Harley Davidson Shift leverbracket INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 24-03-2012

download
Installation of any parts should be performed by a qualified, trained mechanic. • All parts included in the Rocker Boards™Conversion Kit are intended to be used as sold. Modification of any part will void all warranties. • Installation should be performed on a motorcycle that is completely cool to avoid burns or other injuries. • Refer to a specific authorized Harley-Davidson service manual for correct disassembly and reassembly procedures for any parts that need to be removed to facilitate installation. • Motorcycle exhaust fumes are toxic and poisonous and must not be inhaled. Always run motorcycle in a well-ventilated area. • Do not perform any installation steps under the influence of alcohol, drugs, or if feeling fatigued. Warranty Briggs Made Cycle Parts, Inc. Rocker Boards™and all parts included in the conversion kit are warranted to the original purchaser to be free of manufacturing defects in materials and workmanship for a period of one (1) year from the original date of purchase. Any part that fails to conform to these conditions, will be repaired or replaced at the discretion of Briggs Made Cycle Parts, Inc. upon receipt of the defective part within the one year warranty period. In the event a part has been rendered defective, Briggs Made Cycle Parts, Inc. must be notified prior to the return of the defective part. Briggs Made Cycle Parts, Inc. will not be liable for any consequential or incidental damages resulting from the failure of any part, the breach of any warranties, the failure to deliver, delay in delivery or any other breach of duty between Briggs Made Cycle Parts, Inc. and a customer

Harley Davidson 6- SPEED CONVERSION KIT FOR BIG TWIN 5- SPEED TRANSMISSIONS INSTALLATION

0

Filed Under (Harley Davidson) by admin on 05-03-2012

download
5/16 Bolt hole boss clearance This can easily be checked with the trap door gasket. Put the gasket on the dowel pins. AII material of the boss around the hole that “sticks outside” the gasket (60 degrees forward to 60 degree backwards) must be removed (see figure A). Primary fork clearance Place the gasket on the housing and remove material as indicated for clearing the shifter fork (see figure B). WWW . ZODIAC . NL PERFORMANCE PRODUCTS FOR HARLEY-DAVIDSON ® INSTALLATION INSTRUCTIONS FOR 6 SPEED CONVERSION KIT AND 6 SPEED BUILDER KIT speed transmission. Also make sure you have a 1990 or later Factory Service Manual available. Tools The conversion kit should only be used in new or low milage transmissions. If gears or bearings of a used Gear set Removal Refer to the Factory Service Manual Section for Mainshaft and Countershaft removal. When you get to the point of actually sliding the gear set out make sure you properly mark the 5th gear set as described in the Factory Service Manual (for used transmissions only). Further follow the factory removal procedure. Clearance Checks The 6 Speed conversion and builder kit will fit in most OEM or aftermarket transmission housings without may be needed. The following clearances must be checked before assembling the 6 speed transmission. 28-05-2008 We recommend the kits are installed by a qualified mechanic with knowledge of the Harley-Davidson 5 needed are the same as used for a 5 Speed transmission. 5 speed transmission are worn, new ones must be installed, or better, the builder kit should be used. any modification of the housing. However due to casting differences, in some instances some modification
WWW . ZODIAC . NL PERFORMANCE PRODUCTS FOR HARLEY-DAVIDSON ® Pillow block clearance (right side) Make sure there is clearance between the pillow block and the housing. Any clearance is O.K. (see figure C). Fork shaft support clearance Again use the gasket as the template and remove the material as indicated (see figure D). Shift drum end play The end play of the shift drum must be checked prior to final installation. Install the shift drum. Measure the end play with feeler gauges at the right pillow block (see figure E). End play should be between .004″ and .010″, some 1/2″ X 7/8″ 0.008″ thick shims are included to adjust the end play

Incoming search terms:

HONDA HT1500 GOLD WING CONVERSION KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Honda) by admin on 25-11-2011

download
Cut-off the saddlebag support tubes where the vertical tube meets the angled tube in the front and back. All you want left is the tour pack support. Loosen tour pack support at bottom bolts, remove top bolts, and then lift up a little. This allows the body to go under the support. If you have the fuel tank: Secure the two black control boxes, facing each other, one on top of the other. Secure to frame using the green ground wire hole at center of frame. Use the 2 ¼”
spacer tube and long screw provided to hold them together. If no fuel tank: leave rear half of fender in place Install machined studs in the swing arm pivot hole with some blue Locktite on them. This provides a 5/8” stud on the side of the frame for the suspension side plates. Screw in until flush with frame. Remove the 6mm bolts from the exhaust heat shield on the outside of the frame rail. nInstall the shock replacement bars on the top shock stud and re-install bolts, leave bars hanging loose for now. Install air-compressor relocation bracket (1 ½” x 4″ w/ 3 holes) and remount compressor. After
mounting, secure the compressor to the bracket with a wire tie.

HONDA VTX 1300 AND 1800 TRIKE CONVERSION KIT Owner's Maintenance Notes

0

Filed Under (Honda) by admin on 17-02-2011

download
1. Tire Pressure and Rotation : Keep the nominal tire pressure at about 20-25 psi. It is not necessary to periodically rotate the trike tires unless you experience unusual tire wear. 2. Bearing Lubrication . Your Swing Arm and wheel bearings are sealed and do not require greasing. However, should you experience unusual wheel bearing noise you should take your trike to a Champion Trike Dealer or to your motorcycle mechanic for a checkup. 3. Body Lubrication . There are no grease fittings on the trike body and no required body lubrication points. 4. Rear end lubrication . Your differential comes filled with 1 quart of SAE 85W140 API GL-6 gear oil. You should not have to top-off the differential unless you experience axle seal or pinion seal leaks. Check the oil level every 10,000 miles, or sooner if you experience leaks, and refill as necessary. Do not fill higher than the fill-hole. Change the differential oil every 30,000 – 35,000 miles. 5. Brakes . Check your front and rear brake system fluid levels every 3,000 miles and top-off as necessary. Inspect brake pads every 10,000 miles and replace as necessary. Pads are Volkswagen Part # D101P. 6. Drive Train . If your driveshaft U-joint and/or spline are fitted with grease fittings, pump the fittings with wheel- bearing, graphite or high-pressure grease every 3000 to 5,000 miles. If yours does not have grease fittings then lubrication is not required. 7. Suspension System : The suspension system is designed to give you the best ride with a load of no more than 500 pounds (passengers plus cargo plus trailer tongue weight)

HARLEY DAVIDSON AUXILIARY BRAKE/ RUN/ TURN SIGNAL CONVERSION KIT INSTALLATION MANUAL

0

Filed Under (Harley Davidson) by admin on 12-02-2011

download
INSTALLATION To prevent accidental vehicle start-up, which could cause death or serious injury, disconnect negative (-) battery cable before proceeding. (00048a) -J03990 Disconnect negative (-) battery cable first. If positive (+) cable should contact ground with negative (-) cable connected, the resulting sparks can cause a battery explosion, which could result in death or serious injury. (00049a) 1. Refer to the Service Manual and follow the instructions given to remove the seat and disconnect the battery cables, negative cable first. 2. See Figure 1. Locate the rear wiring harness coming out of the rear fender in the area underneath the seat. Disconnect the rear fender lighting wiring connector (1) from the main harness connector (2). 3. Obtain the turn signal module from the kit, and mate the module connectors to the male and female rear fender wiring harness connections. Snap into place. NOTE Due to variations between models, there is no single best location to secure the module. When deciding on a location for securing the module, make sure that the connectors and module will not be bound, and that the wiring will not be pinched when the seat is re-installed. Also, be certain to maintain clearance between the wiring harness and the rear wheel underneath the fender. 4. Using cable straps from the kit, secure the module, connector and wiring in the area underneath seat. 1997-1999 FLHR and FLHRCI models: Go to Step 5. All other models: Proceed to Step 6.

HARLEY DAVIDSON EFI SCREAMIN' EAGLE BIG BORE EFI STAGE 2 KIT INSTALLATION INSTRUCTIONS

0

Filed Under (Harley Davidson) by admin on 29-01-2011

download
INSTALLATION Installation of this kit is divided into six steps: 1. Big-Bore Cylinder and Piston Conversion 2. High Performance Camshafts 3. High Performance Clutch Diaphragm Spring 4. High Performance Air Cleaner 5. Calibrate the ECM 6. Exhaust NOTES This Big-Bore Stage 2 kit is intended for High Performance applications only. This engine-related performance part is legal for sale or use in California on pollution-controlled motor vehicles. Engine-related performance parts are intended for the experienced rider only. -J04173 1 of 5 The air cleaner contained in these kits is designed to perform with these kits only. Any other combination of components is not confirmed to be legal for street use. The Product Information Label contained in this kit is required in the state of California only. This label is required to aid in passing the California Smog Check Program. Place the Product Information Label on the right side of the frame, directly beneath the VIN sticker. Do not place the label on motorcycles other than those specified in the Instruction Sheet. Gaskets provided in the 1690 conversion kit eliminate the need for original head gasket O-rings. For this reason, DO NOT install the Original Equipment (OE) O-rings (Part Number 11273) to the top of cylinder dowels, or severe engine damage may occur. Big-Bore Cylinder and Piston Conversion NOTE Installation of this kit requires removal of the cylinder heads, cylinders and pistons. Refer to Section 3, ENGINE: STRIPPING MOTORCYCLE FOR SERVICE and TOP END OVERHAUL of the applicable Service Manual for instructions. High Performance Camshafts NOTE Installation of this kit requires removal and re-installation of the cam support plate. Refer to Section 3, ENGINE: BOTTOM END Cam Support Plate, Removal and Disassembly/Assembly (Camshaft, Camshaft Bearings) of the applicable Service Manual for instructions. Measuring Piston-to-Valve Clearance After installing non-stock cams, check piston-to-valve clear- ance. 1. Apply 1/8-inch (3 mm) layer of clay to crowns of pistons in areas where valves meet pistons. 2. Refer to the appropriate Service Manual and assemble the heads and valve train, and tighten cylinder studs to torque specified. 3. Turn engine through two complete revolutions by hand. 4. Remove heads and measure clay at its thinnest point. NOTE Clay must measure 0.080 inch (2.03 mm) at its thinnest point. If this measurement does not meet minimum thickness, depth of valve notches must be increased. The depth of the notches must not exceed 0.135 inch (3.43 mm). Measuring Valve-to-Valve Clearance NOTE Wait ten minutes before turning the engine after installing push rods. This allows tappets to bleed down and prevents you from bending push rods or valves. 1. Rotate the engine so that both valves of the front cylinder are partially open. Shine a light through the exhaust port and look through the spark plug hole to view the valves. Turn engine, if required, to the point where the exhaust evel sensor to the fuel pump with screw (3). Tighten the screw enough to seat the fuel sensor against the mounting tab e. Route fuel level sensor wiring under the fuel hose and connect the fuel level sensor to the low fuel switch connector on the fuel pump module. If necessary use the jumper harness (Figure 4, item 5). f. See Figure 2. Secure the fuel pump wires and con- nectors

Incoming search terms:

1987 to Current Harley Davidson Softail (FLST Only) Motorcycle Trike Conversion removal and Installation Guide

0

Filed Under (Harley Davidson) by admin on 03-11-2010

download
Removal of Original Parts Secure and raise motorcycle 9 to 10 inches using a quality motorcycle lift. Remove the following from the vehicle. See OEM manual for detailed instructions. Items to be retained for reinstallation after modification are noted. • Seat (to be re-installed without modification). • Left and right saddle bags (if so equipped). • Left and right rear crash bars, saddlebag rails (if so equipped). • Left and right passenger foot rests (to be re-installed without modification) • Complete exhaust system (to be replaced with new system). • Rear wheel NOTE: Prior to removing rear wheel, depress foot brake and secure in down position (e.g., zip-tie to floor board). This will prevent fluid flow when rear brake caliper is removed • Remove Rear Caliper (disconnect brake line at caliper) NOTE: Cap line to prevent introduction of dust / debris into line. Remove caliper. • Rear Drive Pulley (1987-99 models to be re-installed without modification). • Rear Fender (2000 and newer models, fender mount plates to be reused). • Swing Arm NSTALLING TRIKE CONVERSION KIT 3.1 Sprockets and Drive Belts Specifications See following table for belt installation (1987-99 will use a 4 tooth longer belt) Note : See OEM manual for belt replacement procedure. Year Drive Sprocket OEM Belt New Belt / Sprocket 1987-92 70 T 132 T 136 1993-94 61 T 128 T 132 1995-99 65 T 130 T 136/70TOEM 2000-06 Champion Sprocket, 70 T 135 T Use OEM 2007 Up Champion Sprocket, 66 T Use OEM 3.2 Install Swing Arm É Noting size and location of bolts, remove Cross Assembly from Champion Swing Arm. Do not discard hardware. Figure 1 3.2.1 1987-99 Model Years • Remove bearings from OEM Swing Arm using OEM shop tools and hydraulic press. Note : Although original bearings can be re-used, it is HIGHLY recommended that NEW bearings be installed to Champion Swing Arm a. b. Press bearings into Champion Swing Arm in the same way as the OEM Swing Arm. Using OEM Spacer Tube and supplied washers (four ¾” flat washers), install Champion Swing Arm using OEM bolt, outside washers and nut. Do not torque pivot bolt nut at this time. Figure 2 Note : Insure belt path is over and under Swing Arm pivot. c. d. Replace cross assembly and hardware (previously removed in step 3.2) to Champion Swing Arm. Note that the 2 upper left hand side bolts are countersunk. Torque pivot bolt to OEM specification

Incoming search terms:

INDIAN MECHANICAL- TO- ELECTRONIC SPEEDOMETER CONVERSION KIT INSTALLATION

0

Filed Under (Indian) by admin on 31-10-2010

download
Speed Sensor Requirement Identification Certain motorcycles are not equipped with a port that will accept a Transmission Speed Sensor. Those models will require a Rear Wheel Speed Sensor. To determine which sensor is required, follow the following procedure: Determine if you have a mechanical speedometer 1. The mechanical speedometer is around 2 ¼” in diameter. 2. On the axle on the left side of the front wheel, there will be a 2″ diameter ‘donut like’ part that the axle passes through. This is the speedometer drive. Attached to the speedometer drive and extending back and up under the fuel tank will be a housed cable. This is the speedometer drive and cable to drive the mechanical speedometer. 3. If these conditions are true, you have a mechanical speedometer. Determine which speedometer drive sensor you need. You must determine if your transmission will accept the transmission sensor. If not, you will need the rear axle sensor. 1. On the top, right, rear of the transmission, will be a 1″ by 1/2″ (approximately) cover held in by one bolt. 2. If you find this then REMOVE the bolt and over. 3. If after removal of the cover you find a larger hole underneath, then you can use the transmission sensor. Figure 1—Transmission Sensor Port (Inset Shows Cover Removed) 4. If you have no cover, or under the cover is not a hole, then you need the rear axle sensor. Be sure to look closely and under the gasket under the cover. 5. If you have no sensor hole, then you need to make sure you have the rear wheel sensor. Contact Thunder Heart Performance if you need to exchange your sensor for a different one. 1.3 Preparation and Painting of the Console Your console is made of Lexan®, which is a clear, durable plastic. It can be painted on the inside (so that outside scratches will not affect the paint), or on the outside. For the best paint results, thoroughly clean the console only with the following cleaners

Incoming search terms:

KAWASAKI Turn Signal Conversion Kit Installation Instructions

0

Filed Under (Kawasaki) by admin on 25-10-2010

download
1. Place motorcycle on solid, level ground and on center stand if equipped. 2. Remove your turn signal lens. Place it upside down and clean the lens interior with the supplied alcohol wipe. Allow to completely air dry. Note: the LEDs are mounted to the inside of the turn signal lens with the LEDs making direct contact with the lens. The supplied silicone is used to secure the LED board to the lens. It remains flexible but can be removed. Test fit the board in your lens prior to using silicone. 3. Using a small screwdriver, poke a small hole in the end of the tube of silicone. Place a dab of silicone on each of the 12 LEDs on the circuit board. CAUTION : Note the position of the metal pins on the back of the LED board, They must be located 90 degrees from where the holes are that secure the lens to the housing. See attached diagram. 4. Position the round circuit board over the inside of your turn signal lens with the LEDs facing down. Get the board as centered as possible. Allow the silicone to make contact with the inside of the lens and then push down and slightly rotate the board back and forth to allow the LEDs to make contact with the lens surface. Repeat other side. NOTE : the silicone will require 30 minutes in 70 degree weather to tack up. Full cure will occur within 24 hours. We suggest not riding for several hours if possible to allow the best adhesion. 5. You will need to access the following wires; running light (license plate can be used), brake lights, right turn and left turn. Disassemble the bike as needed to gain access to the wiring