rusi motorcycle wiring diagram

You search Auto repair manual PDF rusi motorcycle wiring diagram, if there are search results will appear below. If search results do not exist, please search by others keyword.



  rusi motorcycle wiring diagram Direct Download speed 5282 Kb/s

  rusi motorcycle wiring diagram Full Version speed 6162 Kb/s



HONDA GL1100 AM/FM RADIO INSTALLATION MANUAL/ WIRING DIAGRAM

0

Filed Under (Honda) by admin on 22-04-2011

download
INSTALLATION ■ Outline Procedures This section gives general information needed for mounting the individual radio components on and in the fairing. A) Fairing 1) Install radio on fairing before mounting fairing on motorcycle. (Remove fairing from your motorcycle when already mounted). 2) Remove fairing parts. 3) Drill unit mount holes. 4) Install six wire clips. 5) Install windshield on fairing before install- ing speakers. 6) Install radio indicator I on indicator panel II , then install indicator panel on fairing. 7) Install speakers III. 8) Install nutplate IV. 9) Install Power Amplifier in fairing. 10) Install radio funer VI. 11) Install the radio controller VII. 12) Install controller base panel VIII 13) Install radio switch sub-wire. 14) Connect adapter harness and wires inside fairing by working through left turn signal lens hole. B) Motorcycle frame and handlebar 1) Remove travel trunk and seat. Unscrew four shelter bolts (M6, one on each side at front and rear) to route antenna feeder. 2) Install antenna mount and antenna IX. 3) Route antenna feeder along the frame tube. 4) Install radio switch X on left handlebar lever bracket and route the wires. 3 of 11 Page 4 C) Fairing instllation 1) Install fairing on motorcycle. 2) Connect motorcycle wire harness 9-P coupler to fairing wire 9-P coupler. 3) Connect radio switch wire to switch sub- wire.4) Connect antenna feeder. 5) Confirm that radio operates properly. Reinstall parts removed in step 2 or (A) and in step 1 of (B). REWORKING ■ Remove Fairing and Fairing Parts (Fig.10) 1) Install radio on fairing before mounting fairing on motorcycle. (Remove fairing from your motorcycle when already mounted). 2) Remove right and left fairing pockets, right and left turn signal lenses, right and left nutplates, left hole cover and indi- cator base panel from fairing. (Fig.10) Fig. 10 LEI-1 NU I PLATE 4 of 11■ Reworking on Fairing — Speaker mounting holes- 1) Remove 18 mm grommet. 2) Lightly roll template so that it will follow contour of fairing snugly. 3) Position template on fairing with its upper and outer edges aligned with those offairing as indicated by arrows. 4) Attach template to fairing using adhesive tape where shown. 5) Punch mark centers of four holes with a
drift and hammer. 6) Drill 6 mm holes through marked centers. To obtain a more balanced response with richer, deeper bases, drill two 50 mm holes in the fairing so as to link the speaker box with the inside of the fairing. Fig. 11-1
—Power amplifier mounting holes- 7) Drill two 5.5 mm holes through concaves in fairing. Fig. 11-2 RIGHT HAND SHOWN, LEFT SIMILAR ADHESIVE TAPE

Incoming search terms:

AIR / HYDRAULIC MOTORCYCLE LIFT REMOVABLE INSPECTION PLATE

0

Filed Under (Tips and Review) by admin on 19-11-2010

download
For best service, you should incorporate an oiler, regulator, and inline filter, as shown in the diagram on the next page. Hoses, couplers, oilers, regulators, and filters are all available at Harbor Freight Tools. NOTE: If an automatic oiler is not used, put 3-5 drops of pneumatic Tool Oil (not included) in the Motorcycle Lift’s Quick Coupler (38A) before each use. (See Figure B, next page.) To Check The Level Of Hydraulic Oil: 1. The Motorcycle Lift already contains some hydraulic oil in its Hydraulic Pump Reservoir (32P). Even so, it is recommended that you check the oil level in the Reservoir and, if necessary, top off the Reservoir with the proper amount of 15/40 hydraulic oil (not included). (See Assy. Diagram, page 15.) 2. Make sure to screw the two Adjusting Screws clockwise enough to lift the two Caster Wheels (14) off the floor so as to provide stability for the Motorcycle Lift. (See Figure A.) 3. To check the level of hydraulic oil, remove the Sliding Plate (36) from the Platform (35) to expose the Hydraulic Pump Reservoir (32P). (See Assy. Diagrams, pages 13 and 15.) 4. Remove the rubber Filler Plug (33P) located on the top of the Reservoir (32P). If necessary, top off the Reservoir with hydraulic oil. (See Assy. Diagram, page 15.) 5. Connect the air compressor’s hose to the to the Air Motor assembly. Then turn on the air compressor and set its regulator at 120 PSI. (See Assy. Diagram, page 14.) 5. Insert the Lift Foot Pedal (11) onto the Pump Piston Spindle (9), and slowly pump the Lift Foot Pedal until a slight amount of hydraulic oil begins to leak out of the Reservoir (32P). Discontinue pumping the Lift Foot Pedal. Then, replace the Filler Plug (33P) on the top of the Reservoir. (See Assy. Diagram, page 15.) REGULATOR OILER FILTER TO QUICK COUPLER (38A) OF MOTORCYCLE LIFT FIGURE B 6. Insert the Release Foot Pedal (10) onto the Release Valve Spindle (5). Pump the Lift Foot Pedal (11) until the Platform (35) of the Motorcycle Lift reaches its maximum height. Then press down slightly on the Release Foot Pedal until the Platform is fully collapsed to the floor. Repeat this procedure several times to ensure the Motorcycle Lift is operating properly. (See Figure E, page 10.)

Incoming search terms:

EDELBROCK NITROUS SYSTEM UNIVERSAL MOTORCYCLE NITROUS SYSTEM

0

Filed Under (Suzuki) by admin on 26-11-2010

download
Wiring Diagram #1 Wiring Diagram #2 Red Red Red Red Black Black Black Black Black Black Factory Harness to Horn Factory Harness to Horn Horn Horn Nitrous Solenoid Nitrous Solenoid Switch Switch Bottom View Bottom View +12V with Key On From Horn Button (Ground when button is pressed) From Horn Button (Ground when button is pressed) To Nitrous Bottle To Nitrous Bottle To Nitrous Nozzle To Nitrous Nozzle Install Relay for OPTIONAL RPM Activated Switch Here. See Section 7.0 for More Details. Install Relay for OPTIONAL RPM Activated Switch Here. See Section 7.0 for More Details ©2007 Edelbrock Corporation Brochure #63-71940 Catalog #71940 Rev. 2/07 – DC/mc Page 4of 4 To Nitrous Bottle To Nitrous Nozzle Nitrous Solenoid To Starter Solenoid Switch Bottom View Ground Starter Button +12V when Pushed Install Relay for OPTIONAL RPM Activated Switch Here. See Section 7.0 for More Details. Wiring Diagram #3 Starter Button Activation for Suzuki Hayabusa 7.0 – WIRING MSD 8950 RPM SWITCH NOTE – This is a suggested wiring application. There are many ways that the RPMswitch may be installed. The installer needs to set RPMswitch to proper RPM and test operation. Use diagrams on page 3 for relay terminal #30 connection. Nitrous Solenoid To Nitrous Bottle To Nitrous Nozzle RPM ACTIVATED SWITCH 10,000 Desired RPM Chip Here Connect as Outlined in Wiring Diagrams White to 4-Coil Tach Adapter #T-101-MSD Black Battery Ground Yellow – N/C Gray – OFF When Set RPMis Exceeded Connect as Outlined in Wiring Diagrams NOTE – RPM Chips are Ordered Separately Red to Switched +12 Volt Tailight Power or any Other +12 Volt Source with the Key On Note – This Method Will Turn the Nitrous Off When Set RPM has Been Exceeded. 85 87A 30 86 87 A Test Light Can Be Used Here to Check Operation 8.0 – OPTIONAL PRODUCTS FOR EFI MOTORCYCLES A Progressive Timing Retard Controller is available from Schnitz Racing for fuel injected motorcycles. The EFIR Series Timing Retard Controllers can be used with or without a Power Commander installed.

Incoming search terms:

Vengeance Motorcycle Specification And Owner's Manual

0

Filed Under (Vengeance) by admin on 20-11-2010

download
Vengeance Maxis • Vengeance Raven • Vengeance Banshee • Vengeance Whiplash • Hotrod Drifter • Hotrod CalChop • Hotrod Teacher • Hotrod Bone Shifting Gears Starting off and changing gears requires coordination of the clutch and throttle and gearshift lever. If you don’t do things right, the amount of control you have over the bike is lessened. To start off, pull in the clutch, shift into first gear, roll on the throttle a little, and ease out the clutch. You will become familiar with the friction zone (that’s where the clutch begins to take hold and move the bike), and you add a bit more throttle. You don’t want to stall the engine, nor do you want to over-rev it. There’s a sweet spot in there; find it. Shift while traveling in a straight line. Shifting in a curve is not good practice, and something to be avoided. Become familiar with the sound of your engine, so you can tell when you should shift without looking at your instruments. When you downshift to a lower gear, you should (in one swift, smooth movement) be able to squeeze the clutch, rev the engine a little to let it catch the lower gear smoothly, and shift down. When you come to a stop in traffic, leave the bike in first gear with the clutch disengaged (just in case you want to accelerate out of there in a hurry). Who knows what may be coming up behind you. Braking Don’t ever forget: The front brake on your motorcycle can supply as much as 70 percent or more of your stopping power. The single most important thing you can learn about braking is to use that front brake every single time you want to slow down. Turning When you are riding along the road, you lean a motorcycle into a turn. Learning to lean is an essential part of riding a motorcycle. It is a normal function of the bike when you are changing its path of travel – and quite different from turning the steering wheel of your car. To get the motorcycle to lean in a normal turn, press the handlebar in the direction of the turn and maintain slight pressure on that handlebar to take you smoothly through that particular turn. In other words: press right to go right; press left to go left. Your instincts to keep the motorcycle on a smooth path while keeping it from falling over usually take care of this without you even noticing it. (Demonstrate to yourself how a motorcycle moves by pressing a handlebar slightly while traveling in a straight line. The motorcycle will move in the direction of the handlebar you pushed.) • Slow down before you enter the turn; look as far ahead as possible through the turn. • Keep your feet on the pegs, and grip the gas tank with your knees. • Lean with the motorcycle; don’t try to sit perpendicular to the road while the motorcycle is leaning over. • Keep an even throttle through the turn, or even accelerate a little bit. Checking the Bike before the Ride It’s not fun to have things go wrong on a motorcycle, but if you spend a minute before you go off on a ride, you can increase the chances that nothing will.

Incoming search terms:

SUZUKI SV 1000 RADIATOR (COOLING SYSTEM) SERVICE MANUAL

0

Filed Under (Suzuki) by admin on 26-02-2011

download
FI SYSTEM MALFUNCTION CODE AND DEFECTIVE CONDITION MALFUNCTION CODE DETECTED ITEM DETECTED FAILURE CONDITION CHECK FOR COO NO FAULT C11 Camshaft position sen- sor The signal does not reach ECM for more than 3 sec . after receiving the starter signal . The camshaft position sensor wiring and mechanical parts (Camshaft position sensor, intake cam pin, wiring/coupler con- nection) C12 Crankshaft position sensor The signal does not reach ECM for more than 2 sec . after receiving the starter signal . The crankshaft position sensor wiring and mechanical parts (Crankshaft position sensor, wiring/coupler connection) C13 Intake air pressure sensor The sensor should produce following voltage . (0.50 V < sensor voltage < 4 .85 V) Without the above range, C13 is indicated. Intake air pressure sensor, wiring/coupler connection C14 Throttle position sen- sor The sensor should produce following voltage . (0.20 V < sensor voltage < 4 .80 V) Without the above range, C14 is indicated. Throttle position sensor, wiring/coupler connection C15 Engine coolant temperature sensor The sensor voltage should be the following. (0.15 V <_ sensor voltage < 4 .5 V) Without the above range, C15 is indicated. Engine coolant temperature sensor, wiring/coupler connection C21 Intake air temperature sensor The sensor voltage should be the following. (0.15 V < sensor voltage < 4 .5 V) Without the above range, C21 is indicated. Intake air temperature sensor, wiring/coupler connection C22 Atmospheric pressure sensor The sensor voltage should be the following. (0.50 V < sensor voltage < 4 .5 V) Without the above range, C22 is indicated. Atm. pressure sensor, wiring/coupler connection C23 Tip over sensor The sensor voltage should be the following for more than 2 sec . after ignition switch turns ON . (0 .20 V < sensor voltage < 4 .80 V) Without the above value, C23 is indicated. Tip over sensor, wiring/coupler connection C24 or C25 Ignition signalCrankshaft position sensor signal is produced and ECM determines the ignition signal but signal from ignition coil is interrupted continuous by 4 times or more. In this case, the code C24 or C25 is indicated. Ignition coil, wiring/coupler connection, power supply from the battery SERVICING INFORMATION 8 .3 C28 Secondary throttle valve actuator No operating voltage is supplied from the ECM, C28 is indicated. STVA can not operate. STVA lead wire/coupler, STVA C29 Secondary throttle valve position sensor The sensor should produce following voltage . (0.10 V < sensor voltage < 4 .90 V) Without the above range, C29 is indicated . Secondary throttle position sensor, wiring/coupler connection C31 Gear position signalGear position signal voltage should be higher than the following for more than 2 seconds. (Gear position switch voltage >_ 0 .6 V) Without the above value, C31 is indicated. Gear position sensor, wiring/coupler connection, gearshift cam, etc. C32 or C33 Fuel injector Crankshaft position sensor signal is produced and ECM determines the injection signal but fuel injection signal is interrupted continuous by 4 times or more. In this case, the code C32 or C33 is indicated. Injector, wiring/coupler connection, power supply to the injector C41 Fuel pump relay No voltage is applied to fuel pump although fuel pump relay is turned ON, or voltage is applied to fuel pump although fuel pump relay is turned OFF . Fuel pump relay, connecting lead, power source to fuel pump relay C42 Ignition switchIgnition switch signal is not input in the ECM . Ignition switch, lead wire/coupler C44 Heated oxygen sensor (HO2S) [For E-02, 19] During 02 feedback control, 02 sensor voltage is higher or lower than the specification . No signal is detected during engine operation or no electrical power is supplied from the battery . HO2S lead wire/coupler connection Battery voltage supply to the HO2S C49 PAIR control solenoid valve (PAIR valve) When no operating voltage is supplied from the ECM, C49 is indicated. PAIR valve can not operate. PAIR valve lead wire/coupler

Incoming search terms:

Suzuki GSX-R 1000 AFR Tuner INSTALLATION MANUAL

0

Filed Under (Suzuki) by admin on 20-02-2012

download
The installation of the AFR Tuner should be done by experienced technicians only. Always disconnect the battery from the motorcycle before making any modification to the wiring harness. Remove the negative terminal from the battery before starting the installation work. The quality of the installation work greatly affects the reliability of the AFR Tuner and the motorcycle. Work precisely and very carefully when modifying the wiring harness of the vehicle. Always double check that the wire you are about to cut or tap into is the correct one. The ECM or the AFR Tuner can be destroyed by a faulty installation. 3.2. Installing the AFR Tuner to the wiring harness 3.2.1. Main cable The AFR Tuner connects to the motorcycle through its Main connector . Figure 2 shows the wiring diagram and the necessary modifications, which needs to be made when installing the unit into the fuel injection system of the motorcycle. Information about the ECM terminal numbers and wire colors for some popular motorcycles can be found in Chapter 6 . The best location for installing the AFR Tuner main unit is at the passenger seat area of the motorcycle mounted in the trunk space or on the subframe under the fairing, as this place provides protection from engine heat and the weather. Electrical contact between the metal casing of the AFR Tuner and the rear subframe must be prevented by using insulating material, such as the included self adhesive velcro strips. If necessary use some cable ties to secure the unit in place. The installation of the AFR Tuner into the wiring harness involves tapping into some wires and cutting others while connecting the two ends to the AFR Tuner. The harness modifications are best done near the ECM, since most of the wires can be found there. Part of the wiring modifications are related to connecting the AFR Tuner in-line between the ECM and the fuel injectors. In such cases when the motorcycle is equipped with primary and secondary injectors the AFR Tuner has to be installed on the primary injectors, which operate under all engine conditions. Correct grounding of the AFR Tuner is very important for electrical noise reduction. The above mentioned insulation of the metal case from the motorcycle frame is necessary for the same reason, which is to avoid the forming of a ground loop. An even more important requirement is the correct connection of the three ground wires of the AFR Tuner. As shown on Figure 2 , these three wires must be led out separately to the ECM and connected together at same point where the ECM ground wire is tapped into. This point should be as close to the ECM terminal as possible. For best quality of the electrical contacts all connections should be done by soldering and covering the exposed part of the wire with heat shrink tubing. For reliability reasons do not use clip on type wire taps

1300 Yamaha V-Star Installation Manual

0

Filed Under (Yamaha) by admin on 07-11-2010

download
1) Place motorcycle on a firm level surface and secure in a upright position. 2) Remove saddle bags and saddle bag hardware (Tourer model only) Also remove rear riders pegs (Tourer model requires removal of rear footpeg offset hardware as well) 3) Attach bracket A (right) / B (left) to rear footpeg attachment point using new bolts provided. Remount footpegs/saddlebag hardware over top of brackets A/B. NOTE: Do not attach leveling stand bracket at this time 4) Attach bracket C(right) / D(left) to rear fender sub frame using new bolts provided. (Tourer model only – Saddle bag hardware mounts to the outside of brackets C/D. Brackets C/D mount between chrome side rail and saddlebag hardware.) NOTE: Brackets C/D have welded spacers which attach in toward rear fender 5) Attach top of Bracket E(right) / F(left) to rear of brackets C/D. Brackets E/F mount to the inside of brackets C/D. NOTE: Use ½ inch spacer between brackets E/F and C/D on Tourer model ONLY
6) Attach rear of brackets A/B to TOP of forward hitch arms. Attach bottom to brackets E/F to rear hitch plate. 7) Carefully tighten all bolts at this time ensuring hitch is square with motorcycle. Hitch Bracket Identification Leveling stand screw jack installation 1) Attach leveling stand brackets to brackets A and B 2) Thread right side screw jack into threaded hole on leveling stand bracket attached to bracket A sand adjust leveling jack bolt out. 3) Push motorcycle over from left side until right screw jack is touching floor. 4) Thread left side screw jack into threaded hole on leveling stand bracket attached to bracket B and adjust out until motorcycle will rest upright on both screw jacks. 5) Adjust screw jacks until motorcycle is level. 6) After InstaTrike is attached to or removed from receiver hitch, be sure to remove leveling stands and leveling stand brackets. CAUTION – Use screw jacks to hold motorcycle upright and level ONLY. Do not lift motorcycle with screw jacks. CAUTION – Use care when installing screw jacks. Be certain that motorcycle is always in a stable balanced position.
INSTALLATION OF THE TOW-PAC HITCH CART. 1. Place your motorcycle on a smooth flat surface, like a garage floor, and install leveling stands. Install right leveling stand first. Carefully raise motorcycle off of side stand and install left leveling stand. Caution – Use leveling stands to level motorcycle ONLY. Do not raise motorcycle with stands Caution – Be certain that motorcycle is always in a stable balanced position when installing leveling stands. 2. Assemble the axles, tires and wheels, and fenders onto the tow- pac hitch cart. 3. Carefully align the tow-pac hitch cart’s hitch mount with the receiver hitch on the motorcycle. Now push the hitch mount into the receiver hitch. (this might be a little difficult until you get use to doing it. Removing the paint from the hitch mount and applying a little grease will help.) 4. Place the hitch pin through the receiver hitch and hitch mount ( alignment plate ). Install and tighten the tension bolt

LED Motorcycle Power Box Installation Instructions

0

Filed Under (Tips and Review) by admin on 29-01-2011

download
This box requires the presence of a mounting plate secured to the motorcycle’s luggage rack. If the bike in question is not equipped with a mounting plate, one must be fabricated prior to installation of this box. Five mounting holes (.281″ dia.) are required to mount this box. If the motorcycle is already equipped with a mounting plate, it may be necessary to drill the 5 mounting holes required for this installation. Use the diagram shown to determine the precise location of these holes. 1. Position the box onto the mounting plate. Align the 5 vibration dampeners with the 5 mounting holes in the mounting plate. 2. Using the illustrations shown, secure the box to the mounting plate using the provided hardware. Note: Your luggage rack may already have the correct mounting holes drilled. Check the measurements below and if these holes already exist at the proper distance, remove any existing mounting hardware from the holes and secure the box with the supplied mounting hardware. 3. Place the box into its mounting position on the deck and secure it with the supplied mounting hardware as shown in the diagram. Wiring: Diagrams for optional equipment are found below. Refer to the diagram on the following page for general motorcycle box wiring information

Motorcycle LED lights RENEGADE LIGHTS Disconnection Guide

0

Filed Under (Tips and Review) by admin on 29-01-2011

download
1. Make sure your bike is cool and parked on a flat secure surface! 2. Find your battery (you may have to remove your seat or side covers in order to get to your battery) Disconnect the NEGATIVE ( -) cable. Negative battery cable must be disconnected from the battery in order to avoid safety hazards! Be sure as you disconnect the Negative cable that it does not touch or make contact with your Positive terminal 3. Disconnect the fuse holder from the battery – both the positive ( +) and negative ( -) sides. 4. Cut the wire to the light that is not working with the side cutters. 5. At the problem light twist the light case back and forth slowly and then pull firmly, DO NOT yank to remove from the motorcycle. 6. If the motorcycle led light does not come off easily, repeat the twisting motion back and froth until you feel the light loosen – then pull. 7. Pull the motorcycle led light away from the motorcycle slowly until the cut end of wire falls free. 8. If you will NOT be using your motorcycle until the new lights arrive, you may stop at this step. SAFETY POINT: Otherwise, where you cut the wire, you need to dead end or tape the cut wire. This will keep it from shorting out until the new motorcycle led light is installed. 9. Reconnect fuse holder to battery. 10. Reconnect the battery and then install the seat. 11. Return the motorcycle led light or lights to Renegade Lights along with Warranty Return Policy Form. 12. Renegade Lights will return your new motorcycle led lights along with instructions for installing them.

1992 Toyota Cressida Vehicle Wiring Chart and Diagram

0

Filed Under (Toyota Manuals) by admin on 18-06-2011

Download
Listed below is the vehicle specific wiring diagram for your car alarm, remote
starter or keyless entry installation into your 1992 Toyota Cressida . This
information outlines the wires location, color and polarity to help you identify the
proper connection spots in the vehicle. Please be sure to test all of your wires
with a digital multimeter before making any connections. More information on
using a multimeter and testing wires please see our Technical Support Area.

Incoming search terms:

Incoming search terms: