HARLEY DAVIDSON TOURING OIL COOLER KIT AND CHROME OIL COOLER COVER INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 20-02-2011

download
INSTALLATION 1. See Figure 1. Remove the spin-on oil filter (2) and oil filter adapter (1) from oil filter mount location. Clean the oil filter mounting area thoroughly. Discard oil filter adapter. NOTE The oil adapter assembly has two flanges protruding out of the back. The flanges must be installed toward the oil filter mounting location and through the oil adapter gasket. 2. See Figure 2. Install the oil adapter gasket (3) onto the oil filter adapter assembly (1). The oil adapter assembly flanges should be aligned so they are installed into the oil adapter gasket cutout as shown. 1 2 is00602 1. Oil filter adapter 2. Oil filter Figure 1. Oil Filter and Adapter 1 2 3 5 4 is00761a 1. Oil cooler adapter assembly 2. Mounting fitting 3. Oil cooler adapter gasket 4. Gasket adhesive side 5. Oil cooler adapter assembly gasket surface Figure 2. Install Oil Adapter

HARLEY DAVIDSON LOCKING GLOVE BOX DOOR KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 15-02-2011

download
INSTALLATION 1. Unsnap the original equipment (O.E.) left-side glove box door, and unfasten the tether by bringing the aglet end (see Figure 1, B) out through the retaining hole. Always wear proper eye protection when drilling or grinding. Flying debris could cause serious eye injury. (00402e) 2. Using an 3/16 inch (5 mm) bit positioned in the center of each snap, drill out the four plastic snaps surrounding the glove box opening. NOTE The glove box door, hinge and frame assemblies are side- specific. The assemblies install so that the tether retaining hole (C) in the door frame is to the inboard side. 3. Obtain the new left-side glove box door, hinge and frame assembly (1), a lock (2) and a tether assembly (8) from the kit. Remove the nut (3) from the lock. 4. Insert the lock through the hole in the glove box door as shown. Assemble the tether over the lock threads with the tab (A) on the inboard side of the lock, same as the retaining hole in the door frame. Tighten securely. 5. Open the left-side door, and position the door assembly at the glove box opening, lining up the holes. 6. Insert a screw (9) through each of the holes in the door frame and glove box. Install a hex nut with washer (10) onto the threads of each screw. Tighten finger-tight. NOTE Ambient temperature should be at least 60° F (16° C) for proper adhesion of the gaskets to the glove box door frame. 7. Clean the glove box door frame with a mixture of 50 to 70% isopropyl alcohol and 30 to 50% distilled water. Allow to dry thoroughly. NOTE The glove box gaskets are side-specific. With the paper backing facing the door frame, the oblong hole at the top of the gasket is to the outboard side. 8. Obtain the left-side gasket (6) and a hinge gasket (7) from the kit. Install the gaskets to the glove box door frame. a. The gasket liner on the large gasket is split to aid alignment. Peel one half of the liner from the adhesive backing of the left-side gasket. b. Using the frame edges and screw heads as a guide, carefully position the gasket to the glove box door frame and press firmly into place. c. Peel the remaining half of the liner from the gasket backing, and carefully position the rest of the gasket to the door frame. Press firmly into place. d. Apply steady pressure for a few seconds at all areas of the gasket to verify proper adhesion. e. Peel the liner from the hinge gasket. f. Carefully position the gasket to the door frame above the hinge, and press firmly into place.

HARLEY DAVIDSON TOUR-PAK WALL ORGANIZER INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 11-02-2011

download
This kit fits 1997 and later models equipped with King Tour- Paks INSTALLATION NOTE Maximum Wall Organizer weight capacity is 3 pounds (1.4 Kg) evenly distributed. Do not exceed tour-pak weight capacity. Too much weight can cause loss of control, which could result in death or serious injury. (00401b) Tour-Paks With Molded Liner 1. Remove the two nuts that hold the pouch and liner in the Tour-Pak. Remove pouch and liner and carefully wash the inside of the Tour-Pak with warm, soapy water. Rinse and dry thoroughly. 2. Use the alcohol prep pad in the kit to thoroughly clean the interior surface of the Tour-Pak sides where fastener strips will be attached. Make sure any residue is removed, then allow Tour-Pak to dry completely. Make sure the surface is free of condensed moisture. NOTES The hook and loop fastener strips and organizer must be installed below the edge of Tour-Pak base to avoid interference with top gasket and lock. The ideal temperature range for applying the fastener strip is 70-100° F (21-38° C). Minimum application temperature is 50° F (10° C). If you attempt to apply the tape below these temperatures, the adhesive will become too firm to adhere readily. 3. See Figure 1 and Figure 2. Remove the hook and loop fastener strips from the hinged hook and loop strips. Remove the paper backing and firmly press the fastener strips into the locations (1) shown in Figure 2. The fastener strips should be located approximately 1/8 in. (3 mm) below the edge of the Tour-Pak base. 4. See Figure 1. Bend the hinged hook and loop strips (3) into shape as shown. Attach the hinged strips onto the fastener strips (2) installed in Step 3. NOTE The Tour-pak Wall Organizer installs in place of the pouch removed in Step 1, therefore the pouch will not be re-installed. 5. Reinstall the liner removed in Step 1. The hinged strips (3) will go over the top of the liner (4) as shown in Figure 1. 6. See Figure 1. Attach the organizer (5) to the hinged strips (3). Adjust the organizer’s lock cut out so that it is centered around the lock, and press the hook side of the hook and loop strips on the bottom of the organizer into place on the liner. The hook side will attach to the liner. NOTE 2006 and later Tour-Paks equipped with Passenger Backrest will have two acorn nuts at the front of the base. Remove and discard the 8 in. (200 mm) long hook and loop hinged fastener strip from the center panel. In one of the organizer pockets there will be 4 in. (100 mm) and 1-1/2 in. (38 mm) hook and loop hinged fastener strips. Install the hinged strips on the organizer center panel as shown in Figure 3. 7. Check to make sure the Tour-Pak lid closes over the organizer and the lock works without interference. Adjust as necessary. 8. Allow tape to cure (“wet-out”) for a minimum of 48 hours at 70° F (21° C) (allow extra time if temperature is below 70°). Do not place items in the Wall Organizer while adhesive is curing

HARLEY DAVIDSON CHROME/BLACK FRONT MASTER CYLINDER COVER KITS INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 11-02-2011

download
INSTALLATION Do NOT allow dirt or debris to enter the master cylinder reservoir. Dirt or debris in the reservoir can cause improper operation and equipment damage. (00205b) NOTE If this is a master cylinder cover replacement, start with step 1. If this is new installation for a hydraulic clutch kit, go to step 3. D.O.T. 4 brake fluid will damage painted and body panel surfaces it comes in contact with. Always use caution and protect surfaces from spills whenever brake work is performed. Failure to comply can result in cosmetic damage. (00239b) 1. Clean front master cylinder cover, then remove the two screws that hold the cover in place. 2. Remove the original cover (with sight glass) and gasket. 3. Put new cover and gasket in position. 4. See Service Parts illustration. Install the new cover screws (1) and tighten to 6-8 in-lbs (.7-.9 Nm). Direct contact of D.O.T. 4 brake fluid with eyes can cause irritation. Avoid eye contact. In case of eye contact flush with large amounts of water and get medical attention. Swallowing large amounts of D.O.T. 4 brake fluid can cause digestive discomfort. If swallowed, obtain medical attention. Use in well ventilated area. KEEP OUT OF REACH OF CHILDREN. (00240a) NOTE The cover is lab led for D.O.T. 4 brake fluid. Install this cover on reservoirs filled only with D.O.T. 4 brake fluid. Do not mix grades of brake fluid. as they are not compatible and could cause equipment damage.

HARLEY DAVIDSON CHROME SADDLEBAG LID TRIM KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 08-02-2011

download
INSTALLATION 1. Remove all articles from inside, then thoroughly wash and dry the saddlebag lid. 2. Close the saddlebag lid. Cut a piece of masking tape at least 10 inches (25 cm) long and lay it lengthwise down the center of the top outer surface of the lid starting at the front. Mark a line lengthwise down the tape, measuring an equal distance from each side so the line is centered on the lid. 3. Obtain the template (7) from the kit, and position it on the line, with the short leg held against the front surface of the lid. Carefully mark the tape at the two arrows, then remove the template and set it aside. 4. At each of the marks made in Step 3, carefully drill a 1/8 inch (3 mm) diameter pilot hole. 5. Using the pilot holes drilled in Step 4, use a 9/32 inch (7 mm) diameter bit to finish drilling the holes for the trim piece. NOTES Before installing the lid trim, test fit to ensure adequate clearance of both mounting pads through the drilled holes in the saddlebag lid. The trim pieces are side-specific; the front legs are angled to match the lid front. If the pads do not fit loosely in the holes, it may be necessary to slightly enlarge the holes to provide clearance and maintain proper alignment of the trim on the lid. Clean the saddlebag lid inside and out, and the inside of the saddlebag with a soft cloth, making sure to remove any shavings left from drilling. 6. Obtain the correct saddlebag lid trim (1 or 2) and a trim gasket (3) from the kit. Peel the liner from the adhesive backing of the gasket. 7. Position the gasket onto the bottom surface of the trim, making sure the gasket remains inside the outer edges of the trim, and smooth it into place. 8. Obtain a pan head screw (6) from the kit. 9. Using a T25 TORX® drive head, start the screw part way into one of the holes on the underside of the trim, to form a few threads in the hole, then back the screw out of the hole. Repeat for the second hole. 10. Install the trim piece onto the lid, fitting the mounting pads into the holes drilled in Step 5. 11. Place a flat washer (5) from the kit onto the threads of the screw (6), followed by a rubber washer (4). Place two drops of Loctite® 243 (blue) onto the screw threads. 12. While supporting the lid trim in place, open the saddlebag lid and install the washers and screw through the lid into one of the trim mounting pads, finger tight. Repeat for the remaining trim mounting pad, with another screw, flat washer and rubber washer. 13. Apply a small amount of pressure to the trim piece above each screw and continue to tighten both screws to 25-28 in-lbs (2.8-3.2 Nm) . 14. Repeat steps 1 through 13 for the opposite saddlebag lid

Incoming search terms:

STREET TUNNEL RAM INTAKE MANIFOLD INSTALLATION INSTRUCTIONS

0

Filed Under (Tips and Review) by admin on 07-02-2011

download
PREP AND TUNING FOR POWER: 1. Specific applications may show an increase in performance through additional carburetor tuning. 2. Aftermarket distributor curve kits and aftermarket ignitions may be used with the Street Tunnel Ram intake manifold. 3. Use modified or high performance cylinder heads such as our Performer RPM, and port match the intake manifold to the heads. 3. The engine’s compression ratio should be at least 9.5:1 to work properly with Torker-Plus or Performer RPM camshafts. INSTALLATION PROCEDURE INTAKE MANIFOLD BASE 1. Use only recommended intake gaskets set when installing this intake manifold. 2. Fully clean the cylinder head intake flanges and the engine block end seal surfaces. 3. Apply Edelbrock Gasgacinch sealant P/N 9300 to both cylinder head flanges and to the cylinder head side of the gaskets, allow to air dry, and attach the intake gaskets. 4. Do not use cork or rubber end seals. Use RTV silicone sealer instead. Apply a ¼” high bead across each block end seal surface, overlapping the intake gasket at the four corners. This method will eliminate end seal slippage. 5. Install the intake manifold hold-down bolts (We offer an Intake Manifold Bolt Kit #8504 that includes small-head silver Cadmium-plated bolts and matching hardened washers). Apply a small amount of RTV silicone to the threads of the eight inner bolts (1,2,3,4,5,7,9, & 11) (See Figure 1) . This will prevent oil weepage, as generally these are not blind holes in the cylinder head. 6. Torque all of the manifold bolts in two steps by the sequence shown in Figure 1 to 25 ft/lbs. INTAKE MANIFOLD TOP 1. Apply Edelbrock Gasgacinch sealant P/N 9300 to the gasket mating surface and install the gasket and manifold top. 2. Install and tighten the supplied hold down bolts using a liquid thread-locking compound on the bolt threads. As an extra safety precaution, we suggest you drill a small safety wire hole in the head of each bolt and safety wire them together. Edelbrock Corporation expressly disclaims any liability for any and all consequential damages

Incoming search terms:

HARLEY DAVIDSON DERBY COVER KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 05-02-2011

download
These kits are designed for installation on all 1999 and later 1340 Evolution and Twin Cam equipped models.INSTALLATION For models equipped with left side exhaust pipe: Perform this installation when the engine is cool. Working on or near the exhaust system when the engine is hot could result in severe burns. (00311a) NOTE Remove clutch inspection (derby) cover with motorcycle upright, not on side stand. If cover is removed with motorcycle on side stand, primary fluid will leak out of primary chaincase. 1. On models so equipped, remove the left-side passenger footboard. Using a T27 TORX® drive head, remove the derby cover from the primary chaincase. Discard the derby cover and fasteners. NOTE The gasket between the clutch inspection cover and the chaincase cover must be removed and all oil must be wiped from the gasket and groove in chaincase cover each time the cover is removed. 2. Remove the gasket from the groove in the chaincase cover and mounting surface. 3. Inspect gasket for tears or damage. Replace as required with gasket 25416-99C (sold separately). NOTE If installing the Derby cover on a 2006 and later Dyna, 2007 Softail, or 2007 Touring model, the original equipment gasket must be discarded and replaced with Derby Cover Gasket 25416-99C (sold separately). 4. To avoid punching holes in the clutch inspection cover gasket or enlarging the existing holes, install the new derby cover and gasket as follows: a. Align the triangular shaped hole in the gasket with the top hole in the derby cover. Be sure the rubber molding and the words “towards clutch” face the motorcycle. b. See Figure 2. Place a washer (2) from the kit onto the threads of one of the new screws (3). Insert the screw threads through the top hole in the derby cover, and carefully thread it all the way through the triangular shaped hole in the gasket. Do not push the screw through the hole. c. Hang the derby cover on the primary chaincase cover flange by starting the top cover screw. d. Start the remaining four screws and washers. 5. Install gasket (part number 25416-99C) and derby cover (1) on primary chaincase cover using screws and washers from the kit. Tighten screws to 84-108 in-lbs (10-12 Nm) in the sequence shown in Figure 1

Incoming search terms:

HARLEY DAVIDSON VRSC BRACKET FOR BILLET HEADLAMP SHELL REMOVAL AND INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 31-01-2011

download
REMOVAL VRSCA Models 1. Remove windshield (if equipped). Refer to appropriate Instruction Sheet for procedures. 2. Remove right side cover and maxi-fuse. Refer to MAXI- FUSE in Service Manual. 3. See Figure 1. Disconnect headlamp connector (1) from vehicle wire harness. 4. Remove two screws (2), headlamp mounting bracket (3), and headlamp assembly (4) from upper bracket. 2 3 4 5 1 is03046 1. Connector 2. Screw (2) 3. Bracket 4. Headlamp assembly 5. Screw (2) Figure 1. VRSCA Headlamp Assembly VRSCB Models 1. Remove windshield (if equipped). Refer to appropriate Instruction Sheet for procedures. 2. Remove right side cover and maxi-fuse. Refer to MAXI- FUSE in Service Manual. 3. See Figure 2. Disconnect headlamp connector (1) from vehicle wire harness. 4. Remove two screws (2), headlamp assembly (3), and headlamp mounting bracket (4) from upper bracket. 5. Remove nut (5), screw (6), and trim ring (7) from head- lamp. 6. Remove lens assembly (8) from headlamp shell (9). Save lens assembly for Billet Headlamp Shell Kit 67704-03 installation INSTALLATION 2004-Earlier VRSCA and VRSCB Models 1. Assemble Chrome Billet Headlamp Shell Kit (67704-03). Refer to Instruction Sheet-J03018. NOTES VRSCA models use Headlamp 68297-05, while VRSCB models use original equipment lens assembly (including gasket and boot). Adapter ring from kit (Figure 6, Item 1) will be used to install billet headlamp assembly on Instruction Sheet-J03018. 2. See Figure 3. Cut the two connectors (1) from existing headlamp wire harness (2). Be sure to cut the wires as close to the back of the connector as possible. 3. See Figure 6. Route new wire harness (2) through the hole in bottom of the billet headlamp shell (A). NOTE Only one 16 AWG wire will fit into pin terminals included in kit. Both black wires (ground) can be joined together, then connected to a single wire, if desired. 4. Tape end of one black wire with electrical tape and secure it to wire harness. 5. See Figure 3 and Figure 6. Install terminal pin (3) and socket housing (4) onto new wire harness (Figure 6, Item 2). Refer to MULTILOCK ELECTRICAL CONNECTORS in Service Manual for installing socket/pin terminals. 3 4 1 2 is03025 1. Connector (2) 2. Wire harness 3. Terminal pin (4) 4. Socket housing Figure 3. 2004-Earlier VRSCA and VRSCB Headlamp Wire Harness 2005-Later VRSCA and VRSCB Models 1. Assemble Chrome Billet Headlamp Shell Kit (67704-03). Refer to Instruction Sheet-J03018. NOTES VRSCA models use Headlamp 68297-05, while VRSCB models use original equipment lens assembly (including gasket and boot). Adapter ring from kit (Figure 6, Item 1) will be used to install billet headlamp assembly on Instruction Sheet-J03018. 2. Disconnect and discard existing wire harness. 3. See Figure 6. Connect new wire harness (2) to billet headlamp shell (A). 4. Route wire harness (2) through hole in bottom of billet headlamp shell (A) before installing socket housing (4) provided in kit

HARLEY DAVIDSON CHROME REAR MASTER CYLINDER COVER KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 30-01-2011

download
1. Clean rear master cylinder cover, then remove two screws that hold cover in place. 2. Remove original cover (with sight glass) and gasket. 3. Put new cover and gasket in position. 4. Install cover screws and tighten screws (1) to 6-8 in-lbs (.7-.9 Nm). Direct contact of D.O.T. 4 brake fluid with eyes can cause irritation. Avoid eye contact. In case of eye contact flush with large amounts of water and get medical attention. Swallowing large amounts of D.O.T. 4 brake fluid can cause digestive discomfort. If swallowed, obtain medical attention. Use in well ventilated area. KEEP OUT OF REACH OF CHILDREN. (00240a

HARLEY DAVIDSON CUSTOM HAND LEVER KIT BRAKE LEVER INSTALLATION

0

Filed Under (Harley Davidson) by admin on 29-01-2011

download
1. See Figure 1. Squeeze the brake lever and place the cardboard insert between the brake lever and lever bracket. NOTE Use the eyelet of an ordinary cable strap if the cardboard insert is not available. NOTE Do not remove the handlebar clamp or switch housing assembly to remove the brake lever. Wear safety glasses or goggles when removing or installing retaining rings. Retaining rings can slip from the pliers and could be propelled with enough force to cause serious eye injury. (00312a) 2. See the Figure 2 and the FRONT BRAKE MASTER CYLINDER section of the Service Manual. Remove the retaining ring (B) from the groove in the pivot pin (C). Inspect the retaining ring (part number 11143) and replace if needed. 3. Remove the pivot pin and retain for re-use. Remove and discard the original equipment brake lever and pivot lever bushing. 4. Insert the pivot lever bushing (2) from the kit into the new brake lever (1). NOTE Follow the instructions in Steps 4 and 5 carefully in order to prevent the actuating tab on the brake lever from damaging the rubber boot and plunger of the front stoplight switch. -J04165 1 of 3
5. Gently press and hold the piston cap (A) forward with a screwdriver. Slip the brake lever into position and align the pivot pin holes. 6. Install the pivot pin and retaining ring removed in Steps 1 and 2. 7. Check the front brake for proper operation. There should be no free play in the hand lever. A slight preload is per- missible. A plugged or covered relief port can cause brake drag or lock-up, which could lead to loss of control, resulting in death or serious injury. (00288a) 8. To verify proper operation of the master-cylinder relief port, actuate the brake lever with the reservoir cover and gasket removed. A slight spurt of fluid will break the surface if internal components are working properly. 9. Reinstall the master cylinder cover. Be sure that all lights and switches operate properly before operating motorcycle. Low visibility of rider can result in death or serious injury. (00316a) 10. Check that the stop light goes on when the brake lever is actuated. CLUTCH LEVER INSTALLATION See the CLUTCH CONTROL section of the appropriate Service Manual for all clutch lever removal, installation and adjustment procedures.

Incoming search terms: