5/16 Bolt hole boss clearance This can easily be checked with the trap door gasket. Put the gasket on the dowel pins. AII material of the boss around the hole that “sticks outside” the gasket (60 degrees forward to 60 degree backwards) must be removed (see figure A). Primary fork clearance Place the gasket on the housing and remove material as indicated for clearing the shifter fork (see figure B). WWW . ZODIAC . NL PERFORMANCE PRODUCTS FOR HARLEY-DAVIDSON ® INSTALLATION INSTRUCTIONS FOR 6 SPEED CONVERSION KIT AND 6 SPEED BUILDER KIT speed transmission. Also make sure you have a 1990 or later Factory Service Manual available. Tools The conversion kit should only be used in new or low milage transmissions. If gears or bearings of a used Gear set Removal Refer to the Factory Service Manual Section for Mainshaft and Countershaft removal. When you get to the point of actually sliding the gear set out make sure you properly mark the 5th gear set as described in the Factory Service Manual (for used transmissions only). Further follow the factory removal procedure. Clearance Checks The 6 Speed conversion and builder kit will fit in most OEM or aftermarket transmission housings without may be needed. The following clearances must be checked before assembling the 6 speed transmission. 28-05-2008 We recommend the kits are installed by a qualified mechanic with knowledge of the Harley-Davidson 5 needed are the same as used for a 5 Speed transmission. 5 speed transmission are worn, new ones must be installed, or better, the builder kit should be used. any modification of the housing. However due to casting differences, in some instances some modification
WWW . ZODIAC . NL PERFORMANCE PRODUCTS FOR HARLEY-DAVIDSON ® Pillow block clearance (right side) Make sure there is clearance between the pillow block and the housing. Any clearance is O.K. (see figure C). Fork shaft support clearance Again use the gasket as the template and remove the material as indicated (see figure D). Shift drum end play The end play of the shift drum must be checked prior to final installation. Install the shift drum. Measure the end play with feeler gauges at the right pillow block (see figure E). End play should be between .004″ and .010″, some 1/2″ X 7/8″ 0.008″ thick shims are included to adjust the end play

Incoming search terms:

ULTIMA 6 SPEED BUILDERS KIT INSTALLATION MANUAL

0

Filed Under (Tips and Review) by admin on 03-03-2011

download
DISASSEMBLY For 5 speed gear set removal refer to your factory service manual. You willneed to remove the main drive gear, main drive gear bearings, retaining clip & countershaft needle bearings. NOTE: Removal of the shifter arm is notnecessary for 99 & earlier transmissions. NOTE: Removal of the shifter arm isnecessary for 2000 & later transmissions. After trans. housing is disassembled thoroughly clean & inspect. ASSEMBLY For 2000 & later models removal of approximately 1/4 of an inch off of the shifter arm bushing is likely required. Doing so will allow installation of the retaining clip & washer onto the shifter arm. It is good practice to double check how much material should be removed before cutting the bushing. See fig. 1 & 2 Install supplied Main drive gear bearings & countershaft needle bearings using special tool # 97-164 NOTE: Lightly coat bearings with assembly lube or gear oil for easier installation. Install supplied Main drive gear retaining clip & verify that it is fully seated and cannot come out. Do not re-use old bearings or retaining clip. Install supplied Main drive gear into bearings using special tool # 97-166 See fig. 3 Install supplied trap door gasket & verify that it is on correctly. Install supplied 6 speed gear set making sure to align the countershaft with the needle bearing assembly. Slowly slide in gear set until the mainshaft & countershaft will not slide in any further. Lightly tapping on the trap door (while verifying that there is no interference) with a soft blow hammer will then fully seat the shafts & trap door. See fig. 4 Once gear set is installed use the supplied 5/16-18×1-1/2 & 1/4-20×1-1/2 bolts to secure the trap door. Torque the 5/16 bolts to 15 ft-lbs w/ red loctite (high strength) Torque the 1/4 bolts to 9 ft-lbs w/ red loctite (high strength) See fig. 5

Incoming search terms:

Kymco MXU 250 WINCH MOUNTING KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Kymco) by admin on 26-10-2010

download
Begin by placing winch in freespool. Support the winch so that it will stand upright on the workbench, Fig. 1. This will ensure that the winch drivetrain will not be dislocated during disassembly. 2. Remove the two lower cap screws and nuts. Next remove the two upper cap screws, Fig. 2. Figure 2: Remove Cap Screws Figure 1: Position the Winch Upright Lower Cap Screws Upper Cap Screws Freespool Lever Position 3 Lift the gear housing straight up off the gears. Take care not to disturb the gear set. 4. Rotate the gear housing clockwise 90 degrees and place back down over the gear set. It may take slight twisting motion to have the housing align and drop over the gear set. 5. Align holes and replace hardware securing the endhousing back on the winch. Torque bolts to 45 in-lbs. The winch is now ready to be installed. Figure 3: Lift Gear Housing Figure 5: Reinstall Hardware Figuere 4: Rotate and Replace Gear Housing Rotate and Lower IV. Kymco MXU 250 Installation 1. Begin by removing the plastic bumper located on the front of the ATV. Remove the four front bolts and two bolts securing the bumper on the back side, Fig. 6. 2. Set the bumper aside. Save the fasteners to reinstall the bumper.