motorcycle on a smooth flat surface, like a garage floor, and install leveling stands. Install right leveling stand first. Carefully raise motorcycle off of side stand and install left leveling stand. Caution – Use leveling stands to level motorcycle ONLY. Do not raise motorcycle with stands Caution – Be certain that motorcycle is always in a stable balanced position when installing leveling stands. 2. Assemble the axles, tires and wheels, and fenders onto the tow- pac hitch cart. 3. Carefully align the tow-pac hitch cart’s hitch mount with the receiver hitch on the motorcycle. Now push the hitch mount into the receiver hitch. (this might be a little difficult until you get use to doing it. Removing the paint from the hitch mount and applying a little grease will help.) 4. Place the hitch pin through the receiver hitch and hitch mount ( alignment plate ). Install and tighten the tension bolt

Incoming search terms:

Incoming search terms: