2006-2007 Honda TRX450R SR4 4 Stroke racing system INSTALLATION

0

Filed Under (Honda) by admin on 30-11-2011

download
Install Motoworks header pipe using stock nuts, finger tight at this point ( Fig 4) 2. Install Motoworks tailpipe with muffler using bolt and spacer supplied in kit on upper rear mount, use stock nut and bolt on lower mount finger tight at this point. (Fig 5 and 6) 3. Torque header pipe nuts to 1.0 kg-m ( 7.3 lb-ft ) 4. Torque tailpipe mounting bolts to 2.5 kg-m ( 18 lb-ft ) 5. Re-check all your work 6. We recommend that you clean the entire exhaust system with a mild detergent, i.e. glass cleaner prior to starting as any oily residue may cause permanent stainingBefore operating check for proper clearance between Motoworks exhaust and ATV i.e. frame, plastic, brake line, fuel line etc if problems exist re-check work

HARLEY DAVIDSON DYNA STATOR AND ROTOR KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 30-03-2011

download
REMOVAL To prevent accidental vehicle start-up, which could cause death or serious injury, disconnect negative (-) battery cable before proceeding. (00048a) 1. Disconnect negative battery cable. See BATTERY MAINTENANCE in Service Manual. 2. Remove primary cover, primary drive, and clutch. See DRIVE COMPONENTS in Service Manual. 3. Remove primary chaincase according to the instructions in the Service Manual. 4. See Figure 2. Pull off the alternator rotor (1) using two bolts inserted through the holes in the rotor face. 5. Remove the two T-27 TORX screws (2). 6. Unplug the voltage regulator and remove the stator (3). See VOLTAGE REGULATOR in Service Manual. 7. Disassemble connector [46B] (A). See DEUTSCH ELECTRICAL CONNECTORS in Service Manual. NOTE Contact cleaner, alcohol, or glass cleaner sprayed on rubber grommet (B) will provide lubrication when pulling it through crankcase hole. 8. Move grommet (3) to one side and spray contact cleaner into gap. Repeat for other side. Pull rubber grommet (B) through crankcase hole. 9. Pull wires through crankcase hole. INSTALLATION 1. Insert wires through crankcase hole. 2. See Figure 1. Push rubber grommet (B) through crankcase hole. If necessary, apply the same lubricant used during removal. 3. Insert wires into connector [46B] (A). 4. Mate connector [46]. See VOLTAGE REGULATOR in Service Manual. is03776 Figure 1. Voltage Regulator 5. See Figure 2. Install the stator (3) on the crankcase and fasten in place using new TORX screws (2). Tighten to 55-75 in-lbs (6.2-8.4 Nm). 6. Install the rotor (1) on the sprocket shaft. 7. Apply Loctite Threadlocker 262 (red) to sprocket nut threads. Tighten sprocket nut to 150-165 ft-lbs (203.4- 223.7 Nm). 8. Install primary chaincase according to the instructions in the Service Manual. 9. Install clutch, primary drive, and primary cover. See DRIVE COMPONENTS in Service Manual. 10. Connect negative battery cable. See BATTERY MAINTENANCE in Service Manual

Incoming search terms:

Kawasaki Brute Force 750 MudSlinger Slip-On with S-Bend Installation Instructions

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
Remove the stock muffler and rear cylinder head pipe as described in your owner’s manual. Retain the stock fasteners for MudSlinger installation. (Do not remove the front cylinder head pipe; this will be used with your new system). 2) Remove stock Heat Shield and retain for MudSlinger installation. 3) Remove and inspect the rear cylinder exhaust gasket. Retain or replace for MudSlinger installation. MUDSLINGER INSTALLATION: 1) Slide the 1 ¾ T-bolt clamp over the supplied Y pipe and attach pipe to MudSlinger muffler. (DO NOT TIGHTEN) 2) Slide the 1 ½ T-bolt clamp over the front cylinder head pipe. 3) Install the new Y pipe and muffler using the stock fasteners. Align the muffler with the rear mount point on the frame. (DO NOT TIGHTEN). 4) Tighten all clamps and fasteners starting with the two flange nuts at the exhaust port and working back to the muffler. 5) Re-install the stock heat shield. (NOTE: only 2 fasteners will be used to install the heat shield to the new system. Make sure to use medium strength Loctite on the 2 fasteners when installing). 6) Start and check for leaks then re-install all body panels. IMPORTANT: After a short test ride, check and retighten all fasteners as necessary. CLEANING & MAINTENANCE The Mudslinger system is manufactured from stainless steel and aluminum. Stainless steel is used for its high strength at high temperatures and resistance to corrosion. The aluminum is used for it’s weight and strength. Before you run your new SuperTrapp MudSlinger for the first time, clean all grease, fingerprints, and dirt from the entire system. (A good glass cleaner works well.) A clean, grease-free surface will allow even coloration. Over time, the MudSlinger will begin to take on a gold tint. The coloration will be relatively even throughout the entire system. The hotter you get the system, the darker it will become. Due to the unique properties of these materials, the care of the MudSlinger is minimal. The following instructions should be followed to maintain your MudSlinger muffler

Incoming search terms:

Kawasaki KFX 400 SR4 4 Stroke racing system INSTALLATION MANUAL

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
Installation Motoworks exhaust 1. Install Motoworks tailpipe with muffler using bolt supplied in kit. (Fig 3) 2. Tighten tailpipe mounting bolt. 3. RECHECK ALL YOUR WORK 4. We recommend that you clean the entire exhaust system with a mild detergent, i. e. glass cleaner prior to starting as any oily residue may cause permanent staining. 5. Before operating check for proper clearance between Motoworks exhaust and ATV i. e. frame, plastic, brake line, fuel line etc. if problems exist, recheck work. Note: It is normal for the new exhaust to emit white smoke the first time you start the ATV. This is from the oil used during manufacturing.