HARLEY DAVIDSON SPORTSTER ALUMINUM SHIFT LINKAGE KITS INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 10-03-2011

download
INSTALLATION 1. See Figure 1. Remove stock capscrews (4) and stock shifter rod (2). Discard stock capscrews. 2. See Figure 2 and Table 2. Loosen the lock nuts (5) and turn the rod ends on the new aluminum shifter rod (1) to match the length of the stock shifter rod. 3. See Figure 2 and Table 2. Slide longer capscrew (3) through the front rod end of new shifter rod (1). Place rod on the outside of the lever assembly. Thread capscrew (3) into the lever assembly. 4. Slide shorter capscrew (2) through the rear rod end of new shifter rod (1). Place rod on the outside of the transmission shift lever. Thread capscrew (2) into the transmission shift lever. 5. Tighten capscrews to 10-15 ft-lbs (13.6-20.3 N-m) . 6. Firmly tighten the lock nuts (5) against the rod ends to 20- 24 ft-lbs (27.1-32.5 Nm) . 1 4 2 4 3 is05394 1. Lever assembly 2. Shifter rod 3. Transmission shift lever 4. Capscrew Figure 1. Shift Linkage Components