shovelhead pinion gear shaft

You search Auto repair manual PDF shovelhead pinion gear shaft, if there are search results will appear below. If search results do not exist, please search by others keyword.



  shovelhead pinion gear shaft Direct Download speed 5282 Kb/s

  shovelhead pinion gear shaft Full Version speed 6162 Kb/s



Harley-Davidson Motorcycle Reverse Gear Installation Instructions

0

Filed Under (Harley Davidson) by admin on 31-10-2010

download
2.1 Obtain a small tube of Loctite® #262 (red) for use later. 2.2 Drain the transmission oil. 2.3 Remove the clutch adjustment cover (left side). 2.4 Remove rear exhaust header pipe (cross over exhaust pipe). 2.5 Remove the muffler support bracket. 2.6 Remove the clutch release cover (right side). 2.7 Remove clutch push rod and oil slinger. To be disassembled and modified later. 2.8 Remove the two nuts from the main (rear) and counter (front) transmission shafts. 2.9 Remove the transmission bearing housing (puller available from Champion Sidecars). To be replaced with new reverse gear transmission bearing housing (Trap Door). 2.10 Cover the exposed gears in the transmission with a cloth in preparation to cut the shifter fork shaft. 3 Install New Main and Countershaft Gears NOTE: Gears and Tapered Split Rings are factory matched sets. Do not mix!. 3.1 Locate the shifter fork rod, mark fork rod flush at transmission case and pull out 1/4″. Figure 1 Figure 2. Exposed Shoulders Mark shifter fork rod flush with case Remove Spacers Vehicle Transmission Counter Shaft Main Shaft Front of Motorcycle Figure 1
Reverse Gear Installation Instructions For EVO / 5 Speed and Twin Cam Harley-Davidson® Motorcycle Page 3 of 6 Revision 7 © 2007 Champion Motorcycle Accessories International, Inc. dba Champion Sidecars 11841 Monarch Street Garden Grove, CA 92841 (800) 875-0949 (714) 847-0949 www.championsidecars.com www.championtrikes.com Figure 6 CAUTION: Do not pull the shifter fork rod out of the transmission more than 1/4″. If you pull the shifter fork rod out too far, it will be difficult to realign it with the internal shifter fork. 3.2 Cut the shaft at the mark and push it back in. The shaft end MUST NOT stick out of the transmission case. If the shaft is in deeper, fill the hole with silicone to prevent the shaft from moving in and out. NOTE: Shifter fork is made of non-tempered metal and may be cut with a hacksaw or Dremel® cutting tool. 3.3 Important: Remove stock spacers from main and counter shafts. Spray with silicon remover (Brake-Clean) then, using supplied cleaning pad, clean shafts, new counter and main shaft gears and tapered lock rings (inside and outside) Figure 1 3.4 With motorcycle in neutral, pull both the shafts out and simultaneously push the OEM outermost gears in until seated completely to expose the shoulders of both shafts. The countershaft shoulder should be flush with the gear face. For the main shaft the gear would “hang over” the shoulder a small bit. Figure 2 3.5 Apply supplied Champion Super-Lock retaining compound to the inside and outside surfaces of the large gear tapered split ring, to the inside of the new countershaft gear (large gear) and to the transmission countershaft (the forward most shaft). 3.6 Install new countershaft gear to the transmission countershaft. Insert tapered split ring (tapered end first) into the countershaft gear. Install ring seat tool and spring to counter shaft and new countershaft gear. Torque ring seat tool to 40 ft-lb’s. Figures 3 and 4

Incoming search terms:

HARLEY DAVIDSON SHIFTER SHAFT COVER WITH INSERT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 03-02-2011

download
INSTALLATION 1 2 4 3 5 6 7 is01872 1. Shifter shaft 2. Inner cover 3. Toe shifter lever 4. Outer cover 5. Set screw (for outer cover) 6. Set screw (for inner cover) 7. Casting Figure 1. Shifter Shaft Covers 1. See Figure 1. Remove the stock heel shift lever and toe shift lever (3) from the gear shifter shaft (1). 2. Install the set screw (6) into the inner gear shifter shaft cover (2). 3. Install inner gear shifter shaft cover with installed set screw over the casting (7) in-board of the shifter shaft (1). 4. Tighten the set screw until light contact is made with the casting. Do not overtighten. 5. Re-install toe shift lever on the gear shifter shaft. Tighten the shifter retaining screw to 18-22 lb-ft (24-30 Nm) . 6. Install the set screw (5) into the outer gear shifter cover (4). 7. Install outer gear shifter shaft cover with installed set screw over the end of the gear shifter shaft (1). 8. Loosen the set screw slightly to allow the gear shifter shaft cover to rotate. Rotate the cover until the set screw faces down, then tighten the set screw. SERVICE PARTS

Incoming search terms:

HARLEY DAVIDSON GEAR SHIFTER SHAFT COVER INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 30-03-2011

download
Models This kit fits 1982 and later Touring and FL Softail model motorcycles. Kit Contents Table 1. Kit Contents Part Number Description (Quantity) Not Sold Separately Gear shifter shaft cover Not Sold Separately Screw, set There are no Service Parts available with this kit. INSTALLATION 1. Remove the stock heel shift lever from the gear shifter shaft. 2. Install the set screw into the gear shifter shaft cover. 3. Install gear shifter shaft cover with installed set screw over the end of the gear shifter shaft. 4. Tighten the set screw until light contact is made with the shaft groove. 5. Loosen the set screw slightly to allow the gear shifter shaft cover to rotate. Rotate the cover until the set screw faces down, then tighten the set screw.

COMPUFIRE 1084 GEAR SETS INSTALLATION INSTRUCTIONS

0

Filed Under (Tips and Review) by admin on 26-11-2010

download
1. Remove the seat and disconnect the cables at the battery. Remove the ground cable first and then the positive (+) cable. 2. Drain the oil in the outer primary case and remove the outer primary cover following instructions in the Factory Shop manual. 3. Bend the tab on the jackshaft bolt away from the bolt head. Remove the starter pinion gear with the jackshaft bolt, lock plate and washer. 4. Remove the clutch assembly using the procedure found in the Factory Shop manual. 5. Remove the original equipment ring gear from the clutch basket by drilling out the rivets with a 5/16-inch drill bit. Drill through the rivet head and tap the ring gear off the clutch basket using a hammer. 6. Drill out the six holes in the clutch basket with the 5/16-inch drill bit. RING AND STARTER PINION GEAR INSTALLATION 1. Attach the new 84-tooth ring gear to the clutch basket using the six 5/16×24 socket head cap screws supplied. NOTE… The bevel side of the ring gear (identified by the three dots) faces away from the starter motor. Torque the socket head cap screws to 29 ft lbs. 2. Assemble and install the primary drive assembly following the instructions in the factory Shop manual. 3. Install the new 10-tooth pinion gear with the jackshaft bolt, lock plate and thrust washer. Torque the jackshaft bolt to 7 – 9 ft lbs. Bend the lock tab on the lock plate against a flat on the jackshaft bolt head. 4. Measure and adjust the air gap between the ring gear and the pinion gear. See Fig-1 . The correct gap is .075 – .125 inch. If the gap is larger than .125 inch, use the supplied shim washers inside the jackshaft coupler. See Fig-2 . If the air gap is smaller than .075 inch, the jackshaft must be shortened by removing material from the splined end of the shaft. See Fig-3 . 5. Install the outer primary cover following instructions in the Factory Shop manual and refill the primary case with the proper amount of primary oil. 6. Re-install the battery cables in the reverse order they were removed. Re-install the seat

Incoming search terms:

HARLEY-DAVIDSON BIG TWINS COMPUFIRE 1084 GEAR SETS INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 26-11-2010

download
1. Remove the seat and disconnect the cables at the battery. Remove the ground cable first and then the positive (+) cable. 2. Drain the oil in the outer primary case and remove the outer primary cover following instructions in the Factory Shop manual. 3. Bend the tab on the jackshaft bolt away from the bolt head. Remove the starter pinion gear with the jackshaft bolt, lock plate and washer. 4. Remove the clutch assembly using the procedure found in the Factory Shop manual. 5. Remove the original equipment ring gear from the clutch basket by drilling out the rivets with a 5/16-inch drill bit. Drill through the rivet head and tap the ring gear off the clutch basket using a hammer. 6. Drill out the six holes in the clutch basket with the 5/16-inch drill bit. RING AND STARTER PINION GEAR INSTALLATION 1. Attach the new 84-tooth ring gear to the clutch basket using the six 5/16×24 socket head cap screws supplied. NOTE… The bevel side of the ring gear (identified by the three dots) faces away from the starter motor. Torque the socket head cap screws to 29 ft lbs. 2. Assemble and install the primary drive assembly following the instructions in the factory Shop manual. 3. Install the new 10-tooth pinion gear with the jackshaft bolt, lock plate and thrust washer. Torque the jackshaft bolt to 7 – 9 ft lbs. Bend the lock tab on the lock plate against a flat on the jackshaft bolt head. 4. Measure and adjust the air gap between the ring gear and the pinion gear. See Fig-1 . The correct gap is .075 – .125 inch. If the gap is larger than .125 inch, use the supplied shim washers inside the jackshaft coupler. See Fig-2 . If the air gap is smaller than .075 inch, the jackshaft must be shortened by removing material from the splined end of the shaft. See Fig-3 . 5. Install the outer primary cover following instructions in the Factory Shop manual and refill the primary case with the proper amount of primary oil. 6. Re-install the battery cables in the reverse order they were removed. Re-install the seat

Incoming search terms:

Harley Davidson Twist Gear and Wide Gear Installation Instructions

0

Filed Under (Harley Davidson) by admin on 11-04-2012

download
Assemble triple lip output seal 705002 and output spacer 280001 together. The seal is shipped with high performance grease packed into the seal lips to ensure lubrication and exclude dust & water. (Caution: Only high temperature grease should be used, grease is better than oil, never install the seal dry.) Slide the quad ring and seal/spacer assembly onto the transmission output shaft, then slide tool JE300001 ( TwistGear TM ) or JE300002 ( WideGear ) onto the shaft and finally tighten the nut until the tool drives the seal flush with the case. Do not attempt to install the main drive seal without the JE tool or the seal will be damaged, and the seal performance will be compromised (the JE seal is wider around the shaft for the third sealing lip, which will be damaged if a tool is pressed against it.) It is best that a new JE spacer be used each time a new seal is installed for quick break-in of the main lip seal surface. Counter Shaft Assembly Note the order and orientation of the gears on the counter shaft when it is removed from the trapdoor. Disassemble the counter shaft and transfer the parts to the TwistGear TM counter shaft. Note that the TwistGear TM counter shaft assembles in different order than the OEM counter shaft. Two washers are required in the position as shown in figure 1 (see arrow) before the retainer ring is installed. The second washer is included in the kit.

Incoming search terms:

Harley-Davidson Six Speed Transmissions FLH 2009 Up Champion Reverse Gear Installation Instructions

0

Filed Under (Harley Davidson) by admin on 17-02-2011

download
Preparation Remove Original Parts From Vehicle. 2.1 Purchase a small tube of Loctite #262 (red) for use later. 2.2 To torque the large gear: 2.2.1 Purchase Snap-On (or equivalent) filter tool. Part #: FWA62121. OR 2.2.2 Purchase Champion special tool – Part # RG-100-100 2.3 Drain the transmission oil. 2.4 Remove front and rear exhaust header pipe. 2.5 Remove the clutch release cover (right side). 2.6 Remove throw out bearing assembly. (to be reinstalled later without modification) 2.7 Remove the two nuts from the main and counter transmission shafts. WARNING : Do not attempt to push shafts into gearbox or remove the trap door – This can cause spacers inside the gearbox to be miss-aligned and lock up the gearbox when gears are installed and tightened. 2.8 Remove clutch push rod (to be replaced w/ Champion supplied rod) Note: For hydraulic clutch bikes, obtain Champion Part # RG-100-082, a longer push rod) Snap-On Part No: FWA62121 Snap-On Part No: FWA62121 Champion Part No: RG-100-100 Reverse Gear Installation Instructions Harley-Davidson Six Speed Transmission HD FLH 2009 Up Page 3 of 5 Revision 2 Boring Tool 3 Installation 3.1 Thoroughly clean threads of main and counter shafts using a silicon remover. 3.2 Apply the green thread locking compound (supplied) to main shaft threads and screw the small gear onto the main shaft. Figure 1 3.3 Install the supplied (ear)plug into the main shaft hole. To be removed later. 3.4 Install the supplied special tool to the small gear. Ensure the holes of the special tool align with the holes in the small gear. Figure 2 3.5 Install torque wrench to special tool and torque the small gear to 80 lb. ft. 3.6 Remove torque wrench from special tool. Do not remove special tool from small gear. 3.7 Using the supplied boring tool and the special tool as a guide, drill the main shaft through two holes of the special tool as shown. Stop when cutter contacts bearing race. Figure 3 3.8 Remove special tool, leaving main shaft plug in place, and thoroughly clean out the holes. Use care to ensure debris does not enter transmission. 3.9 Remove plug from main shaft hole. Figure 1 Figure 2 Figure 3 Note: To prevent gears from rotating during torque procedures, engage transmission into 1st gear and apply brakes Note: Frequently stop cutting and remove bit from hole to clean bit and vacuum debris from hole

Incoming search terms:

HARLEY-DAVIDSON 5 Speed Transmissions 1984 – 1999 EVO / 5 Speed & 1999 – 2006 Twin Cam Installation Instructions

0

Filed Under (Harley Davidson) by admin on 26-11-2010

download
Remove Original Parts From Vehicle. 2.1 Obtain a small tube of Loctite® #262 (red) for use later. 2.2 Drain the transmission oil. 2.3 Remove the clutch adjustment cover (left side). 2.4 Remove rear exhaust header pipe (cross over exhaust pipe). 2.5 Remove the muffler support bracket. 2.6 Remove the clutch release cover (right side). 2.7 Remove clutch push rod and oil slinger. To be disassembled and modified later. 2.8 Remove the two nuts from the main (rear) and counter (front) transmission shafts. 2.9 Remove the transmission bearing housing (puller available from Champion Sidecars). To be replaced with new reverse gear transmission bearing housing (Trap Door). 2.10 Cover the exposed gears in the transmission with a cloth in preparation to cut the shifter fork shaft. 3 Install New Main and Countershaft Gears NOTE: Gears and Tapered Split Rings are factory matched sets. Do not mix!. 3.1 Locate the shifter fork rod, mark fork rod flush at transmission case and pull out 1/4″. Figure 1 3.2 Cut the shaft at the mark and push it back in. The shaft end MUST NOT stick out of the transmission case. If the shaft is in deeper, fill the hole with silicone to prevent the shaft from moving in and out. NOTE: Shifter fork is made of non-tempered metal and may be cut with a hacksaw or Dremel® cutting tool. 3.3 Important: Remove stock spacers from main and counter shafts. Spray with silicon remover (Brake-Clean) then, using supplied cleaning pad, clean shafts, new counter and main shaft gears and tapered lock rings (inside and outside) Figure 1 3.4 With motorcycle in neutral, pull both the shafts out and simultaneously push the OEM outermost gears in until seated completely to expose the shoulders of both shafts. The countershaft shoulder should be flush with the gear face. For the main shaft the gear would “hang over” the shoulder a small bit. Figure 2 3.5 Apply supplied Champion Super-Lock retaining compound to the inside and outside surfaces of the large gear tapered split ring, to the inside of the new countershaft gear (large gear) and to the transmission countershaft (the forward most shaft). 3.6 Install new countershaft gear to the transmission countershaft. Insert tapered split ring (tapered end first) into the countershaft gear. Install ring seat tool and spring to counter shaft and new countershaft gear. Torque ring seat tool to 40 ft-lb’s. Figures 3 and 4

Incoming search terms:

2007 Ural Models Gear Up Patrol Tourist Installation Manual

0

Filed Under (Ural) by admin on 02-11-2010

download
Font Brake Control Lever Clutch control lever: When the clutch lever is squeezed, the engine is disengaged from the gearbox. When the lever is released, the engine and gearbox are engaged. WARNING: MAKE SURE FINGERS ARE NOT POSITIONED BETWEEN HAND CONTROL LEVERS AND HANDLEBAR GRIPS OR OPERATION OF VEHICLE COULD BE IMPAIRED . WARNING: B EFORE STARTING ENGINE , ALWAYS SHIFT TRANSMISSION TO NEUTRAL TO PREVENT ACCIDENTAL MOVEMENT WHICH COULD CAUSE POSSIBLE DAMAGE TO MOTORCYCLE AND PERSONAL INJURY . Caution: Always engage the clutch release lever when shifting. Serious internal damage may result to the transmission if the clutch release lever is not engaged. Front brake control lever: When the lever is squeezed, the front wheel brake is actuated. The front brake should be used together with rear brake. When the brake lever is squeezed, the stop signal lights are switched on. 19 Kickstart lever : Designed to start the engine. Upon kicking the lever the crankshaft is actuated through the gearbox. The lever is returned to its initial position by the spring inside the gearbox. Gear shift lever: This is a heal shift type of lever. To shift up from a low gear to a high gear the rear arm(heal shift) is pressed. To shift down from a high gear to a low gear the from arm is depressed. Since the heel-toe shift lever is short-coupled, it is much easier to shift up using the heal shift, and to shift down using the toe shift with the ball of your foot. The neutral gear is between the 1st and 2nd gears. It is important to shift smoothly with a constant force, and not to kick the gear shift pedal. Serious damage may result to the shifting mechanism if the gear shift pedal is kicked, rather than pressed. NOTE: The neutral lamp will illuminate when the transmission is in neutral. (see “Starting the Engine”). Gear Shift Foot Pedal Kick Lever 20 Parking Brake Sidecar Drive Lever Rear Brake Pedal Parking Brake: Used to hold the bike when parked. To engage, press the rear brake pedal, push down and twist the parking brake lever counter clockwise. Sidecar drive engagement lever: Used to engage the drive axle to the sidecar wheel on the Patrol and Gear Up model motorcycles. WARNING: Never engage sidecar drive on concrete or hard surface. Severe damage to drivetrain will result if the sidecar drive is engaged on pavement. Rear brake lever: Actuates the rear brakes on both the motorcycle and sidecar. WARNING: DO NOT APPLY EITHER BRAKE STRONGLY ENOUGH TO LOCK THE WHEELS BECAUSE THIS MAY CAUSE POSSIBLE LOSS OF CONTROL OF THE MOTORCYCLE . ALWAYS USE BOTH BRAKES . NEVER STOP WITH FRONT OR REAR BRAKE ONLY . WARNING: AN IMPROPERLY ADJUSTED REAR BRAKE PEDAL COULD INTERFERE WITH PROPER REAR BRAKE OPERATION RESULTING IN POOR BRAKE ACTION

Incoming search terms:

Moto Guzzi Sport 1100i Owners Manual

0

Filed Under (Moto Guzzi) by admin on 29-11-2010

download
General features Identification data Instruments and controls Riding your motorcycle Break-in Maintenance and adjustments Wheel removal Service schedule Cleaning – Storing Cleaning the windscreen Lubrication Valve gear WEBER injectionignition system (I.A.W.) Electrical equipment Wiring diagram Illustrations Lubrication Pressure fed by gear pump. Oil filters: wire mesh inside sump and replaceable cartridge filter outside sump. Normal lubrication pressure 3.8Ö 4.2 [5] kg/cm2, pressure valve, thermostat and cooler. Low oil pressure sensor (electrical) on crankcase. Generator/Alternator On front of crankshaft (1 4V – 25A). Ignition “WEBER MARELLI” electronic digital induced discharge, with high efficiency coil. Spark plugs: Spark plug gap: 0,7 mm. SPORT 1100 DAYTONA R NGK BPR 6 ESI NGK DR9 E IMS Starting Electric starter (12V-1,2 kW) with solenoid engagement. Ring gear bolted on flywheel. Starter button (START) on right of handlebars. Driveline data Clutch Twin driven plates, dry type, on flywheel. Hand controlled by lever on left of handlebars. Primary drive By gears. Ratio: 1 to 1.3529 (tooth ratio 17/23). Gearbox 5-speed, with constantly meshed gears with front dog clutch. Incorporated cush drive. Pedal operated on the left side of the motorcycle. Gear ratios: Low gear = 1 to 1,812 (tooth ratio 16/29) 2nd gear = 1 to 1,250 (tooth ratio 20/25) 3rd gear = 1 to 1 (tooth ratio 23/23) 4th gear = 1 to 0,833 (tooth ratio 24/20) 5th gear = 1 to 0,730 (tooth ratio 26/19) Ratio: 1:4,125 (tooth ratio 8/33) Overall gear ratios (Engine-wheel): Low gear = 1 to 10,1150 2nd gear = 1 to 6,9761 3rd gear = I to 5,5809 4th gear = 1 to 4,6507 5th gear = 1 to 4,0783 Frame Rectangular section single-beam in NiCrMo steel. Semisupporting engine base. Suspensions Front: White Power upside-down hydraulic telescopic fork with individually adjustable rebound and compression; Rear: steel swing arm with oval cross section. Single shock absorber White Power with separate adjustment of spring preload and of hydraulic rebound and compression damping. Wheels Light alloy castings with 3 hollow spokes (rear wheel with cush drive unit). Rim sizes: – front: 3,50x 17 MT H2 – rear: 4,50×17 MT H2 Tires -front: 120/70 ZR 17 – rear: 160/70 ZR 17 [160/60 ZR 17] Type: Tubeless Front: two Brembo drilled semi-floating disc brakes in stainless steel for SPORT I 100; [two Brembo drilled floating discs, Racing type for DAYTONA RS] with fixed 4 differential piston calipers. Adjustable manual control lever on the right side of the handle-bar; – disc 320 mm;

Incoming search terms:

Incoming search terms: