Toyota Power Steering Conversion Kit Installation Instructions

0

Filed Under (Toyota Manuals) by admin on 04-10-2011

download
Remove the stock steering box and column. Be sure to clear the area of all wiring, brake lines and fuel lines. 2. Bolt the Toyota box to the mounting bracket so that the long arm of the bracket points in the same direction as the steering column input shaft (small shaft.) To mount the bracket and box correctly, the longer end should be towards the rear of the vehicle. It may be necessary to grind on the power steering box where the two flanges protrude above the bracket. For technical help call Classic Performance Products Monday thru Friday 8:30am to 5:00pm at (714) 522-2000. Rev. 8/17/2009 3. Locate the box/bracket assembly into the frame by centering the Toyota sector shaft through the original hole in the frame. This hole will need to be elongated approximately 3/8″ to allow the sector shaft to clear the frame. Bolt the bracket directly into the mounting holes for the original steering box. 4. With the first bolt in, check the fit by reattaching the steering box. Make sure the splined shaft goes through the frame without interference. Torque down the mounting bolts to 45 lbs. 5. Attach the pitman arm to the steering box. Before this is done the steering sector must be centered. Turn the input shaft clockwise as far as it can go. Make a reference mark. Now turn the shaft counter clockwise as far it can go and be sure to count the turns. Turn the shaft back half the distance and now the box is centered. Be sure to double and triple check this procedure. Attach the pitman arm to the output shaft with the output shaft nut. Torque the bolt down to 110ft/lbs. Reconnect the stock drag link and you are on your way

1953 Toyota Ford Truck Power Steering Conversion Kit Installation Instructions

0

Filed Under (Toyota Manuals) by admin on 01-10-2011

download
of all wiring, brake lines and fuel lines. 2. Bolt the Toyota box to the mounting bracket so that the long arm of the bracket points in the same direction as the steering column input shaft (small shaft.) To mount the bracket and box correctly, the longer end should be towards the rear of the vehicle. It may be necessary to grind on the power steering box where the two flanges protrude above the bracket. For technical help call Classic Performance Products Monday thru Friday 8:30am to 5:00pm at (714) 522-2000. Rev. 8/17/2009 3. Locate the box/bracket assembly into the frame by centering the Toyota sector shaft through the original hole in the frame. This hole will need to be elongated approximately 3/8″ to allow the sector shaft to clear the frame. Bolt the bracket directly into the mounting holes for the original steering box. 4. With the first bolt in, check the fit by reattaching the steering box. Make sure the splined shaft goes through the frame without interference. Torque down the mounting bolts to 45 lbs. 5. Attach the pitman arm to the steering box. Before this is done the steering sector must be centered. Turn the input shaft clockwise as far as it can go. Make a reference mark. Now turn the shaft counter clockwise as far it can go and be sure to count the turns. Turn the shaft back half the distance and now the box is centered. Be sure to double and triple check this procedure. Attach the pitman arm to the output shaft with the output shaft nut. Torque the bolt down to 110ft/lbs. Reconnect the stock drag link and you are on your wa

HARLEY DAVIDSON KING TOUR-PAK WRAP AROUND LIGHT UNIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 11-03-2011

download
INSTALLATION To prevent accidental vehicle start-up, which could cause death or serious injury, disconnect battery cables (negative (-) cable first) before proceeding. (00307a) Disconnect negative (-) battery cable first. If positive (+) cable should contact ground with negative (-) cable connected, the resulting sparks can cause a battery explosion, which could result in death or serious injury. (00049a) 1. Disconnect the negative battery cable (-) following the instructions in the owner’s manual. 2. Locate the two-sided template (part number 50002-01) printed on a 11 x 17 inch sheet of poster board. Cut out the template as indicated. 3. If the motorcycle is radio equipped, separate the antenna cable from terminal at antenna base. Remove the nut, lockwasher and ground ring terminal from antenna terminal. Remove phillips head screw threaded into antenna base. Remove mast and antenna base. Detach mast from antenna base by turning counterclockwise with adjustable wrench across flats. 4. See Figure 10. Shield threads of antenna terminal stud with strip of light cardboard. Remove terminal with pliers across cardboard strip. Save terminal and mast for later installation. 5. See Figure 1. Open Tour-Pak top and remove all loose contents. Remove Tour-Pak. Align the template as follows: a. Place center line template (4) along rear top edge of Tour-Pak (1) with curved end against one corner. b. Mark centerline at top edge of Tour-Pak. c. Reverse center line template and mark center with curved end against opposite corner. d. If centerlines overlap, mark center one half the distance between the two lines. e. Place a square against lip at top of Tour-Pak and draw a 3 in (76 mm) line down from the center mark