torque specs for metric motorcycle bolts

You search Auto repair manual PDF torque specs for metric motorcycle bolts, if there are search results will appear below. If search results do not exist, please search by others keyword.



  torque specs for metric motorcycle bolts Direct Download speed 5282 Kb/s

  torque specs for metric motorcycle bolts Full Version speed 6162 Kb/s



1300 Yamaha V-Star Installation Manual

0

Filed Under (Yamaha) by admin on 07-11-2010

download
1) Place motorcycle on a firm level surface and secure in a upright position. 2) Remove saddle bags and saddle bag hardware (Tourer model only) Also remove rear riders pegs (Tourer model requires removal of rear footpeg offset hardware as well) 3) Attach bracket A (right) / B (left) to rear footpeg attachment point using new bolts provided. Remount footpegs/saddlebag hardware over top of brackets A/B. NOTE: Do not attach leveling stand bracket at this time 4) Attach bracket C(right) / D(left) to rear fender sub frame using new bolts provided. (Tourer model only – Saddle bag hardware mounts to the outside of brackets C/D. Brackets C/D mount between chrome side rail and saddlebag hardware.) NOTE: Brackets C/D have welded spacers which attach in toward rear fender 5) Attach top of Bracket E(right) / F(left) to rear of brackets C/D. Brackets E/F mount to the inside of brackets C/D. NOTE: Use ½ inch spacer between brackets E/F and C/D on Tourer model ONLY
6) Attach rear of brackets A/B to TOP of forward hitch arms. Attach bottom to brackets E/F to rear hitch plate. 7) Carefully tighten all bolts at this time ensuring hitch is square with motorcycle. Hitch Bracket Identification Leveling stand screw jack installation 1) Attach leveling stand brackets to brackets A and B 2) Thread right side screw jack into threaded hole on leveling stand bracket attached to bracket A sand adjust leveling jack bolt out. 3) Push motorcycle over from left side until right screw jack is touching floor. 4) Thread left side screw jack into threaded hole on leveling stand bracket attached to bracket B and adjust out until motorcycle will rest upright on both screw jacks. 5) Adjust screw jacks until motorcycle is level. 6) After InstaTrike is attached to or removed from receiver hitch, be sure to remove leveling stands and leveling stand brackets. CAUTION – Use screw jacks to hold motorcycle upright and level ONLY. Do not lift motorcycle with screw jacks. CAUTION – Use care when installing screw jacks. Be certain that motorcycle is always in a stable balanced position.
INSTALLATION OF THE TOW-PAC HITCH CART. 1. Place your motorcycle on a smooth flat surface, like a garage floor, and install leveling stands. Install right leveling stand first. Carefully raise motorcycle off of side stand and install left leveling stand. Caution – Use leveling stands to level motorcycle ONLY. Do not raise motorcycle with stands Caution – Be certain that motorcycle is always in a stable balanced position when installing leveling stands. 2. Assemble the axles, tires and wheels, and fenders onto the tow- pac hitch cart. 3. Carefully align the tow-pac hitch cart’s hitch mount with the receiver hitch on the motorcycle. Now push the hitch mount into the receiver hitch. (this might be a little difficult until you get use to doing it. Removing the paint from the hitch mount and applying a little grease will help.) 4. Place the hitch pin through the receiver hitch and hitch mount ( alignment plate ). Install and tighten the tension bolt

Incoming search terms:

Yamaha Virago 750/ 1100 InstaTrike REMOVAL AND INSTALLATION MANUALS

0

Filed Under (Yamaha) by admin on 26-12-2011

download
Remove any aftermarket accessories (saddle bags, back rests, etc) before hitch installation. After installation remount accessories. NOTE: Some aftermarket accessories may not be compatible with InstaTrike hitch. 1) Place motorcycle on a smooth level surface on center stand. 2) Attach Bracket A (left) to outside of rear passenger foot peg mount. Place spacers between Bracket A and foot peg mount. Use new bolts provided. 3) Attach Bracket B (right) to outside of rear passenger foot peg. Place spacers between Bracket B and foot peg mount. Use new bolts provided. Bracket will extend over top of mufflers. 4) Attach Brackets C (left) and D (right) to rear frame bolts on
motorcycle. Located near rear turn signals Use new bolts provided. (10M x 25mm long) It may be necessary to loosen or remove backrest covers or hardware in order to easily access rear frame bolts. After Bracket C and D installation, reattach and/or tighten backrest mounts. 5) Attach Bracket E(left) / F(right) to bottom of Brackets A & B and to the TOP of the forward hitch arms. Ensure hitch is square on motorcycle and snug bolts for Brackets A, B, and E,F at this time. 6) Raise rear of hitch so bottom of Brackets C & D are flush with top of rear hitch plate. Ensuring that hitch is square with motorcycle, carefully mark hole locations for bottom of Brackets C&D on rear hitch plate. Drill rear hitch plate holes with 3/8 inch drill. This step ensures proper alignment and spacing of hitch on the motorcycle. 7) Tighten all bolts ensuring that hitch is square on motorcycle. Periodically check bolts for tightness. Bracket Identification
INSTALLATION OF THE TOW-PAC HITCH CART.
1. Place your motorcycle on a smooth flat surface, like a garage floor, and rest it on its center stand. 2. Assemble the axles, tires and wheels, and fenders onto the tow- pac hitch cart. 3. Carefully align the tow-pac hitch cart’s hitch mount with the receiver hitch on the motorcycle. Now push the hitch mount into the receiver hitch. (this might be a little difficult until you get use to doing it. Removing the paint from the hitch mount and applying a little grease will help.) 4. Place the hitch pin through the receiver hitch and hitch mount ( alignment plate ). Install and tighten the tension bo

Incoming search terms:

How to Replacing Rear Main Seal 1

0

Filed Under (Tips and Review) by admin on 24-11-2010

download
The next day I woke up early and drank lots of coffee before going out to the garage. I knew I had two distinct problems confronting me. First, I would have to purchase an impact tool in order to loosen the six bolts holding the clutch together. Also, I would have to purchase at least three 8mm by 50mm bolts and nuts in order to prevent the clutch from exploding when the six bolts were unscrewed. For the third time in two days, I went to Sears and asked the salesman, (who I now I knew as Art,) where I could find an impact tool. He did not know what it was I was looking for, but he asked another employee and soon I had the tool as well as a 6mm Allen socket. Unfortunately, the Allen socket only came in 3/8″ drive, and the impact tool only came in 1/2″ drive. Thinking quickly, I purchased a 1/2″ to 3/8″ adapter, as well as a 3lb. dead- blow hammer. On the way home, I stopped at a Chief Auto Parts to buy the bolts I would need. The closest size they had were 8mm by 40mm, which was nearly 10mm too short. I was unsure whether the clutch cover bolts were coarse thread or fine thread, so I bought three of each, along with corresponding nuts. Finally, around 11 o’clock in the morning, I was back at the garage ready to work. I prepared the impact tool and placed the adapter and the Allen socket on it. I began to hammer on the end of the tool, trying to loosen each of the six bolts. None of them seemed to move, even though it seemed the impact tool was turning. Finally, I put the Allen socket on the breaker bar and found that all of the bolts had actually come loose. The tension from the clutch spring made it nearly impossible to see, however. I removed three of the bolts in a triangular pattern. Into these empty holes I threaded the fine- thread 40mm bolts with nuts attached and tightened them evenly. I was now able to remove the remaining Allen bolts. By slowly turning and loosening the nuts evenly on the 40mm bolts, I relieved the pressure from the clutch spring until the cover plate was free. I removed the cover plate, the clutch, the pressure plate, and finally the clutch spring. I had already marked each of the elements with Whiteout to insure that they would fit together the same way on installation. Apparently, this is essential as the flywheel could be rendered out-of-balance if the clutch components are not installed correctly. The flywheel itself was now exposed. I could see the five bolts that attached it to the crankshaft. I now used a tool I had fabricated. Although the manual describes two possible tools that can be fabricated, I found a piece of metal that resembled the tool and decided to use it. Unfortunately it was not strong enough and broke. I turned and looked at my workbench, and noticed a bracket which I had previously fabricated for mounting a mirror on my Vespa. The piece of steel was extremely strong and was already pre-drilled with correct-sized holes. It fit perfectly, so I placed it over the exposed bolt which protruded from the case, and placed the other end on one of the 40mm bolts, which I then bolted into the flywheel itself. I used the breaker bar again and removed the five bolts. The flywheel came loose after inserting two more 40mm bolts and tugging on them evenly

Incoming search terms:

Vengeance Motorcycle Specification And Owner's Manual

0

Filed Under (Vengeance) by admin on 20-11-2010

download
Vengeance Maxis • Vengeance Raven • Vengeance Banshee • Vengeance Whiplash • Hotrod Drifter • Hotrod CalChop • Hotrod Teacher • Hotrod Bone Shifting Gears Starting off and changing gears requires coordination of the clutch and throttle and gearshift lever. If you don’t do things right, the amount of control you have over the bike is lessened. To start off, pull in the clutch, shift into first gear, roll on the throttle a little, and ease out the clutch. You will become familiar with the friction zone (that’s where the clutch begins to take hold and move the bike), and you add a bit more throttle. You don’t want to stall the engine, nor do you want to over-rev it. There’s a sweet spot in there; find it. Shift while traveling in a straight line. Shifting in a curve is not good practice, and something to be avoided. Become familiar with the sound of your engine, so you can tell when you should shift without looking at your instruments. When you downshift to a lower gear, you should (in one swift, smooth movement) be able to squeeze the clutch, rev the engine a little to let it catch the lower gear smoothly, and shift down. When you come to a stop in traffic, leave the bike in first gear with the clutch disengaged (just in case you want to accelerate out of there in a hurry). Who knows what may be coming up behind you. Braking Don’t ever forget: The front brake on your motorcycle can supply as much as 70 percent or more of your stopping power. The single most important thing you can learn about braking is to use that front brake every single time you want to slow down. Turning When you are riding along the road, you lean a motorcycle into a turn. Learning to lean is an essential part of riding a motorcycle. It is a normal function of the bike when you are changing its path of travel – and quite different from turning the steering wheel of your car. To get the motorcycle to lean in a normal turn, press the handlebar in the direction of the turn and maintain slight pressure on that handlebar to take you smoothly through that particular turn. In other words: press right to go right; press left to go left. Your instincts to keep the motorcycle on a smooth path while keeping it from falling over usually take care of this without you even noticing it. (Demonstrate to yourself how a motorcycle moves by pressing a handlebar slightly while traveling in a straight line. The motorcycle will move in the direction of the handlebar you pushed.) • Slow down before you enter the turn; look as far ahead as possible through the turn. • Keep your feet on the pegs, and grip the gas tank with your knees. • Lean with the motorcycle; don’t try to sit perpendicular to the road while the motorcycle is leaning over. • Keep an even throttle through the turn, or even accelerate a little bit. Checking the Bike before the Ride It’s not fun to have things go wrong on a motorcycle, but if you spend a minute before you go off on a ride, you can increase the chances that nothing will.

Incoming search terms:

YAMAHA YZF-R1P YZF-R1PC ASSEMBLY MANUAL

0

Filed Under (Yamaha) by admin on 26-02-2011

download
PREPARATION To assemble the motorcycle correctly, supplies and working space are required. Supplies oils, greases, shop rags. Workshop The workshop where the motorcycle is assembled should be clean and large. The floor should be level. Self-protection Protect your eyes with suitable safety spectacles or safety goggles when using compressed air, when grinding or when doing any operation which may cause particles to fly off. Product hands and feet by wearing safety gloves or doing. SYMBOLS USED ON CRATE CARTON Contents of the transport package are fragile therefore it shall be handled with care. Indicates correct upright position of the transport package. Transport package shall be kept away from rain. Insertion of the lift arm from this side is prohibited. Lift arm inserting position. -1- UNPACKING 1. Remove the frame cover 1. NOTE: To remove the frame cover, cut the vinyl bands around the cover using a cutter or scissors. 2. Remove the bolts 2 (upper bracket). 3. Remove the bolt 3 (front tire). 4. Remove the packing frames 4 (upward and sideways). NOTE: Remove the bolts while holding frame. NOTE: Before starting the assembly, check for damaged or missing parts. The parts are contained in the cartan and the motorcycle for damage, scratches and other defects. -2- PARTS LOCATION 1 Carton box -3- 1 Carton box Screw, washer and special nuts (windscreen) Bolt (front master cylinder) Bolt (handle crown and handlebar) Nut (rear view mirror) Nut (front reflector) Front reflector Vinyl bag 1 Plugs (handle crown) Owner’s manual Rear view mirrors Windscreen – -5- 1. Handlebar 1 2 3 4 5 6 1 1 1 1 2 1 Reservoir tank (brake) Hexagon socket bolt Crown nut Hexagon socket bolt Cap Hexagon socket bolt * V * V V * d = 6 (0.24), r= 12 (0.47) d = 6 (0.24), r= 25 (0.98) d = 8 (0.31), r= 30 (1.18) 2. Front reflector A: Tighten the crown nut to specified torque. Tightening torque: 115 Nm (11.5 m • kg, 85.0 ft • lb) B: Tighten the bolt to specified torque. Tightening torque: 13 Nm (1.3 m • kg, 9.4 ft • lb) C: Tighten the bolt to specified torque. Tightening torque: 13 Nm (1.3 m • kg, 4.4 ft • lb) A: Tighten the screws to specified torque. Tightening torque: 40 Nm (4.0 m • kg, 29 ft • lb) 1 2 3 4 5 2 2 2 4 4 Reflector bracket Reflector Nut Washer Caliper bolt * V V * * d = 5 (0.20) d = 10 (0.39) d = 10 (0.39), r= 30 (1.18) 3. Clutch cable 1 Clutch cable 1 * A: Check the clutch lever for smooth action. CAUTION: Proper cable routing is essential to assure safe motorcycle operation. Refer to “CABLE ROUTING

Incoming search terms:

1500cc Honda Goldwing Installation Manual

0

Filed Under (Honda) by admin on 02-12-2010

download
Review entire installation manual Loosen saddle bags and remove rear fender cover Modify rear fender cover Install receiver hitch and double check all bolts Remount rear fender and tighten saddle bags Assemble InstaTrike hitch cart Attach InstaTrike to motorcycle via receiver hitch Attach leanstop brace bolts to receiver hitch Align InstaTrike wheels Double check all bolts for tightness Test ride InstaTrike slowly in an open area to familiarize yourself with handling characteristics Receiver Hitch Installation NOTICE: Install all bolts and brackets loosely until all bolts and brackets are in place 1) Place motorcycle on center stand. NOTE: Some Goldwings are not level when on center stand. Shim underneath center stand to level motorcycle. 2) Remove side covers 3) Loosen saddle bags and remove rear fender cover. 4) Modify rear fender cover. See diagram 5) Remove muffler bolts. Replace with enclosed muffler bolts. (hex bolt head toward inside with washers on bolt head side) This allows clearance between the hitch and muffler bolt. 6) Replace existing motorcycle rear crashbar bolts with those provided (2 each side). Ensure new crashbar bolts are securely tightened before attaching brackets A and B. 7) With brackets A (left) and B (right) attached to bottom of forward arms of hitch, slide hitch under bike and loosely attach A and B to bottom of rear crash bar with provided U-bolts. Use caution not to crush crash bar with U-bolt

1100cc Honda Goldwing Installation Manual

0

Filed Under (Honda) by admin on 29-04-2011

download
Receiver Hitch Installation Install all bolts loosely until all brackets are in place 1) Place motorcycle on center stand and be certain it is level. 2) Remove saddlebags if necessary for easier installation. 3) Mount bracket A to the lower front crash bar bolt Left side (new bolts provided) and top of left hitch arm. 4) Mount bracket B to the lower front crash bar bolt Right side (new bolts provided) and top of right hitch arm. 5) Bracket C mounts to rear of hitch and sub frame bolt located behind tail light (new bolt provided) This bracket mounts inside the rear fender. 6) Attach brackets D and E to rear of hitch. 7) Bracket F attaches to bottom of bracket D and trunk sub frame with U-bolts. Insert bottom U-bolts at step 9 8) Bracket G attaches to bottom of bracket E and trunk sub frame with U-bolts. Insert bottom U-bolts at step 9 9) Brackets D and E (with brackets F and G) attach to bottom rear saddlebag sub frame with U-bolts. 10) Tighten all bolts. INSTALLATION OF THE TOW-PAC HITCH CART. 1. Place your motorcycle on a smooth flat surface, like a garage floor, and rest it on its center stand. 2. Assemble the axles, tires and wheels, and fenders onto the tow- pac hitch cart. 3. Carefully align the tow-pac hitch cart’s hitch mount with the receiver hitch on the motorcycle. Now push the hitch mount into the receiver hitch. (this might be a little difficult until you get use to doing it. Removing the paint from the hitch mount and applying a little grease will help.) 4. Place the hitch pin through the receiver hitch and hitch mount ( alignment plate ). Install and tighten the tension bolt. 5. Push the motorcycle off of the center stand and risers if used. 6. Bolt leanstop braces to hitch. (Bolt inserts from the bottom) Be certain to replace washers/spacers in the same configuration as when you removed them. see diagram next page 7. Check all bolts for tightness. 8. You are now ready for the test ride. A. Keep your feet up! B. Ride slowly in first gear until you are comfortable with the Tow-Pac system.

Incoming search terms:

Kawasaki Voyager Installation And Removal Manual

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
Review entire installation manual Remove saddle bags and rear fender cover Modify rear fender bolt slots Install receiver hitch and double check all bolts Remount saddle bags Assemble InstaTrike hitch cart Attach InstaTrike to motorcycle via receiver hitch Attach leanstop brace bolts to receiver hitch Align InstaTrike wheels Double check all bolts for tightness Test ride InstaTrike slowly in an open area to familiarize yourself with handling characteristics Receiver Hitch Installation INSTALL ALL BOLTS AND BRACKETS LOOSLEY UNTIL ALL COMPONENTS ARE IN PLACE! 1) Place motorcycle on its center stand 2) Remove saddle bags and rear fender 3) At the bottom of the rear fender locate two bolt slots. (bolts were removed from these when rear fender was removed) Open the front end of these slots in order to remount fender. 4) Replace bottom fender bolts about 2 or 3 turns. This is necessary to be able to remount rear fender. 5) Attach bracket A to motorcycle. Locate two threaded holes (6mm) near the top of the sub frame. Bolt top of bracket A to these holes. ( bolts provided ) 6) Attach bracket B ( left side ) / C ( right side ) to motorcycle by replacing the bolt that holds the muffler to the frame and vibration absorber with the new bolt provided. Bracket B/C mounts on the outside of the large chrome washer. 7) Attach brackets A, B, C to the hitch ( top ) 8) Replace rear fender 9) Attach brackets D and E to the motorcycle sub frame with U- bolts provided. Attach brackets to hitch. 10) Tighten all bolts and double check. 11) Reinstall saddle bags

Incoming search terms:

Yamaha V-Star 1100 InstaTrike REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 05-01-2012

download
Receiver Hitch Installation y Install all bolts loosely until all brackets are in place y Remove any aftermarket accessories (saddle bags, back rests, etc) before hitch installation. After installation remount accessories. NOTE: Some aftermarket accessories may not be compatible with InstaTrike. 1) Place motorcycle on a firm level surface. 2) Remove saddle bags (if applicable) 4) Attach bracket G to underside of motorcycle frame with U-bolts provided. 5) Attach bracket C (left) and bracket D (right) to the two rear fender side attachment bolts between fender and chrome side rail. Use new bolts provided. ( reattach saddle bags now if applicable) 6) Attach bracket E (left) and bracket F (right) to the outside of the rear holes on brackets C and D . Bolt inserts from inside of brackets C and D . 7) Attach bottom of brackets E and F to rear plate on receiver hitch. 8) Attach rear of brackets A and B to TOP of forward arms on receiver hitch. 9) Attach front of brackets A and B to TOP of bracket G 10) Ensure hitch is square on motorcycle and tighten all bolts.
Installation Diagrams
Leveling stand screw jack installation 1) Thread right side screw jack into threaded area on bracket B sand adjust leveling jack bolt out. 2) Push motorcycle over from left side until right screw jack is touching floor. 3) Install left side screw jack on bracket A and adjust out until motorcycle will rest upright on both screw jacks. 4) Adjust screw jacks until motorcycle is level. CAUTION – Use screw jacks to hold motorcycle upright and level ONLY. Do not lift motorcycle with screw jacks. CAUTION – Use care when installing screw jacks. Be certain that motorcycle is always in a stable balanced position

Yamaha Road Star Forward Control Kit Installation Instructions

0

Filed Under (Yamaha) by admin on 08-11-2010

download
Before starting to assemble this forward kit on your motorcycle check the packing list to make sure that the kit you received is the correct one for your model motorcycle and that the foot pegs are the style you ordered (billet or ISO). Next check the contents hardware kit P.N.0109-1000 against the packing list for completeness. Installing The Shift Control Photo 1 Remove wires from horn. Remove the two hex head bolts (Save for later installation) that mount the OEM shift controls to your motorcycle. Unthread stock shift rod at trans shift arm, leaving OEM rod end connected to stock shift arm. Using Original Metric hardware, place a drop of Loctite #242 (blue) to the bolt threads and mount the shift control plate to the motorcycle frame, Photo 2. FORWARD CONTROL KIT PM SHIFT CONTROL ASSEMBLY Note Before torquing the shift control mounting bolts down, tighten them snug and look behind the shift control mounting plate to where it contacts the mounting lug on the frame. Make sure it fits squarely to the lug before proceeding further. Torque the two shift control mounting bolts down to 25 ft-lb. Using a 3/8″ x 1″ hex head bolt with a lock and flat washer put a drop of Loctite #242 (blue) on the threads and insert the bolt through the rear of the control mounting plate and attach the foot-peg pivot to it. Tighten the bolt while holding the footpeg pivot so that its hinge is lined up in a 45˚ rear facing angle. Thread supplied shift rod coupler to stock shift rod end at trans arm. Mount the shift pedal to the other end of the shift ro d using a 5/16″ x 1″ socket head screw and Nylocnut . Adjust the transmission shift linkage so that the shift arm on the forward controls and the shift arm on the transmission are parallel. Secure it with the jam nuts. Apply a drop of Loctite #242 (blue) to the threads under the jam nut before tightening see Photo 3 After you have assembled the shift control onto your motorcycle you must align the footpeg. The folding footpeg assembly uses a blind stud to attach the footpeg to the footpeg pivot. Shim washers (3/8″ x .015″) are used on the stud between the footpeg and the pivot, see Photo 4, so that the top surface of the footpeg is correctly aligned for your foot when it is tightened down on the pivot. This is done by setting a couple of shim washers on the footpeg mounting stud “A” and then screwing the footpeg onto the mounting stud, if the footpeg is rotated to far forward then add another shim washer, if not far enough then remove a shim washer. After you have the selected the correct number of shims for your footpeg, disassemble the footpeg and put a drop of Loctite #271 (red) on both ends of the stud and reassemble the footpeg. This will also need to be done on the brake control footpeg. Setting Up the Master Cylinder The master cylinder pushrod return spring and pushrod boot must be installed on the master cylinder before it is assembled onto the forward control mount. The parts are shown in Photo 5: pushrod boot (A), pushrod return spring (B), spring seat washer (C), and master cylinder (D). Place the return spring seat washer into bore of master cylinder so that is sits on top of the piston retaining snap ring. Next set the pushrod return spring on the seat washer and slide the pushrod boot over the return spring now slip the big end of the boot over the flange on the master cylinder so that the ridge on the inside of the boot fits into groove “A” that is machined into the end of the master cylinder flange, see Photo 6. Installing The Brake Control Unplug stock brake light switch at master cylinder. Remove brake line from rear caliper. Remove the existing brake controls from your motorcycle down to the control mounting lug that is welded on to the frame’s right side, see Photo 8. Save Metric hardware for later use. A Shim Washer PHOTO 4 A B C D PHOTO 5 A PHOTO 6 PHOTO 7 Note For complete brake system removal instructions and precau – tions refer to the appropriate service manual for your year and model motorcycle

Incoming search terms:

Incoming search terms: