Yamaha V-Star 650 Jet Kit REMOVAL AND INSTALLATION MANUAL

0

Filed Under (Yamaha) by admin on 16-01-2012

download
Remove the vacuum slide from the carburetor. • Remove the OEM needle and spacer, noting the order of assembly. • Counting from the top to the bottom, install the new Baron needle clip on groove #4 of the replacement Baron adjustable needle. • Reinstall the OEM spacer and washer. • Reinstall the vacuum slide along with the diaphragm spring. • Reattach the diaphragm cover and tighten its screws. Note: Verify that the slide maintains a full range of movement! • Drain the fuel from float bowl and remove the bowl cover. • Remove the new cap head Allen screws in place of the OEM Phillips head screws. • Repeat above steps for other OEM main jet and pilot jet, and replace them with Baron’s main and pilot jets. • Thoroughly clean the inside of the float bowl prior to reinstalling it. • Reassemble the carburetor by reversing the order of previous steps. Use thecarburetor. • Locate the fuel mixture plug on each carburetor; it will either be a screw head or a brass plug. If it is a screw head, skip to step c . If you see a brass plug with a small hole in the center, proceed as follows: a. With a 5/32″ drill bit, carefully and slowly drill through the fuel mixture plug for each carburetor. CAUTION: The fuel mixture screw is located directly beneath this plug. Be prepared to stop the drill and remove the bit the instant you break through the plug. b. Insert a self-tapping sheet metal screw into the drilled hole and remove the plug. 311 #1 Industrial Way – Fallbrook, CA 92028 – USA Phone: (760) 731-1200 Fax: (760) 731-1284 E-mail: tech@baronscustom.com Website: www.baronscustom.com Included in this kit: (2) Mikuni main jets, (2) pilot jets, (2) titanium needles, (2) clips, (8) cap head Allen screws Revision 2.0 c. With air/fuel screw now accessible, use a flat blade screwdriver to turn the screw clockwise until it seats, then carefully turn it counter-clockwise 3 turns. Refer to final step for assistance in fine-tuning the setting of the air/fuel adjustment screw. • Reinstall the OEM air filter assembly. • Check all vent lines, fuel lines, and linkage for any obstructions or blockage

Yamaha V-Star 1100 Needle/ Jet Kit REMOVAL AND INSTALLATION MANUALS

0

Filed Under (Honda) by admin on 27-12-2011

download
To install this needle and jet kit: • Remove carburetors from the engine per Yamaha shop manual procedures. Note: Always perform internal carburetor work in a clean area. • Remove the vacuum slide from each carburetor. • Remove the OEM needle, spacer and washers, noting order of assembly. (Note; the washers are used as shims to raise the needle, each is equivalent to ½ clip position, use these to fine tune the needle) • Counting from the top to the bottom, install the new Baron needle clip on groove #4 of the replacement Baron adjustable needles. The top is the blunt end of the needle. • Reinstall the OEM spacer and washers as shown in the figure below. • Reinstall the vacuum slides along with the diaphragm spring and reattach the diaphragm covers Note: Verify that the slides maintain their full range of movement! • Drain the fuel from the float bowls and remove the bowl covers. • Remove the OEM main jets and replace them with Baron’s supplied Mikuni main jets. Install the “base setting” main jets as indicated above. NOTE: V-Star 1100 carburetion runs staggered jetting! Make sure the front cylinder’s carburetor gets the larger main jet (numerically), and the rear cylinder’s carburetor gets the smaller main jet . Important! Extra jets have been included in your kit. These will help you fine-tune the carburetors for changing conditions. These conditions include climate and weather patterns in your area as well as exhaust equipment on your motorcycle. Barons determines the jet and clip recommendations that best suit your average riding conditions based upon information supplied to us at the time of your order. Changes in weather, altitude or modifications to your exhaust system may require jets other than those supplied. • Thoroughly clean the inside of the float bowls prior to reinstalling them. 311 #1 Industrial Way – Fallbrook, CA 92028 – USA Phone: (760) 731-1200 Fax: (760) 731-1284 E-mail: tech@baronscustom.com Website: www.baronscustom.com Included in this kit: (4)Mikuni main jets #107.5, 110, 112.5, 115, (2) titanium needles, (2) clips, (8) cap-head allen screws Tools required: 3-4-5 mm allen wrenches, 10&12 mm sockets, 10mm end wrench, phillips & flat screwdrivers, pliers, drill. Revision 4.0 • Reassemble the carburetors by reversing the order of above steps. Use the new supplied cap head Allen screws in place of the OEM Phillips head screws for the float bowls. • Locate the fuel mixture screws – they will either be a screw head or a brass plug. If it is a screw head, skip to step c . If you see a brass plug with a small hole in the center, proceed as follows: a. With a 5/32″ drill bit, carefully and slowly drill through the fuel mixture plugs

Incoming search terms:

2007-2008 Honda VTX1300C/R/S/T Fuel Valve Diaphragm Replacement Manual

0

Filed Under (Honda) by admin on 21-04-2011

download
According to Federal law, any affected units in your new or used inventory cannot be sold or leased until they are repaired. Refer to the REPAIR VERIFICATION and REPAIR PROCEDURE sections of this Service Bulletin.
Before you begin the repair procedure, check if the repair has been performed on the unit. See the IDENTIFICATION section of this Ser- vice Bulletin for more details. • If there is a punch mark – No further action is necessary. • If there is no punch mark – You must pro- ceed with the REPAIR PROCEDURE sec- tion of this Service Bulletin. NOTE: Units repaired in the warehouse may not be reflected on iN at the begin- ning of the campaign. For this reason, always check the VIN stamp prior to per- forming this repair. If you have any questions about repair verifi- cation, please contact your DSeM or TechLine at (800) 421-1900, option 9. NOTE: Refer to section 2-7 of the 2003-2008 VTX1300C/R/S/T Service Manual for specific fuel tank removal instructions. 1. Remove the fuel tank using the procedure in the Service Manual. However, do not remove the fuel valve from the fuel tank. 2. Drain the fuel into an approved container. 3. Remove the four screws and diaphragm cover. NOTE: The diaphragm cover is under spring pressure. Do not lose the spring or screws. The countermeasure part has a paint mark near the air vent hole. 4. Replace the diaphragm, spring, cover, and screws with new parts included in the kit. Install the new diaphragm with the plastic retainer facing the diaphragm cover. NOTE: Make sure the air vent hole is facing downward towards the ground. 5. Reinstall the fuel tank using the procedures in the Service Manual. 6. Refill the fuel tank

HARLEY DAVIDSON SCREAMIN' EAGLE TWIN CAM 110 (1800 CC) CONVERSION KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 19-02-2011

download
REMOVAL Prepare for Service 1. Position motorcycle on a suitable lift. NOTE If vehicle is equipped with Harley-Davidson Smart Security System, see owner’s manual for instructions to disarm the system. To prevent accidental vehicle start-up, which could cause death or serious injury, disconnect negative (-) battery cable before proceeding. (00048a) 2. Disconnect battery cables, negative (-) battery cable first. 3. Remove seat according to the instructions in the service manual. 4. Refer to service manual to remove left saddlebag and side cover. When servicing the fuel system, do not smoke or allow open flame or sparks in the vicinity. Gasoline is extremely flammable and highly explosive, which could result in death or serious injury. (00330a) 5. Remove fuel tank according to the instructions in the service manual. Remove Engine Components 1. Remove existing air cleaner assembly. Discard backplate but save remaining parts. Refer to AIR CLEANER REMOVAL in service manual. 2. Remove existing exhaust system. Refer to EXHAUST SYSTEM REMOVAL in service manual. 3. Remove engine from chassis following the instructions in the service manual. 4. Disassemble engine top end and bottom end. Refer to appropriate ENGINE sections in service manual. 5. Remove existing clutch diaphragm spring. Refer to CLUTCH REMOVAL in service manual. The procedures in this instruction sheet should be performed by one experienced in precision measuring techniques. Failure to meet tolerances called for in this instruction sheet can result in engine damage. (00511b) -J04793 1 2 is03517 1. O-ring counterbore 2. Spigot bore Figure 1. Spigot Bore and O-Ring Counterbore Dimensions Table 1. Spigot Bore and O-Ring Counterbore Dimensions Depth Bore Description 1.625 +/- 0.010 in. (41.3 +/- 0.25 mm) 4.205 +/- 0.010 in. (107 +/- 0.25 mm) Spigot Bore 0.085 +/- 0.003 in. (2.16 +/- 0.08 mm) 4.415 +/- 0.002 in. (112 +/- 0.05 mm) O-Ring Counter- bore is03456 Figure 2. Cylinder Wall MACHINE CRANKCASE Crankcase Boring Preparation NOTE During final assembly of the engine, Harley-Davidson recommends replacing the OE cylinder studs with Screamin’ Eagle High Tensile Studs (16505-01). 1. Remove cylinder studs from the engine crankcase. 2. Mask off all bearings and oil holes to prevent debris and contaminants from entering those areas. 3. Inspect and clean engine case mating surfaces. 4. See Figure 6. Reassemble engine case with OE screws, except the top center screw between the cylinders, and tighten to specifications listed in service manual. NOTE To prevent damage to crankcase boring tool, it is important to replace the top center screw with a modified top center screw (1093). This screw is included in the Crankcase Boring Tool Kit (94419-06) and can be purchased separately from a Harley- Davidson dealer. 5. Install modified top center screw (1093) between the cylinders and tighten to 50-90 in-lbs (5.6-10.2 Nm). 6. See Figure 1 and Table 1. Machine crankcase cylinder spigot bore and O-ring counterbore to the dimensions shown. Modify Crankcase

Incoming search terms:

HARLEY DAVIDSON EFI SCREAMIN' EAGLE BIG BORE EFI STAGE 2 KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 29-01-2011

download
INSTALLATION Installation of this kit is divided into six steps: 1. Big-Bore Cylinder and Piston Conversion 2. High Performance Camshafts 3. High Performance Clutch Diaphragm Spring 4. High Performance Air Cleaner 5. Calibrate the ECM 6. Exhaust NOTES This Big-Bore Stage 2 kit is intended for High Performance applications only. This engine-related performance part is legal for sale or use in California on pollution-controlled motor vehicles. Engine-related performance parts are intended for the experienced rider only. -J04173 1 of 5 The air cleaner contained in these kits is designed to perform with these kits only. Any other combination of components is not confirmed to be legal for street use. The Product Information Label contained in this kit is required in the state of California only. This label is required to aid in passing the California Smog Check Program. Place the Product Information Label on the right side of the frame, directly beneath the VIN sticker. Do not place the label on motorcycles other than those specified in the Instruction Sheet. Gaskets provided in the 1690 conversion kit eliminate the need for original head gasket O-rings. For this reason, DO NOT install the Original Equipment (OE) O-rings (Part Number 11273) to the top of cylinder dowels, or severe engine damage may occur. Big-Bore Cylinder and Piston Conversion NOTE Installation of this kit requires removal of the cylinder heads, cylinders and pistons. Refer to Section 3, ENGINE: STRIPPING MOTORCYCLE FOR SERVICE and TOP END OVERHAUL of the applicable Service Manual for instructions. High Performance Camshafts NOTE Installation of this kit requires removal and re-installation of the cam support plate. Refer to Section 3, ENGINE: BOTTOM END Cam Support Plate, Removal and Disassembly/Assembly (Camshaft, Camshaft Bearings) of the applicable Service Manual for instructions. Measuring Piston-to-Valve Clearance After installing non-stock cams, check piston-to-valve clear- ance. 1. Apply 1/8-inch (3 mm) layer of clay to crowns of pistons in areas where valves meet pistons. 2. Refer to the appropriate Service Manual and assemble the heads and valve train, and tighten cylinder studs to torque specified. 3. Turn engine through two complete revolutions by hand. 4. Remove heads and measure clay at its thinnest point. NOTE Clay must measure 0.080 inch (2.03 mm) at its thinnest point. If this measurement does not meet minimum thickness, depth of valve notches must be increased. The depth of the notches must not exceed 0.135 inch (3.43 mm). Measuring Valve-to-Valve Clearance NOTE Wait ten minutes before turning the engine after installing push rods. This allows tappets to bleed down and prevents you from bending push rods or valves. 1. Rotate the engine so that both valves of the front cylinder are partially open. Shine a light through the exhaust port and look through the spark plug hole to view the valves. Turn engine, if required, to the point where the exhaust evel sensor to the fuel pump with screw (3). Tighten the screw enough to seat the fuel sensor against the mounting tab e. Route fuel level sensor wiring under the fuel hose and connect the fuel level sensor to the low fuel switch connector on the fuel pump module. If necessary use the jumper harness (Figure 4, item 5). f. See Figure 2. Secure the fuel pump wires and con- nectors

Incoming search terms:

HONDA VTX1300C / R/ S/ T Fuel Valve Diaphragm Replacement

0

Filed Under (Honda) by admin on 28-11-2010

download
1. Remove the fuel tank using the procedure in the Service Manual. However, do not remove the fuel valve from the fuel tank. 2. Drain the fuel into an approved container. 3. Remove the four screws and diaphragm cover. NOTE: The diaphragm cover is under spring pressure. Do not lose the spring or screws. The countermeasure part has a paint mark near the air vent hole. 4. Replace the diaphragm, spring, cover, and screws with new parts included in the kit. Install the new diaphragm with the plastic retainer facing the diaphragm cover. NOTE: Make sure the air vent hole is facing downward towards the ground. 5. Reinstall the fuel tank using the procedures in the Service Manual. 6. Refill the fuel tank. DEALER INVENTORY REPAIR VERIFICATION

Honda Shadow VT750C Fuel Valve Diaphragm Replacement

0

Filed Under (Honda) by admin on 25-11-2010

download
1. Drain the fuel into an approved container. 2. Remove the fuel tank using the procedure in the Service Manual. However, do not remove the fuel valve from the fuel tank. 3. Remove the four screws, and diaphragm cover. NOTE: The diaphragm cover is under spring pressure. The countermeasure part has a paint mark near the air vent hole. 4. Replace the diaphragm, spring, cover, and screws with new parts included in the kit. Install the new diaphragm with the plastic retainer facing the diaphragm cover. NOTE: Make sure the air vent hole is facing downward towards the ground. 5. Reinstall the fuel tank using the procedures in the Service Manual. 6. Refill the fuel tank

Yamaha Road Star NEEDLE/ JET KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Yamaha) by admin on 10-11-2010

download
1. Remove the vacuum slide from the carburetor. 2. Remove the OEM needle, spacer and washers, noting order of assembly. 3. Counting from the top to the bottom, install the new Baron needle clip on groove #4 for 04-07 models and on groove #5 for 99-03 models of the replacement. NOTE: Baron adjustable needle – The top is the blunt end of the needle. 4. Reinstall the OEM spacer and washers as shown in this diagram. 5. Reinstall the vacuum slide along with the diaphragm spring. 6. Reattach the diaphragm cover back and tighten screws. NOTE: Verify that the slide maintains its full range of movement. 7. Drain the fuel from the float bowl and remove the bowl cover. 8. Remove the OEM main jet and replace it with a Barons genuine Mikuni main jet. Install the correct main jet as indicated in JET SELECTION area above on this page. Our install guides provide a basic outline on the proper installation of our products. Further tuning and/or fitment may be required. Page: 2 BA-2420RD NEEDLE/JET KIT – Yamaha Road Star (99-07) 9. Thoroughly clean the inside of the float bowl prior to reinstalling it. 10. Reassemble the carburetor by reversing the order of step #1 through step #10. Use the new cap head allen screws in place of the OEM phillips head screws. 11. Locate the fuel mixture screw – it will either be a screw head or a brass plug. If it is a screw head, skip to step #11c. 11c. If you see a brass plug with a small hole in the center, proceed as follows: With the drill bit, carefully and slowly drill through the fuel mixture plug. CAUTION: The fuel mixture screw is located directly beneath this plug. Be prepared to stop the drill and remove the bit the instant you break through the plug. Insert the self-tapping sheet metal screw into the drilled hole and remove the plug. With air/fuel screw now accessible, use a flat blade screwdriver to turn the screw clockwise until it seats, then carefully turn it counter-clockwise 3 1/2 turns. Refer to step #16 for assistance in fine tuning the setting of the air/fuel adjustment screw. 12. Reinstall the carburetor. We strongly suggest that you attach the throttle cables prior to mounting to intake manifold. 13. Reconnect the fuel line, ensuring the clamp is firmly in place. 14. Reinstall all vent hoses and electrical connectors that were previously removed, checking for any obstructions or blockage. 15. Reinstall the OEM air filter assembly or, if you are installing our Big Air Kit (BAK), follow the instructions that accompany that kit, then continue with next step. NOTES: When the BAK is installed, the vent hose that terminated on the rear of the OEM airbox can be relocated in any safe position that does not kink or pinch it. It is important to verify proper throttle operation before starting the engine.

Incoming search terms: