polyester mesh exporters and suppliers in spain yahoo com 419 scam fraud mail

You search Auto repair manual PDF polyester mesh exporters and suppliers in spain yahoo com 419 scam fraud mail, if there are search results will appear below. If search results do not exist, please search by others keyword.





HONDA GL1800 Chrome Mesh Grill Accents Installation Manual

0

Filed Under (Honda) by admin on 04-03-2011

download
NOTE: Read instructions thoroughly before installing. Work one side at a time. 1. Place bike on center stand. 2. Thoroughly clean outside surface of the chrome air intake area where inserts will be install with rubbing alcohol pads- provided. 3. Using the silicone provided, run a bead of silicone as shown in figure 1 or on the original side fairing in the same manner. 4. Carefully place insert mesh into place. 5. Press the accent into place. 6. Using two wire ties, secure the chrome accent by wrapping the wire ties through the original radiator grill as shown in figure 2. Note: You may want to use masking tape or a soft material to protect the chrome or painted surface while placing the piece on the bike. 7. Repeat on the other side. 8. Wait at least 12 hours before removing wire ties.

Harley Davidson BoonDocker Nitrous System Installation MANUAL

0

Filed Under (Harley Davidson) by admin on 01-03-2012

download
BoonDocker Liquid Nitrous – 1589 Hollipark Dr. Idaho Falls, ID 83401 – (208) 542-4411 web site: www. boon dockers. com – email: info@boon dockers. com Revised 02-27-04 Page 2 of 10 This manifold is also designed to vary the float bowl pressure in relation to nitrous pressure, thus keeping the nitrous and fuel delivery in sync. Fluctuations in bottle temperature greatly affect nitrous pressure, which affects nitrous delivery. By automatically adjusting the fuel delivery as nitrous pressure varies, this manifold makes nitrous safe, reliable, and easy to use. Be sure to understand and follow the tuning instructions at the end of these instructions. Proper tuning is an important part of any performance-enhancing product. Part I – Bottle Installation A. Bottle Valve Fittings Insert the 4AN x 1/8″ NPT fitting and the 1/8″ NPT Plug into the bottle valve (these are attached to the lid of the box for the bottle) . Use Teflon tape to seal the threads – be sure not to get tape inside the threads! B. Bottle Mounting Position With nitrous in the bottle, both nitrous liquid and nitrous gas are present under high pressure (760 psi at 70 deg F) . Due to gravity and acceleration forces, the liquid portion of the nitrous will be at the bottom and rearward parts of the bottle. For this nitrous system to work properly, it is important that nitrous liquid be drawn from the bottle. Nitrous vapor will cause a significant decrease in performance. For best results, the bottle should be mounted so the valve is pointed down and towards the back of the vehicle as shown below. ************** *************** ******** ********* *************** (can be installed on top or bottom of air boot) ********** ********* push-button switch (mounts on handlebar) +12 V *********** ************ **** ****** *! “**#$******%* *! “**#$*#*%* 20 deg to 90 Front of motorcycle Rear of motorcycle BoonDocker Liquid Nitrous – 1589 Hollipark Dr. Idaho Falls, ID 83401 – (208) 542-4411 web site: www. boon dockers. com – email: info@boon dockers. com Revised 02-27-04 Page 3 of 10 Bottle mounted inside airbox: For some applications, a small bottle can be mounted inside the airbox as shown. Note: because of the restricted space, it was necessary to mount this bottle at a non-optimal angle (the valve is pointed towards the front instead of the rear)

Incoming search terms:

Yamaha V-Star 650 Jet Kit REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 16-01-2012

download
Remove the vacuum slide from the carburetor. • Remove the OEM needle and spacer, noting the order of assembly. • Counting from the top to the bottom, install the new Baron needle clip on groove #4 of the replacement Baron adjustable needle. • Reinstall the OEM spacer and washer. • Reinstall the vacuum slide along with the diaphragm spring. • Reattach the diaphragm cover and tighten its screws. Note: Verify that the slide maintains a full range of movement! • Drain the fuel from float bowl and remove the bowl cover. • Remove the new cap head Allen screws in place of the OEM Phillips head screws. • Repeat above steps for other OEM main jet and pilot jet, and replace them with Baron’s main and pilot jets. • Thoroughly clean the inside of the float bowl prior to reinstalling it. • Reassemble the carburetor by reversing the order of previous steps. Use thecarburetor. • Locate the fuel mixture plug on each carburetor; it will either be a screw head or a brass plug. If it is a screw head, skip to step c . If you see a brass plug with a small hole in the center, proceed as follows: a. With a 5/32″ drill bit, carefully and slowly drill through the fuel mixture plug for each carburetor. CAUTION: The fuel mixture screw is located directly beneath this plug. Be prepared to stop the drill and remove the bit the instant you break through the plug. b. Insert a self-tapping sheet metal screw into the drilled hole and remove the plug. 311 #1 Industrial Way – Fallbrook, CA 92028 – USA Phone: (760) 731-1200 Fax: (760) 731-1284 E-mail: tech@baronscustom.com Website: www.baronscustom.com Included in this kit: (2) Mikuni main jets, (2) pilot jets, (2) titanium needles, (2) clips, (8) cap head Allen screws Revision 2.0 c. With air/fuel screw now accessible, use a flat blade screwdriver to turn the screw clockwise until it seats, then carefully turn it counter-clockwise 3 turns. Refer to final step for assistance in fine-tuning the setting of the air/fuel adjustment screw. • Reinstall the OEM air filter assembly. • Check all vent lines, fuel lines, and linkage for any obstructions or blockage

Suzuki M 109 WINDSHIELD INSTALLATION AND OWNER'S MANUAL

0

Filed Under (Suzuki) by admin on 18-02-2012

download
Position the motorcycle securely on its stand or a work stand. Cover the front fender and fuel tank with a cloth to avoid scratches from dropped tools. 1. Use the above diagram toidentify left from right Lower and Upper Mount Brackets. Figure 1 2. Cut each of the clamp spacers in half to make 8 pieces, each 2.5 x 1.55″. 3. Apply one spacer to the inside of each mount bracket. Figure 2 Figure 1 Figure 2 N28201 and N28202 WINDSHIELD INSTALLATION AND OWNER’S MANUAL for Suzuki®M109 Right and Left side of Motorcycle is determined while sitting on the bike. Determine left from right Upper bracket. Washer angles inboard about 5 degrees. Note, Angle distinguishes Right from Left Lower Mount Bracket 1 2 4 3 5 6 8 9 10 National Cycle, Inc. Maywood, IL 60153-0158 USA 708-343-0400 / Fax: 708-343-0625 www.nationalcycle.com / e mail:info@nationalcycle.com Page 1 of 3 10-114056-000 08/07 / Rev B. 03/08 7 3, Left Upper Bracket 4, Right Upper Bracket About 5 0 inboard angle
INSTALLATION Measurements provided for clamp location. From this point you can adjust the brackets 1″ (22mm) higher if you prefer keeping in mind, position of the front nose of windshield should have a minimum of 1/2″ (13mm) clearance from cowling . Figure 3. Right Side Lower Mount Assembly 1. Start on the Right Side of motorcycle. At the top of the fork, place one inner black clamp on the fork tube. Figure 4 2. Hook the RIGHT SIDE lower mount bracket (2) to the inside clamp. Figure 5 3. Slide assembly down fork so bottom edge of bracket is 1.75″ (44mm) from top of lower triple clamp. Adjust bracket so flat in bracket runs parallel with motorcycle. Figure 6 and 7 4. Loosely install one M8 x 16 screw. (6mm Hex Key) Figure 7 Right Side Upper Mount Assembly 5. Place the second inside black clamp on the right fork tube.

Incoming search terms:

Yamaha V-Star 1100 Needle/ Jet Kit REMOVAL AND INSTALLATION MANUALS

0

Filed Under (Honda) by admin on 27-12-2011

download
To install this needle and jet kit: • Remove carburetors from the engine per Yamaha shop manual procedures. Note: Always perform internal carburetor work in a clean area. • Remove the vacuum slide from each carburetor. • Remove the OEM needle, spacer and washers, noting order of assembly. (Note; the washers are used as shims to raise the needle, each is equivalent to ½ clip position, use these to fine tune the needle) • Counting from the top to the bottom, install the new Baron needle clip on groove #4 of the replacement Baron adjustable needles. The top is the blunt end of the needle. • Reinstall the OEM spacer and washers as shown in the figure below. • Reinstall the vacuum slides along with the diaphragm spring and reattach the diaphragm covers Note: Verify that the slides maintain their full range of movement! • Drain the fuel from the float bowls and remove the bowl covers. • Remove the OEM main jets and replace them with Baron’s supplied Mikuni main jets. Install the “base setting” main jets as indicated above. NOTE: V-Star 1100 carburetion runs staggered jetting! Make sure the front cylinder’s carburetor gets the larger main jet (numerically), and the rear cylinder’s carburetor gets the smaller main jet . Important! Extra jets have been included in your kit. These will help you fine-tune the carburetors for changing conditions. These conditions include climate and weather patterns in your area as well as exhaust equipment on your motorcycle. Barons determines the jet and clip recommendations that best suit your average riding conditions based upon information supplied to us at the time of your order. Changes in weather, altitude or modifications to your exhaust system may require jets other than those supplied. • Thoroughly clean the inside of the float bowls prior to reinstalling them. 311 #1 Industrial Way – Fallbrook, CA 92028 – USA Phone: (760) 731-1200 Fax: (760) 731-1284 E-mail: tech@baronscustom.com Website: www.baronscustom.com Included in this kit: (4)Mikuni main jets #107.5, 110, 112.5, 115, (2) titanium needles, (2) clips, (8) cap-head allen screws Tools required: 3-4-5 mm allen wrenches, 10&12 mm sockets, 10mm end wrench, phillips & flat screwdrivers, pliers, drill. Revision 4.0 • Reassemble the carburetors by reversing the order of above steps. Use the new supplied cap head Allen screws in place of the OEM Phillips head screws for the float bowls. • Locate the fuel mixture screws – they will either be a screw head or a brass plug. If it is a screw head, skip to step c . If you see a brass plug with a small hole in the center, proceed as follows: a. With a 5/32″ drill bit, carefully and slowly drill through the fuel mixture plugs

Incoming search terms:

Kawasaki VN1600 Highway Bar INSTALLATION AND OWNER'S MANUAL

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
PREPARATION 1. Insure that the motorcycle is on flat level ground. 2. It is recommended that the motorcycle sit for at least one hour prior to installation to allow the engine to cool. During installation tight all fasteners to hold. Wait until you check all clearances and operation of the brake and shift lever to firmly tighten and torque all fasteners. INSTALLATION Right Side Highway Bar 1. Remove the front floor board bolt (M10). (14mm Socket) Figure 1. Right and Left side of Motorcycle is determined while sitting on the bike.
MAINTENANCE / CAUTION The high quality chrome finish of your National Cycle Chrome Highway Bar can be maintained with any quality chrome cleaner and / or polish applied with a soft cloth. Check hardware for tightness regularly. Never ride with loose mounting hardware. Check to be sure your Highway Bar does not contact any part of the motorcycle at a full turn left and right. Correct any problem before using the motorcycle. ©2005 National Cycle, Inc. PO Box 158, Maywood, IL60153-0158 USA 708-343-0400 / Fax: 708-343-0625 / www.nationalcycle.com / e mail: info@nationalcycle.com Page 2 of 2 10-114857-000 09/05 Install Upper “U” Bolt 2. Place “U” Bolt between the radiator and the down tube at the location shown in Figure 2. Threaded ends of “U” will face out- ward. 3. Select the right side Highway Bar. 4. Loosely install the Highway Bar at the lower mount point using the stock screw. (14mm Socket) Figure 3. While installing the Whizlock Nuts in the following Step #5 , be certain to tighten the nuts evenly, alternating left and right as you tighten. When complete you want the same amount of threads exposed on the ends of the “U” to insure the bolt does not rotate. 5. Install the upper Highway Bar with Whizlock Nuts. (1/2″ Socket) Figure 4. Orient assembly so Whizlock Nuts face outside. Firmly tighten after all clearances are checked. LEFT SIDE INSTALLATION 6. Repeat Steps 1 and 2. On the Left Side due to tight clearances between the radiator and the down tube you must locate the point where the radiator is “notched out” slightly. Figure 5. 7. Select the left side Highway Bar. 8. Repeat Steps 4 and 5.

Incoming search terms:

Contact Us

0

Filed Under () by admin on 23-05-2017

If you have any question or suggestions about this website, or want to advertise on this website, or found any copyrighted document, please contact us at this email: septryadi @ yahoo.com. If you want to send DMCA request, please follow DMCA page to send copyright issues.

We are a free pdf share document that provides an option to search for and download various PDF documents, data sheets etc. We don’t host any files. Our crawlers harvested a huge database PDF files through different open Internet resources such as blogs, forums, BBS and others. This database is regularly checked for file validity so now you can search within more than three million of live PDF files.

We are glad to see You at Our Service. We hope it will be useful to you and your friends, You’ll enjoy our service and share Your experience with your friends! Check back in from time to time to see what we’ve done new. If You have any questions or have something interesting to offer please feel free to contact us.

Incoming search terms:

SUZUKI VX800 SPECIFICATIONS AND SERVICE MANUAL

0

Filed Under (Suzuki) by admin on 25-11-2010

download
DIMENSIONS AND DRY MASS Overall length ………………………… 2280 mm (89.8 in) . . . E15, 16, 17, 22, 25, 39 2355 mm (92.7 in) . . . El8 2255 mm (88.8 in) . . . Others Overall width ………………………… Overall height ………………………… Wheel base …………………………… 805 mm (31.7 in) 1115 mm (43.9 in) . . . E03, 28,33 1085 mm (42.7 in) . . . Others 1565 mm (61.6 in) . . . E03,33 1555 mm (61.2 in) . . . Others Ground clearance ……………………… Seat height ………………………….. Dry mass …………………………… 145 mm ( 5.7 in) 800 mm (31.5 in) . . . EOI, 03, 28,33 795 mm (31.3 in) . . . Others 214 kg (472 Ibs). . . E33 213 kg (470 Ibs) . . . Others ENGINE Type ………………………………. Valve clearance ……………………….. Number of cylinders. …………………… Bore ………………………………. Stroke …………………………….. Piston displacement ……………………. Compression ratio …………………….. Carburetor, Front. …………………….. Rear ……………………… Air cleaner ………………………….. Starter system ……………………….. Lubrication system …………………….. Four-stroke, water-cooled, OHC, TSCC, 45″ V-twin 0.08 – 0.13 mm (0.003 – 0.005 in) 2 83.0 mm (3.268 in) 74.4 mm (2.929 in) 805 cm3 (49.12 cu. in) 10.0 : 1 MI KUN I BDS36SS, single MI KUN I BS36SS, single Polyester fiber element Electric starter motor Wet sump TRANSMISSION Clutch …………………………….. Transmission ………………………… Gearshift pattern ……………………… Primary reduction ratio …………………. Gear ratios, Low ……………………… 2nd ………………………. 3rd ………………………. 4th ………………………. Top ……………………… Secondary reduction ratio ……………….. Wet multi-plate type 5-speed constant mesh 1 -down, 4-up 1.690 (71/42) 2.285 (32/14) 1.631 (31/19) 1.227 (27/22) 1 .OOO (25/25) 0.851 (23/27) 1.133 (17/15x 30/30) . . . E03,33 1.096 (17/15x 30/31) . . . Others 3.090 (34/l 1) Final reduction ratio …………………… Drive system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Shaft drive

2010 Toyota Motorsports/ TRD USA Contingency Award Program

0

Filed Under (Toyota Manuals) by admin on 29-09-2011

download
To enroll in the program, complete the registration form included in the enclosed material and mail, fax or e-mail it to TRD per the instructions at the bottom of the form. Contact personnel are listed on the attached 2010 Contingency Award Guidelines sheets. These people are available to assist you throughout the year. Parts Ordering: If you are planning to order Toyota parts during 2010 you must supply us with your Visa or Master Card credit card number at the time you register in the program. There is a line on the registration form for this number. See the attached Parts Ordering Guidelines for detailed information on how to order parts. TRD is looking forward to working with each of you, and we wish you a very successful year with your racing program

Incoming search terms:

MOTO GUZZI Quota 1100 ES Specifications And Owner's Manual

0

Filed Under (Moto Guzzi) by admin on 25-11-2010

download
Engine 4-stroke, twin cylinder Cylinder configuration: 90° V-twin Bore: 9 2 mm Stroke: 80 mm Capacity: 1064 cc Compression ratio: 9.5:1 Max. torque: Nm 85 (kgm 8.7) at 3,800 rpm Max. power: Kw 51 (CV 70) a 6,400 rev/min Timing system With rods and rockers and 2 valves per cylinder. One camshaft in the crankcase driven by duplex chain with automatic chain tensioner. Feed system Indirect electronic injection, timed sequential MAGNETI MARELLI IAW 15M “Alfa-N” system, single throttlebody, Weber IW031 injectors, electric pump with pressure regulator, digital control of optimized injection times. Lubrication Pressure fed by gear pump. Wire mesh and cartridge filters on oil sump. Normal lubrication pressure 3.8÷4.2 kg/cm2 (pressure valve on oil sump). Low oil pressure sensor (electrical) on crankcase. Generator / Alternator On front of crankshaft. Output power: 350W at 5000 rev./min. (14V – 25A). Ignition “MAGNETI MARELLI” Inductive discharge digital electronics. Spark plugs: NGK BPR 6 ES. Spark plug gap: 0.7 mm 2 ignition coils Starter Electric starter motor 12V-1.2 Kw with electromagnetic ratchet control. Ring gear on the flywheel. START « » push-button on right handlebar. Transmission Clutch Dry, twin driven plates. Located on engine flywheel. Clutch lever on left handlebar. Primary drive With helical gears, 1:1.3529 (Z=17/23). Gearbox 5-speed, front engaging, constant mesh. Incorporated Cush drive Control pedal on left side of machine. Gear ratios: 1st 1:2 (Z=14/28) 2nd 1:1.3158 (Z=19/25) 3rd 1:1 (Z=23/23) 4th 1:0.8462 (Z=26/22) 5th 1:0.7308 (Z=26/19) Final drive Cardan shaft with gears Ratio: 1:4.125 (Z=8/33) Overall gear ratios (engine-wheel) 1st gear = 1: 11.1618 2nd gear = 1: 7.3433 3rd gear = 1: 5.5809 4th gear = 1: 4.7223 5th gear = 1: 4.0783 Frame Double steel rectangular bar with double cradle

Incoming search terms: