super splendor borpistan rings value

You search Auto repair manual PDF super splendor borpistan rings value, if there are search results will appear below. If search results do not exist, please search by others keyword.



  super splendor borpistan rings value Direct Download speed 5282 Kb/s

  super splendor borpistan rings value Full Version speed 6162 Kb/s



Yamaha V Star 1300 Fuel Injected INSTALLATION INSTRUCTIONS

0

Filed Under (Yamaha) by admin on 08-11-2010

download
1. Be sure the main switch is in the off position during the installation process. Failure to do this will cause the “check engine” light to be set. 2. Remove seat exposing the tool tray and battery. 3. Remove the (2) 12mm Hex head bolts securing rear of tank. Prop up the rear of the tank. 4. Locate and unplug the white 4-pin connector under left side of tank as shown in figure 1. 5. Route Fuelpak as shown in figure 2. Plug Fuelpak white connectors to the factory connectors unplugged in step 4. 6. Connect brown and green wires to the negative side of the battery. 7. Route Fuelpak long black wire under right side of tank and down to the horn as shown in figure 3. Disconnect the factory black / white wire from horn. Plug in Fuelpak long black wire to horn and then connect factory black / white wire to terminal on Fuelpak black wire. 8. Locate the throttle position sensor on the throttle body located on right side of the tank. As shown in figure 4, attach T-tap to yellow / black wire on throttle position sensor. Connect Fuelpak violet wire to T-tap. 9. Using supplied Velcro, mount Fuelpak next to tool tray as shown in figure 5. 10. Reinstall tank with (2) 12mm Hex head bolts removed in step 3. 11. You are now ready to set-up your Fuelpak 1. Remove Fuelpak clear case cover by removing all four screws, save hardware . 2. Turn on main power with key, but do not start engine. Fuelpak display should light up, if not, turn power off and verify the connectors are fully seated. 3. Refer to Fuelpak Setting Reference to locate the Setting Values specific to your bike and exhaust system. If you do not find your setting, visit fuelpakfi.com or call tech support at (562) 921-0071. 4. Starting with mode 1 selected, press the value (+) or the value (-) buttons to input the correct value as indicated in your Setting Value. After entering your first value, press the mode select button to move to mode 2 and enter the value. Continue until you have entered the value for each of the first 18 mode positions. Each time the value (+) is pressed, the value increases by one number. Each time the value (-) is pressed, the value decreases by one number. (Please refer to the “How It Works” section directly above if you have questions about this step. 5. As the next procedure, after you have entered in your values for the first 18 modes, press the mode select button to move to mode 19. Fully twist open the throttle and return to idle position to calibrate the Fuelpak to your bike. 6. By pressing the mode select button twice, move to mode 21 and verify that it reads “0″ with the throttle closed, “50″ at approximately half-throttle and “99″ when fully opened; if not, repeat step 5. Do not proceed to step 7 until mode 21 is verified. 7. Enter any other mode values as required for your application. 8. Turn off power. 9. Reinstall clear cover, tuck Fuelpak under seat area and reinstall seat. 10. You are now ready to ride

YAMAHA ROADLINER / STRATOLINER Fuel Injected INSTALLATION INSTRUCTIONS

0

Filed Under (Yamaha) by admin on 28-10-2010

download
1. Be sure the main switch is in the off position during the installation process. Failure to do this will cause the “check engine” light to be set. 2. Remove seat exposing the Electronic Control Unit (ECU) and battery. 3. Remove the right side coil cover by removing two allen screws and gently pulling. 4. Disconnect the 6 pin factory connector behind the ignition coils. (Fig 1) 5. Connect Fuelpak 6 pin connectors in-line with factory connectors. 6. Disconnect 3 pin factory connectors behind the ignition coils and connect Fuelpak 3 pin connectors in-line with factory connectors. 7. Route Fuelpak harness up to battery area and reinstall coil side cover. 8. Connect Fuelpak black wire to negative ground wire. (Fig 2) 9. Locate factory 2 pin connector with brown and black wires. Disconnect empty connector and attach Fuelpak red wire connector. 10. Connect Fuelpak 10 pin connector to Fuelpak harness. 11. You are now ready to set-up your Fuelpak. INSTALLATION INSTRUCTIONS FOR P/N 65001 READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION FUEL INJECTION MANAGEMENT SYSTEM ROADLINER / STRATOLINER NOTICE: Fuelpak is intended for racing or off-highway use only, and is not legal for sale or use in California on pollution-controlled vehicles. PLEASE NOTE: FUELPAK USE REQUIRES A HIGH PERFORMANCE AIR FILTER. HOW IT WORKS ENTERING VALUES 1. Remove Fuelpak clear case cover by removing all four screws, save hardware . 2. Turn on main power with key, but do not start engine. Fuelpak display should light up, if not, turn power off and verify the connectors are fully seated. 3. Refer to Fuelpak Setting Reference to locate the Setting Values specific to your bike and exhaust system. If you do not find your setting, visit fuelpakfi.com or call tech support at (562) 921-0071. 4. Starting with mode 1 selected, press the value (+) or the value (-) buttons to input the correct value as indicated in your Setting Value. After entering your first value, press the mode select button to move to mode 2 and enter the value. Continue until you have entered the value for each of the first 18 mode positions. Each time the value (+) is pressed, the value increases by one number. Each time the value (-) is pressed, the value decreases by one number. (Please refer to the “How It Works” section directly above if you have questions about this step. 5. As the next procedure, after you have entered in your values for the first 18 modes, press the mode select button to move to mode 19. Fully twist open the throttle and return to idle position to calibrate the Fuelpak to your bike. 6. By pressing the mode select button twice, move to mode 21 and verify that it reads “0″ with the throttle closed, “50″ at approximately half-throttle and “99″ when fully opened; if not, repeat step 5. Do not proceed to step 7 until mode 21 is verified.

Incoming search terms:

Yamaha Road Star Warrior Fuel Injected Models INSTALLATION INSTRUCTIONS

0

Filed Under (Yamaha) by admin on 08-11-2010

download
1. Remove seat and fuel tank. 2. Remove airbox and left airbox cover. We highly recommend you consult the factory service manual for proper removal of airbox. 3. Route wiring harness under frame bracket towards airbox. (Fig 1) 4. Unplug stock black connector for fuel injectors. (Fig 2) 5. Plug Fuelpak 4-pin connectors in-line with the connectors from step 4. 6. Unplug the TPS connector and attach T-tap connector to the center wire (yellow). (Fig 3) 7. Route the Fuelpak violet wire to T-tap. (Fig 4) 8. Reattach the TPS connector. 9. Route black wire to the front of engine and down to the horn. (Fig 5) 10. Disconnect the factory black/white wire from horn. Plug Fuelpak into horn and plug Fuelpak black/white wire to Fuelpak connector. 11. Route black and green wires to battery negative. 12. Attach Fuelpak to Fuelpak harness and mount under seat as shown. (Fig 6) 13. Before reassembling the bike, make sure handlebar switch is in the engine-not-running position and turn the key on. Fuelpak should light up. Sound the horn. If Fuelpak turns off when the horn is sounded, recheck the black wire connection on the horn and that it is connected to the correct wire from the factory harness. 14. Follow the service manual to reinstall the airbox and gas tank. INSTALLATION INSTRUCTIONS FOR P/N 65005 READ ALL INSTRUCTIONS BEFORE BEGINNING INSTALLATION FUEL INJECTION MANAGEMENT SYSTEM ROAD STAR WARRIOR NOTICE: Fuelpak is intended for racing or off-highway use only, and is not legal for sale or use in California on pollution-controlled vehicles. PLEASE NOTE: FUELPAK USE REQUIRES A HIGH PERFORMANCE AIR FILTER. HOW IT WORKS ENTERING VALUES 1. Remove Fuelpak clear case cover by removing all four screws, save hardware . 2. Turn on main power with key, but do not start engine. Fuelpak display should light up, if not, turn power off and verify the connectors are fully seated. 3. Refer to Fuelpak Setting Reference to locate the Setting Values specific to your bike and exhaust system. If you do not find your setting, visit fuelpakfi.com or call tech support at (562) 921-0071. 4. Starting with mode 1 selected, press the value (+) or the value (-) buttons to input the correct value as indicated in your Setting Value. After entering your first value, press the mode select button to move to mode 2 and enter the value. Continue until you have entered the value for each of the first 18 mode positions. Each time the value (+) is pressed, the value increases by one number. Each time the value (-) is pressed, the value decreases by one number. (Please refer to the “How It Works” section directly above if you have questions about this step. 5. As the next procedure, after you have entered in your values for the first 18 modes, press the mode select button to move to mode 19. Fully twist open the throttle and return to idle position to calibrate the Fuelpak to your bike. 6. By pressing the mode select button twice, move to mode 21 and verify that it reads “0″ with the throttle closed, “50″ at approximately half-throttle and “99″ when fully opened; if not, repeat step 5. Do not proceed to step 7 until mode 21 is verified. 7. Enter any other mode values as required for your application. 8. Turn off power. 9. Reinstall clear cover, tuck Fuelpak under seat area and reinstall seat. 10. You are now ready to ride.

Incoming search terms:

2008 Harley-Davidson TOURING INJECTION FUEL INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 29-03-2012

download
1. Remove seat, exposing factory computer (ECU). disconnect factory wiring by pressing lock and pushing lever back. 2. Remove ECU by pushing tab and sliding the ECU to the right as you lift. 3. Gently align the pins of the Fuelpak connector with the ECU and press the connector on the ECU. Be sure the single large pin is aligned with the single large socket before pressing Fuelpak connector into the ECU. Make sure all four tabs fully latch. (Fuelpak connector Patent Pending# 29 295831) 4. Connect factory wiring to Fuelpak connector and pull lever to locked location. Be sure that lock snaps into position. 5. Reinstall ECU. 6. Remove left side cover. 7. Slide Fuelpak down through opening leading to the area under the left side cover. 8. Attach Fuelpak to the fuse cover using supplied velcro.
HOW IT WORKS ENTERING VALUES 1. Remove Fuelpak clear case cover by removing all four screws, save hardware . 2. Turn on main power and handlebar switches, but do not start engine. Fuelpak display should light up, if not, turn power off and verify the connectors are fully seated. 3. Refer to Fuelpak Setting Reference to locate the Setting Values specific to your bike and exhaust system. If you do not find your setting, visit fuelpakfi.com or call tech support at (562) 921-0071. 4. Starting with mode 1 selected, press the value (+) or the value (-) buttons to input the correct value as indicated in your Setting Value. After entering your first value, press the mode select button to move to mode 2 and enter the value. Continue until you have entered the value for each of the first 18 mode positions. Each time the value (+) is pressed, the value increases by one number. Each time the value (-) is pressed, the value decreases by one number. (Please refer to the “How It Works” section directly above if you have questions about this step. 5. By pressing the mode select button 3-times, move to mode 21 and verify that it reads “0″ 6. Enter any other mode values as required for your application. 7. Turn power off, wait one second then turn power back on. Verify all modes then turn power off. 8. Reinstall Fuelpak clear cover then reinstall side cover

KTM 990 SUPER DUKE 950 SUPERMOTO 950 SUPER ENDURO REPAIR MANUAL

0

Filed Under (KTM) by admin on 22-11-2010

download
Adjusting the position of the compression and rebound damping Rebound damping: -Turn in the adjusting screw 1 in a clockwise direction all the way to the stop. -Turn back the respective number of clicks in a counterclockwise direction. Compression damping, low speed: -Turn in the adjusting screw 2 in a clockwise direction all the way to the stop. -Turn back the respective number of clicks in a counterclockwise direction. Compression damping, high speed: -Turn in the adjusting screw 3 in a clockwise direction all the way to the stop. -Turn back the respective number of clicks in a counterclockwise direction. Adjusting the spring preload NOTE: the spring preload is the difference between the unloaded and preloaded length of the spring. -Tighten the adjusting nut 4 with the special tool T106 until you have the prescribed spring preload. -Tighten the lock screw on the adjusting nut Disassembling the shock absorber -Write down the spring preload. -Write down the rebound and compression damping settings, counting the clicks or number of turns while turning in a clockwise direction. -Unscrew all of the adjusting screws in a counterclockwise direction. -Clamp the upper part of the shock absorber in a vise as shown in the photo, using protective jaws. -Loosen the lock screw 1 (AH 4 mm), loosen the adjusting nut 2 using the special tool T106 3 and relieve the spring. NOTE: mark the position of the lock screw. -Press the spring down with the special tool T101S and pull out the spring retainer 4 . -Remove the washers 5 and spring 6 . 4-2 Repair manual WP Shock absorber 990 Super Duke, 950 Supermoto, 950

Incoming search terms:

BMW PISTONS AND RINGS INSTALLATION INSTRUCTIONS

0

Filed Under (BMW) by admin on 26-10-2010

download
1. Always clean the grooves before installing rings. Carbon build-up in the groove will lead to ring “bottoming” and can result in engine seizure. 2. Check the fit of rings in the groove. A maximum of .003″ side clearance is allowable. 3. Check the cylinders for taper and out-of-roundness. Any taper of out-of-roundness will have an adverse effect on the performance of an engine. Excessive piston clearance will detract from maximum performance as well. 4. Allow ample ring gap. There is far more danger of ring butting than of an appreciable compression loss through the ring gap. Gaps, if staggered, do not cause any measurable reduction of compression. Compression rings should be fitted with a minimum of .004″ end gap per inch of cylinder deglazing. 5. Always deglaze cylinder walls before installing new rings. A 400 grit stone is recommended for deglazing. 6. All parts should be spotlessly clean before installation. Dirt in any form is the worst enemy of a hi- performance engine. You may wash all parts in hot, soapy water. Ring Gap Installation 1. Do not gap oil control rings. Start with the oil control expander. Expander Ring ends butt together. Do not overlap them. 2. Install oil control rings. Set gap 90 from where expander ring butts together. Gap top oil control ring 180 from lower oil control ring gap. 3. Install 2nd and top ring also with marks up. Stagger gaps

Harley-Davidson S&S Super E and G Series Shorty Carburetors Installation and Jetting Instructions

0

Filed Under (Harley Davidson) by admin on 24-10-2010

download
throttle linkage with no cable modification. S&S Super E and G carb kits for 1936 to 1989 Big Twins contain a throttle cable guide (11-2339) designed for butterfly type throttle cables, and kits for 1990 and later Big Twins contain a taller throttle cable guide (11-2338) designed for CV type throttle cables. See Picture 2. The two throttle cable guides are interchangeable on the carburetor body, and can be changed very easily to update older carburetors or to accommodate custom throttle cables which are not stock for a particular year chassis. 1981 to Present Sportster Models Stock Sportster models from 1981 to 1987 have two cable throttle system designed for butterfly type carburetors. Sportsters from 1988 to present have a two cable throttle system designed for use with the stock constant velocity (CV) type carburetor. Since the taller #11-2338 cable guide bracket can not be used on a Sportster chassis due to insufficient frame clearance, throttle cables on Sportsters originally equipped with a CV type carburetor must be changed to butterfly style cables. S&S can supply the correct style throttle cables. See S&S Throttle Cable Application Chart. Picture 2 S&S THROTTLE CABLE APPLICATION CHART Length Total Housing Length Vinyl Housing Part Number Open Side Part Number Close Side Fitment 36″ 32″ #19-0430 #19-0431 For Buell with 7/8″ handlebars 36″ 32″ #19-0432 #19-0433 To ’95 ’81-’85 FX and FL; All ’81-’85 XL (Also pre-’81 w/2-cable throttle housing replaced.) For Buell with 1″ diameter handlebar 36″ 32″ #19-0436 #19-0437 ’96-Up 883-1200 XL 39″ 35″ #19-0434 #19-0435 To ’95 Softail (FXSTC, FXST, FLSTC, FLSTF) ’86-’94 FXR, ’93-’95 Dyna 39″ 35″ #19-0438 #19-0439 ’96-Up Softail (FXSTS, FXSTC, FLSTC, FLSTF) ’96-Up Dyna 42″ 38″ #19-0446 #19-0447 To ’95 custom application 42″ 38″ #19-0440 #19-0441 ’96-Up custom application 48″ 44″ #19-0462 #19-0463 To ’95 All FLT Models 48″ 44″ #19-0464 #19-0465 ’96-Up All FLT Models ” 1996 to Present Buells 1996 and 1997 Buells require special S&S butterfly style throttle cables for Buells, which are compatible with the stock 1996-1997 throttle assembly. 1998 and later carburated Buells require installation of stock 1996 – 97 throttle grip and the special S&S Buell style throttle cables when installing Super E or G carburetors. S&S Throttle Kits S&S throttle kits fit 1″ handlebars and can be used on most chassis. (An adapter sleeve is available for use with earlier, 7 ⁄ 8 ” OEM handlebars originally equipped with internal throttle cable.) Barrel fittings on S&S cables readily “plug in” to S&S Super E, G, and stock H-D 1981-’90 butterfly type carb throttle linkage. Kits include one opening and one closing side cable, left and right grips, and handlebar clamps. Kits with 36″, 39″, 42″, or 48″ length cables are available. Length specified refers to overall cable length. Vinyl covered outer housing is 4″ shorter than overall length

Incoming search terms:

Vespa GTS Super Specification

0

Filed Under (Vespa) by admin on 11-11-2010

download
Gts super 300 ie Gts super 125 ie s 125cc s 50cc Gts 250 ie Gts 125cc LX 125cc LX 50cc 2 stroke Engine Single-cylinder, catalised, QUASAR 4 stroke, 4 valve electronic injection Single-cylinder LEADER 4 stroke with electronic injection Single-cylinder LEADER 4 stroke Single-cylinder HI-PER 2 stroke Single-cylinder, catalised, QUASAR 4 stroke, 4 valve electronic injection Single-cylinder, catalised, LEADER 4 stroke, 4 valve Single-cylinder LEADER 4 stroke Single-cylinder HI-PER 2 stroke Capacity 278cc 124cc 124cc 50cc 249cc 124cc 124cc 49cc Power 16.4 kW / 7500 rpm 10.5 Kw / 9500 rpm 7.65 Kw / 8250 rpm 3.2 Kw / 7500 rpm 15.7 Kw / 8500 rpm 7.65 Kw / 8250 rpm 7.65 Kw / 8250 rpm 2.5 Kw / 8500 rpm Max Torque 22Nm / 6500 rpm 12 Nm / 8000rpm 9.6 Nm / 7250 rpm 4.4 Nm / 6500 rpm 20.1 Nm / 6500 rpm 9.6 Nm / 7250 rpm 9.6 Nm / 7250 rpm 3.3 Nm / 6500 rpm Cooling Liquid Liquid Forced Air Forced Air Liquid Liquid Forced Air Forced Air Starter Electric Electric Electric and kick starter Electric and kick starter Electric Electric Electric and kick starter Electric and kick starter Transmission Automatic twist and go Automatic twist and go Automatic twist and go Automatic twist and go Automatic twist and go Automatic twist and go Automatic twist and go Automatic twist and go Front Suspension Single arm, dual chamber hydraulic shock absorber with coaxial spring Single arm link with coil spring and double hydraulic shock absorber Single arm link with coil spring and double hydraulic shock absorber Single arm link with coil spring and double hydraulic shock absorber Single sided trailing link with hydraulic shock absorber Single sided trailing link with hydraulic shock absorber Single sided trailing link with hydraulic shock absorber Single sided trailing link with hydraulic shock absorber Rear Suspension Two dual effect shock absorbers with adjustable preload Coil spring and double hydraulic shock absorber Coil spring and double hydraulic shock absorber Coil spring and double hydraulic shock absorber Twin hydraulic shock absorbers with preload adjuster Twin hydraulic shock absorbers with preload adjuster Hydraulic shock absorbers with preload adjuster Hydraulic shock absorber Front Brake ø 220mm disc brake 220mm disc brake ø 200mm disc brake ø 200mm disc brake ø 220mm disc brake ø 220mm disc brake ø 200mm disc brake ø 200mm disc brake Rear Brake ø 220mm disc brake 220mm disc brake ø 110mm drum brake ø 110mm drum brake ø 220mm disc brake ø 220mm disc brake ø 110mm drum brake ø 110mm drum brake Front Tyre Tubeless 120/70-12″ Tubeless 120/70 – 12″ Tubeless 110/70 – 11″ Tubeless 110/70 – 11″ Tubeless 120/70-12″ Tubeless 120/70-12″ Tubeless 110/70 – 11″ Tubeless 110/70-11″ Rear Tyre Tubeless 130/70-12″ Tubeless 130/70 – 12″ Tubeless 120/70 – 10″ Tubeless 120/70 – 10″ Tubeless 130/70-12″ Tubeless 130/70-12″ Tubeless 120/70 – 10″ Tubeless 120/70-10″ Running weight 158kg 158kg 114kg 96kg 151kg 145kg 114kg 96kg Length/Width/Height 2230mm / 755mm / 1170mm 1930mm / 755mm / 1930mm 1770mm / 740mm / 1140mm 1755mm / 740mm / 1140mm 1930mm / 755mm / 1170 mm 1940mm / 755mm / 1180 mm 1770mm / 740mm / 1140mm 1755mm / 740mm / 1140mm Fuel Tank Capacity 9 litres 9 litres 8.5 litres 8.5 litres 9.2 litres 10 litres 8.5 litres 8.5 litres Emmissions Euro 3 Euro 3 Euro 3 Euro 2 Euro 3 Euro 3 Euro 3 Euro 2 Colours Rosso Dragon Nero Lucido Montebianco Rosso Dragon Nero Lucido Montebianco Taormina Nero Lucido Montebianco Taormina Nero Lucido Montebianco Marrone Terra Di Toscana Bronzo Perseo Nero Vulcano Blu Midnight

Incoming search terms:

S&S Super Stock Cylinder Head Kit Installation Instructions for 1984 And Later Evolution Big Twin and Sportster Engines

0

Filed Under (Harley Davidson) by admin on 28-11-2010

download
check Piston Alignment in Cylinder Bore The purpose of this procedure is to check for and correct possible piston misalignment in the cylinder bore. During normal manufacturing, engine components such as crankcases, cylinders, and connecting rods can be machined to dimensions within factory specifications but on the extreme ends of the tolerance range. Sometimes these components when combined together form an assembly that is borderline or actually “out of print”. The worst result is that the pistons can run cocked in the cylinder bores causing the connecting rods to thrust to the sides exerting unnecessary stress on the pistons, rings, rod bearings and other related parts. This procedure is not the same as “blue printing”, but it provides almost the same result. We feel that not enough emphasis is given to checking the piston alignment in the cylinder bore. NOTE – All engines should be checked upon disassembly. This applies to any engine receiving new pistons which includes those being completely overhauled. CAUTION – Pistons which do not run true in cylinder bores may cause excessive connecting rod side thrusting. This may lead to premature ring, piston, connecting rod and rod bearing wear and eventual failure of these parts. Visual Procedure A. Reinstall cylinders on old pistons without rings. Hold cylinders securely in place. B. Move piston tight toward camside of engine. C. Turn engine over in normal direction of travel 2 or 3 revolutions and observe piston during process. D. Move piston toward driveside of engine and repeat Step C. If misalignment exists, piston will appear closer to cylinder wall at one point around circumference. Condition can be corrected by bending rod in opposite direction. Figure 1 shows an exaggerated side view. E. Repeat Steps B to D for other cylinder. F. Remove pistons and cylinders. Observe pistons for wear spots on sides above top compression ring. If either side near wristpin is worn clean while side opposite is carboned up, then piston was not running straight and true in cylinder bore. Piston will also generally show diagonal wear pattern on thrust faces of skirts and possibly signs of connecting rod to wristpin boss contact inside piston.

Incoming search terms:

HARLEY-DAVIDSON V-ROD BIG BORE KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 31-10-2010

download
The cylinder sleeves provided with the Wiseco V-Rod big bore kit have been finished honed to size and the piston to cylinder clearance has been set. Prior to installation, the sleeves must be washed in hot soapy water (not parts washer solvent) and dried. Coat the bore surface with motor oil and wipe it with a white towel. If the towel shows any remaining grit, repeat the hot soapy water washing process until the towel will only show clean motor oil. CAUTION: Test fit the cleaned sleeve (without O-Rings installed) into the engine block. Sleeve should drop into position. If sleeve will not easily drop into position, warm the engine block with a hair dryer until sleeve will drop into position. Remove sleeve, then continue installation procedures. From the bottom side of the sleeve, gently roll the 2-cylinder sleeve O-rings into the two grooves on each sleeve. Apply motor oil to the O-rings and gently install the sleeves into the block until bottomed. CAUTION: DO NOT ATTEMPT TO INSTALL SLEEVES WITHOUT LUBRICATING THE O-RINGS. FAILURE TO LUBRICATE O-RINGS COULD RESULT IN TORN OR DAMAGED O-RINGS THAT WOULD NOT BE EVIDENT UNTIL ENGINE WAS STARTED. INCORRECTLY INSTALLED O-RINGS CAN RESULT IN CATASTROPHIC ENGINE DAMAGE. NOTE: REFER TO THE OEM SERVICE MANUAL FOR ALL TORQUE SPECIFICATIONS PISTON RING PREPARATION Wiseco V-Rod pistons incorporate an advanced 2 ring system • The top ring is file-fit, and as such, requires that the end gap must be clearanced. The proper end gap clearance is .016-.018″ with the ring installed squarely in the bore. The top ring must be installed on the piston with the dot marking toward the top of the piston. • The oil ring is comprised of the expander and two rails. Install the expander first, and then the rails. Check to make sure the expander tips have not overlapped. It is not necessary to clearance the end gaps on the oil rails. The rails should be installed without modification. PISTON INSTALLATION The Wiseco V-Rod big bore kit is supplied with pistons that are front and rear cylinder specific. Install the front piston 4792M10795 in the front cylinder with the arrow facing the front of the engine. Install the rear piston 4793M10795 in the rear cylinder with the arrow facing the front of the engine. A piston ring compressor is required to install the pistons into the cylinders. Front of engine ➔ 4792M10795 ( Front piston) 4793M10795 ( Rear piston) FWD 4793M10795 FWD 4792M10795 For further information call the Wiseco Tech Line:

Incoming search terms: