torque specs on 16 hd ultra

You search Auto repair manual PDF torque specs on 16 hd ultra, if there are search results will appear below. If search results do not exist, please search by others keyword.



  torque specs on 16 hd ultra Direct Download speed 5282 Kb/s

  torque specs on 16 hd ultra Full Version speed 6162 Kb/s



2008 FLT Police Models Service Manual Supplement

0

Filed Under (Harley Davidson) by admin on 25-11-2010

download
ITEM SERVICED 14-21 ft-lbs (19.0-28.5 Nm) Drain plug torque Engine oil and filter 4 qt. (3.8 L) Oil capacity Hand tighten 1/2-3/4 turn after gasket contact Filter 63798-99A Chrome filter part number 63731-99A Black filter part number FORMULA+ TRANSMISSION AND PRIMARY CHAIN LUBRICATION (Part No. 99851-05) Lubricant type and capacity Primary chain lubricant Wet: 38 oz. (1124 ml) Dry: 45 oz. (1331 ml) 14-21 ft-lbs (19.0-28.5 Nm) Primary chaincase drain plug torque 1/2-1 turn Adjuster screw free play Clutch adjustment 72-120 in-lbs (8.1-13.6 Nm) Adjuster screw locknut torque 1/16-1/8 in. (1.6-3.2 mm) Free play at hand lever 84-108 in-lbs (9.5-12.2 Nm) Clutch inspection cover torque Dipstick at FULL with motorcycle on jiffy stand and filler plug resting on threads. Lubricant level Transmission lubricant FORMULA+ TRANSMISSION AND PRIMARY CHAIN LUBRICATION (Part No. 99851-05) Lubricant type and capacity 32 oz (0.95 liters) 14-21 ft-lbs (19.0-28.5 Nm) Transmission drain plug torque 25-75 in-lbs (2.8-8.5 Nm) Transmission filler plug/dipstick torque Front: 36 psi (248 kPA) Pressure: solo rider Tire pressure and wear Rear: 36-40 psi (248-276 kPA) Replace if less than 1/32 in. (0.8 mm) of tread pattern Wear 55 in-lbs (6.2 Nm) minimum Spoke nipple torque Wheel spokes 99953-99A (12 oz.) D.O.T. 4 hydraulic brake fluid part number Brake fluid level Front: 0.20 in. (5.0 mm) Fluid level (from top of master cylinder reservoir) Rear: 0.26 in. (6.5 mm) Front: 7-10 in-lbs (0.8-1.1 Nm) Master cylinder reservoir cover screw torque Rear: 12-15 in-lbs (1.4-1.7 Nm) 0.016 in. (0.4 mm) Minimum brake pad thickness Brake pads and discs 75-102 in-lbs (8.5.-11.5 Nm) Brake caliper pad pin torque Front: 0.18 in. (4.5 mm) Minimum brake disc thickness Rear: 0.25 in. (6.3 mm) 0.008 in. (0.2 mm) Maximum brake disc lateral runout (warpage) 10 lb. (4.5 kg) Upward force applied at midpoint of bottom belt strand Drive belt deflection 3/8-7/16 in. (9.5-11.1 mm) FLHTP 1/4-5/16 in. (6.4-7.9 mm) FLHP/FLHPE 40-60 in-lbs (4.5-6.8 Nm) Air cleaner cover bracket screw torque Air cleaner 36-60 in-lbs (4.1-6.8 Nm) Air cleaner cover screw torque LOCTITE MEDIUM STRENGTH THREADLOCKER 243 (BLUE) Air cleaner cover screw Threadlocker Part No. 99642-97 (6 ml) LUBIT-8 SUPER OIL, Part No. 94968-85TV (1/4 fl. oz.) Lubricant part number Clutch cable 35-45 in-lbs (4.0-5.1 Nm) Handlebar switch housing screw torque

Incoming search terms:

2009 Kawasaki ULTRA 250X/ 260X FUEL INJECTION CONTROLLERS And REGULATORS INSTALLATION MANUAL

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
The R&D high performance Air Filter Kit will improve acceleration and top speed performance by increasing air flow and reducing air temperatures that enter directly into the Ultra 250X’s air plenum box area. The O.E.M. air plenum box on the Ultra 250X is a great design that will flow plenty of air. However, the air that feeds the plenum box is heated by the engine. R&D has created an easy to install “flat filter” that installs directly in place of the large center access inspection cover located directly under the main glove box. The R&D Flat Air Filter insert will allow unrestricted fresh and cool air to enter the air plenum box area which will add power you can feel and a nice high performance tone. The R&D Performance Filter Kit also features two filters, one for each of the surge and blowoff protections valves. The O.E.M. surge valve recycles compressed hot air back into the air box plenum at idle and under deceleration conditions. The R&D surge and blowoff valve filter kit removes the air recycling hoses which will keep the hot air from entering the air plenum box reducing the engines intake air temperatures. The R&D Ultra 250X Air Filter Kit offers great performance tips on how to remove the restrictive air vent hoses which will further reduce the under seat ambient air temperatures. The R&D Filter system does not remove or alter the O.E.M. plenum box in any way, therefore there are no questions to be answered regarding water ingestion

Incoming search terms:

Yamaha R1 2007-2008 Frame Slider Installation

0

Filed Under (Yamaha) by admin on 01-01-2012

download
Installation Steps: 1. Remove left and right body panels. 2. Remove the left side engine stud. Mount the left side offset using 99-HB-SH10125080 Socket Cap 10 X 1.25 X 80 Main Engine Stud. Tip: Only tighten enough so you can still move the offset by hand. Loosely mount the left side body panel. Adjust the offset so the frame slider when mounted will clear the bodywork. There is also a groove cut in the offset, this is so the body can clear the offset. 3. With the offset in the correct position remove body and torque down to OEM torque specs. 4. Using one drop of blue thread locker mount the left side puck to the offset with 99-HB- SH10150045 Socket Cap 10 X 1.5 X 45 (Holds puck to offset). Torque down to 30 to 32 foot lbs. 5. Remove the right side engine stud. Mount the right side offset using 99-HB-SH10125080 Socket Cap 10 X 1.25 X 80 Main Engine Stud. Tip: Only tighten enough so you can still move the offset by hand. Loosely mount the right side body panel. Adjust the offset so the frame slider when mounted will clear the bodywork. There is also a groove cut in the offset, this is so the body can clear the offset. 6. With the offset in the correct position remove body and torque down to OEM torque specs. 7. Using one drop of blue thread locker mount the right side puck to the offset with 99-HB- SH10150045 Socket Cap 10 X 1.5 X 45 (Holds puck to offset). Torque down to 30 to 32 foot lbs. 8. Mount left and right bodywork

Incoming search terms:

YAMAHA YZF-R1P YZF-R1PC ASSEMBLY MANUAL

0

Filed Under (Yamaha) by admin on 26-02-2011

download
PREPARATION To assemble the motorcycle correctly, supplies and working space are required. Supplies oils, greases, shop rags. Workshop The workshop where the motorcycle is assembled should be clean and large. The floor should be level. Self-protection Protect your eyes with suitable safety spectacles or safety goggles when using compressed air, when grinding or when doing any operation which may cause particles to fly off. Product hands and feet by wearing safety gloves or doing. SYMBOLS USED ON CRATE CARTON Contents of the transport package are fragile therefore it shall be handled with care. Indicates correct upright position of the transport package. Transport package shall be kept away from rain. Insertion of the lift arm from this side is prohibited. Lift arm inserting position. -1- UNPACKING 1. Remove the frame cover 1. NOTE: To remove the frame cover, cut the vinyl bands around the cover using a cutter or scissors. 2. Remove the bolts 2 (upper bracket). 3. Remove the bolt 3 (front tire). 4. Remove the packing frames 4 (upward and sideways). NOTE: Remove the bolts while holding frame. NOTE: Before starting the assembly, check for damaged or missing parts. The parts are contained in the cartan and the motorcycle for damage, scratches and other defects. -2- PARTS LOCATION 1 Carton box -3- 1 Carton box Screw, washer and special nuts (windscreen) Bolt (front master cylinder) Bolt (handle crown and handlebar) Nut (rear view mirror) Nut (front reflector) Front reflector Vinyl bag 1 Plugs (handle crown) Owner’s manual Rear view mirrors Windscreen – -5- 1. Handlebar 1 2 3 4 5 6 1 1 1 1 2 1 Reservoir tank (brake) Hexagon socket bolt Crown nut Hexagon socket bolt Cap Hexagon socket bolt * V * V V * d = 6 (0.24), r= 12 (0.47) d = 6 (0.24), r= 25 (0.98) d = 8 (0.31), r= 30 (1.18) 2. Front reflector A: Tighten the crown nut to specified torque. Tightening torque: 115 Nm (11.5 m • kg, 85.0 ft • lb) B: Tighten the bolt to specified torque. Tightening torque: 13 Nm (1.3 m • kg, 9.4 ft • lb) C: Tighten the bolt to specified torque. Tightening torque: 13 Nm (1.3 m • kg, 4.4 ft • lb) A: Tighten the screws to specified torque. Tightening torque: 40 Nm (4.0 m • kg, 29 ft • lb) 1 2 3 4 5 2 2 2 4 4 Reflector bracket Reflector Nut Washer Caliper bolt * V V * * d = 5 (0.20) d = 10 (0.39) d = 10 (0.39), r= 30 (1.18) 3. Clutch cable 1 Clutch cable 1 * A: Check the clutch lever for smooth action. CAUTION: Proper cable routing is essential to assure safe motorcycle operation. Refer to “CABLE ROUTING

Incoming search terms:

HARLEY DAVIDSON XLH 1200cc BIG BORE KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 06-03-2011

download
Boring and Honing Procedures 1. Check again for burrs on cylinder gasket surfaces and remove burrs before performing Step 2. 2. Install original head and base gaskets, CYLINDER TORQUE PLATES (Part Number 33446-A) and TORQUE BOLTS (Part Number 33446-4). Tighten TORQUE BOLTS following tightening procedure given in the INSTALLATION, CYLINDER HEAD procedure in the ENGINE section of the Service Manual. NOTE Torque plates, properly tightened and installed with gaskets, simulate engine operating conditions. Measurements will vary as much as 0.001 inch without torque plate. 3. The cylinder must be bored with gaskets and torque plates attached. Bore the cylinder to 0.003 inch under the desired finish size. 1 WARNING CAUTION CAUTION 1 WARNING Kit Number 4. Hone the cylinder to its finished size (See Figure 1) using a 280 grit rigid hone followed by a 240 grit flexible ball hone. Honing must be done with torque plates attached. All honing must be done from the bottom (crankcase) end of the cylinder. Work for a 60 degree crosshatch pattern. 5. See Figure 1. After machining and honing, chamfer the bottom edge of the cylinder liner. the chamfer provides a beveled surface for easier installation of the cylinder over the piston rings. Break leading edge of liner to a flat surface. The bottom edge of the liner will be somewhat sharp after machining. This sharp edge could easily be damaged during installation of the cylinder. Piston Installation The 1200cc pistons have an arrow on the top of the piston. This arrow must face the front of the engine when piston is installed. There is no front cylinder piston or rear cylinder piston. New pistons can be installed in either cylinder. Check piston rings for proper side clearance and end gap (See XLH Service Manual). Be sure end gaps of adjacent rings are installed 90 degrees apart. Assembly Follow assembly and torque specifications given in the ENGINE section of the applicable Service Manual. Replace original gaskets, O-rings and seals with new components furnished in kit. NOTE Push rod covers on 1991 and later models are one-piece and the correct O-rings are as follows: Bottom – Part Number 17944-89 Upper – Part Number 11190 Engine Break In For the first 500 miles, to wear-in critical parts, observe these few simple driving rules: During the first 50 miles, keep the engine speed below 2500 RPM in any gear. Up to 500 miles, vary the engine speed, avoiding any steady speed for long distances. Engine speed up to 3000 RPM is permissible in any gear. Avoid fast starts at wide open throttle. Drive slowly until engine warms up. Avoid running the engine at extremely low RPM in higher gears. 2 of 3 -J00001 1200cc CYLINDER FINAL BORE SIZE AFTER HONING STANDARD BORE DIAMETER 3.4980 inch + 0.0002 inch Figure 1. Bottom Edge of Cylinder Liner Chamfer i04852 Break Edge to Flat Surface

Incoming search terms:

Kawasaki Ultra/ STX-R Billet Head Installation Instructions

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
1) Remove stock head and clean the top surface of the cylinder. 2) Remove the stock water fittings from the stock head and install them in the ADA head in the same order. 3) Install all o’rings in the ADA billet head, use small amounts of grease to hold them in place, do not use super glue or silicone. 4) Apply a small amount of grease to the small (OR020) o’ring at the top of the dome. This will allow the dome to easily slip into the head shell. Be careful when turning the head upside down to install onto the cylinder, as the domes can slide out of the head shell. 5) Make sure all the o’rings are in place and place the head on top of the cylinder with the water outlets on the top side. You must be sure that none of the o’rings slip out of their groove, as this will cause an o’ring to get pinched and a water or compression leak could result. 6) Use the additional 8mm flat washers on the taller studs, along with the stock wash- ers. 7) Torque all of the nuts to 15ft/lbs, in a center-out criss-cross pattern. Now, torque them again to 18ft/lbs. 8) After the 1st time out riding the head should be re-torqued

2006 DUCATI 996 HORSEPOWER & TORQUE BAR GRAPH installation

0

Filed Under (Ducati) by admin on 26-10-2010

download
BLUE BEFORE MTECH RED AFTER INSTALLATION OF MTECH MAXIMUM HORSEPOWER INCREASED FROM 106.7 TO 109.2 TORQUE CURVE SHOWS AN INCREASE EVEN THIS HIGHLY SOPHISTICATED ENGINE’S HORSEPOWER IMPROVED WITH THE MTECH FUEL SAVER TORQUE CURVE IS MUCH SMOOTHER AT LOW SPEED

ADLY Electric corrosion problem solved

0

Filed Under (Adly) by admin on 27-10-2010

download
makes the most patient equipment manager’s jaw get tight. It’s a messy process that involves draining, disassembly, flushing, and days of downtime. Now, our dealership offers a new, more thorough, less invasive solution to hydraulic contamination that can be brought right to your jobsite. It’s called the Ultra Clean®System. The innovative Ultra Clean hose and tube cleaning system removes contamination by using a pneumatic launcher to shoot a projectile through hydraulic lines and hoses. A “shelled” pump can send a lot of metal debris downstream with the last few gallons of oil that flow through the system. Flushing hydraulic lines with solvent and air can be tedious, and sometimes ineffective, but the Ultra Clean system makes decontaminating hydraulic systems fast and easy. It also lets you skip the hassle of handling and disposing harsh chemicals. It is as simple as disconnecting both ends of a line or hose and launching the specially designed projectile through it. “The Ultra Clean system is more efficient than any other method we’ve tried,” says Scott Dickey, Service Manager, Murphy Tractor, the John Deere dealership in Lincoln, Nebraska. “We no longer worry about the time and expense of hose replacement and tube disassembly for repair service. Ultra Clean is clearly superior than flushing with solvents and air blow-down.” Dickey says the Ultra Clean system is also used to prepare fabricated hose assemblies for over-the-counter sales at his dealership. He points out it has increased the value of parts and service by assuring delivery of cleaned assemblies that are ready for service. Logo sealing tape covers the open assembly ends and assures the customer that the assembly has been cleaned. It also serves as a reminder to keep contamination out of the system when the new assembly is put into place. Cleaning fabricated hoses right after they are constructed is another way in which dealers are taking a proactive approach to reducing contamination in hydraulic systems and reducing the risk of contam- ination. DataTrending Is A Road Map to Less Downtime. It’s important to understand that a little dirt can cost a lot of money if you let it get into your hydraulic system. Dirt circulating in your hydraulic fluid grates like a belt sander on internal machine parts. Trending, along with a proactive approach to contamination control and elimination, can help you prevent this scary scenario. “A little bit of contamination can cause lots of wear and tear in just a short time,” explains Mike Daly, fluid analysis program marketing manager for John Deere Construction & S

HARLEY DAVIDSON TLE/TLE-ULTRA SIDECAR ATTACHMENT KIT REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 13-03-2011

download
REMOVAL NOTES Refer to the service manual for more information on these generalized steps. Save all removed parts (unless otherwise noted) for installation of this kit or for motorcycle operation without the sidecar. 1. For TLE-Ultra Models: Remove both lower fairings. 2. Remove the bolt and lockwasher securing the right passenger footrest bracket and remove the bracket with footrest. 3. Remove the three right side exhaust heat shields. Some models may require removal of the right side exhaust pipes. 4. Remove stock clutch cable. 5. Remove rear master cylinder/rear brake pedal assembly. Remove rear brake pedal from master cylinder assembly. Remove and save rubber pedal pad and brake pedal. Discard cotter pin. 6. Cut the cable straps holding front oxygen sensor connector to frame bracket. 7. Remove wire harness/brake line clip from right lower frame tube. INSTALLATION New Clutch Cable Installation 1. Refer to the service manual and follow instructions to remove stock clutch cable. 2. Refer to the service manual and follow instructions to connect the new clutch cable to clutch hand lever. 3. For FLHT/C/CU: Follow the instructions in the service manual to route new clutch cable through fairing. 4. For FLHR/C Models: Capture the cable in a clamp at the left upper passing lamp bolt. On FLTR models, capture the cable in a clamp at the left upper bolt securing the speedometer and tachometer housing to the upper fork bracket. These locations are identical with stock cable routing. 5. See Figure 1. Route clutch cable down along left frame downtube (1). 6. Continue to route cable down between left front engine isolator and crankcase. Clutch cable will cross to the right side of motorcycle beneath the crankcase, to the clutch release cover on the right side of the transmission. 7. Install clutch cable fitting into clutch release cover. Refer to the service manual. NOTES The final positioning and attachment of the clutch cable and clutch cable adjustment will be performed after sidecar mounts have been installed. Verify that the clutch cable and the rear brake line do not make contact. Damage could result. 1 2 3 is05785 1. Downtube 2. Clutch cable 3. Route clutch cable behind left front engine iso- lator Figure 1. Route Clutch Cable Relocating Oil Pressure Sending Unit NOTES Perform this procedure on all models equipped with an oil pressure gauge or Police models. All other models proceed to “Master Cylinder Assembly/Rear Brake Pedal Modification.” 1. Remove cable strap securing oil pressure wire harness to frame. 2. Locate the latch on connector to oil pressure sender (next to lower right frame downtube). Raise latch on connector and disconnect connector from oil pressure sender. 3. Remove the oil pressure sender using a 1-1/16 inch open- end crowfoot wrench. 4. See Figure 16. Coat threads of elbow (44) with Loctite 565 and install into crankcase oil pressure sender threads. 5. See Figure 2. Install elbow (1) until snug so open end is in the five-o’clock position (2). Do not over-tighten or crankcase may be damaged. 6. Coat threads of oil pressure sender with Loctite 565 and install into 90 degree brass elbow. Use a 1-1/16 inch open- end crowfoot and tighten to 96-120 in-lbs (11-14 Nm) . 7. Install connector on oil pressure sender unit. Verify that slight clearance to the right engine isolators is present. Adjust position of elbow as required to provide clearance

HARLEY DAVIDSON REAR SADDLEBAG GUARDRAILS INSTALLATION MANUAL

0

Filed Under (Harley Davidson, Uncategorized) by admin on 18-04-2011

download
Installation KITNUMBER 49087-01 1. Remove and save fasteners that retain saddlebag guardrails. 2. Replace stock saddlebag guardrails with new guardrails from kit. 3. Screw in and torque each stock fastener as follows: a. Four stock screws, Part No. 3678, using two new locknuts (1), Part No. 7667. Torque each screw to 19 ft-lbs. b. Two stock screws, Part No. 3601 using two new locknuts (2), Part No.7686. Torque each screw to 9 ft-lbs. For Domestic FLHRC/I Vehicles Only. (Does not apply to Harley Davidson International (HDI) vehicles): Federal Motor Vehicle Safety Standard (FMVSS) 108 requires all motorcycles to be equipped with side reflectors. Install, or have Dealer install, the reflectors, Part Nos. 59370-98 and 59371-98, which are purchased separately. Loss of visibility to other motorists could result in death or serious injury. 1. See Service Parts illustration. Position reflector so it is centered on the vertical portion of the saddlebag guard 1″ above the top end of the lower bend where the radius turns upward. Measure and use a small piece of tape to mark location for attachment of the lower edge of the reflector at the 1″ mark. 2. Remove protective tape backing from one reflector. Locate reflector above the 1″ mark. Apply reflector, using even pressure by rubbing back and forth on reflector. Repeat for other side. Note Reflectors are specific for each side. Reflectors have a flat end and a curved end. The curved end goes down. Top edge should be horizontal when positioned on guard. If not, reflector is for opposite side. KITNUMBER 49088-01 1. Remove and save fasteners that retain saddlebag guardrails. 2. Replace stock saddlebag guardrails with new guardrails from kit. 3. Using four hexsocket button head screws (4) removed earlier, attach saddlebag guards using the remaining two existing holes in each guardrail. 4. Screw in and torque each stock fastener as follows: a. Four stock screws, Part No. 3678, using two new locknuts (1), Part No. 7667. Torque each screw to 19 ft-lbs. b. Two stock screws, Part No. 3601 using two new locknuts (2), Part No.7686. Torque each screw to 9 ft-lbs

Incoming search terms: