step by step carburetor replacement fourtrax

You search Auto repair manual PDF step by step carburetor replacement fourtrax, if there are search results will appear below. If search results do not exist, please search by others keyword.



  step by step carburetor replacement fourtrax Direct Download speed 5282 Kb/s

  step by step carburetor replacement fourtrax Full Version speed 6162 Kb/s



HONDA ATV Carburetor Repair Kits Installation

0

Filed Under (Honda) by admin on 21-12-2011

download
ATV Carburetor Repair Kits Complete kits to rebuild one OEM carburetor. Each kit contains necessary gaskets/o-rings, needle valve or needle valve set, and jets. Made in Japan. Note: Check all parts before installation. Honda Model Year Order No AT C70 78-85 025-001 AT C90 70-71 025-003 ATC90K1/K2/K3 72-75 025-003 AT C90 76-78 025-003 TRX90 Fourtrax 90 93-98 025-084 ATC110 79-83 025-005 ATC110 84-85 025-061 ATC125M 84-85 025-062 TRX125 Fourtrax 85-86 025-050 TRX125 Fourtrax 87-88 025-063 ATC185 1980 025-009 ATC185S 81-83 025-009 AT C200 81-82 025-008 AT C200 1983 025-009 ATC200E Big Red 82-83 025-064 ATC200ES Big Red 1984 025-064 AT C200M 84-85 025-064 AT C200S 84-86 025-065 AT C200X 83-85 025-012 AT C200X 86-87 025-014 TRX200 Fourtrax 200 90-91 025-066 TRX200D Fourtrax 200 Type II 1991 025-066 TRX200D Fourtrax 200 Type II 92-93 025-067 TRX200D Fourtrax 200 Type II 94-97 025-068 TRX200SX Fourtrax 87-88 025-069 ATC250R 81-82 025-017 ATC250R 83-84 025-018 AT C250R 1985 025-019 ATC250ES Big Red 85-87 025-029 AT C250SX 1985 025-070 TRX250 Fourtrax 250 1985 025-071 TRX250 Fourtrax 250 86-87 025-072 TRX250EX Sportrax 250EX 01-04 025-085 TRX250R Fourtrax 250R 86-87 025-060 TRX250R Fourtrax 250R 1988 025-073 TRX250X 91-92 025-074 TRX300 Fourtrax 300 1988 025-075 TRX300 Fourtrax 300 91-92 025-076 TRX300 Fourtrax 300 93-95 025-078 Honda Model Year Order No TRX300EX Fourtrax 300EX 93-98 025-081 TRX300FW Fourtrax 300 4×4 1988 025-075 TRX300FW Fourtrax 300 4×4 91-92 025-076 TRX300FW Fourtrax 300 4×4 93-95 025-078 AT C350X 1985 025-035 TRX350 Fourtrax 4×4 86-87 025-079 TRX350FE Fourtrax Rancher 4×4 ES 00-03 025-082 TRX350FM Fourtrax Rancher 4×4 00-03 025-082 TRX350TE Fourtrax Rancher ES 00-03 025-082 TRX350TM Fourtrax Rancher 00-03 025-082 TRX350D Fourtrax Foreman 4×4 87-89 025-079 TRX400FW Fourtrax Foreman 95-00 025-080 TRX450ES Fourtrax Foreman ES 98-01 025-083 TRX450FE Fourtrax Foreman ES 02-03 025-083 TRX450FM Fourtrax Foreman S 02-03 025-083 TRX450S Fourtrax Foreman S 98-01 025-083 TRX500FAFourtrax Rubicon 01-04 025-086

Incoming search terms:

Harley-Davidson Electronic Ignition Module Installation instructions

0

Filed Under (Harley Davidson) by admin on 23-04-2012

download
Step 1: Switch main dashboard switch to “off” position (Ignition& light switch) Step 2: Disconnect negative (ground) cable from the Battery Step 3: Remove the Condenser and Breaker points from the circuit breaker timing base. Step 4: Disconnect advance/ retard cable from timing base Step 5: Remove timing base from timer shaft and housing (see your manual for instructions) Step 6: Remove circuit breaker wire stud or circuit breaker to coil wire assembly from timing base Step 7: Remove circuit breaker wire from Ignition coil, and mark terminal on coil with piece of tape. Step 8: Install the Electronic Ignition Module on the timing base. Mount this short black wire to one on the timer base screws by keeping some slack in this wire so the timing base can turn free. Solder the flag terminal to this short black wire and mount it under the timer to motor bolt. This way of mounting provides a much better grounding. Do NOT use the screws (number 1 or 2 screws from picture below) from the timing base!!!! Step 9: Now three wires pass this hole via the rubber grommet. Figure 1 Figure 2 Step 10: Reinstall the timer base on the timer shaft housing, and keep some slack in the wires before protruding the hole in the timer shaft housing, and secure with ground spring and cover retainer. Reconnect the advance/retard cable to the timer base. Step 11: Route the two long wires to the ignition coil. Check in the HD service manual for a proper route to the ignition coil. (Keep away from hot surfaces like exhaust systems). Cut the wires to the exact length necessary for mounting. Step 12: Determine the exact length of the wire loom. Keep in mind that one end of the loom enters the timer shaft housing by 1cm. Cut the loom to the proper length. Step 13: Insert both wires in the loom. Strip both wire ends and solder the two flag terminals on the wires. Step 14: Connect the red wire to the ignition coil, on the terminal where the 6 or 12 volt is supplied to. This terminal has at minimum one wire connected which runs to the main switch. Step 15: Connect the black wire to the ignition coil on the terminal which is empty, and has piece of tape on it. (Old place where the circuit breaker wire was connected to) Step 16: Install the trigger rotor on the timer shaft cam, and tighten the hex screw by using the hex key tool. Do not over tighten the screw! Step 17: Check for clearance between trigger rotor and Electronic Ignition Module. Appropriate clearance is between 0,5mm and 1,5mm . Minor adjustments can be made by unlocking the two screws and slightly shift/move the Electronic Ignition Module. Check if the rotor moves free. Timing instructions: Remove the spark plugs from the engine, but keep them connected to the spark coil cables and engine ground. This enables normal operation of the spark, and prevents unwanted engine firing on compression stroke. See service manual or handbook for timing instructions of your model Step 18: Reconnect the negative (ground) cable to the battery. Step 19: Switch main power to “on” position. The red light in the Electronic Ignition Module might already light up. If not, turn the kick starter slowly. The red light is on while charging (closed points)the Ignition coil, facing solid metal of the trigger rotor. The light goes off (open points) when the end of the solid surface of the trigger rotor passes the centre of the Electronic Ignition Module. At that point a spark is generated by the coil

Incoming search terms:

kawasakI 9400 hyPercharger kIt INSTALLATION MANUAL

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
steP 1 Remove the seat. steP 2 Remove the bottom of the three dash plaque bolts (8mm). steP 3 Lift up on the dash panel and unscrew the speedometer cable (knurled nut). steP 4 Unplug the three electrical connections. steP 5 With a 12mm socket, remove the tank-mounting bolt under the dash and at the rear of the tank. steP 6 Close the fuel valve and clamp off the fuel line. Disconnect the line from the fuel valve. steP 7 Raise the rear of the tank, and disconnect the two vent hoses, and remove the tank. steP 8 Refer to the section of your factory service manual that deals with removal and installation of the following components. • Remove the two round chrome “air cleaner covers”, their backing plates, the stock black plastic air box (air inlet under tank), and the crossover tube. • Remove the intake manifold to remove and crossover tube. Use extreme care when replacing the intake manifold. Uneven torque, damage to the intake gaskets, or contamination can cause an intake leak that will result in very poor running, and nearly impossible jetting!! • Unplug all hoses or lines from these components. You may want to label these hoses at this time. The Largest of these hoses (3/4″ I.D.) is for the fresh air injection system; the second largest (3/8″ I.D.) is the crankcase breather. The smallest of the hoses is a drain. steP 9 Remove the brackets that held each round backing plate. The right hand bracket is also a carb stabilizer. This function is duplicated with one of the included brackets. steP 10 Remove the carburetor according to the section in your factory service manual that outlines procedures for carburetor removal, disassembly, reassembly and installation. We recommend that you label each hose or fitting as they are removed to make reassembly easier. An example of hose labeling is shown in PIC. 1. carburetor re-jettIng Procedure note Different combinations of aftermarket exhaust and air cleaners will have a significant impact on carburetor jetting. The supplied jetting components have been tested and found to be a good combination to produce drivability and performance with stock or free flowing, muffled/baffled exhaust pipes. We highly recommend NOT using drag pipes (open style). Using drag pipes in conjunction with our air cleaner will require additional jetting above and beyond the components included in this kit. a) Consult your factory service manual for details of this procedure. We have supplied jets to cover many common configurations. Remove the four Phillips head screws securing the plastic carb top to the carb body. Carefully remove the plastic carb top making sure not to damage the rubber diaphragm.

HSR Carburetor Total Kits Installation Instructions

0

Filed Under (Mikuni) by admin on 31-10-2010

download
Intake Manifold: 1. Install MAP sensor in Mikuni manifold (Twin Cam only). 2. Attach the Mikuni manifold to the engine. Align the manifold before tightening the bolts. The flange surface of the Mikuni manifold should be parallel with the front of the engine’s cam cover. Use a level or angle meter to check this. Tighten the manifold bolts. 3. Attach the rubber flange to the Mikuni manifold with the furnished 5/16″x3/4″ bolts and washers. Choke Cables: Mikuni & Harley-Davidson Route the cable with largest radius bends possible. Check the cable for free-play after installation. If there is no free-play, the engine may run rich and deliver poor performance or low fuel mileage. Harley Cable (Twin Cam Kits: 42-19, 45-4) : 1. Remove the Harley choke cable from the stock carb. 2. Remove the spring and plunger from the cable. 3. Remove the spring and plunger from the Mikuni. 5. Install the Mikuni spring and plunger onto the Harley choke cable. Change nothing else; be sure to use the Harley plastic nut, not the Mikuni nut (See Figure 1). Total Kit Installation Instructions The HSR series carburetors are precise yet durable instruments; however, like any other piece of fine equipment, they require correct installation and reasonable care to assure optimum performance and long life. Extra time spent during installation will pay off in both short and long term performance and reliability. This Mikuni HSR carburetor kit is designed to be a bolt-on application, and as such, is set-up and jetted properly for most applications. However, since Harley-Davidson motors are often highly modified, alternate tuning settings may be required. The Mikuni Tuning Manual helps make jetting alterations and adjustments an easy matter. NOTE: Carburetor Kits not designated as C.A.R.B. exempt, are not legal for motor vehicles operated on public highways in the state of California, or in any other states and countries where similar laws apply. WARNING NOTE: NOTE: WARNING CAUTION NOTE: NOTE: TK-2 6. Install the new assembly into the Mikuni carburetor. Be careful to only gently tighten the plastic nut. 7. Loosen the knurled plastic friction nut behind the choke knob and check for free-play (see Figure 2). Figure 1: Harley nut with Mikuni spring & plunger Figure 2: Choke cable adjustments Mikuni Cable (Evo Kits: 42-8, 45-2 & 45-3) : 1. Remove nut, spring and plunger from the Mikuni. 2. Install the nut, spring and plunger onto the cable. 3. Install the assembly into the Mikuni HSR carburetor. Be careful to only gently tighten the plastic nut. 4. Check for free-play. Adjust the cable as necessary. An optional choke cable mounting bracket is included in the Evo kits for custom installations. Carburetor Installation: 1. Insert the carb fully into the rubber flange, align with engine and tighten the clamp. 2. Slip the fuel hose onto the carburetor’s fuel fitting and secure with the enclosed hose clamp. NOTE: Some Twin Cam installations may require removal of a small amount of fin material from the cylinders to clear the float bowl. Throttle Cables The HSR carburetor uses stock 1990 and later Harley- Davidson cables. However, if your Harley is fitted with some other carburetor, you may need to purchase a set of cables. See your dealer for the correct cable set. 1. Route the throttle cables with large radius curves and so they do not interfere with other components. 2. Screw the cable adjusters together to make them as short as possible. 3. Connect the “close” cable first (see Figure 3). 4. Install the “open” cable next (see Figure 3). 5. Adjust the opening cable until the slide can be opened fully. Snug the adjuster lock nut. 6. Turn the handlebar to the right and adjust the throttle free-play with the closing cable adjuster to approximately 1/8″ (see Figure 4)

Incoming search terms:

KTM 60 SX / 65 SX REPAIR MANUAL ENGINE

0

Filed Under (KTM) by admin on 12-11-2010

download
Carburetor adjustment Basic information about the original carburetor setting The original carburetor setting was adapted for an altitude of approx. 500 meters (1600 ft.) above sea level, and the ambient temperature of approx. 20°C (68°F), mainly for off-road use and central European premium-grade fuel (ROZ 95). Mixing ratio 2-stroke motor oil : super fuel 1:40 . Basic information of changing the carburetor setting Always start out from the original carburetor setting. Essential requirements are a clean air filter system, air-tight exhaust system and an intact carburetor. Experience has shown that adjusting the main jet, the idling jet and the jet needle is sufficient and that changes of other parts of the carburetor will not greatly affect engine performance. RULE OF THUMB: high altitude or high temperatures  choose leaner carburetor adjustment low altitude or low temperatures  choose richer carburetor adjustment * WARNING * -ONLYUSE PREMIUM – GRADE GASOLINE ROZ 95 MIXED WITH HIGH – GRADE TWO – STROKE ENGINE OIL . OTHER TYPES OF GASOLINE CAN CAUSE ENGINE FAILURE , AND USE OF SAME WILL VOID YOUR WARRANTY . -ONLYUSE HIGH – GRADE 2- STROKE ENGINE OIL OF KNOWN BRANDS ( I . E .SHELL ADVANCE RACING X). -NOTENOUGH OIL OR LOW – GRADE OILCAN CAUSE EROSION OF THE PISTON . USING TOO MUCH OIL , THE ENGINE CAN START SMOKING AND FOUL THE SPARKPLUG . -INTHE CASE OFA LEANER ADJUSTMENT OF THE CARBURETOR PROCEED CAUTIOUSLY . ALWAYSREDUCETHEJETSIZEINSTEPSOFONENUMBERTOAVOID OVERHEATING AND PISTON SEIZURE . NOTE: If despite a changed adjustment the engine does not run properly, look for mechanical faults and check the ignition system. Basic information on carburetor wear As a result of engine vibrations, throttle valve, jet needle, and needle jet are subjected to increased wear. This wear may cause carburetor malfunction (e.g., overly rich mixture). Therefore, these parts should be replaced after 1000 hours of using. Idling range – A Operation with closed throttle valve. This range is influenced by the idle adjusting screw 1 . Only make adjustments when the engine is hot. The idling speed can be changed by turning the idle adjusting screw. Turning it clockwise produces a higher idling speed and turning the screw counterclockwise produces a lower idling speed. Opening up – B Engine behavior when the throttle opens. The idle jet and the shape of the throttle valve influences this range. If, despite good idling-speed and part-throttle setting, the engine sputters and smokes when the throttle is fully opened and develops its full power not smoothly but suddenly at high engine speeds, the mixture to the carburetor will be too rich, the fuel level too high or the float needle is leaking. Part-throttle range – C Operation with partly open throttle valve. This range is only influenced by the jet needle (shape and position). The optimum part-throttle setting is controlled by the idling setting in the lower range and by the main jet in the upper range. If the engine runs on a four-stroke cycle or with reduced power when it is accelerated with the throttle partly open, the jet needle must be lowered by one notch. If then the engine pings, especially when accelerating under full power at maximum engine revs, the jet needle should be raised. If these faults should occur at the lower end of the part throttle range at a four-stroke running, make the idling range leaner; if the engine pings, adjust the idling range richer

Incoming search terms:

TRIUMPH 750 BIG BORE CYLINDER AND PISTON SET FOR 650 TWINS INSTALLATION

0

Filed Under (Triumph) by admin on 29-10-2010

download
Step 1. Unpack your big bore kit and inspect the contents. There should be the following: 1. Cylinder x l 2. piston with wristpin x 2 3. Hepolite piston ring set x l 4. Special big bore head gasket Step 2. Thoroughly wash the cylinder bores with soap and water. Do not use solvent! Dry bores with air or a lint free towel and let completely air dry. This step is most important and will greatly extend the life of the pistons. Step 3. Following the procedure outlined in your service manual, drain the fuel tank, remove the exhaust system, fuel tank and carburetors. Have a catch basin handy to capture any fuel that may spill from the carburetors, as fuel is highly flammable and can be ignited by a dryer pilot light etc. from a long distance. Clean up any spilled fuel immediately and dispose of away from any source of ignition. Store the fuel tank in a well vented area, outdoors is best, in the event your fuel taps should leak. Step 4. Remove the rocker boxes by slacking the 9 head bolts a little at a time in a star pattern. Remove the 6 nuts at the front and back of the head. Remove the 4 corner rocker box bolts. Remove the head bolts and rocker boxes. Remove the push rods. Examine the push rods to insure they are straight and the ends are tight. Replace any suspect push rod. Step 5. Remove the cylinder head. Now would be a good time for guide and valve renewal. This is best left to an expert. More cylinder heads have been ruined by auto machine shops than by hard use. If you do not have a qualified shop in your area please call for a referral. Step 6. Remove the push rod tubes and the cylinder base nuts. Clip rubber bands around the top of the lifters to keep them from dropping into the crankcase. Have a few lint free rags handy. Bring the pistons to the top of the stroke and begin lifting off the cylinder. If the cylinder is hard to lift off, thread a nut on one of the base studs and use a tire lever to pry against the bottom fin close to its base using the stud as a fulcrum. After partially raising the cylinder stuff the crankcase mouth with rags to keep any carbon or broken rings from entering the crankcase. These will remain in place until step 12. Step 7. Leaving the rags in the crankcase remove the wrist pin circlips from the pistons and discard. Heat the piston and gently push the wrist pin out. Do not use force as this can damage the connecting rod or its bearings. Be sure to account for all the clips as one left in the crankcase can do extensive damage. Step 8. Clean all gasket surfaces to remove any traces of the old gaskets. Use Pennatex gasket remover if needed. Be very careful not to scratch the gasket surface or to allow any gasket particles to enter the crankcase. Even a small bit of gasket can stop the oil pump from working! Step 9. Note the direction and location of the lifters. These must be replaced in the same position as when removed. Remove the lifter blocks from the old cylinder. Start by removing the small retaining bolts and washers. The lifter blocks are extremely fragile and are easily broken. They are also very expensive so great care must be taken in this step! Triumph special tool 222-616008 is advisable here. Apply pressure to the center of the block only. Do not press against the tangs that locate the lifter! A tool can be fabricated using two dowels to locate in the lifter holes. Step 10. Clean and examine the lifters and camshaft faces. Clean the lifter blocks and remove the sealing oring under the locating flange. Replace these with the new orings in the gasket set. Apply a smear of gasket sealant to the lifter block oring and press into the new cylinder. Be sure the lifter block is parallel with the bores and the grooved block is on the exhaust side. Apply a small amount of assembly oil to the lifters and replace in the exact position they came from

Incoming search terms:

HARLEY DAVIDSON BIG TWIN SPIGET MOUNT CARBURETOR INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 26-03-2012

download
A. BEFORE INSTALLATION OF YOUR NEW ZENITH CARBURETOR, NSPECT THE RUBBER MANIFOLD SEAL FOR NICKS,CRACKS, OR DEBRIS. APPLYING A LIGHT FILM OF PETROLEUM BASED LUBRICANT AROUND THE INSIDE LIP OF THE RUBBER SEAL WILL ALLOW THE CARBURETOR TO SLIP INTO PLACE EASIER. B. BEFORE ACTUAL INSTALLATION OF UNIT INTO MANIFOLD, THROTTLE CABLES SHOULD BE HOOKED TO THETHROTTLEWHEEL.MAKESURETHATTHE PULL CABLE IS LOCATEDPROPERLY TO OPEN THE THROTTLE PLATE (IN SOME APPLICATIONS THROTTLE CABLE SLACK MAY NEED TO BE ADJUSTED FOR PROPER HOOKUP AND OPERATION) SEE FIG. #1 C. AFTER THROTTLE CABLES ARE PROPERLY HOOKED UP,UNITCAN BE INSERTED INTO MANIFOLD. MAKE SURE THAT UNIT IS FULLY SEATED. WITH CARBURETOR SEATED INTO MANIFOLD AND FUEL LINE HOOKED UP TO FUEL INLET, INSTALL CHOKE CABLE AND HOOK TO CHOKE LEVER. PLACE AIR INTAKE GASKET ON END OF CARBURETOR, NEXT PLACE INTAKE ADAPTOR OVER INTAKE GASKET. SEE FIG#2 ZENITH MOD.16P12 SPIGET MOUNT CARBURETOR -HARLEY DAVIDSON ™ BIG TWIN INSTALLATION INSTRUCTIONS FIG. # 1 FIG. # 2 D. WITH ADAPTOR IN PLACE, LOCATE THE STOCK AIR BOX OVER THE ADAPTOR, UTILIZING THE STOCK AIR BOX GASKET (THERESHOULDBENO GAPS BETWEEN ADAPTOR, AIRBOX OR CARBURETOR WHEN PROPERLY INSTALLED) STAND-OFF SPACERS PROVIDED ARE TOBEPLACEDBETWEENAIR BOX& ENGINE HEADS BEFORE INSTALLING THE VENT/RETAINING BOLTS. FOR EVALUATION ENGINES STOCK VENT BOLTS CAN BE USED WITH LARGERI.D. SPACER PROVIDED. SEE FIG#3 E. WITH AIR BOXSECURELY IN PLACE, INSTALL THE AIR FILTER COVER RETAINING BRACKET AND FILTER USING THE STOCKBOLTS, AND REPLACE AIR FILTER COVER AND SECURE WITH STOCK BOLT. SEE FIG#4 F. AFTER INSTALLATION IS COMPLETE AND FUEL FLOW HAS BEEN RE-ESTABLISHED, CHECK FOR ANY LEAKS BEFORE STARTING ENGINE. H. AFTER STARTING ENGINE, SOME ADJUSTMENTS OF IDLE AND MAIN JET MAYBE REQUIRED FOR PROPER OPERATION. AFTER ADJUSTMENTS HAVE BEEN MADE AND WITH ENGINEAT IDLE, TURN WHEEL FULLYTOLEFTANDRIGHT.ANYCHANGEIN IDLE SPEED INDICATES THROTTLE CABLES ARE TOO TIGHT AND MORE SLACK MUST BE PROVIDED.

Incoming search terms:

YAMAHA RAPTOR 350 Removing stock carburetor and cables

0

Filed Under (Yamaha) by admin on 18-01-2012

download
remove seat and gas tank. Make sure fuel petcock is in “off” position. 2. Remove throttle cable paying close attention to routing, as the new cable (s) will need too be routed the same. 3. Remove stock carburetor and stock throttle housing. Stuff a clean, dry rag into manifold to keep debris out of motor. 4. Remove stock air box. 5. Remove choke cable from handlebars. 6. Remove carb vent line from bike. Carburetor installation 1. Carefully trim the rubber alignment tab off of the face of the manifold with a razor blade or side cutters. 2. Remove the hex pipe plug from the carb cap using a 11mm or 7/16 wrench. Do not discard plug, as it will be needed later. Install the metering adjustment tool included in the hardware kit. Do not over-tighten as damage may occur to cap. 3. Attach fuel line to carburetor and secure with clamp. 4. Install remote idle cable into tab on top of carburetor. See main manual for this step. NOTE: Nut must be removed from cable before installation 5. Place carburetor into manifold

Incoming search terms:

TWIN VELOCITY FOR YAMAHA V-STAR 650 INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 09-11-2010

download
STEP 1 Remove the stock air cleaner and components to the point shown in PIC. 1. The stock plastic airbox adapter “A” and stock mounting brackets “B” will remain in place. STEP 2 Insert both flanges of the rubber adapter through the mounting bracket as shown in PIC.2. The hardware components used for installation are placed near their respective mounting points: •”A” Socket head cap screw – 30mm long, tapered bolt cap, and two spacers. The spacers are placed between the chrome, and the stock mounting brackets. •”B” Socket head cap screw – 15mm long , tapered bolt cap •”C” Socket head cap screw – 30mm long, tapered bolt cap, two spacers (place between chrome and stock brackets), and flange nut. •”D” Mounting holes. STEP 3 The opening in the adapter boot must be slipped over the flange of the stock airbox and secured with the stock clamp. Install the mounting bracket as shown in PIC.3. Secure this assembly to the bike with the hardware specified in the previous step. STEP 4 Disassemble the Twin Velocity. Use 1/4″ 12 point combination wrench for the three fasteners that hold the front and rear sections of the Twin Velocity together. Pay close attention to the location of all components to simplify re- assembly. STEP 5 The 5/16″ button head bolts, reducer washers, nylon washers, flat washers, and acorn nuts will secure the air cleaner to the mounting bracket. See PIC.4. STEP 6 “Work” the radiused flange of the adapter through the inlet of the air cleaner. Using the hardware shown in the previous step, mount the air cleaner to the mounting bracket. See PIC.5. STEP 7 See PIC.6. Push two each of the oval rubber pads into the corresponding pockets in the air cleaner until they are flush with the back plate — two per side. You will find 3 holes behind the radiused flange that was previously installed through the air cleaner inlet in Step 6. With the three 1/4″-20 Socket head cap screws and nylock nuts secure the air cleaner to the mounting bracket. STEP 7 Reassemble the Twin Velocity Air Cleaner.

Harley-Davidson Mid Kit POWERLET Installation Instructions

0

Filed Under (Harley Davidson) by admin on 07-05-2012

download
STEP #1 Remove seat. STEP #2 Route wires starting at the battery end and finishing at the bracket. STEP #3 Connect the wires to the socket. STEP #4 Mount the bracket on the horn bracket located under the gas tank. STEP #5 Fasten ty-wraps. STEP #6 Put everything you took off back on. Detailed Instruction: STEP #1 -Remove the seat exposing the battery. See the owner’s manual. STEP #2 – Remove negative battery lead. Remove the positive battery lead and attach the red wire [B]. Attach the black wire to the gas tank bolt [C]. Run the wires below the gas tank by passing through the gap between the frame & gas tank [D]. STEP #3 – Finish routing the wire under the tank and up to the horn bracket. Install the fuse in the fuse-holder. The center terminal is plus and the outer ring is negative (see dwg below). Apply either dielectric grease or Vaseline to the spade terminals. Connect the red wire to the positive spade terminal & the black wire to the negative terminal. Use a voltmeter to check if the polarity is correct. STEP #4 – On the left side of the bike, under the gas tank, locate the horn and bracket. Remove the acorn nut from the bracket [A]. You may need to remove the second nut also. Attach the Powerlet bracket utilizing the supplied chrome & rubber washers (if necessary). Adjust the bracket so it is aligned. Tighten to 8 Nm. STEP #5 – Apply the three ty-wraps. Use one to secure the fuse-holder and the other near point [D] and the third near the socket. Do NOT allow the harness to directly contact the motor or exhaust

Incoming search terms: