zongshen 250cc el diagram

You search Auto repair manual PDF zongshen 250cc el diagram, if there are search results will appear below. If search results do not exist, please search by others keyword.



  zongshen 250cc el diagram Direct Download speed 5282 Kb/s

  zongshen 250cc el diagram Full Version speed 6162 Kb/s



Piaggio MP3 250ie 250cc specification

0

Filed Under (Piaggio) by admin on 11-11-2010

download
Capacity 250cc (EURO 3) Engine QUASAR 4 valve, 4 stroke single cylinder with electronic injection Cooling Liquid Electric Starter * Transmission Automatic Twist and Go Front Suspension Parallelogram, cantilever Rear Suspension Twin hydraulic shock absorbers with pre-load adjuster Front Brake Disc Double Ø240mm disc Rear Brake Disc Ø240mm disc Wheel Size 12″-12″ Running Weight 213 kg Lockable Glove Box * Underseat Storage Compartment * Digital Clock * Colours Available Sky Blue, Excalibur Silver, Black Graphite, Cherry Red

Incoming search terms:

1992 Toyota Cressida Vehicle Wiring Chart and Diagram

0

Filed Under (Toyota Manuals) by admin on 18-06-2011

Download
Listed below is the vehicle specific wiring diagram for your car alarm, remote
starter or keyless entry installation into your 1992 Toyota Cressida . This
information outlines the wires location, color and polarity to help you identify the
proper connection spots in the vehicle. Please be sure to test all of your wires
with a digital multimeter before making any connections. More information on
using a multimeter and testing wires please see our Technical Support Area.

Incoming search terms:

Express ATVS -250cc Cobra Setup/ Installation Manual

0

Filed Under (Cobra) by admin on 10-11-2010

download
Unpacking your Cobra Installing the front shock Installing the front tires Installing rear shocks Installing the rear tires Installing seats and harnesses Steering wheel installation Roll cage installation Safety checks / Adjustments General maintenance Unpacking your Cobra First off you should pull the carton off from your new 250 Cobra cart. Inspect the cart thoroughly to make sure that your new Cobra has not been heavily damaged. You will notice that the product has a metal frame holding it in place; you may want to start removing bolts from the shipping steel frame. The next step is to remove the metal frame and lift it off of the cart. Remove any of the metal frame that may afford resistance when working on the cart it self. Be careful the metal frame may be heavy and sharp. Now would also be a good time to inspect your Cobra a little more thoroughly. In the box with the Cobra you should have found a box containing miscellaneous hardware. Installing the front shock Using some of the bolts you found in your box, install the front shocks sliding the bolt through the brackets and tighten the nut down. Next, you will need to place the ball head into the turning arm, then tighten the castle nut and insert a cotter pin so that the castle nut doesn’t loosen and become a hazard. Installing the front tires
Find the front tires and place them on the front hub and place the lug nuts on the studs. Tighten them down. Make sure that all of the lug nuts are on tightly. Installing the rear shocks Moving to the rear of the Cobra you will notice the rear shocks are not inserted. Place the rear shocks into the bracket on the rear of the Cobra. Slide one of the provided bolts through the bracket and shock eyelet and tighten the bolt down. Installing the rear tires Now that the shocks have been placed properly you can install the rear tires, place the tires onto the axle then place the rear rim lined up onto the axle and tighten the provided castle nut down. Place the cotter pin through the axle and bend off to the side. This is so the castle nut does not loosen under load. Installing the seats and harnesses
(The arrow points to an example of where the seat bolts mount) Find the two racing seats shipped in the box with the Cobra. You will need to affix them to the frame by sliding the bolts up through the bottom of the frame. This can be tricky so have patience. Once both seats have been placed in the cart and tightened find the harnesses. Once found the harnesses mount to a bracket behind the seats. Place a bolt through the bracket and bolt the harnesses down tightly. Installing the steering wheel Find the steering wheel and place it onto the steering wheel mount. Grab the six small screws and place them through the steering wheel and mount, tighten them down but also make sure the top of the wheel is facing up. Installing the roll cage

Incoming search terms:

HONDA GL1100 AM/FM RADIO INSTALLATION MANUAL/ WIRING DIAGRAM

0

Filed Under (Honda) by admin on 22-04-2011

download
INSTALLATION ■ Outline Procedures This section gives general information needed for mounting the individual radio components on and in the fairing. A) Fairing 1) Install radio on fairing before mounting fairing on motorcycle. (Remove fairing from your motorcycle when already mounted). 2) Remove fairing parts. 3) Drill unit mount holes. 4) Install six wire clips. 5) Install windshield on fairing before install- ing speakers. 6) Install radio indicator I on indicator panel II , then install indicator panel on fairing. 7) Install speakers III. 8) Install nutplate IV. 9) Install Power Amplifier in fairing. 10) Install radio funer VI. 11) Install the radio controller VII. 12) Install controller base panel VIII 13) Install radio switch sub-wire. 14) Connect adapter harness and wires inside fairing by working through left turn signal lens hole. B) Motorcycle frame and handlebar 1) Remove travel trunk and seat. Unscrew four shelter bolts (M6, one on each side at front and rear) to route antenna feeder. 2) Install antenna mount and antenna IX. 3) Route antenna feeder along the frame tube. 4) Install radio switch X on left handlebar lever bracket and route the wires. 3 of 11 Page 4 C) Fairing instllation 1) Install fairing on motorcycle. 2) Connect motorcycle wire harness 9-P coupler to fairing wire 9-P coupler. 3) Connect radio switch wire to switch sub- wire.4) Connect antenna feeder. 5) Confirm that radio operates properly. Reinstall parts removed in step 2 or (A) and in step 1 of (B). REWORKING ■ Remove Fairing and Fairing Parts (Fig.10) 1) Install radio on fairing before mounting fairing on motorcycle. (Remove fairing from your motorcycle when already mounted). 2) Remove right and left fairing pockets, right and left turn signal lenses, right and left nutplates, left hole cover and indi- cator base panel from fairing. (Fig.10) Fig. 10 LEI-1 NU I PLATE 4 of 11■ Reworking on Fairing — Speaker mounting holes- 1) Remove 18 mm grommet. 2) Lightly roll template so that it will follow contour of fairing snugly. 3) Position template on fairing with its upper and outer edges aligned with those offairing as indicated by arrows. 4) Attach template to fairing using adhesive tape where shown. 5) Punch mark centers of four holes with a
drift and hammer. 6) Drill 6 mm holes through marked centers. To obtain a more balanced response with richer, deeper bases, drill two 50 mm holes in the fairing so as to link the speaker box with the inside of the fairing. Fig. 11-1
—Power amplifier mounting holes- 7) Drill two 5.5 mm holes through concaves in fairing. Fig. 11-2 RIGHT HAND SHOWN, LEFT SIMILAR ADHESIVE TAPE

Incoming search terms:

YAMAHA FZR 400 ELECTRICAL CIRCUIT DIAGRAM

0

Filed Under (Yamaha) by admin on 29-11-2010

download
CHECKING OF SWITCHES Check the switches for the continuity between the terminals to determine correct connection. Read the following for switch inspection. SWITCH CONNECTION AS SHOWN IN MANUAL The manual contains a connection chart as shown left showing the terminal connections of the switches (e.g., main switch, handlebar switch, brake switch, lighting switch, etc.) The extreme left column indicates the switch positions and the top line indicates the colors of leads connected with the terminals in the switch component. “C’&-0″ indicates the terminals between which there is a continuity of electricity; i.e., a cl.osed circuit at the respective switch positions. In this chart: “R and Br” and “L/W and L/R” are continuous with the “ON” switch position. “B and B/W” is continuous with the “OFF” switch position. “B and B/W” is continuous with the “LOCK” switch position. “B and B/W” and “R and L/R” are continuous with the “P” switch position. CHECKING SWITCH FOR TERMINAL CONNECTION Before checking the switch, refer to the connection chart as shown above and check for the correct terminal connection (closed circuit) by the color combination. To explain how to check the switch, the main switch is taken for example in the following

Incoming search terms:

AIR / HYDRAULIC MOTORCYCLE LIFT REMOVABLE INSPECTION PLATE

0

Filed Under (Tips and Review) by admin on 19-11-2010

download
For best service, you should incorporate an oiler, regulator, and inline filter, as shown in the diagram on the next page. Hoses, couplers, oilers, regulators, and filters are all available at Harbor Freight Tools. NOTE: If an automatic oiler is not used, put 3-5 drops of pneumatic Tool Oil (not included) in the Motorcycle Lift’s Quick Coupler (38A) before each use. (See Figure B, next page.) To Check The Level Of Hydraulic Oil: 1. The Motorcycle Lift already contains some hydraulic oil in its Hydraulic Pump Reservoir (32P). Even so, it is recommended that you check the oil level in the Reservoir and, if necessary, top off the Reservoir with the proper amount of 15/40 hydraulic oil (not included). (See Assy. Diagram, page 15.) 2. Make sure to screw the two Adjusting Screws clockwise enough to lift the two Caster Wheels (14) off the floor so as to provide stability for the Motorcycle Lift. (See Figure A.) 3. To check the level of hydraulic oil, remove the Sliding Plate (36) from the Platform (35) to expose the Hydraulic Pump Reservoir (32P). (See Assy. Diagrams, pages 13 and 15.) 4. Remove the rubber Filler Plug (33P) located on the top of the Reservoir (32P). If necessary, top off the Reservoir with hydraulic oil. (See Assy. Diagram, page 15.) 5. Connect the air compressor’s hose to the to the Air Motor assembly. Then turn on the air compressor and set its regulator at 120 PSI. (See Assy. Diagram, page 14.) 5. Insert the Lift Foot Pedal (11) onto the Pump Piston Spindle (9), and slowly pump the Lift Foot Pedal until a slight amount of hydraulic oil begins to leak out of the Reservoir (32P). Discontinue pumping the Lift Foot Pedal. Then, replace the Filler Plug (33P) on the top of the Reservoir. (See Assy. Diagram, page 15.) REGULATOR OILER FILTER TO QUICK COUPLER (38A) OF MOTORCYCLE LIFT FIGURE B 6. Insert the Release Foot Pedal (10) onto the Release Valve Spindle (5). Pump the Lift Foot Pedal (11) until the Platform (35) of the Motorcycle Lift reaches its maximum height. Then press down slightly on the Release Foot Pedal until the Platform is fully collapsed to the floor. Repeat this procedure several times to ensure the Motorcycle Lift is operating properly. (See Figure E, page 10.)

Incoming search terms:

HONDA TRX 650 RINCON 4X4, TRX 680 Rincon BLADE HARDWARE MOUNTING REMOVAL AND INSTALLATION MANUALS

0

Filed Under (Honda) by admin on 26-12-2011

download
Push tube/ Swivel/ Blade Assembly Instructions 1. Install the blade swivel (15) onto the front of the push tube (14) using the 1/2″ shoulder bolt (4), two 1/2″ washers (5), and a 3/8″ Nylock nut (3) from the bolt bag per diagram #1. Make sure the flat washers seat properly on the bottom of the shoulder bolt while tightening the nut. Make sure the blade turns freely. 2. Remove the 2 bottom flanged nuts (I) from the u-bolt (D) and 2 from the 3/8″ bolts (H) on the blade position pin assembly (23). Run the 2 top flanged nuts up the threads of the u-bolt. Place the blade position pin assembly on the push tube as shown in the Diagram, sliding the blade position pin through one of the oval holes on the swivel and through the rear blade position pin support bracket on the push tube. 3. Re-install the u-bolt and 3/8″ bolts and flanged nuts per the Diagram. On the u-bolt, thread the bottom nuts up until they are flush with the bottom of the threads then run the top ones down, making sure the bottom nuts remain flush with the bottom of the u-bolt. Tighten all 4 bottom nuts. 4. Remove the two shoulder bolts (18) from the pivot point brackets on the back of the blade (1). Attach the blade to the swivel by sliding the ears on each side of the swivel into the pivot point brackets on the blade, reinstall the two shoulder bolts and Nylock nut (3) and tighten. 5. Hook the blade springs (6) to the two round holes on either side of the 5 oval holes on the swivel. Hook the eyebolts through the other end of the springs, push the eyebolts through the spring attaching points on the back of the blade and install 3/8″ Nylock nuts (3). Spring tension may be increased by tightening both Nylock nuts on the eyebolts evenly. 6. Install the blade stops (16) with the two 3/8″ x 1″ bolts (17) and 3/8″ nuts (3) per the Diagram. Rotating the stops allows you to change the blade pitch to suit changing conditions or materials

Incoming search terms:

Yamaha 1998 XVS1100 REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 03-01-2012

download
EXPLODED DIAGRAMS To help identify parts and clarify procedure steps, there are exploded diagrams at the start of each removal and disassembly section. 1. An easy-to-see exploded diagram 4 is provided for removal and disassembly jobs. 2. Numbers 5 are given in the order of the jobs in the exploded diagram. A number that is enclosed by a circle indicates a disassembly step. 3. An explanation of jobs and notes is presented in an easy-to-read way by the use of symbol marks 6 . The meanings of the symbol marks are given on the next page. 4. A job instruction chart 7 accompanies the exploded diagram, providing the order of jobs, names of parts, notes in jobs, etc. 5. For jobs requiring more information, the step-by-step format supplements 8 are given in addition to the exploded diagram and the job instruction chart.
24 21 18 15 16 17 10 12 13 11 14 1 3 5 7 9 2 4 8 6 19 20 22 23 25 EB003000 ILLUSTRATED SYMBOLS Illustrated symbols 1 to 9 are printed on the top right of each page and indicate the subject of each chapter. 1 General information 2 Specifications 3 Periodic inspections and adjustments 4 Engine 5 Cooling system 6 Carburetion 7 Chassis 8 Electrical 9 Troubleshooting Illustrated symbols 10 to 17 are used to identify the specifications appearing in the text. 10 Can be serviced with engine mounted 11 Filling fluid 12 Lubricant 13 Special tool 14 Torque 15 Wear limit, clearance 16 Engine speed 17 Ω, V, A Illustrated symbols 18 to 23 in the exploded diagrams indicate the types of lubricants and lubrication points. 18 Apply engine oil 19 Apply gear oil 20 Apply molybdenum disulfide oil 21 Apply wheel bearing grease 22 Apply lightweight lithium-soap base grease 23 Apply molybdenum disulfide grease Illustrated symbols 24 to 25 in the exploded diagrams indicate where to apply locking agent 24 and when to install new parts 25. 24 Apply locking agent (LOCTITE) 25 Replace

Incoming search terms:

EDELBROCK NITROUS SYSTEM UNIVERSAL MOTORCYCLE NITROUS SYSTEM

0

Filed Under (Suzuki) by admin on 26-11-2010

download
Wiring Diagram #1 Wiring Diagram #2 Red Red Red Red Black Black Black Black Black Black Factory Harness to Horn Factory Harness to Horn Horn Horn Nitrous Solenoid Nitrous Solenoid Switch Switch Bottom View Bottom View +12V with Key On From Horn Button (Ground when button is pressed) From Horn Button (Ground when button is pressed) To Nitrous Bottle To Nitrous Bottle To Nitrous Nozzle To Nitrous Nozzle Install Relay for OPTIONAL RPM Activated Switch Here. See Section 7.0 for More Details. Install Relay for OPTIONAL RPM Activated Switch Here. See Section 7.0 for More Details ©2007 Edelbrock Corporation Brochure #63-71940 Catalog #71940 Rev. 2/07 – DC/mc Page 4of 4 To Nitrous Bottle To Nitrous Nozzle Nitrous Solenoid To Starter Solenoid Switch Bottom View Ground Starter Button +12V when Pushed Install Relay for OPTIONAL RPM Activated Switch Here. See Section 7.0 for More Details. Wiring Diagram #3 Starter Button Activation for Suzuki Hayabusa 7.0 – WIRING MSD 8950 RPM SWITCH NOTE – This is a suggested wiring application. There are many ways that the RPMswitch may be installed. The installer needs to set RPMswitch to proper RPM and test operation. Use diagrams on page 3 for relay terminal #30 connection. Nitrous Solenoid To Nitrous Bottle To Nitrous Nozzle RPM ACTIVATED SWITCH 10,000 Desired RPM Chip Here Connect as Outlined in Wiring Diagrams White to 4-Coil Tach Adapter #T-101-MSD Black Battery Ground Yellow – N/C Gray – OFF When Set RPMis Exceeded Connect as Outlined in Wiring Diagrams NOTE – RPM Chips are Ordered Separately Red to Switched +12 Volt Tailight Power or any Other +12 Volt Source with the Key On Note – This Method Will Turn the Nitrous Off When Set RPM has Been Exceeded. 85 87A 30 86 87 A Test Light Can Be Used Here to Check Operation 8.0 – OPTIONAL PRODUCTS FOR EFI MOTORCYCLES A Progressive Timing Retard Controller is available from Schnitz Racing for fuel injected motorcycles. The EFIR Series Timing Retard Controllers can be used with or without a Power Commander installed.

Incoming search terms:

LED Motorcycle Power Box Installation Instructions

0

Filed Under (Tips and Review) by admin on 29-01-2011

download
This box requires the presence of a mounting plate secured to the motorcycle’s luggage rack. If the bike in question is not equipped with a mounting plate, one must be fabricated prior to installation of this box. Five mounting holes (.281″ dia.) are required to mount this box. If the motorcycle is already equipped with a mounting plate, it may be necessary to drill the 5 mounting holes required for this installation. Use the diagram shown to determine the precise location of these holes. 1. Position the box onto the mounting plate. Align the 5 vibration dampeners with the 5 mounting holes in the mounting plate. 2. Using the illustrations shown, secure the box to the mounting plate using the provided hardware. Note: Your luggage rack may already have the correct mounting holes drilled. Check the measurements below and if these holes already exist at the proper distance, remove any existing mounting hardware from the holes and secure the box with the supplied mounting hardware. 3. Place the box into its mounting position on the deck and secure it with the supplied mounting hardware as shown in the diagram. Wiring: Diagrams for optional equipment are found below. Refer to the diagram on the following page for general motorcycle box wiring information

Incoming search terms: