what should the shock bolts on a harley davidson be torqued to

You search Auto repair manual PDF what should the shock bolts on a harley davidson be torqued to, if there are search results will appear below. If search results do not exist, please search by others keyword.



  what should the shock bolts on a harley davidson be torqued to Direct Download speed 5282 Kb/s

  what should the shock bolts on a harley davidson be torqued to Full Version speed 6162 Kb/s



HARLEY-DAVIDSON SOFTAIL MODELS STEALTH AIR SHOCK MOUNTING

0

Filed Under (Harley Davidson) by admin on 16-12-2010

download
INSTALLATION 1. Remove the seat, inner fender, and ignition coil cover. Removing the rear wheel assembly is recommended for ease of installation, but not absolutely necessary. Remove the nut cup and outer grommet on each of the Works shocks. If you intend to leave the ride height at stock height for road riding, position the inner nut cup SHOC KS SHOC KS WORKS PERFORMANCE PRODUCTS, INC. 21045 Osborne St., Canoga Park, CA 91304 818.701.1010 fax 818.701.9043 STEALTH AIR SHOCK MOUNTING FOR HARLEY-DAVIDSON SOFTAIL MODELS 2000-ON #HDAIR-00 – 02/15/2006 WARNING! THESE SHOCKS MUST ONLY BE USED WITH STOCK SWINGARMS AND ON STOCK FRAMES WITH THE STOCK BOTTOMING BUMPERS ON THE CHASSIS TO LIMIT THE TRAVEL OF THE SHOCKS. AFTERMARKET SWINGARMS, OR MODIFIED SWINGARMS THAT DO NOT HAVE THE UPPER BRACE THAT ACTS AGAINST THE BOTTOMING BUMPERS CANNOT BE USED WITH THESE SHOCKS. INCREASING THE TRAVEL BY ELIMINATING THE BUMP STOPS OR A NON-STANDARD SWINGARM DESIGN WILL ALLOW THE TIRE TO MAKE CONTACT WITH THE FENDER OR OTHER CHASSIS COMPONENTS, AND CAN DAMAGE THE SHOCKS. 19. Lock Washers 20. Long Bolts (2) 21. Short Bolts (2) 13. Din Plug Screw 14. Din Plug Gasket 15. Cap 16. Eye Spacers (4) 17. Cotter Pins (2) 18. Switch Bracket 7. Compressor Bracket 8. Harness 9. Fuse Block 10. Din Connector 11. Solenoid 12. Hose 1. Damper Shock 2. Air Spring Shock 3. Nut Cup 4. Grommet 5. Hose 6. Compressor 1 2 3 4 5 6 7 8 9 10 11 12 13 15 16 17 14 18 19 20 21 Fig. 1–Nomenclature on the damper shock up against the ring nut. The shocks are now ready to install. 2. Place the motorcycle on a suitable frame stand allowing unrestricted access to the shocks. 3. Place a small screw jack under the swing arm to support the weight as well as allow you to position the swing arm correctly to line up the shock mounting bolts. Remove stock shocks. 4. Install the left side (damping) shock with the stock mounting bolt. Make sure that the bolt threads and threaded portions of the frame are free of oil and grease. Grease the shoulders of the bolts and use thread lock compounds on the threads. Discard the stock shock washers on both shocks. Do not use any washers- -including the stock washers on these bolts. Use only the spacers included. The 3/16-inch wide spacers are used on each side of the shock eye. Do not “double-up” the spacers together on either side of the shock eye, as this will cause misalignment of the shocks which can lead to premature wear or damage to the shocks. 5. Put the supplied spacers on each side of the eye. The shoulder of the bolt must protrude a small amount through the shock eyes in order to allow the shock to pivot freely. This is extremely important. With the shocks fully tightened, the spacers should be free to rotate with finger pressure. If the washer is used or a non-stock bolt is used, the bolts will work loose or break because the shocks are in a bind.

Incoming search terms:

Harley-Davidson XL 883 and 1200 MODELS SADDLEBAG SUPPORT KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 27-04-2012

download
1. 1994-99 models: Remove upper shock absorber nut, washer, shock cover and backing washer. Save nut and washer and discard shock cover and backing washer. 2000-03 models: Remove upper shock bolt, washer and shock cover and save washer. NOTE: Do not remove stock inboard washer that is positioned behind shock cover and against shock absorber. 2. All models: Remove OEM buttonhead screw and flanged nut directly to the rear of the upper shock mount on fender support. Note T-spacer in fender support. Save nut and discard bolt. 3. 1994-99 models: Position saddlebag support (item 1) with front bracket over shock stud and rear mount over hole in fender support. Install ½ * bushing (Item 2) over shock stud and into hole of support front mount. Install saved OEM nut and washer (items 3,4) and tighten securely. 2000-03 models: Apply Locktite to the OEM shock screw (Item 5) and install through the saved washer (Item 6), front bracket of the saddlebag support (Item 1), shock and into the frame. Tighten to 21-35 ft. -lbs torque. NOTE: If installing supports with sissy bar side plates, omit 5/16 * lock washer (Item 8). H-D sissy bar side plate mounts between fender support and fender. Khrome Werks® sissy bar plate mounts outboard of fender support. CAUTION: Be careful to not dislodge T-spacer from its position in fender while inserting screw through fender support and fender. 4. Insert supplied socket head cap screw (Item 7) and lock washer (Item 8) (if applicable) through the rear saddlebag support mount, sissy bar side plate (if applicable) , fender with T-spacer and frame. Apply Loctite to the saved flanged nut and secure. Tighten to 8-13 ft-lbs torque.

HARLEY DAVIDSON CHROME BELT SPROCKET COVER KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 11-02-2011

download
Installation 1. Remove rear wheel. Refer to the applicable Service Manual for the proper removal procedure. 2. Remove bolts and washers from sprocket. •If you intend to install Acorn Nut and Stud Kit (Part No. 91734-85), refer to that Instruction Sheet at this time (please note that this Acorn Nut and Stud Kit does not fit Sportster (XL) models). •If you do not intend to install Acorn Nut and Stud Kit (Part No. 91734-85), retain bolts and washers for reassembly. Proceed to Step 3. 3. Position sprocket cover so that its mounting holes align with the holes in the sprocket. NOTE There is only one position which allows each hole in the cover to align with a hole in the sprocket. If replacement bolts, washers, or nuts are required, use only genuine Harley-Davidson parts specified for your particular model. Aftermarket fasteners can adversely affect performance, which could result in death or serious injury. NOTE • See Harley-Davidson service manual for proper torque val- ues; •Aftermarket fasteners may not have the specific property requirements to perform properly. 4. Install bolts with washers through holes in sprocket cover and sprocket, and into threaded holes in wheel hub. Depending on the tensile strength grade of the bolts in your particular application, tighten bolts in a crosswise pattern to one of the torque values listed in the following table: 5. Refer to the applicable Service Manual for the proper procedure and perform the following: •Install axle. •Align belt. •Adjust belt tension. •Tighten rear axle nut to 60 – 65 ft-lbs torque. 6. Check sprocket for radial runout (eccentricity). If runout is visible, mark outer edge of sprocket at the location of runout. Loosen sprocket bolts and tap the marked location with a rubber mallet. Tighten sprocket bolts in a crosswise pattern to the applicable torque specified in Step 4.

Incoming search terms:

HARLEY DAVIDSON ADVANCED AUDIO CB RADIO KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 11-03-2011

download
2006 models: communication switch 77173-06 2007 models: communication switch 77173-07 2008 models: communication switch 77173-08 FLHT models will require prior installation of: •Advanced Audio AM/ FM/ CD Radio Kit (76412-06) •AM/ FM Antenna Kit (76325-06 or 76317-06) Unless one has already been fitted as part of another Advanced Audio kit installation: 2006-2007 FLHX models will require the separate purchase of: •fuel tank console (61270-98A), •tank console gasket (71294-89), •a button-head screw (3652), •nut (7964) •clip (10103 and 10120). •tank pod mounting screws (2462) quantity 3 •FLHT trim piece (52447-96) and cb pod trim badge 2008 FLHX models: •fuel tank console (61270-08) •clips (10103 and 10120) NOTE The console screws, fuel door, gasket, mounting bracket will all need to be reused. FLTR models will require the separate purchase of: •a Console Pod Assembly (77136-03), and •three pan-head screws (2462). NOTE See a Harley-Davidson dealer for availability of optional decorative inserts for the Console Pod Assembly. ALL models will require the additional purchase of: •a Non-Ultra Overlay Harness (70169-06), and EITHER : •a Premium Stereo Helmet Headset (77147-98) OR a Hand-Held CB Microphone Kit (76312-98), All of these items are available from a Harley-Davidson Dealer. If two modules are already installed on top of the radio, two Dual-LockTM mounts, (76434-06), will be needed. Models WITHOUT a Tour-Pak installed will require the additional purchase of a Frame Mount CB Antenna Kit (76415- 06). Models WITH a Tour-Pak installed will require the additional purchase of a Tour-Pak Mount CB Antenna Kit (76414-06). All of these items are available from a Harley-Davidson Dealer. The rider’s safety depends upon the correct installation of this kit. Use the appropriate service manual procedures. If the procedure is not within your capabilities or you do not have the correct tools, have a Harley-Davidson dealer perform the installation. Improper installation of this kit could result in death or serious injury. (00333a) NOTE This instruction sheet references Service Manual information. A Service Manual for your model motorcycle is required for this installation and is available from a Harley-Davidson Dealer. Electrical Overload It is possible to overload your motorcycle’s charging system by adding too many electrical accessories. If your combined electrical accessories operating at any one time consume more electrical current than your vehicle’s charging system can produce, the electrical consumption can discharge the battery and cause vehicle electrical system damage. See a Harley-Davidson dealer for advice about the amount of current consumed by additional electrical accessories, or for necessary wiring changes. (00211b)

Incoming search terms:

2010 Harley-Davidson FLHR Road King front and rear 4-piston braking system Installation

0

Filed Under (Harley Davidson) by admin on 31-10-2010

download
in Vivid Black with blue and silver pinstripes, six-speed. Air-cooled, Twin Cam 96™ engine with Electronic Sequential Port Fuel Injection (ESPFI), ABS, security system, cast wheels with independent front and rear 4-piston braking system. Motorcycle generously donated by Harley-Davidson Motor Company Police & Fleet Sales. MSRP excludes all taxes title/documentary fees, registration, tags, dealer prep, labor and installation charges, insurance, optional equipment and accessories, certificate of compliance or non-compliance fees, and finance charges. Delivery must be coordinated through Rockville Harley-Davidson by November 30, 2010. Winner is responsible for any applicable fees above. 6,000 tickets printed. Odds of winning are 1:6,000. Ticket holder need not be present to win. Licensed by the D.C. Lottery and Charitable Games Control Board. Must be 18 years or older to win. No substitutes, return for cash, or other models. As per IRS tax code, amounts paid for chances in a raffle do not qualify as a deductible charitable contribution. Taxes on prizes are the responsibility of the winner. Harley-Davidson is proud to be a sponsor of the National Law Enforcement Officers Memorial Fund. Harley-Davidson Motor Company is a prize provider only, and Harley-Davidson, Inc., and Harley-Davidson Motor Company have no responsibility regarding conduct or administration of the raffle.

Incoming search terms:

ATK 50MX INSTALLATION AND ADJUSTMENT TIPS

0

Filed Under (Atk) by admin on 01-11-2010

download
PRELOAD ADJUSTMENT— On some Works shocks a threaded preload is standard. This allows the adjustment of the ride height of the motorcycle. The preload is changed by turning a threaded nut down towards the spring (higher ride height) or up away from the spring (lower ride height). The nut is a right-hand thread. CHECKING RIDE HEIGHT— 1. With the bike unloaded on the side stand and the shock fully extended, have an assistant measure from a point at the axle (center point) to a point on the frame, fender or bodywork directly above it. Record this measurement. 2. With the bike off the stand and the rider in the seat, bounce on the suspension and let the bike settle. Have the assistant measure from the same two points. Subtract the second measurement from the first. HM CRX50 / BAJA & ATK 50MX INSTALLATION AND ADJUSTMENT TIPS Continued on next page. #HM50 – 5/27/99 #HM50 – 5/27/99 To Front Valve Mounting channel Spacer Flange Shock eye Top View of Shock Mount Fig. 1 Top view of upper shock mount. The flange on the shock bushing must face toward the spacer. The valve should point toward the front of the bike Fig. 1 Top view of upper shock mount. The flange on the shock bushing must face toward the spacer. The valve should point toward the front of the bike 3. The amount of settle, or “sag” is a function of the wheel travel. It should only be between 1/4 and 1/3 of the total travel. 4. If the difference is less than the minimum, reduce the spring preload. Measure the distance again starting with Step 2. Adjust again if necessary. 5. If the difference is more than the maximum, increase the spring preload. Measure the distance again starting with Step 2. Adjust again if necessary. Note: If the ride height is too low, the shock will bottom unnecessarily, resulting in a harsh ride. If the ride height is too high, the shock will “top out” too easily when rebounding from a bump or under hard deceleration. NITROGEN PRESSURES IN EMULSION SHOCKS CAUTION: The pressure in these shocks cannot successfully be checked. Concerns with the gauge volume and the gas volume in the shock body create a situation where you cannot accurately determine what pressure was in the shock. In addition when the pressure is lowered (i.e. checking the pressure) the gas and some of the shock oil escapes into the gauge. It is possible to lose a large percentage of the shock oil by depressing the core of a charged shock to the atmosphere. Please note that in order to check the pressure, some of the gas must escape and fill the gauge assembly. The volume of the gas pocket is about half the size of your thumb, so a very small volume change results in a large pressure drop. Because the gauges’ volumes vary, it is not possible to deduce the actual pressure in the shock prior to attaching the gauge. Therefore it is imperative that any attempt to check pressure be accompanied by the capability of refilling the shock. In other words: If you don’t have a nitrogen source handy, don’t check the pressure! PRESSURIZING EMULSION SHOCKS The pressure setting for Works gas shocks is 250 p.s.i. of dry nitrogen. To pressurize a shock with some residual pressure in it, bring the gauge manifold up to 250 p.s.i. and depress the core with the T-handle. This will either equalize the pressure or refill the shock without transferring oil from the shock into the gauge assembly. The best gauges for this purpose screw on to the valve and incorporate a T-handled core depressor to isolate the shock from the gauge. This allows a leak-free separation once the desired pressure is reached. For simplified operation, an extra valve is provided for the filling apparatus, allowing pressure adjustment with the gauge in place. Works offers a suitable gauge and filling manifold. Most motorcycle shops that deal with dirt bikes can pressurize the shock

Incoming search terms:

HARLEY DAVIDSON SOFTAIL REAR LOWERING KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 11-02-2011

download
INSTALLATION Prepare the Motorcycle 1. Follow the Service Manual instructions to remove the seat. To prevent accidental vehicle start-up, which could cause death or serious injury, disconnect negative (-) battery cable before proceeding. (00048a) 2. Disconnect the negative (-) battery cable from the battery. 3. Place motorcycle on a lift and secure the front wheel. 4. Use an overhead crane or hoist attached to the frame to lift the rear of the motorcycle to allow the rear fork to pivot through its range of travel. 5. Place a screw jack under the rear wheel to support and adjust the rear fork during shock removal, installation and ride height adjustment. Be sure rear wheel is supported when removing rear shocks. If wheel is not supported rear fork can drop down, which could result in death or serious injury. (00481b) Removal 1. See Figure 1. Remove the bolt and washer (1) that fasten each of the shock absorbers (2) to the rear fork. NOTE Snap-on Tool Co. adapter, Part Number SRES 24, is necessary to gain access to the shock absorber bolts. 2. Remove the flanged locknut (6) and cup washer with grommet (5) fastening the shock absorber to the frame bracket (4) and remove the shock absorber. 3. Remove, inspect and, if necessary, replace the rubber grommets, the cup washers (5), and the bushing (3). 4. Repeat for the other shock absorber. Disassemble the Shock 1. Thoroughly clean the rear fork end of the shock, especially near the shock canister seal. 2. Support the rear fork end of the shock absorber and shock canister on the table of a press. 3. Press on the shaft to compress the spring in the canister until the keeper plate drops down away from the retaining ring.

Incoming search terms:

HARLEY-DAVIDSON FLH/ FLT MODELS 1985-1996 REAR LOWERING KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 04-03-2012

download
may encounter clearance problems when re-installing the saddlebags. Check for a minimum of 5mm. clearance to prevent damage to the saddlebags. Measure clearance in the recessed area in the “backside” of the saddlebags where the shock sits. Check front, back and side clearance. THE BAGS MUST INSTALL WITHOUT UNDO FORCE. If they don’t, they are hitting the shock and/or shock boot. ****************** Inspect the clearance through the full range of motion of the swing arm ******************* n If more clearance is required, three suggested options are as follows: 1. Place washers between the mounting points where the saddlebags attach to the rails. This will move the bag slightly outward and away from the shock body. NOTE: On saddlebags utilizing DZUS FASTENERS (’85-’92), replace these with bolt/nut combination (as on ’93-’94 years). This will allow you to use washers to gain necessary clearance. 2. Remove or slide off the rubber boot that covers the shock shaft and attaches the body of the shock. The boot can be modified and reattached to the shaft (not the body) and secured with nylon ties and/or removed completely. This should gain you a minimum of 3mm of clearance. 3. Slot and/or space the saddlebag “rail/frame cage” mounting holes to allow the entire frame assembly to be moved out slightly from the shock body. You should use this modification only as a last resort n Lower motorcycle and check preload (shock spring stiffness). Adjustment may be necessary to suit personal preference in ride comfort. Read your Harley-Davidson owners manual for procedure. Test Ride.

Harley Davidson Road Rod Saddle Bag System Kit INSTALLATION Instructions

0

Filed Under (Harley Davidson) by admin on 16-04-2012

download
Use locktite on all fasteners!! 2. Put bike on lift and place jack under frame. Raise bike to lift rear wheel. 3. If swing arm pivot shaft is drilled and tapped on each end, they need to be redrilled and tapped to 3/8-16 to a depth of _” deep. If you are unable to drill & tap your swing arm pivot shaft, you can purchase one from Cycle Visions (part #CV6121), See Harley Davidson® V-Rod® Service Manual Section 2, Page 2.89 for removal and installation instructions. 4. Remove seat, passenger seat, turn signal module, rear fender cover, turn signal license plate assembly, and rear foot peg assemblies. NOTE: Our bag system will not work with stock exhaust system… we recommend the 2-into-1 Supertrap, or you may use any exhaust system that is lower than the rear axle bolt. 5. Remove the two upper shock bolts. Relocate the shock spacer from the right side to the left side, and use the new spacer supplied on the right side. 6. Install front bag mount between frame and spacer (see Figure 1), reinstall shock bolts and torque to 31-50 lbs. 7. Install lower bag support frame to swing arm pivot shaft using the 3/8″ bolt through rear foot peg clevis and cover (see in Figure 2). NOTE: There is a right and left covers and bag support, install accordingly. Torque to 35 foot lbs. 8. Install rear fender front mounting tabs using 8mm 1.25 x _ and flat washers (supplied in kit) (see Figure 3). 9. Install upright saddlebag support brackets to the lower bag mount assembly and lower fender extension crossover mount. (see Figure 4). Torque to 25 lbs. NOTE: Install crossover mount with gusset facing down. 10. Remove license plate light from your rear turn signal bracket license plate assembly. Install license plate light on our license plate light bracket (see Figure 5). 11. Install the license plate bracket on the inside of the rear fender extension using the top holes of the license plate frame (see Figure 6 & 7). 12. Install fender washers on the inside of the fender extension (see Figure 8). 13. Install upper fender bracket to rear fender extension with a _-20 bolt supplied in kit (see Figure 9). 14. Install rear fender extension with chrome button fitted bolts. (see Figure 10 & 11). 15. To check alignment and fit of rear fender extension reinstall original rear fender. Once you have everything lined up and fitted, remove original rear fender, drill & tap (2) two 5/16 x 18 holes in rear fender support bracket (see Figure 12). 16. Install Harley Davidson® Part #70909-95 and 47449-97 bracket and receptacle on front and rear bag supports (see Figure 13 & 14). 17. Install Harley Davidson® Part #47449-97 bracket with receptable (see Figure 14). Make sure the bolts come from the inside out. This bracket is adjustable for location.

Incoming search terms:

2000 & later Harley Davidson Softails Drag Specialties Shocks Installation Manual

0

Filed Under (Harley Davidson) by admin on 31-03-2012

download
1. Place motorcycle securely on stand or blocks so the rear wheel is slightly off the ground. 2. Per instructions in a authorized shop manual, remove your old shocks. Note location of the mounting hard- ware. 3. Before reinstalling a Drag Specialties adjustable ride height shock, spin the non-flanged nut all the way onto the stud mount, followed by a bushing-cup, bushing, and sleeve. Then install shocks as you would a stock unit, following an authorized shop manual. With the non-flanged nut spun all the way onto the stud, the stock ride height is achieved. Once you have installed the other bushing, bushing-cup, and flanged nut you can now install the safety E-clip. This E-clip is snapped into the groove near the end of the stud mount where the threads stop. This is to serve as a reference point ONLY – when the flanged-nut reaches it you have lowered your ride height the maximum 2 inches. DO NOT torque the flange-nut against the E- clip (see figure 1). 4. Tighten all shock mounting bolts to the proper torque specifications (see shop manual for specs). 5. Drag Specialties shocks have adjustable pre-load to compensate for varying weights. A Harley Davidson pre-load adjustment wrench is necessary to adjust the pre-load setting. Progressive Suspension, Inc. wrenches are available as Part # SW-784 from most Dealers and Accessory Stores and the Harley Davidson wrench is available as part #94455-89 from any Harley Davidson Dealer. Spring preload is set by us to the lightest setting. To increase preload for heavier riders/loads/passengers, loosen locknut with the inside portion of the supplied wrench or a 1 1/ 16 ” wrench and back it off several turns. Use the supplied wrench or a Harley

Incoming search terms:

Incoming search terms: