shovelhead solid lifters diagram

You search Auto repair manual PDF shovelhead solid lifters diagram, if there are search results will appear below. If search results do not exist, please search by others keyword.



  shovelhead solid lifters diagram Direct Download speed 5282 Kb/s

  shovelhead solid lifters diagram Full Version speed 6162 Kb/s



HARLEY DAVIDSON CHROME BILLET LIFTER-COVER KIT REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 25-02-2011

download
Installation with Stock Pushrods Refer to the service manual for your motorcycle model. Installation with Adjustable Pushrods Lifter-Cover Removal Installing or removing the pushrods with the valve train loaded can result in engine damage. On the cylinder being serviced, always set the lifters to the base circle on the cam before servicing pushrods, lifters, rocker arms, and valves. 1. Set the lifters of the rear cylinder to their lowest point, or base circle, on the cam. Refer to Setting the Lifters to the Base Circle in this instruction sheet. 2. See Figure 1. Insert a screwdriver into the slot on the side of the spring-cap retainer on the pushrod cover. 3. Press the spring-cap and retainer down while pulling outward to remove the spring-cap retainer. 4. See Figure 2. Lift the lower pushrod cover to reveal the lower third of the pushrod. 5. If the engine has stock pushrods installed and you are installing adjustable pushrods with this lifter-cover installation, go to step 6. If the engine already has adjustable pushrods installed and you are installing adjustable pushrods with this lifter-cover installation, go to step 7 6. Use a bolt cutter or similar tool to cut the stock pushrod. Avoid cutting the pushrods with a saw, grinder, or other method that may allow metal debris into the engine. Go to step 8. 7. Loosen the jam nut on each adjustable pushrod and resize each rod to its shortest length. 8. Remove the pushrod covers and pushrods from the engine. 9. Remove the O-rings from the seats in the engine at the top and bottom of the pushrod cover. 10. Remove the four screws fastening the lifter cover to the engine to remove the cover and gasket. 11. Remove old lifter-cover gasket material from the engine, taking care not to allow material to fall into the engine. Continue to Lifter-Cover Installation in this I-Sheet. Lifter-Cover Installation 1. See Figure 3. Verify that the lifter anti-rotation pin is in position. Installing or removing the pushrods with the valve train loaded can result in engine damage. On the cylinder being serviced, always set the lifters to the base circle on the cam before servicing pushrods, lifters, rocker arms, and valves. 2. Verify that the cylinder lifters are set to their lowest point, or base circle, on the cam. Refer to Setting the Lifters to the Base Circle in this instruction sheet. 3. Fasten the new lifter-cover gasket and chrome billet lifter cover to the engine using the chrome screws from this kit. In a cross pattern, torque the lifter-cover screws to 90 – 120 in-lbs (10.2 – 13.6 Nm). 4. See Figure 4. Loosen the jam nut on all of the pushrods and adjust the pushrods to their shortest length. NOTE See Figures 4 and 5. Install the narrow-band pushrods in the cylinder-intake location. Install the wide-band pushrods in the cylinder-exhaust location. 5. Assemble the O-rings (purchased separately) and pushrod covers. 6. Install the pushrods with the pushrod covers. The adjustment-end of the pushrod must be on the lifter

Incoming search terms:

HARLEY-DAVIDSON Sportster Solid Axle Suspension Owner's Maintenance Notes

0

Filed Under (Harley Davidson) by admin on 16-02-2011

download
1. Tire Pressure and Rotation : Keep the nominal tire pressure at about 24-26psig. It is not necessary to periodically rotate the trike tires unless you experience unusual tire wear. 2. Bearing Lubrication . Your Swing Arm, external differential, and axle bearings are sealed and do not require greasing. However, should you experience unusual differential or axle bearing noise you should take your trike to a Champion Trike Dealer or to your motorcycle mechanic for a checkup. 3. Body Lubrication . There are no grease fittings on the trike body and no required body lubrication points. 4. Differential lubrication . Your differential is a sealed unit and comes filled with high-pressure grease. No maintenance is required. 5. Brakes . Check your brake system fluid level every 3,000 miles and top-off as necessary. Inspect rear disc brake pads every 10,000 miles and replace as necessary. Pads are Volkswagen Part # D101P. 6. Drive Train . Inspect your drive belt as recommended in your motorcycle Owner’s Manual. When properly tensioned after the trike conversion, the belt should “deflect” approximately ¾”-1″ with a new belt or 1″ to 1-1/2″ with a used belt of total vertical movement. Do not use commercial belt dressing compounds on the belt except for Harley Davidson Poly-Oil, PN 99860- 81. These compounds are designed for friction, not toothed, belts and can collect dirt and sand. 7. Suspension System. The suspension is a “Zero Flex” solid axle with high performance adjustable pre-load coilover shocks. The suspension system is designed to give you the best ride with a load of no more than 400 pounds. 8. EZ-Steer (rake kit) : If your trike is equipped with Champion’s EZ-Steer, the bearings are a wear item. You should follow your motorcycle manufacturer’s recommended front-end triple-tree maintenance requirements. Generally these call for an initial service at 1,000 miles followed by periodic maintenance at 10,000 mile intervals

Incoming search terms:

1992 Toyota Cressida Vehicle Wiring Chart and Diagram

0

Filed Under (Toyota Manuals) by admin on 18-06-2011

Download
Listed below is the vehicle specific wiring diagram for your car alarm, remote
starter or keyless entry installation into your 1992 Toyota Cressida . This
information outlines the wires location, color and polarity to help you identify the
proper connection spots in the vehicle. Please be sure to test all of your wires
with a digital multimeter before making any connections. More information on
using a multimeter and testing wires please see our Technical Support Area.

Incoming search terms:

Harley-Davidson Camshaft TC, EVO, Shovelhead, XL EVO, Iron Head, XR Specifications

0

Filed Under (Harley Davidson) by admin on 02-11-2010

download
EVO Black Widow PP8833-2 – 29 55 62 25 264 267 54 103 109 105.8 0.600 0.602 EVO Black Widow PP8826-2 – 27 61 63 29 268 272 56 107 107 107.0 0.602 0.602 EVO Black Widow PP8817-2 – 254 254 0.590 0.590 EVO Carl’s Speed Shop CM4 – 28 44 52 20 252 252 48 98 106 102.0 0.495 0.495 EVO Carl’s Speed Shop CM495F Y 19 47 50 16 246 246 35 104 107 105.5 0.495 0.495 0.179 0.168 EVO Carl’s Speed Shop CM580 – 19 47 50 16 246 246 35 104 107 105.5 0.580 0.580 0.194 0.163 EVO Carl’s Speed Shop CM612 – 36 60 68 28 276 276 64 102 110 106.0 0.612 0.612 0.277 0.235 88 EVO Carl’s Speed Shop CM660 – 38 62 68 28 280 276 66 102 110 106.0 0.660 0.660 0.314 0.277 90 EVO Carl’s Speed Shop CM774 – 284 284 0.784 0.784 0.277 0.236 EVO Carl’s Speed Shop CM780F – 34 70 74 30 284 284 64 108 112 110.0 0.774 0.774 103 EVO Crane EVR0020 – 31 64.5 77 23 275 280 54 107 117 112.0 0.608 0.589 88 EVO Crane Fireball 2000 Y -12 22 20 -10 190 190 -22 107 105 106.0 0.490 0.490 0.026 0.032 EVO Crane Fireball 300 Y 12 34 41 15 226 236 27 101 103 102.0 0.490 0.490 4000 EVO Crane Fireball 310 Y 16 40 43 19 236 242 35 102 102 102.0 0.490 0.490 1500 4500 75 EVO Crane Fireball 316 Y 19 43 48 24 242 252 43 102 102 102.0 0.490 0.490 2000 5000 80 EVO Crane Fireball 326 – 24 48 57 25 252 262 49 102 106 104.0 0.490 0.500 2500 5500 EVO Crane H286 Y 19 43 48 24 242 252 43 102 102 102.0 0.490 0.490 2000 5000 80 EVO Crane H290 – 17 43 45 23 240 248 40 103 101 102.0 0.581 0.581 1800 5200 EVO Crane H296 – 24 48 57 25 252 262 49 102 106 104.0 0.490 0.500 2500 5500 EVO Crane H304 – 24 50 55 25 254 260 49 103 105 104.0 0.600 0.600 2500 5800 EVO Crane H306 – 28 54 69 23 262 272 51 103 113 108.0 0.500 0.510 0.224 0.195 3000 6000 EVO Crane H310 – 23 63 68 28 266 276 51 110 110 110.0 0.550 0.550 0.229 0.229 3000 6500 88 EVO Crane H314 – 26 54 65 21 260 266 47 104 112 108.0 0.600 0.600 2800 6000 EVO Crane HEV0042 – 27 59 71 23 266 274 50 106 114 110.0 0.600 0.576 0.226 0.194 3000 6000 100 116 EVO Crane HEV0067 – 24 50 56 24 254 260 48 103 106 104.5 0.600 0.530 0.128 0.113 EVO Crane HEV0098 – 36 62 72 34 278 286 70 103 109 106.0 0.650 0.650 0.171 0.156 96 EVO CycleRama CR-E550 – 24 52 53 23 256 256 47 104 105 104.5 0.550 0.530 EVO CycleRama CR-E581 – 22 46 53 23 248 256 45 102 105 103.5 0.581 0.550 EVO CycleRama CR-E600A – 24 50 56 24 254 260 48 103 106 104.5 0.600 0.530 EVO CycleRama CR-E600B – 23 51 54 22 254 256 45 104 106 105.0 0.600 0.550 EVO CycleRama CR-E617 – 22 50 50 22 252 252 44 104 104 104.0 0.617 0.617 EVO CycleRama CR-E630 – 18 60 63 13 258 256 31 111 115 113.0 0.630 0.630 EVO CycleRama CR-E660 – 27 59 71 23 266 274 50 106 114 110.0 0.660 0.660 3500 6500 140 EVO Dave Mackie DM500 Y 22 38 52 12 240 244 34 98 110 104.0 0.500 0.500 0.189 0.138 EVO Dave Mackie DM500X Y 25 40 55 20 245 255 45 98 108 102.5 0.500 0.500 0.208 0.178 EVO Dave Mackie DM530 – 28 42 55 15 250 250 43 97 110 103.5 0.530 0.530 0.221 0.141 EVO Dave Mackie DM580 – 26 42 56 12 248 248 38 98 112 105.0 0.580 0.580 0.227 0.144 113 EVO Dave Mackie DM581 – 26 42 56 12 248 248 38 98 112 105.0 0.580 0.580 0.227 0.144 EVO Dave Mackie DM595 – 21 49 57 14 250 251 35 104 112 107.8 0.595 0.595 0.192 0.150 EVO Dave Mackie DM635 – 20 56 59 18 256 257 38 108 111 109.3 0.635 0.635 0.194 0.176 EVO Edlebrock 1740 Y 19 43 48 24 242 252 43 102 102 102.0 0.490 0.490 0.176 0.203 EVO Edlebrock 1741 – 20 46 52 22 246 254 42 103 105 104.0 0.600 0.600 0.183 0.187 EVO Head Quarters HQ-23 – 19 47 52 24 246 256 43 104 104 104.0 0.600 0.530 EVO Head Quarters HQ-24 Y 20 36 52 19 236 251 39 98 107 102.3 0.500 0.500 EVO Head Quarters HQ-25 – 18 38 42 14 236 236 32 100 104 102.0 0.550 0.550 EVO Head Quarters HQ-26 – 20 54 53 22 254 255 42 107 106 106.3 0.600 0.530 89 EVO Head Quarters HQ-27 – 26 60 70 24 266 274 50 107 113 110.0 0.650 0.575

Incoming search terms:

HARLEY-DAVIDSON 1340cc SHOVELHEAD INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 29-02-2012

download
Each cylinder should be deburred on top and generously chamfered on bottom for ease of piston and ring installation. Finish hone with a 280-400 grit hone. A good cross hatch finishing pattern is important for best results. CAUTION: Wash cylinder assembly with soap and water, then swab with new # 10 oil on a clean rag until all tendency of rag discolor is gone. Washing in solvent will not remove the abrasive from finished cylinder walls

Incoming search terms:

Honda Goldwing GL1800 Solid Rear Axle Trike Conversion Installation Manual

0

Filed Under (Honda) by admin on 16-02-2011

download
Specifications Overall Width: 57.75″ Overall Length: 108″ Overall Length w/EZ-Steer 109.5 Wheel Base: 71″ Extended 4.5″ At Rear Axel Wheel Base w/EZ Steer 72.5″ Load Capacity: 500 Lb Tire Size: 205 / 70 / R15 Wheel Size (15″) Offset +35 mm 15x7JJ 4×4.5 Tire Pressure 20 PSI Suspension: “Zero-Flex” Internal Swing Arm utilizing 3 shocks, OEM shock absorber plus 2 coil over shock absorbers. Rear Differential: Champion Lightweight rear axle / differential assembly. Gear Ratio 2.93:1 gear ratio Brakes: Original front plus 2 high performance disc brakes at rear. Storage Capacity: 6.75 cubic feet. 3 full-face helmets and additional storage. Trike Conversion Installation Kit Honda Goldwing GL1800 Champion Trikes Page 7 of 28 Revision 10 4 Removal of Original Parts Most tasks necessary in this guide can be accomplished with the vehicle on its center stand. Secure the center stand to one of the forward crash bars with a ratchet strap to keep vehicle from rolling forward and off the center stand. Be sure that the vehicle is laterally stable as well. Remove the following from the vehicle. See OEM manual for detailed instructions. Items to be retained for return of deposit or re-installation after modification shall be duly noted. • Seat (to be re-installed without modification) • Left and right side covers (to be re-installed without modification) • Battery and battery box (to be re-installed without modification) • Left and right saddle bags • Remove taillight and locking assemblies from saddlebags (to be returned for refund of deposit) • Trunk (to be re-installed without modification) • Left and right passenger foot rests (to be re-installed without modification) • Left and right foot rest under covers (to be modified and re-installed) • Left and right rear crash bars • Saddle bag trunk stay (to be modified and re-installed) • Left and right mufflers (Mufflers only, do not remove decorative covers) • Rear wheel • Left and right pivot bolt covers (to be re-installed without modification) • Reverse resistor (to be relocated) • Swing Arm – Note : Carry out brake system modifications (Section 5) prior to removing Swing Arm. • Note : Upper bolt of mono shock can be removed without removing the fuel tank. • Note : Do not remove actuator hose from actuator pump or shock absorber. Dismounting shock actuator pump will allow more movement of shock absorber when removing swing arm.Trike Conversion Installation Kit Honda Goldwing GL1800 Champion Trikes Page 8 of 28 Revision 10 5 Brake System Modification Note : Modification to the vehicle brake system should be carried out prior to removal of the swing arm. From the manufacturer, your Honda Gold Wing brake system utilizes both front and rear brakes when the foot brake is applied. In order to insure safe operation of your Gold Wing when converted to a Champion Sidecars Trike, the brake system must be modified to isolate the front and rear brake systems from each other. Once modification is complete, four of the six pistons in the front calipers operate only when the hand brake lever is applied. The rear brakes operate only when the foot brake pedal is applied. The diagrams below outline the difference between the GL1800 OEM brake system and the system as modified by the Champion Sidecars Trike Conversion Kit.

Incoming search terms:

Victory LED Brake Light Module Installation

0

Filed Under (Victory) by admin on 31-10-2010

download
Brake Module Installation: Locate the Auto Cancel Module (ACM) under the seat on the right side of the battery box area. Select a suitable location to mount this product near the ACM module. Disconnect negative terminal on battery before installation.. Do not attached attach the product at this time. Setup: Set dip switches according to the chart below. Switch Settings: 1 2 3 4 Result OFF OFF OFF OFF 3 Flashes-Solid-Repeat ON OFF OFF OFF 3 Strobes-Solid-Repeat OFF ON OFF OFF 3 Strobes -Solid ON ON OFF OFF 3 Flashes – Solid OFF OFF ON OFF Variable Flash Rate – Use Pot to adjust flash rate Route and connect the wires as follows: Refer to block diagram on page 2. Locate the White with Pink Tracer wire leading into the ACM module. Cut this wire approximately 2-3 inches from the ACM module. A: Red: Input: Connect this wire to the cut White/Pink wire leading away from the ACM module using supplied posi-tap. (See enclosed instructions for Posi-Tap) B: Yellow: Output: Connect this wire to the cut White/Pink leading into the ACM module using supplied posi-tap. C: Black: Ground: Connect this wire to a good bare metal contact or negative terminal of battery using supplied terminal ring, crimp terminal ring onto black wire, heat terminal ring to form with heat gun or hair dryer until heat shrink, shrinks. Attach the unit to your vehicle using supplied 3M tape or tie wraps. Reconnect negative terminal to battery. Operation: Apply power and check that LED(s) operate correctly in both running light and brake light mode. Caution! This product is designed for use on DC motorcycle applications with negative ground only! This product is not recommended or approved for any other application. Warning! This product is intended to drive high output LEDs ONLY. Do not connect this product’s output to any other type lamp. Maximum output current is 2 amps. Overloading, improper use or improper operation of this product will void the warranty and many damage the product. Warning! Consult your owners’ manual or the vehicle manufacture before installing this or any other electronic product

Incoming search terms:

AIR / HYDRAULIC MOTORCYCLE LIFT REMOVABLE INSPECTION PLATE

0

Filed Under (Tips and Review) by admin on 19-11-2010

download
For best service, you should incorporate an oiler, regulator, and inline filter, as shown in the diagram on the next page. Hoses, couplers, oilers, regulators, and filters are all available at Harbor Freight Tools. NOTE: If an automatic oiler is not used, put 3-5 drops of pneumatic Tool Oil (not included) in the Motorcycle Lift’s Quick Coupler (38A) before each use. (See Figure B, next page.) To Check The Level Of Hydraulic Oil: 1. The Motorcycle Lift already contains some hydraulic oil in its Hydraulic Pump Reservoir (32P). Even so, it is recommended that you check the oil level in the Reservoir and, if necessary, top off the Reservoir with the proper amount of 15/40 hydraulic oil (not included). (See Assy. Diagram, page 15.) 2. Make sure to screw the two Adjusting Screws clockwise enough to lift the two Caster Wheels (14) off the floor so as to provide stability for the Motorcycle Lift. (See Figure A.) 3. To check the level of hydraulic oil, remove the Sliding Plate (36) from the Platform (35) to expose the Hydraulic Pump Reservoir (32P). (See Assy. Diagrams, pages 13 and 15.) 4. Remove the rubber Filler Plug (33P) located on the top of the Reservoir (32P). If necessary, top off the Reservoir with hydraulic oil. (See Assy. Diagram, page 15.) 5. Connect the air compressor’s hose to the to the Air Motor assembly. Then turn on the air compressor and set its regulator at 120 PSI. (See Assy. Diagram, page 14.) 5. Insert the Lift Foot Pedal (11) onto the Pump Piston Spindle (9), and slowly pump the Lift Foot Pedal until a slight amount of hydraulic oil begins to leak out of the Reservoir (32P). Discontinue pumping the Lift Foot Pedal. Then, replace the Filler Plug (33P) on the top of the Reservoir. (See Assy. Diagram, page 15.) REGULATOR OILER FILTER TO QUICK COUPLER (38A) OF MOTORCYCLE LIFT FIGURE B 6. Insert the Release Foot Pedal (10) onto the Release Valve Spindle (5). Pump the Lift Foot Pedal (11) until the Platform (35) of the Motorcycle Lift reaches its maximum height. Then press down slightly on the Release Foot Pedal until the Platform is fully collapsed to the floor. Repeat this procedure several times to ensure the Motorcycle Lift is operating properly. (See Figure E, page 10.)

Incoming search terms:

YAMAHA FZR 400 ELECTRICAL CIRCUIT DIAGRAM

0

Filed Under (Yamaha) by admin on 29-11-2010

download
CHECKING OF SWITCHES Check the switches for the continuity between the terminals to determine correct connection. Read the following for switch inspection. SWITCH CONNECTION AS SHOWN IN MANUAL The manual contains a connection chart as shown left showing the terminal connections of the switches (e.g., main switch, handlebar switch, brake switch, lighting switch, etc.) The extreme left column indicates the switch positions and the top line indicates the colors of leads connected with the terminals in the switch component. “C’&-0″ indicates the terminals between which there is a continuity of electricity; i.e., a cl.osed circuit at the respective switch positions. In this chart: “R and Br” and “L/W and L/R” are continuous with the “ON” switch position. “B and B/W” is continuous with the “OFF” switch position. “B and B/W” is continuous with the “LOCK” switch position. “B and B/W” and “R and L/R” are continuous with the “P” switch position. CHECKING SWITCH FOR TERMINAL CONNECTION Before checking the switch, refer to the connection chart as shown above and check for the correct terminal connection (closed circuit) by the color combination. To explain how to check the switch, the main switch is taken for example in the following

Incoming search terms:

HONDA GL1100 AM/FM RADIO INSTALLATION MANUAL/ WIRING DIAGRAM

0

Filed Under (Honda) by admin on 22-04-2011

download
INSTALLATION ■ Outline Procedures This section gives general information needed for mounting the individual radio components on and in the fairing. A) Fairing 1) Install radio on fairing before mounting fairing on motorcycle. (Remove fairing from your motorcycle when already mounted). 2) Remove fairing parts. 3) Drill unit mount holes. 4) Install six wire clips. 5) Install windshield on fairing before install- ing speakers. 6) Install radio indicator I on indicator panel II , then install indicator panel on fairing. 7) Install speakers III. 8) Install nutplate IV. 9) Install Power Amplifier in fairing. 10) Install radio funer VI. 11) Install the radio controller VII. 12) Install controller base panel VIII 13) Install radio switch sub-wire. 14) Connect adapter harness and wires inside fairing by working through left turn signal lens hole. B) Motorcycle frame and handlebar 1) Remove travel trunk and seat. Unscrew four shelter bolts (M6, one on each side at front and rear) to route antenna feeder. 2) Install antenna mount and antenna IX. 3) Route antenna feeder along the frame tube. 4) Install radio switch X on left handlebar lever bracket and route the wires. 3 of 11 Page 4 C) Fairing instllation 1) Install fairing on motorcycle. 2) Connect motorcycle wire harness 9-P coupler to fairing wire 9-P coupler. 3) Connect radio switch wire to switch sub- wire.4) Connect antenna feeder. 5) Confirm that radio operates properly. Reinstall parts removed in step 2 or (A) and in step 1 of (B). REWORKING ■ Remove Fairing and Fairing Parts (Fig.10) 1) Install radio on fairing before mounting fairing on motorcycle. (Remove fairing from your motorcycle when already mounted). 2) Remove right and left fairing pockets, right and left turn signal lenses, right and left nutplates, left hole cover and indi- cator base panel from fairing. (Fig.10) Fig. 10 LEI-1 NU I PLATE 4 of 11■ Reworking on Fairing — Speaker mounting holes- 1) Remove 18 mm grommet. 2) Lightly roll template so that it will follow contour of fairing snugly. 3) Position template on fairing with its upper and outer edges aligned with those offairing as indicated by arrows. 4) Attach template to fairing using adhesive tape where shown. 5) Punch mark centers of four holes with a
drift and hammer. 6) Drill 6 mm holes through marked centers. To obtain a more balanced response with richer, deeper bases, drill two 50 mm holes in the fairing so as to link the speaker box with the inside of the fairing. Fig. 11-1
—Power amplifier mounting holes- 7) Drill two 5.5 mm holes through concaves in fairing. Fig. 11-2 RIGHT HAND SHOWN, LEFT SIMILAR ADHESIVE TAPE

Incoming search terms:

Incoming search terms: