yerf dog diagrams

You search Auto repair manual PDF yerf dog diagrams, if there are search results will appear below. If search results do not exist, please search by others keyword.



  yerf dog diagrams Direct Download speed 5282 Kb/s

  yerf dog diagrams Full Version speed 6162 Kb/s



Yerf Dog 3203 REPAIR AND OWNERS MANUAL

0

Filed Under (Tips and Review) by admin on 22-11-2010

download
ENGINE Tecumseh warrants the engine for (2) years, NOT Flexible Flyer. See Tecumseh Engine Owner’s Manual. Engine repair, replacement parts, and warranty claims must be handled through an authorized dealer in your locality. Tecumseh has an extensive authorized sales and service dealer network. (See yellow pages of phone directory under “Engine-Gas”). PART 2 FRAME The frame and related components are warranted by Flexible Flyer and are applied to any part found to be defective due to material and/or workmanship when inspected at the Flexible Flyer factory. Flexible Flyer will at its’ option, repair or replace the defective parts to the original purchaser at no charge. The warranty periods are as follows from the date of purchase: A. Frame for 90 days, Void if: 1. Frame is broken or bent due to abuse (underside scraped abusively). 2. Wheels are bent or broken due to impact. 3. Spindles are bent due to impact. 4. Paint is worn off of rear bumper indicating an extra rider. 5. Axels are bent out of ordinary position either horizontally or vertically. 6. Non-Factory altering of engine or it’s components. B. Bearings and sprocket for 30 days C. Clutch for 30 days against breakage of its parts. No warranty is applied for wear of clutch shoes or clutch bearings due to service. D. Throttle cable, brake cable, brake band, chain, tires, seat, shocks, fasteners and other components are not warranted because due to normal service they are subject to excessive wear and abuse.

Incoming search terms:

WORKS PERFORMANCE STREET TRACKER SHOCKS FOR BIG DOG MOTORCYCLES

0

Filed Under (Tips and Review) by admin on 17-12-2010

download
SHOCK REMOVAL AND INSTALLATION– The shocks are fitted with special length spacers to maintain correct alignment between the frame and the swingarm. If the shocks are removed for service or repair, they must be installed in the correct position. Refer to the diagram on the next page for spacer positioning and layout. NOTE: Misalignment between the mounts on the frame and the mounts on the swingarm can cause binding between the shock shaft and shaft bushing. Misalignment of more than 1/4 inch can cause the shocks to bind up and not function properly. If this binding occurs, the shocks will feel overly stiff and harsh. Follow the procedures below to check for misalignment when installing the shocks. NOTE: The shock bushings are designed to have a certain side-to-side “float” to keep them from binding. As a result, do not grind or file the inner or outer edges of the bushings to make them narrower. The amount of “float” in the bushing set is necessary to ensure smooth operation of the damper assembly. If the shock eyes are tightened metal-to-metal (the outer faces of the eyes to the flanges or washers), this will lead to a harsh, stiff or choppy ride and premature seal leakage or damage to the shafts. MULTI-RATE SPRINGS Depending on each application, single or dual-rate springs are available. Dual-rate springs are just that– a spring set with two separate rates. This is done with a short spring stacked on a longer spring. As both springs compress they produce a soft, or initial, rate. The spring set will maintain this initial rate until the short spring stops compressing. At that point, the spring rate “crosses over” to the stiffer, or final, rate. This multi-rate system allows a soft initial rate for comfort on small bumps, but has the capability of soaking up the big pot-holes and other road hazards. PRELOAD ADJUSTMENT— On Works shocks, threaded preload is standard. (See Fig. 2.) This allows the adjustment of the ride height of the motorcycle. The preload is changed by turning a threaded nut down towards the spring (higher ride height) or up away from the spring (lower ride height). The nut is a right-hand thread. It is used primarily to set the ride height for solo riding, but can also be used when

Incoming search terms:

Yamaha 1998 XVS1100 REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 03-01-2012

download
EXPLODED DIAGRAMS To help identify parts and clarify procedure steps, there are exploded diagrams at the start of each removal and disassembly section. 1. An easy-to-see exploded diagram 4 is provided for removal and disassembly jobs. 2. Numbers 5 are given in the order of the jobs in the exploded diagram. A number that is enclosed by a circle indicates a disassembly step. 3. An explanation of jobs and notes is presented in an easy-to-read way by the use of symbol marks 6 . The meanings of the symbol marks are given on the next page. 4. A job instruction chart 7 accompanies the exploded diagram, providing the order of jobs, names of parts, notes in jobs, etc. 5. For jobs requiring more information, the step-by-step format supplements 8 are given in addition to the exploded diagram and the job instruction chart.
24 21 18 15 16 17 10 12 13 11 14 1 3 5 7 9 2 4 8 6 19 20 22 23 25 EB003000 ILLUSTRATED SYMBOLS Illustrated symbols 1 to 9 are printed on the top right of each page and indicate the subject of each chapter. 1 General information 2 Specifications 3 Periodic inspections and adjustments 4 Engine 5 Cooling system 6 Carburetion 7 Chassis 8 Electrical 9 Troubleshooting Illustrated symbols 10 to 17 are used to identify the specifications appearing in the text. 10 Can be serviced with engine mounted 11 Filling fluid 12 Lubricant 13 Special tool 14 Torque 15 Wear limit, clearance 16 Engine speed 17 Ω, V, A Illustrated symbols 18 to 23 in the exploded diagrams indicate the types of lubricants and lubrication points. 18 Apply engine oil 19 Apply gear oil 20 Apply molybdenum disulfide oil 21 Apply wheel bearing grease 22 Apply lightweight lithium-soap base grease 23 Apply molybdenum disulfide grease Illustrated symbols 24 to 25 in the exploded diagrams indicate where to apply locking agent 24 and when to install new parts 25. 24 Apply locking agent (LOCTITE) 25 Replace

Incoming search terms:

YAMAHA V-STAR 650 CRUZER EXHAUST SYSTEM INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 28-12-2010

download
STOCK EXHAUST SYSTEM REMOVAL 1. This Exhaust system is specifically designed for California models, before continuing be sure it is the correct system for your application. 2. Loosen clamp that connects muffler to front head pipe. 3. Remove cylinder exhaust bolts from rear head pipe that connects rear head pipe to cylinder (save for re- use). 4. Remove bolts that connect mufflers to mounting bracket. Remove complete system. Note: Assistance may be required. Page 1of 4 Y411IN Rev. 1.0 YAMAHA V-STAR 650 CRUZER EXHAUST SYSTEM, CA Model Part #31505 Tools required for installation: 1/2”, 12mm & 10mm wrenches 5mm, 6mm Allen wrenches 5/16″ nutdriver / flat blade screwdriver VANCE & HINES EXHAUST SYSTEM INSTALLATION 1. Check condition of stock exhaust gaskets. Replace if damaged or worn. 2. Install mounting bracket (stamped 370-P) in the original muffler mounting position, using two 8mm bolts (supplied)(Figure 1). 3. Mark outside surface of front and rear heat shields with location of mounting clips that are welded to the inside (Figure 2). Place each heat shield on a non abrasive surface such as a blanket or carpet. Lay each head pipe/muffler onto its respective heat shield (Figure 3). 4. Loosely install each hose clamp by feeding tail end of clamp into heat shield clip (Figure 4). Take note of clamp screw head direction (Figure 3). Screw head should be accessible when system is installed on motorcycle for adjustment purposes. Note: Do not tighten yet. 5. Install T-bolt clamp onto front muffler. Slide muffler onto front head pipe. Slide dog bone shaped nut plate (supplied) inside bracket welded to backside of front muffler. Attach muffler to mounting bracket 370-P using two 5/16″ flange bolts (supplied) engaging dog bone nut plate. Leave head pipe/muffler assembly loose at this time (Figure 4). 6. Using stock Allen bolts, carefully install rear head pipe/muffler assembly into exhaust port. (Assistance may be required). Note: Do not tighten yet. 7. Slide dog bone shaped nut plate (supplied) inside bracket welded to backside of rear muffler

Incoming search terms:

EDELBROCK NITROUS SYSTEM UNIVERSAL MOTORCYCLE NITROUS SYSTEM

0

Filed Under (Suzuki) by admin on 26-11-2010

download
Wiring Diagram #1 Wiring Diagram #2 Red Red Red Red Black Black Black Black Black Black Factory Harness to Horn Factory Harness to Horn Horn Horn Nitrous Solenoid Nitrous Solenoid Switch Switch Bottom View Bottom View +12V with Key On From Horn Button (Ground when button is pressed) From Horn Button (Ground when button is pressed) To Nitrous Bottle To Nitrous Bottle To Nitrous Nozzle To Nitrous Nozzle Install Relay for OPTIONAL RPM Activated Switch Here. See Section 7.0 for More Details. Install Relay for OPTIONAL RPM Activated Switch Here. See Section 7.0 for More Details ©2007 Edelbrock Corporation Brochure #63-71940 Catalog #71940 Rev. 2/07 – DC/mc Page 4of 4 To Nitrous Bottle To Nitrous Nozzle Nitrous Solenoid To Starter Solenoid Switch Bottom View Ground Starter Button +12V when Pushed Install Relay for OPTIONAL RPM Activated Switch Here. See Section 7.0 for More Details. Wiring Diagram #3 Starter Button Activation for Suzuki Hayabusa 7.0 – WIRING MSD 8950 RPM SWITCH NOTE – This is a suggested wiring application. There are many ways that the RPMswitch may be installed. The installer needs to set RPMswitch to proper RPM and test operation. Use diagrams on page 3 for relay terminal #30 connection. Nitrous Solenoid To Nitrous Bottle To Nitrous Nozzle RPM ACTIVATED SWITCH 10,000 Desired RPM Chip Here Connect as Outlined in Wiring Diagrams White to 4-Coil Tach Adapter #T-101-MSD Black Battery Ground Yellow – N/C Gray – OFF When Set RPMis Exceeded Connect as Outlined in Wiring Diagrams NOTE – RPM Chips are Ordered Separately Red to Switched +12 Volt Tailight Power or any Other +12 Volt Source with the Key On Note – This Method Will Turn the Nitrous Off When Set RPM has Been Exceeded. 85 87A 30 86 87 A Test Light Can Be Used Here to Check Operation 8.0 – OPTIONAL PRODUCTS FOR EFI MOTORCYCLES A Progressive Timing Retard Controller is available from Schnitz Racing for fuel injected motorcycles. The EFIR Series Timing Retard Controllers can be used with or without a Power Commander installed.

Incoming search terms:

YAMAHA V-STAR 650 EXHAUST SYSTEM REMOVAL AND INSTALLATION

0

Filed Under (Yamaha) by admin on 18-12-2010

download
REMOVING THE STOCK EXHAUST SYSTEM 1. Remove the right hand frame cover to avoid scratching it. 2. Remove the nuts that mount the rear header to the cylinder head. 3. Loosen the pinch clamp on the inlet end of the lower muffler. 4. Remove the two bolts that mount the mufflers to the muffler bracket, located between the two mufflers. Save the hardware for reuse. 5. Pull the rear head pipe out of the exhaust port. Slide the muffler assembly with the rear head pipe attached, rearward, disconnecting it from the front head pipe. Set the assembly aside. Note: Keep the front head pipe attached to the motorcycle, it will integrated with the new exhaust system. 6. Remove the muffler mounting bracket from the frame and set it aside. INSTALLING YOUR NEW VANCE & HINES EXHAUST SYSTEM 1. Install the V&H muffler mounting bracket (stamped 272) to the frame using the stock hardware and mounting location. Refer to figure 1 2. Slip the T-bolt band clamp (supplied) over the straight pipe that is welded to the front muffler. 3. Slip the front muffler assembly over the stock head pipe. Slide one dog bone shaped nut plate (supplied) under the bracket that is welded to the backside of the muffler. Attach the muffler to the mounting bracket using two of the 5/16″ flange head bolts (supplied), but leave them loose at this time. Refer to figure 1. 4. Install the rear header assembly to the exhaust port using the stock 8mm nuts, but leave them loose at this time. 5. Slide one dog bone shaped nut plate (supplied) under the bracket that is welded to the backside of the rear muffler. Attach the muffler to the mounting bracket using two of the 5/16″ flange head bolts (supplied), but leave them loose at this time. Refer to figure 1. 6. Unscrew all of the hose clamps (supplied) until they are completely loose. Mark the top edge of both heat shields with the location of the mounting clips that are welded to the backside. Position the front heat shield over the head pipe and feed the tail end of the hose clamps into the clips. Be sure that each hose clamp is engaged with both clips. Repeat this step with the rear heat shield. Note: The screw end of the hose clamp should be accessible, but not visible when pipe is mounted on the bike. Leave them loose at this time. 7. Align the mufflers so they are parallel when viewing from the right side of the bike, and tighten the 5/16″ flange bolts on the back side of both mufflers. 8. Tighten the two header flange nuts on the rear head pipe. 9. Tighten the T-bolt clamp at the slip joint of the front muffler. 10. Rotate the hose clamps on both heat shields so they are accessible with a screw driver and tighten each of them evenly. Note: The edge of the heat shield should just cover the weld on the inlet of each muffler, if not, adjust the heat shield for correct alignment

Harley davidson Sportster Custom Straightshot Exhaust System REMOVAL AND INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 19-12-2010

download
REMOVING THE STOCK EXHAUST SYSTEM 1. Loosen the heat shield clamps on both front and rear exhaust pipes. 2. Remove the two mounting nuts from each head pipe, located at the cylinder head. 3. Remove the nut that mounts the front muffler to the engine, located below the rear brake master cylinder. 4. Remove the bolt that mounts the rear muffler to the mounting bar. 5. Remove the entire exhaust system and set it aside. 6. Carefully remove the flanges and circlips from the stock exhaust system using snapring pliers. Note: If circlips look bent or twisted replace them with new circlips . INSTALLING YOUR NEW VANCE & HINES EXHAUST SYSTEM 1. Vance and Hines recommends you replace your exhaust gaskets with Sceamin’ Eagle gaskets part number 17048-98. 2. Install the circlips and flanges from the stock system on to both of the new head pipes. 3. Unscrew all of the hose clamps (supplied) until they are completely loose. Mark the top edge of both heat shields with the location of the mounting clips that are welded to the backside. Position the front heat shield over the head pipe and feed the tail end of the hose clamps into the clips. Be sure that each hose clamp is engaged with both clips. Repeat this step with the rear heat shield. Note: The screw end of the hose clamp should be accessible, but not visible when pipe is mounted on the bike. 4. Install the front head pipe using the stock nuts, do not tighten at this time. 5. Install the rear head pipe using the stock nuts, do not tighten at this time. 6. Install one muffler clamp (supplied) over the inlet (notched end) of each muffler. 7. Identify the front and rear muffler mounting brackets. The front bracket is stamped with the number 305 and the rear muffler bracket is stamped 213 . 8. Install the front muffler mounting bracket to the stud on the engine (where the stock muffler mounted) and fasten using the stock nut (leave loose at this time). The bracket will bend inward towards the center of the motorcycle when installed correctly. Note: You may need to move the wires and hoses on the lower frame rail to decrease the possibility of them chaffing on the bracket bolts. 9. Slip one of the mufflers onto the front head pipe. Slide one dog bone shaped nut plate (supplied) under the bracket that is welded to the backside of the muffler. Attach the muffler to the mounting bracket using the 5/16″ flange head bolts (supplied) leave them loose at this time. 10. Attach the rear mounting bracket to the rear muffler. Slide one dog bone shaped nut plate (supplied) under the bracket that is welded to the backside of the muffler. Attach the bracket to the muffler using two of the 5/16″ flange head bolts (supplied), leave them loose at this time. Note: The single hole in the bracket will point downward and slightly forward when installed correctly

HONDA AERO 750 CRUZER EXHAUST SYSTEM REMOVAL And INSTALLATION

0

Filed Under (Honda) by admin on 18-11-2011

download
Install mounting bracket (stamped 363-P) in the original muffler mounting position, using two 10mm bolts and
one 10mm nut. (supplied)(Refer to figure 2). 2. Mark outside surface of front and rear heat shields with location of mounting clips that are welded to the inside.(Refer to figure 3).Place each heat shield on a non-abrasive surface such as a blanket or carpet. Position each head pipe/muffler over its respective heat shield. (Refer to figure 4).
3. Feed tail end of each hose clamp through each mounting clip welded to back side of front and rear heat shields. Take note of clamp hex screw head direction. (Clamp head direction is critical for adjustment when system is installed on bike.) Wrap each clamp around back side of head pipe threading tail end into clamp head. (Refer to figure 3 & 4).
4. Install front head pipe/muffler using stock flange nuts. Slide dog bone shaped nutplate (supplied) inside
bracket welded to backside of muffler. Attach muffler to mounting bracket 363-P using (supplied) 5/16” flange
bolts engaging dog bone nutplate. Leave head pipe/muffler assembly loose at this time (Refer to figure 4). Repeat this step with the rear head pipe.5. Align mufflers so they are parallel when viewing from right side of the motorcycle. Tighten 5/16” flange bolts securing upper and lower muffler positions.. Tighten cylinder exhaust port flange nuts securing head pipes to cylinder heads. 7. Adjust heat shields so they meet front of muffler taper. (Refer to figure 6). Tighten all hose clamps securing heat shield locations. NOTE: Heat shields should cover muffler/head pipe weld joint.

Incoming search terms:

Installation Instructions for TRD’s 3.4-liter V6 Supercharger Kit 1997-2000 Tacoma,1997-1998 T-100, 1996-2000 4Runner

0

Filed Under (Toyota Manuals) by admin on 28-05-2011

Download

begin, TRD recommends you thoroughly Before you and engine compartment.thatyou don’t, grease clean the engine
If buildup  on parts could become dislodged during the procedure and fall into the engine.
• Make sure the engine has cooled fully before you begin. suggest you draw diagrams of your
• To help you later, we you disconnect anything. You can doengine’s cable routing before the same

for the vacuum hoses; however, some of the vacuum connections on your stock manifold may not be the same as those on the supercharger. To ensure the proper hose connections, refer to the diagrams in the back of this manual.
TRD supercharger has been designed to reuse most of • Thestock nuts and bolts.kitTherefore, as you remove them, keep the  them with their components or label them for location. This will assure a faster, easier installation.
B. Removal of Stock Intake Manifold (figure 1)
1. Disconnect the battery ground cable.
2. With tape or a permanent marker, mark the forward edge of the power steering and the air conditioning compressor drive belts (figure 2). This will ensure that the belts will be returned to their original positions and that they will rotate in the same direction. If you reverse the direction of rotation, it may cause the belts to fray.

Incoming search terms:

Yamaha Venture Royal Star Installation Manual

0

Filed Under (Yamaha) by admin on 09-11-2010

download
1) Secure motorcycle in an upright position. 2) Remove saddle bags 3) For hitch clearance you will need to install the enclosed muffler lowering spacers. 4) Attach forward brackets A (left) and B (right) to motorcycle rear crash bar with U-Bolts. Also attach brackets at the point where the saddle bag sub frame and rear crash bar connect using new bolt provided. 5) Attach rear brackets C (left) and D (right) to motorcycle rear frame using new bolts provided. See diagrams next page. Attach top portion first then bottom portion. 6) Attach brackets A and B to forward arms of receiver hitch. Brackets mount on BOTTOM of hitch arms. 7) Attach bottom of brackets C and D to rear of hitch. 8) Now tighten all bolts working from rear forward. 9) Replace saddle bags and double check all bolts for tightness. Hitch Diagrams InstaTrike Installation 1. Place your motorcycle on a smooth level surface and attach leveling jack stands. 2. Push the hitch mount into the receiver hitch. (this might be a little difficult until you get use to doing it. Removing the paint from the hitch mount and applying a little grease will help.) 3. Place the hitch pin through the receiver hitch and hitch mount ( alignment plate ). Install and tighten the tension bolt. 4. Align InstaTrike wheels. (initial installation only. Check periodically and realign if necessary) 5. Bolt leanstop braces to hitch. Be certain to replace washers/spacers in the same configuration as when you removed them. 6. Remove leveling jack stands. 7. Check all bolts for tightness. 8. You are now ready for the test ride. A. Keep your feet up! B. Ride slowly in first gear until you are comfortable with the Tow-Pac system.

Incoming search terms:

Incoming search terms: